Attachment D - Standard Drawings~4.pdf
PDF 3 MB Posted
- Attached to
- Hwy 2 Over Herman Creek Conn Deck Resurfacing
- Solicitation number
- S-73000-00011491
- Issued by
- Hood River County, Oregon
About this file
This document contains Oregon Department of Transportation (ODOT) Standard Drawings related to pavement and drainage construction details, pavement markings, and temporary traffic control devices. The drawings provide technical specifications and installation requirements for asphalt concrete pavement, safety edges, inlet protection, pavement markings, recessed pavement markers, abrupt pavement edges, and temporary traffic control sign supports and barricades. The drawings are effective from June 1, 2024 to November 30, 2024 and are designed in accordance with ODOT's current Standard Specifications. Engineers and contractors must consult a Registered Professional Engineer before using these standard drawings.
The drawings outline requirements for proper pavement construction, drainage infrastructure, pavement marking layout and materials, and temporary traffic control measures needed for highway and road construction or maintenance projects. Key details include pavement feathering, safety edge treatments, inlet protection devices, pavement marking dimensions and retroreflectivity, recessed marker installation, and specifications for temporary sign supports and barricades. These standard drawings must be used in conjunction with project-specific plans and the current Oregon Standard Specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C - Bid Pricing Form~29.xlsx | XLSX spreadsheet | |
| 00 Marion Center Low Slope Roof RFP 9.2024.pdf | ||
| 00011491_Invitation to Bid~1.docx | DOCX document | |
| Preliminary Bid Results~17.xlsx | XLSX spreadsheet | |
| Attachment B - Special Provisions~16.pdf | ||
| Attachment A - Plans~38.pdf | ||
| 00011312_Addendum One.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RD610
DETAILS
PAVEMENT (ACP)
ASPHALT CONCRETE
R D
.d g n
25-JUL-2017N/A
J U
L
1" in 5'
Feather base course Taper 1" in 5'
AT GRAVEL APPROACHES
METHOD OF FEATHERING ACP PAVEMENT
OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE
ACP PAVEMENT MATCH AT PROJECT ENDS
METHOD OF MATCHING EXTG. ACP INLAY SURFACING
TABLE 1
METHOD A *
METHOD B *
TAPER LENGTHS
ACP wearing course
(When present)
Feather ACP base course
Extg. pvmt.
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered
See project plans for method.
Taper (See Table 1)
Cold plane pvmt. removal
Taper (See Table 1)
Cold plane pvmt. removal
Posted Speed Taper Length
1" per 50' 45 mph
1" per 100'> 45 mph
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered top ACP base course
Construct non-feathered
(See "EDGE DETAIL")
Top of ACP base, Extg. pvmt.
ACP wearing course
(When present)
Feather ACP base course
Extg. gravel surfacewearing course thkn.
ACP unfeathered
Thkn. - Var. (2" to 0)
Aggr. base
Thkn. - Var. (2" to 0)
(When present)
Asph. conc. base course
(Thkn. as shown on plans)
ACP wearing course
Extg. pvmt.
Thkn. - 2"
(When present)
ACP base course e x tg p v m t.
E d g e o f
See "EDGE DETAIL"
ACP wearing courseExtg. pvmt.
See "EDGE DETAIL"
Extg. A.C. pvmt.
Cold plane pvmt. removal
(Inlay to extg. asphalt conc. pvmt.)
not acceptable
Mill edge as shown
Nom. depth
Sawcut & seal
EDGE DETAIL
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
may be placed steeper
Slope of individual layer layers to be 1:1
Overall slope of succesive
MULTI-LAYER PAVEMENT CONSTRUCTION
p a v e m e n t
E d g e o f see project plans
Slope varies, Successive layers cement treated base mix bituminous base or
First layer of ACP, plant
(NEW CONSTRUCTION)
SAFETEY EDGE FOR ASPHALT CONCRETE
PORTLAND CEMENT CONCRETE PAVEMENT OVERLAY
SAFETY EDGE FOR
(INCLUDING MILL, INLAY AND OVERLAY)
SAFETY EDGE FOR ASPHALT CONCRETE RECONSTRUCTION
p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, A p p r o x
M in backing material
New shoulder
Safety edge concrete pavement surface
New portland cement pavement
Existing concrete to 1:2
Sl. 1:1
T p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e f
(6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, SAFETY EDGE PLACED WITH LIFTS
SAFETY EDGE PLACED ONLY WITH FINAL LIFT
SINGLE COURSE OVERLAY
PAVEMENT THICKNESS (T) 5" OR LESS
n o te
S e e g e n e r a l
M in
A p p r o x material
Existing shoulder material
Shoulder backing to 1:22
Sl. 1:1
Safety edge
Sl. 1:4 to 1:6
Lift 1
Lift 2 pavement
Existing
Additional pavement surface
New asphalt for shoulder paving
Prepare existing ground n te
S e e g e n e r a l for shoulder paving
Prepare existing ground material
Existing shoulder
T pavement
Existing surface New asphalt
Lift 1
Lift 2 material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge m in for shoulder paving Prepare existing groundpavement
Existing detail below construction, see Multi-layer pavement surface New asphalt
T material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge
A p p ro x
Sl. 1:1
M in material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge
A p p ro x
Sl. 1:1
M in
Lift 1
Lift 2
M in
Additional pavement
Base material
Base material
Lift 2
Lift 1 Additional pavement surface Asphalt surface Asphalt
T
Finish grade with a 1:1 sloped face below the safety edge.
depth of "T" > 5", construct the safety edge to a depth of 5" approximately thickness of the surface and intermediate courses. For total new asphalt For total new asphalt depth of "T"≤5", construct the safety edge to the full4.
obstructions.
Do not construct safety edge at intersections, paved drives, or other3.
pavement surface.
to 1:2 measured from the 2
1Construct the safety edge at a slope of 1:12.
is 2" or greater, except where indicated in the plans.
travel lane or edge of paved shoulders), where the wearing surface thickness Safety edges are required at the outside edges of the paved roadway (edge of1.
T
RD615
DETAILS
SURFACE EDGE
R D
.d g n
TITLE CHANGED, REVISED DETAILS AND NOTES07-2021
19-JUL-2021N/A
-J
U L -2
PAVEMENT THICKNESS (T) GREATER THAN 5"
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD1010
TYPE 2, 3, 6, 7, 10 AND 11
INLET PROTECTION
R D
.d g n
REMOVED CALC BOOK NUMBERS01-2021
20-JAN-2021N/A
J A
N
01-2021 MOVED NOTES UP FROM OVERLAPPING THE SHEET BORDER
20" min. 20" min.
Flow Flow
Drainage grate
Flo w
Flow water
Filtered water
Filtered
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
COMPOST FILTER SOCK OR WATTLE - TYPE 7
GEOTEXTILE/WIRE MESH/AGGREGATE - TYPE 2 PREFABRICATED FILTER INSERT - TYPE 3
SOD PROTECTION - TYPE 6
CURB INLET SEDIMENT DAM - TYPE 10 WATTLE BARRIER WITH FILTER INSERT - TYPE 11
CURB INLET PERSPECTIVE VIEW
AREA DRAIN PERSPECTIVE VIEW
AREA DRAIN PLAN
compost filter socks
Sandbags are not necessary for sandbags to hold wattles in place.
Compost filter sock or wattle. Use
Flo w
Wire tied (Typ.)
grate
Drainage
(Typ.)
Surface flow
3' mi n.
F lo w
Flow
Flow
Curb face inlet
3' mi n.
curb inlet opening to scale to show
Straw wattle not drawn
Insert -Type 3, (not shown)
Prefabricated Filter
Overflow spillway
Catch basin
F lo w
Curb face inlet
Flow vertical bars
Zip-tie to
Flow
Zip-ties over inlet mouth) dam (fit snugly
Curb inlet sediment
Va
r. 3
6" to sediment dam
Curb inlet
3' OC to hold in place end of wattle and
Place a sandbag at each or wattle filter sock
Compost
Inside diameter
12" plans and notes wattle, size varies. See
Compost filter sock or flo w (typ
Su rface not feasible when staking is
Secure with zip-tie around inlet basin
Min. 6' of sodFlow
Flow
Flow
Flow
#5 Rebar
Geotextile insert overlap
Sewn 6"
#5 Rebar
Flow
Grate
Flow overlap
Sewn 6" aggregate
Open graded depth over inlet
Aggregate, 12" min.
Wire mesh
Geotextile at 3' OC in pavement areas
Hold in place with sandbags to prevent sock movement.
3' OC, typ. Tie sock at overlap
2"x2"x36" wooden stakes areas sandbags at 3' OC in pavement movement. Hold in place with
Tie sock at overlap to prevent sock
2"x2"x36" wooden stakes 3' OC, typ.
from entering the catch basin.
as needed to prevent sediment laden water
Adjust, replace or modify the inlet protection site.
filter insert or wattle prior to leaving the wattle to force storm water to flow through side of opening tight against curb. Adjust
Install wattles over opening and 36" to each detail.
Install prefabricated filter insert per Type 3
Type 11 - Wattle barrier with filter insert are combined at a catch basin.
where at-grade inlet grate and curb inlet required for use with inlet filter insert mouth. Curb inlet sediment dam is
Fit curb inlet sediment dam snugly into inlet
Type 10 - Curb inlet sediment dam installations.
use synthetic mesh socks for temporary used safely.
or areas where the larger socks can be
Use 12" to 18" dia sock in non-traffic areas
(Type 7 cont.)
12" compost filter socks necessary for
Sandbags are not hold wattles in place.
Use sandbags to
Sandbags (typ.).
areas.
Use 8" to 12" dia sock on curbside in traffic recommendations (12"min., 36" max.).
Overlap ends of sock per manufacturers of the sock.
6" into ground and flush with the top
Drive 2"x2" wood stakes a minimum of
Type 7 - Compost filter sock
Field fabricated inserts are not allowed.
entering project storm systems.
prevent the potential of sediments accompanied by additional BMP's to overflow are allowed only when
Prefabricated inserts with provisions for manufacturer recommendations.
to the plans, special provisions, and
Install prefabricated filter inserts according
Type 3 - Prefabricated filter inserts
Install aggregate over the geotextile fabric.
structure.
wire mesh and perimeter area around
Place sediment fence geotextile over the
Place the wire mesh over the grate.
Type 2 - Geotextile/wire mesh/aggregate
NOTES:
harvest of the sod of inlets within 36 hours of
Install sod around the perimeter
NOTE:
TM500
STANDARD DETAIL BLOCKS
PAVEMENT MARKING
T M
.d g n
Changed Min. widths for CH, TM, TM-40, and TS07-2020
07-01-2020N/A
DISABLED PARKING DETAIL (white)
4" white edge line
Edge of pavement
17'
1'
20'
4"
Direction of Traffic
36° 36°
3'
4'
36°
4'
LL
L
L
LL
LL
L
LLL
LL
L
TS
LL
LL
L
L
LL
4'
Direc tion o f Tra ffic
36° 3'
L
9'
3'
8" white line
1'
20'
4'
4" 8 " white line
12'12'12'
L For traversable medianL
9'
3'
L
12'
LL
1'
' 6
1'
For Centerline
DLL DLL-2
36°
36° 3'
Direction of Traffic
BYLD
L E G E N D
36°
Direction of Traffic
CH
For lane lines in drop lanes
For lane lines in acceleration/deceleration lanes
40'
40'
40'
10'
10'
40'
For lane extensions and bike lane extensions For lane extensionsFor lane extensions
TM-40
30'10'
8'
40'
20'
30'
10'
40' 40'
30'
30'
(Typ.)
Wheel Stop
YD
NPL
YBWB
TWL
WD-2
NPR
ND
Direction of Traffic
YLD
TM
4 " space
NDW
Thru Traffic Side
WD
D
YW-2W
2'
4" space
36°
36°
L
4" space
4" space
4"
4"
30'
4" YELLOW LINE
4" WHITE BROKEN LINE
4" space
LL
L
L
LL
LL L
L
LL
8'8'
6'6' 6'
2'2'
8'
1' space
8'
4" YELLOW BROKEN LINE
8" WHITE LINE4" WHITE LINE
10'
40'40'
8'
2'
1'
1'
1'
8" WHITE DOTTED LANE LINE4" WHITE DOTTED LANE LINE
Yellow Line Narrow Double
Yellow Line Narrow Double
YIELD LINE (white) for field layout angle orientation for field layout angle orientation for field layout angle orientation striping plans
Lane line dimensions are shown on the Or Thru Traffic Side
Direction Of Traffic, Increasing Stationing
1' WHITE BARS AT 20' SPACING
CHEVRON BARS
BICYCLE YIELD LINE (white)
4" YELLOW LINES
NO-PASS RIGHT
Yellow Line Narrow Double for field layout angle orientation
4" white line
R o u te
A c c e s s ib le w h ite lin e
1' WHITE BARS AT 20' SPACING
TRANSVERSE SHOULDER BARS
4" YELLOW DOTTED LINE
4" white line
1' YELLOW BARS AT 40' SPACING
TRANSVERSE MEDIAN BARS
distance between left turn refuges exceeds 200' For use at painted medians where
Increasing Stationing Increasing Stationing
Yellow Line Narrow Double
2' (Typ.)
8" WHITE DOTTED LINE 4" WHITE DOTTED LINE
1' YELLOW BARS AT 20' SPACING
TRANSVERSE MEDIAN BARS
3' 5"
4" YELLOW LINES
NO-PASS LEFT
4" YELLOW LINES
TWO-WAY LEFT TURN
TWO 4" WHITE LINES
NARROW DOUBLE NO-LANE CHANGE
TWO 4" YELLOW LINES
DOUBLE NO-PASS
TWO 4" YELLOW LINES
NARROW DOUBLE NO-PASS
(thru traffic side )
HC
4.5' min.
min.
4.5' min.
4.5' min.
4.5' the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM502
STANDARD DETAIL BLOCKS
PAVEMENT MARKING
T M
.d g n
Changed min. width of TM/B from 6' to 4.5'07-2020
01-03-2022N/A
For Centerline or Left Turn Lane
20'
LL
20'
LL
2" Space
4" Space
4" Space
10'
L
10'
Thru Traffic Side
L
15'
10' 15'
40'
15'
15'
40'
L E G E N D
2" Space
20'20'
40'
15' 15'
40'
LL
4" Space both left and right in this symbol Bi-directional yellow marker reflects yellow
15'
15' 15'
Direction Of Traffic
3'
LL
L
LL
L 15'
15'
15'
3'
LL
9'
12'
12'12'12'12'
9'
12'
Direction Of Traffic
12'
20'20'
L
10'
10'
40' 40'
LL
36° L
L
Direction Of Traffic
L
1'6" 2'
4' 10'
40'40'
80'
15"
4" Yellow Type II Button
80'
12'
4" Space
2" Space
4" Space
20'
4"
4"
40'40'
20' 40'
2" Space
40'
LL
Increasing Stationing
L
40'40'
L
40'
20' 20'
40'
LL
2" Space
24'
12'
L
20'
Thru Traffic Side
L
L
Direction Of Traffic
L
12'
9' 3'
L
LL
L For Centerline
LL
L
2" Space
20'
L 2" Space
20'20'
4'6"
4'6"
4'6"
15'
15'
10'
L
Direction Of Traffic
L
80'
20'
LL
20'
2" Space
4"
4"
LL
2" Space
20' 20'
WB
R-40
YB
R-40
TRANSVERSE MEDIAN BAR SUBSTITUTION
BUTTON
TM
B
YB
R-80
WHITE DOTTED LANE LINE SUPPLEMENTATION
REFLECTORS WITH 4" WHITE DOTTED LANE LINE
DLL
R-12
4" White Mono-Directional Type I Reflector
4" White Mono-Directional Type I Reflector
WIDE DOTTED LANE LINE SUPPLEMENTATION
REFLECTORS WITH 8" WHITE DOTTED LANE LINE
4" White Mono-Directional Type I Reflector
YELLOW BROKEN LINE SUPPLEMENTATION
REFLECTORS WITH 4" YELLOW BROKEN LINE
YELLOW BROKEN LINE SUPPLEMENTATION
REFLECTORS WITH 4" YELLOW BROKEN LINE
WHITE BROKEN LINE SUPPLEMENTATION
REFLECTORS WITH 4" WHITE BROKEN LINE
12" max.
angle orientation for field layout
Narrow Double Yellow Line
DLL-2
2R-12
CHANNELIZING LINE SUPPLEMENTATION
REFLECTORS WITH 8" WHITE LINE
Mono-directional crystal white marker reflects white to the left in this symbol
W-2 2R-20R
CHANNELIZING LINE POSITIONING GUIDE
REFLECTORS WITH 8" WHITE LINE
4" White Mono-Directional Type I Reflector
4" Yellow Bi-Directional Type I Reflector
4" Yellow Bi-Directional Type I Reflector
NO-PASS LEFT POSITIONING GUIDE
REFLECTORS WITH 4" YELLOW LINES
TWL
R-40
General note:
1) Surface mount Raised Pavement Markers (RPMs) unless otherwise specified.
4" Yellow Bi-Directional Type I Reflector
TWO WAY LEFT TURN POSITIONING GUIDE
REFLECTORS WITH 4" YELLOW LINES
Thru Traffic SideThru Traffic Side
Thru Traffic Side
Thru Traffic Side
Lane line dimensions are shown on the striping plans
Direction Of Travel, Increasing Stationing or Thru Traffic Side
Increasing Stationing
4" White Mono-Directional Type I Reflector
Thru Traffic Side
Thru Traffic Side
4" Yellow Bi-Directional Type I Reflector
W-2 2R-20L
4" White Mono-Directional Type I Reflector
D R-40
NARROW DOUBLE YELLOW POSITIONING GUIDE
REFLECTORS WITH TWO 4" YELLOW LINES
ND
R-20
ND
R-40
WIDE DOTTED LANE LINE SUPPLEMENTATION
REFLECTORS WITH 8" WHITE DOTTED LANE LINE
4" White Mono-Directional Type I Reflector
DLL-2
2R-24
CHANNELIZING LINE SUPPLEMENTATION
REFLECTORS WITH 8" WHITE LINE
W-2 R-20L
4" White Mono-Directional Type I Reflector
YELLOW LINE POSITIONING GUIDE
REFLECTORS WITH 4" YELLOW LINE
Y R-40
NO-PASS RIGHT POSITIONING GUIDE
REFLECTORS WITH 4" YELLOW LINES
NPR
R-40
NPL
R-40
4" Yellow Bi-Directional Type I Reflector
DOUBLE NO-PASS POSITIONING GUIDE
REFLECTORS WITH TWO 4" YELLOW LINES
NARROW DOUBLE YELLOW POSITIONING GUIDE
REFLECTORS WITH TWO 4" YELLOW LINES
DOUBLE NO-PASS POSITIONING GUIDE
REFLECTORS WITH TWO 4" YELLOW LINES
D R-20
4" Yellow Bi-Directional
Type I Reflector
0"-1" space between pair of markers
W-2 R-20R
0"-1" space between pair of markers
0"-1" space between pair of markers
0"-1" space between pair of markers
4" Yellow Bi-Directional Type I Reflector
4" Yellow Bi-Directional Type I Reflector
4" Yellow Bi-Directional Type I Reflector 4" Yellow
Bi-Directional Type I Reflector
4" White Mono-Directional Type I Reflector
WHITE BROKEN LINE SUPPLEMENTATION
REFLECTORS WITH 4" WHITE BROKEN LINE
WB
R-80
30'
CHANNELIZING LANE LINE POSITIONING GUIDE
REFLECTORS WITH 8" WHITE LINE
4" White Mono-Directional Type I Reflector
W-2 2R-20
Thru Traffic
Thru Traffic
Thru Traffic Side
YELLOW LINE POSITIONING GUIDE
REFLECTORS WITH 4" YELLOW LINE
Y R-20
MEDIAN SIDE
(typ. raised median)
4" Yellow Bi-Directional Type I Reflector
MEDIAN SIDE
4.5' min.
CHANNELIZING LINE POSITIONING GUIDE
REFLECTORS WITH 8" WHITE LINE
01-2022 Removed "LANE" from W-2/R-20R title the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM515
PAVEMENT MARKERS
T M
.d g n
01-JUL-2015N/A
J U
L
Reflected light
Note: = o/
1o/
2o/
2o
R-40
YB
W
D
R-40
WB
L E G E N D
PAVEMENT MARKER INSTALLATION ON HORIZONTAL CURVES
surface aimed to direct the reflected light back three markers.
On one way sections the marker shall be installed with the reflective
NOTE:
OR
4'
R-20
ND
R-40
NPL
R-40
NPL
R-20
ND
LL
LL
LL
LL
D
D Y
100' (Typ.)
MEDIAN BULLNOSE DETAIL
R-20
ND
striping plans.
Lane line dimensions are shown on the
LL
LL
LL
(TWO NARROW DOUBLE YELLOW LINES TO ONE-DIRECTION NO-PASSING LINE)
MEDIAN WIDTH TRANSITION
W
W from inside of ND/R-20 One RPM spaced 4" from inside of ND/R-20 One RPM spaced 4" inner yellow stripes One RPM centered between
RAISED PAVEMENT MARKERS
(b) PAVEMENT MARKER INSTALLATION FOR BI-DIRECTIONAL
W
RAISED PAVEMENT MARKERS
(a) PAVEMENT MARKER INSTALLATION FOR MONO-DIRECTIONAL
(Refer to TM539 for additional details)
Direction of Travel left to right Increasing stationing from both the left and right in this symbol) Bi-Directional Yellow (marker reflects yellow to
(marker reflects white to left in this symbol) Mono-Directional White
To be accompanied by Standard Dwg. Nos. TM500 thru TM504 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM517
RECESSED PAVEMENT MARKERS
T M
.d g n
Updated to better fit ODOT drafting standards07-2021
07-06-2021N/A
Taper
Taper
L E G E N D
Direction of Travel
Taper
MONO-DIRECTIONAL RECESSED PAVEMENT MARKER DETAILBI-DIRECTIONAL RECESSED PAVEMENT MARKER DETAIL
Top of pvmt.
4040 40 both left and right in this symbol Bi-directional yellow marker reflects yellow
Taper
Top of pvmt.
reflects white to the left in this symbol Mono-directional crystal white marker
To be accompanied by Standard Dwg. Nos. TM502 and TM515
A A A A
SECTION A - A SECTION A - A
PLAN VIEW PLAN VIEW
Level 6" in level recess Center pavement marker
TaperTaper to top of marker
" from top of pvmt. 16 1" +/- 16
"8 1" +/- 8 top of pvmt.
Recess level with
"8 1" +/- 8 the level recess near the short taper in Install pavement marker
Level 12" to top of marker
" from top of pvmt. 16 1" +/- 16
TaperTaper top of pvmt.
Recess level with
9" Typ.
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM521
NON-PROFILED
SURFACE & GROOVE INSTALLED
PAVEMENT MARKINGS
DURABLE & HIGH PERFORMANCE
T M
.d g n
Changed groove width for 4 in. markings07-2021
20-JAN-2023N/A
J A
N
Top of pavement
Marking Width
Thickness Material
SURFACE INSTALLED MARKINGS
Marking Length
A
Width
Marking
Thickness Material
Depth
Groove
Marking Length Taper 3 ± 1 in.
Taper 3 ± 1 in.
General Notes:
Durable Method 'A' & Method 'D'
2) See Standard Specification 00850.46 for marking installation tolerances.
1) See Standard Drawing TM500 and/or project plans for marking length and width dimensions.
B
GROOVE INSTALLED MARKINGS
B
GROOVE INSTALLED GROOVE AND MATERIAL DIMENSIONS
SECTION B - B
Var. 25 mils
Var.
Pavement Marking Material Type Thickness Material
Groove Depth
High Performance
Recess Depth
Marking Material
Pavement Marking Material Type
SECTION A - A
to top of material from top of pvmt.
Recess depth Top of pavement
Durable Method 'A' & Method 'B' & Method 'D'
25 mils High Performance
Thickness
120 mils 220 ± 20 mils 45 ± 5 mils
60 ± 10 mils
SURFACE INSTALLED MATERIAL THICKNESS
Marking width + 1 ± 0.125 In.
01-2023 Changed groove width back to previous width for 4 in. markings the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM560
ALIGNMENT LAYOUT: GENERAL
T M
.d g n
Extended accompanied by drawings to include TM50407-2020
07-01-2020N/A
25' max.
25' m ax.
contrasts with pavement surface.
Aerosol paint. Use color that highly
Control Points
50' max.50' max.
' m ax
Control Points
* Control points are placed along the lane line for all longitudinal lines except the following:
lines only For center
1.) Use control points to make continous narrow guideline as specified.
General note:
for a ND line when used as a center line.
A control point layout 4" offset from the lane line is required
50' max.
CONTROL POINT LAYOUT - TANGENT SECTIONS
CONTROL POINT
L
CONTROL POINT LAYOUT - CURVE SECTIONS
L E G E N D
ND
1' TYP.
striping plans.
Lane line dimensions are shown on the
L
L
L
L
To be accompanied by Standard Dwg. Nos. TM500 thru TM504 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM800
PCMS DETAILS
TABLES, ABRUPT EDGE AND
T M
.d g n
01-JUL-2022N/A
J U
L
Freeway
Use aggregate wedge when abrupt edge is 2 inches or greater.
four feet wide protect longitudinal abrupt edge as shown.
When paved shoulders adjacent to excavations are less than
NOTES:
shoulder, as far as practical.
Place cart / generator / power supply off of the on 10' spacing.
Use six tubular markers in shoulder taper outside shoulder, where practical.
Install Flagger Station Lighting beyond the
2" or GreaterExtg. pavement aggregate base rock
Shoulder or message sign (PCMS)
Portable changeable
20'
100'
4' B(III)R
Temp. Plastic Drums
Lighting
Flagger Station
50'
10'
Markers
28" Tubular
Place roll-up signs in advance of barricades.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.
Continue signing and other traffic control devices
"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.
8' B(III)R barricades with 8' B(III)L barricades and replace the
If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.
or other roadway work. Use abrupt edge signing for longitudinal
Abrupt edges may be created by paving, operations, excavations
GENERAL NOTES FOR ALL TCP DRAWINGS:
for max. spacing.
See TCD Spacing Table
Temp. Plastic Drums for max. spacing.
See TCD Spacing Table
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION
PORTABLE CHANGEABLE MESSAGE
LIGHTING DELINEATION
FLAGGER STATION
Sl. 1:3
TAPER TYPES & FORMULAS
TEMPORARY BARRIER FLARE RATE TABLE
TAPER FORMULA
Merging (Lane Closure)
Shifting
Shoulder Closure
Flagging (See Drg. TM850)
Downstream (Termination)
"L"
"L"3 1"L"/3 or
50' - 100'
Varies (See Drawings)
"L"2 1"L"/2 or the Speed from the Tables below:
Use Pre-Construction Posted Speed to select
For Lane closures where W < 10', use "L" value for W = 10'.
Limit spacing adjustments to 30% of the "A" dimension for all speeds.
When necessary, sign spacing may be adjusted to fit site conditions.
Place traffic control devices on 10 ft. spacing for intersection and access radii.
NOTES:
SPEED (mph) MINIMUM FLARE RATE
M I N I M U M L E N G T H S T A B L E
"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted
20:1
19:1
18:1
16:1
14:1
12:1
10:1
9:1
8:1
FREEWAYS
SPEED (mph) W = 12 W = 14 W = 16
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
20 - 30
35 - 40
45 - 55
60 - 70 700
100 100
15001000 2640
100 20
Device Spacing (ft)
Max. Channelizing Sign Spacing (ft) SPEED (mph)
A B C
CW21-8A
(As noted)
36x18
C W
(Mount on TSS)
(As needed)
42x18
CW21-8C
OR
C
W
Plaques
CW21-9
Abrupt edge
8' B(III)R 8' B(III)R
mi.4 1 mi.4
1 mi.4
EDGE
ABRUPT
RIGHT
LEFT
(Roll-up sign)
(As needed)
EDGE
ABRUPT 32x11
32x11
32x11
CENTER
RIGHT
LEFT
10≤ W
30≤
W/60, S = Speed, W=WidthS 45: L = WS, Speeds < 45: L = ≥ formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using
TYPICAL ABRUPT EDGE DELINEATION
Smart Work Zone Systems Portable Traffic Signals
Detail as shown is used for trailered and non-crashworthy components of:
barricade may be omitted when PCMS is placed behind a roadside barrier.
Use six drums in shoulder taper on 20' spacing. The drums and
Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.
Install PCMS beyond the outside shoulder, when possible.
To be accompanied by Dwg. Nos. TM820 & TM821.
Flaggers, Traffic Control Measures, or as directed.
Coordinate and control pedestrian movements through a Temporary Accessible Route using
Combine drawing details to complete temporary traffic control for each work activity.
Do not locate sign supports in locations designated for bicycle or pedestrian traffic.
High speed highways have a pre-construction posted speed of 45 mph or higher.
Low speed highways have a pre-construction posted speed of 40 mph or less.
All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.
All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".
background of all temporary warning signs.
Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.
to indicate traffic movements.
Arrows shown in roadway are directional arrows sequential arrow boards.
Place a barricade approx. 20' ahead of all shown are the minimum required.
Signs and other Traffic Control Devices (TCD)
07-2022 Added a note for TPARs the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM820
TEMPORARY BARRICADES
T M
.d g n
01-JUL-2020N/A
J U
L
LC
CL
CL
CL
sheeting on rail encapsulated lens
White and orange
Extg. ground
" 6 m in m in m in m in
V a r
4' min. - 8' max.
m in
V a r m in
"6 m in
24" min. - 48" max.
sheeting on rail encapsulated lens
White and orange
Extg. groundExtg. ground sheeting on rail encapsulated lens
White and orange
M in
V a r
"6
24" min.
direction toward which traffic must turn in detouring.
it is desirable that the stripes slope downward in the
Where a barricade extends entirely across a roadway, at an angle of 45° in the direction traffic is to pass.
Markings for barricade rails shall slope downward directions from the center of the barricade.
slope the chevron striping downward in both
Where both right and left turns are provided for, local road users.
across roadway unless access is required for may be used. Extend barricades completely
For full roadway closures, the C or LR barricade
NOTES:
Traffic Traffic
(For approaching traffic)(For approaching traffic)
(For approaching traffic)
Traffic
(For approaching traffic)
Traffic
BARRICADE RAIL LAYOUT
DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING
BARRICADE NOTATION
B(III)R
LT. SIDE - L
CLOSED - C LT. / RT. - LR
RT. SIDE - R
TYPE I TYPE II TYPE III
is signed according to the TCP. See Dwg. No. TM844.
closed and a temporary pedestrian accessible route (TPAR)
Do not place barricades in sidewalks unless sidewalk is facility is properly closed and signed.
Do not block bike lanes or shoulders unless the space is limited.
Use 4' Type III barricades where horizontal
Use barricades from ODOT Qualified Products List (QPL).
Rails must be 8" min. to 12" max. in height.
For rails less than 36" long, 4" wide stripes shall be used.
from barricade.
Ballast shall not extend above bottom rail or be suspended may be placed on lower frame to provide additional ballast.
Sandbags (approximately 25 lb sack filled with sand)
GENERAL NOTES FOR ALL DETAILS:
Barricade type
Barricade on the roadway
Indicates barricade placement the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM821
TEMPORARY SIGN SUPPORTS
T M
.d g n
14-JUL-2023N/A
J U
L
4"x 4"x 12'
2 - 2"x 4" @ 45° angle
2"x 6"x 37"
36"
Sandbags per side (typ.)
lag screw
"x 3"8 31 -per side (typ.)
" dia. bolts8 32 -screw per side (typ.)
"x 3" lag 8 31 -per support (typ.)
"x 3" lag screws8 32 -
"x 37"2 1"x 54 sign (typ.)
48"x 48" sign area of 20 sq. ft. or less.
Use Double Post TSS for a total
NOTES:
per support (typ.)
2 - 3/8" dia. bolts per support (typ.)
2 - 3/8" dia. bolts
4 - 2"x 6"
40"
"2 12 - 4"x 4"x 5
NOTES:
2' - 8" Sandbags
2' - 6"
A
"4
" - 12 ga. PSST2
" - 12 ga. x 4" PSST Stub2
PSST Stub
" - 12 ga. x 4" 2 12 A
See DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST4 sign (typ.)
48"x 48" per support (typ.)
" dia. bolts8 3Two, support (typ.)
joining brace and
" dia. bolt 8
NOTES:
1 - 2"x 4"
1 - 4"x 4"x 4"
2 - 2"x 4"
1 - 4"x 4"x 4"
1- 2"x 4" 40"
Sandbags lag screws
"x 4"8 34 -
4"x 4"x 10'
"x 3" lag screws8 32 -
2"x 4"x35" @ 45° angle
2"x 4"x 6"
"x 3" lag screws8 32 -
"x 4" lag screws8 34 -
" dia. bolts8 31 -
" dia. bolts8 31 -
" dia. bolts8 32 -
" dia. bolts8 31 -sign (typ.)
36"x 36"
" dia. bolts8 32 -
TEMPORARY SIGN SUPPORT GENERAL NOTES:
Sheeting
Retroreflective
Sheeting
Retroreflective
" Sheeting
Retroreflective m in and Right sides)
Sheeting (Left
Retroreflective
NOTES:
SIGN POST REFLECTIVE SHEETING PLACEMENT
Sheeting
Retroreflective Sheeting
Retroreflective signs. Do not mount signs on Type II or III Barricades.
Use Single Post TSS for mounting "Business Access" (CG20-11)
Use Single Post TSS for a total sign area of 12 sq. ft. or less.
Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.
for wood post TSS's. Use 2" wide sheeting for PSST TSS's.
Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.
Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"
Use A325 Bolts or equivalent.
welding. Repair Galvanizing according to ASTM A780.
designation G90. Remove Galvanizing from steel before
Galvanize steel according to ASTM A653 with coating
All members shall have a minimum yield stress of 50 ksi.
Use PSST TSS's for a total sign area of 16 sq. ft. or less.
Society (AWS) D.1.1.
Weld steel according to American Welding
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" PSST4
1Do not use bolt to secure 2
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" - 12 ga. PSST to extend entire length 4
See Dwg. No. TM204 for flag board mounting detail.
(25 lb. max per bag) (min. 100 lbs per side of each TSS).
Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.
TSS posts.
away from traffic, or cover the sign. Do not cover reflective sheeting on the
When not in use, locate TSS as far from Public Traffic as practicable and turn
Do not place or stack ballast more than 24" above the ground.
See "Temporary Sign Placement" detail on TM822 for sign installation heights.
four sides (S4S) and free of heart center (FOHC).
For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced
Do not locate TSS's in locations that block pedestrian or bicycle traffic.
Do not tip over TSS at any time.
Double Post Perforated Steel Square Tube (PSST) Single Post
DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL
Front Right Left Front FrontRight Left Side
(No Scale)
DETAIL A
" - 12 ga. PSST 4
" - 12 ga. PSST2
A A
(No scale)
SECTION A-A
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM822
TEMPORARY SIGN SUPPORTS
T M
.d g n
01-JUL-2020N/A
J U
L
¼ ¼ as shown.
pedestrian pathway, maximum of 4" into it may extend a
7' above the sidewalk is installed less than
If bottom of plaque
B a c k o f c u rb m in m in
3' (min.)
4" max. *
2' (min.)
width is less than 6'
2' min. when the shoulder
6' - 12'
E d g e o f tr a ff ic l a n e m in m in . R
/W
1' min.
Urban Areas With Curb/Sidewalk surface, as shown.
minimum of 7'0" above pavement
(plaque) so bottom of sign is a bicycle traffic, install secondary sign shoulder or other surface used by adjacent to or intrude into a paved
Where temporary signs are located
E d g e o f tr a ff ic l a n e
Shoulder
Paved m in
R /W
1' min.
6' - 12'
E d g e o f tr a ff ic l a n e m in m in
TEMPORARY SIGN PLACEMENT
L 2-1/2"x 2-1/2"x 5/16"
"8 d eg head and clip
" dia. pin wth4
"16 5"x 2
1"x 22 1L 2
"2
"16 5"x 2
1"x 22 1L 2
" Sch. 40 pipe2 1210"
"2
"2
6" max.
of total sign area) (or, max. 12 sq. ft.
36" x 36" sign
2" Sch. 40 pipe
" Sch. 40 pipe2
Conc. Barrier
NOTES:
CONCRETE BARRIER SIGN SUPPORT
other than concrete.
Follow manufacturer recommendation when installing signs on barrier
Do not use clipped signs.
Weld steel according to American Welding Society (AWS) D.1.1.
Place support at connection between two concrete barrier sections.
Use for supporting a maximum 12 sq. ft. of total sign area.
Support fits both 32" and 42" tall "F" barrier.
All structural steel shall conform to ASTM A36.
and pinned when not in use.
Drill additional holes so sign can be rotated 90 degrees
To be accompanied by Dwg. Nos. TM670, TM671, TM687, TM688 & TM689.
according TCP Design Manual, MUTCD, ADA, or as directed.
Do not block bicycle lanes, sidewalks, or TPAR's with sign supports. Maintain minimum widths for these facilities
Rural Areas
Bicycles On Shoulder Rural or Urban Areas - Curb or No Curb
No Curb/Sidewalk Divided Highway/Freeway Medians the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM861
FREEWAY SECTIONS
T M
.d g n
01-JUL-2020N/A
J U
L
"L"
2'
W 8-
NOTES:
EDGE
ABRUPT
(All stages)
36x24
R2-6aP
B A 2 A
30'±30'±
300'±
30'±
300'±
Median
A
A
A
AC B A
See INSET "A"
Median mi.±2
30'±30'±30'±
8' B(III)R 8' B(III)R
under construction
End of area under construction
Start of area traffic adjacent to
Abrupt edge
Use "LEFT SHOULDER CLOSED" sign.
For left shoulder work, place TCD to close the left shoulder.
NOTE:
Sequential Arrow
(Mount on TSS)
(As needed)
(Mount on TSS)
(Mount on TSS)
C W
C W
W a
W a
W
(Roll-up sign)
CW21-9
32x11
32x11
32x11
(All stages)
36x24
R2-6aP
(All stages)
36x24
R2-6aP
W
W
W
W
W
W
W
W
Traffic
Under
Construction
Under
1000'
Taper
"B"
Buffer
"B"
Buffer
"B"
Buffer
"B"
Buffer
"B"
Buffer
AHEAD
WORK
ROAD
DOUBLE
FINES
CLOSED
SHOULDER
RIGHT
CLOSED
SHOULDER
RIGHT
"L"
RIGHT
LEFT
CENTER
AHEAD
WORK
ROAD
DOUBLE
FINES
½ MILE
CLOSED
RIGHT LANE
½ MILE
CLOSED
RIGHT LANE
AHEAD
WORK
ROAD
DOUBLE
FINES
(As needed)
54x18
CW21-8B
EDGE
ABRUPT
CENTER
(As needed)
54x18
CW21-8B
EDGE
ABRUPT
CENTER
BUMP
(As needed)
BUMP
(As needed) W
W
GENERAL NOTES FOR ALL DETAILS:
To be accompanied by Dwg. Nos. TM820, & TM821.
signed by the State Traffic Engineer.
* Regulatory speed reductions on State Highways require a Speed Zone Order
*Temp. Regulatory Speed Zone Reductions.
work zone, including; PMCS, Radar Speed Trailers, Advisory Speed signing, Additional traffic control devices may be used, as directed, to enhance the area. Locate TMA as per manufacturer's instructions, or as directed.
Truck Mounted Attenuator (TMA) should be used to protect the active work
AHEAD" (W20-5) signs and the appropriate "LEFT LANE ENDS" (W4-2) signs.
For work in the left lane, place TCD to close the left lane. Use "LEFT LANE CLOSED
UNDER CONSTRUCTION
UNDER TRAFFIC
Median
C
30'±
(All stages)
36x24
R2-6aP
W
DOUBLE
FINES
AHEAD
WORK
ROAD
W bAHEAD
CLOSED
SHOULDER
RIGHT
W bAHEAD
CLOSED
SHOULDER
RIGHT
unless otherwise directed.
For Freeway preservation work use Dwg. No. TM880, Remove rumble strip according to the plans and Dwg. No. TM830.
Do not stage traffic across longitudinal shoulder rumble strips.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) where applicable.
"BUMP" (W8-1) signs to be installed on both sides of highway throughout area under construction where applicable.
mile intervals2 1to be installed on both sides of highway at
Additional ''ABRUPT EDGE''(CW21-(7,9)) signs with appropriate riders of 1 inch or greater.
Use "ABRUPT EDGE" (CW21-(7,9)) signing for longitudinal abrupt edges
CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. No. TM800.
To determine sign spacing A, B, and C, use "TRAFFIC on Dwg. No. TM800 to determine Taper Length "L" and Buffer Length "B".
Unless otherwise shown, use the "MINIMUM LENGTHS TABLE"
TM822 for Concrete Barrier Sign Support details.
with a maximum 12 sq. ft. of total sign area. See Dwg. No.
Use Concrete Barrier Sign Supports for mounting signs with the work areas, shall move with the work areas.
Signing and other TCD shown to be installed in conjunction
Flaggers are not permitted to stop or hold freeway traffic.
48x24
CG20-2A
ROAD WORK
END
48x24
CG20-2A
ROAD WORK
END
SHOULDER CLOSURE
Divided Highway or Freeway
ONE LANE CLOSURE
Divided Highway or Freeway
(Signing Detail)
INSET "A"
SECTION A-A
on 40' max. spacing.
Temp. Plastic Drums the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2024 - November 30, 2024
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
| RD610 |
| RD615 |
| RD1010 |
| TM500 |
| TM502 |
| TM515 |
| TM517 |
| TM521 |
| TM560 |
| TM800 |
| TM820 |
| TM821 |
| TM822 |
| TM861 |
File details come from the government source that posted it. Updated .