ATTACHMENT D - Full Schedule - 06.26.2020.pdf
PDF 840 KB Posted
- Attached to
- Q702--Worcester, MA Activations Contract Amendment 002 Federal contract opportunity
- Solicitation number
- 36C77621Q0332
About this file
This is a combined synopsis/solicitation from the Department of Veterans Affairs for initial outfitting, transition, and activation services at the Worcester Outpatient Clinic in Massachusetts. The VA seeks these services through a firm-fixed price contract with options to be awarded to a Service-Disabled Veteran-Owned Small Business. Quotes are due by the date specified in the solicitation. The requirement is set aside 100% for SDVOSBs. The anticipated period of performance is July 2021 through January 2022. The solicitation incorporates FAR provisions and clauses. Offerors must be registered in SAM and verified as an SDVOSB by VA. Questions regarding the solicitation must be submitted by May 24, 2021. The VA will post answers by May 28, 2021 to assist SDVOSBs in preparing quotes due in accordance with the solicitation.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Activity ID Activity Name Orig Dur
Start Finish Total Float
[220031-008.01-MO] WCCC VA CBOC[220031-008.01-MO] WCCC VA CBOC[220031-008.01-MO] WCCC VA CBOC[220031-008.01-MO] WCCC VA CBOC[220031-008.01-MO] WCCC VA CBOC[220031-008.01-MO] WCCC VA CBOC
KEY MILESTONESKEY MILESTONESKEY MILESTONESKEY MILESTONESKEY MILESTONESKEY MILESTONES A1070 Project Duration (24 Months) 1 30-Aug-19 A 31-Aug-21 0
A4800 VA TI Approval - Release of Work 0 04-Sep-20 258
A4870 Garage Tel/Data Room Available to UMass 0 06-Nov-20 212
S35 Garage C of O 0 29-Jan-21* 0
A4810 Permanent Power Available from Utility Company 0 26-Feb-21 133
A4880 CBOC Tel/Data Rooms Available to UMass 0 03-May-21 37
A6390 Umass Complete at CBOC Tel/Data Rooms 0 17-May-21 37
S11 CBOC C of O (8/31/21) 0 31-Aug-21* 0
PROJECT SUMMARYPROJECT SUMMARYPROJECT SUMMARYPROJECT SUMMARYPROJECT SUMMARYPROJECT SUMMARY S4 West Entrance Reconfiguration 46 07-Apr-20 A 24-Jul-20 277
S5 MOB Core & Shell Construction 300 06-May-20 A 19-Jul-21 31
S6 Garage Constuction 145 01-Jul-20 29-Jan-21 0
S7 VA Tenant Improvements 173 08-Oct-20 17-Jun-21 0
S25 Sitework/Site Finishes/Landscaping 90 15-Mar-21 16-Jul-21 32
S8 Start Up Systems 21 20-May-21 18-Jun-21 0
S9 TAB / CX / System Verification 31 04-Jun-21 19-Jul-21 0
S10 Final Inspections / Punchlist 10 21-Jul-21 03-Aug-21 20
DESIGN PHASEDESIGN PHASEDESIGN PHASEDESIGN PHASEDESIGN PHASEDESIGN PHASE
UMMS/WCCC (C/S) DESIGN PHASEUMMS/WCCC (C/S) DESIGN PHASEUMMS/WCCC (C/S) DESIGN PHASEUMMS/WCCC (C/S) DESIGN PHASEUMMS/WCCC (C/S) DESIGN PHASEUMMS/WCCC (C/S) DESIGN PHASE
Site ElectricalSite ElectricalSite ElectricalSite ElectricalSite ElectricalSite Electrical
D1320 Electrical Power Design (Utility) 75 17-Jan-20 A 02-Jul-20 200
VA (TI) DESIGN PHASEVA (TI) DESIGN PHASEVA (TI) DESIGN PHASEVA (TI) DESIGN PHASEVA (TI) DESIGN PHASEVA (TI) DESIGN PHASE
A6940 Review 15 15-Jun-20 A 02-Jul-20 1
A1510 VA NTP (Lease_Sec 4.01.H) 45 03-Jul-20 03-Sep-20 1
A6950 Umass Release of TI Work 0 10-Aug-20* 0
UMMS Tenant Improvement Design (Floors 3 & 4)UMMS Tenant Improvement Design (Floors 3 & 4)UMMS Tenant Improvement Design (Floors 3 & 4)UMMS Tenant Improvement Design (Floors 3 & 4)UMMS Tenant Improvement Design (Floors 3 & 4)UMMS Tenant Improvement Design (Floors 3 & 4)
A1210 Schematic Design 10 16-Jun-20 A 10-Jul-20 203
A6960 Umass Medical Tenant Negotiations 20 13-Jul-20 07-Aug-20 211
A1220 Design Development 25 10-Aug-20 14-Sep-20 202
A1230 Construction Documents 20 15-Sep-20 13-Oct-20 202
PERMITTINGPERMITTINGPERMITTINGPERMITTINGPERMITTINGPERMITTING
MOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & Shell
P1050 Permit Approval 20 26-Jun-20 24-Jul-20 277
VA Tenant ImprovementsVA Tenant ImprovementsVA Tenant ImprovementsVA Tenant ImprovementsVA Tenant ImprovementsVA Tenant Improvements
P1060 Drawing Issuance (VA) 0 03-Sep-20 228
P1070 Permit Approval (VA) 20 04-Sep-20 02-Oct-20 228
Floors 3 & 4Floors 3 & 4Floors 3 & 4Floors 3 & 4Floors 3 & 4Floors 3 & 4
A3750 Drawing Issuance (Floors 3 & 4) 0 13-Oct-20 202
A3740 Permit Approval (Floors 3 & 4) 20 14-Oct-20 10-Nov-20 202
PROCUREMENTPROCUREMENTPROCUREMENTPROCUREMENTPROCUREMENTPROCUREMENT
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Project Duration (24 Months)
VA TI Approval - Release of Work
Garage Tel/Data Room Available to UMass
Garage C of O
Permanent Power Available from Utility Company
CBOC Tel/Data Rooms Available to UMass
Umass Complete at CBOC Tel/Data Rooms
CBOC C of O (8/31/21)
West Entrance Reconfiguration
MOB Core & Shell Construction
Garage Constuction
VA Tenant Improvements
Sitework/Site Finishes/Landscaping
Start Up Systems
TAB / CX / System Verification
Final Inspections / Punchlist
Electrical Power Design (Utility)
Review
VA NTP (Lease_Sec 4.01.H)
Umass Release of TI Work
Schematic Design
Umass Medical Tenant Negotiations
Design Development
Construction Documents
Permit Approval
Drawing Issuance (VA)
Permit Approval (VA)
Drawing Issuance (Floors 3 & 4)
Permit Approval (Floors 3 & 4)
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Worcester, MA
UMass Full Schedule
Start Finish Total Float
VA ProcurementVA ProcurementVA ProcurementVA ProcurementVA ProcurementVA Procurement
A4930 TI MEP Coordination 15 17-Jul-20 06-Aug-20 278
A1900 TI Subcontractor Awards 18 11-Aug-20 03-Sep-20 14
A1600 Shop Drawing Review/Material Procurement (TI) 45 04-Sep-20 05-Nov-20 14
MasonryMasonryMasonryMasonryMasonryMasonry
A2500 Review & Approve Masonry 5 15-Jun-20 A 26-Jun-20 12
A2510 Fabricate & Deliver Masonry 2 29-Jun-20 30-Jun-20 12
Metal Pan StairsMetal Pan StairsMetal Pan StairsMetal Pan StairsMetal Pan StairsMetal Pan Stairs
A2450 Review & Approve Metal Pan Stairs 15 24-Jun-20 A 14-Jul-20 265
A2460 Fabricate & Deliver Metal Pan Stairs 30 15-Jul-20 25-Aug-20 265
RoofingRoofingRoofingRoofingRoofingRoofing
A2520 Bid & Award Roofing 10 04-Jun-20 A 02-Jul-20 228
A2530 Prepare & Submit Roofing 30 03-Jul-20 13-Aug-20 228
A2540 Review & Approve Roofing 15 14-Aug-20 03-Sep-20 228
A2550 Fabricate & Deliver Roofing 30 04-Sep-20 15-Oct-20 228
Lighting FixturesLighting FixturesLighting FixturesLighting FixturesLighting FixturesLighting Fixtures
A3560 Bid & Award Lighting Fixtures 15 01-Jun-20 A 02-Jul-20 228
A3570 Prepare & Submit Lighting Fixtures 10 03-Jul-20 16-Jul-20 228
A3580 Review & Approve Lighting Fixtures 15 17-Jul-20 06-Aug-20 228
A3590 Fabricate & Deliver Lighting Fixtures 50 07-Aug-20 15-Oct-20 228
PanelboardsPanelboardsPanelboardsPanelboardsPanelboardsPanelboards
A3610 Prepare & Submit Panelboards 10 15-Jun-20 A 26-Jun-20 267
A3620 Review & Approve Panelboards 15 29-Jun-20 17-Jul-20 267
A3630 Fabricate & Deliver Panelboards 25 20-Jul-20 21-Aug-20 267
TransformersTransformersTransformersTransformersTransformersTransformers
A3650 Prepare & Submit Transformer 10 15-Jun-20 A 26-Jun-20 272
A3660 Review & Approve Transformer 15 29-Jun-20 17-Jul-20 272
A3670 Fabricate & Deliver Transformer 20 20-Jul-20 14-Aug-20 272
Fire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire Alarm
A3690 Prepare & Submit Fire Alarm 25 15-Jun-20 A 17-Jul-20 262
A3700 Review & Approve Fire Alarm 15 20-Jul-20 07-Aug-20 262
A3710 Fabricate & Deliver Fire Alarm 15 10-Aug-20 28-Aug-20 262
MOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & Shell
FacadeFacadeFacadeFacadeFacadeFacade
Granite BaseGranite BaseGranite BaseGranite BaseGranite BaseGranite Base
A2770 Prepare & Submit Granite Base 20 05-Jun-20 A 16-Jul-20 90
A2780 Review & Approve Granite Base 10 17-Jul-20 30-Jul-20 90
A2790 Fabricate & Deliver Granite Base 40 31-Jul-20 24-Sep-20 90
CurtainwallCurtainwallCurtainwallCurtainwallCurtainwallCurtainwall
A2570 Prepare & Submit Curtainwall 20 21-Apr-20 A 02-Jul-20 40
A2580 Review & Approve Curtainwall 10 03-Jul-20 16-Jul-20 40
A2590 Fabricate & Deliver Curtainwall 80 17-Jul-20 05-Nov-20 40
Punched WindowsPunched WindowsPunched WindowsPunched WindowsPunched WindowsPunched Windows
A2610 Prepare & Submit Punched Windows 20 21-Apr-20 A 02-Jul-20 15
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
TI MEP Coordination
TI Subcontractor Awards
Shop Drawing Review/Material Procurement (TI)
Review & Approve Masonry
Fabricate & Deliver Masonry
Review & Approve Metal Pan Stairs
Fabricate & Deliver Metal Pan Stairs
Bid & Award Roofing
Prepare & Submit Roofing
Review & Approve Roofing
Fabricate & Deliver Roofing
Bid & Award Lighting Fixtures
Prepare & Submit Lighting Fixtures
Review & Approve Lighting Fixtures
Fabricate & Deliver Lighting Fixtures
Prepare & Submit Panelboards
Review & Approve Panelboards
Fabricate & Deliver Panelboards
Prepare & Submit Transformer
Review & Approve Transformer
Fabricate & Deliver Transformer
Prepare & Submit Fire Alarm
Review & Approve Fire Alarm
Fabricate & Deliver Fire Alarm
Prepare & Submit Granite Base
Review & Approve Granite Base
Fabricate & Deliver Granite Base
Prepare & Submit Curtainwall
Review & Approve Curtainwall
Fabricate & Deliver Curtainwall
Prepare & Submit Punched Windows
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
A2620 Review & Approve Punched Windows 25 03-Jul-20 06-Aug-20 15
A2630 Fabricate & Deliver Punched Windows 80 07-Aug-20 26-Nov-20 15
Metal PanelsMetal PanelsMetal PanelsMetal PanelsMetal PanelsMetal Panels
A2650 Prepare & Submit Metal Panels 44 13-May-20 A 13-Jul-20 33
A2660 Review & Approve Metal Panels 11 14-Jul-20 28-Jul-20 33
A2670 Fabricate & Deliver Metal Panels 79 29-Jul-20 16-Nov-20 33
GlassGlassGlassGlassGlassGlass
A2880 Fabricate/Construct Mock-Up 30 12-Jun-20 A 23-Jul-20 216
A2890 Review & Approve Mock-Up 2 24-Jul-20 27-Jul-20 216
A2710 Fabricate & Deliver Glass 70 28-Jul-20 02-Nov-20 216
Stone/TerracottaStone/TerracottaStone/TerracottaStone/TerracottaStone/TerracottaStone/Terracotta
A2730 Prepare & Submit Stone/Terracotta 20 13-May-20 A 16-Jul-20 12
A2740 Review & Approve Stone/Terracotta 15 17-Jul-20 06-Aug-20 12
A2750 Fabricate & Deliver Stone/Terracotta 110 07-Aug-20 07-Jan-21 12
ElevatorsElevatorsElevatorsElevatorsElevatorsElevators
Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3
PR1370 Elevator Equipment Procurement / Delivery Elevators 1-3 120 26-May-20 A 13-Nov-20 52
Service Elevator 4Service Elevator 4Service Elevator 4Service Elevator 4Service Elevator 4Service Elevator 4
PR1390 Elevator Equipment Procurement / Delivery Elevator 4 120 26-May-20 A 13-Nov-20 52
MEPMEPMEPMEPMEPMEP
PR1110 Shop Drawing Review and Approval (MEP) 40 05-Jun-20 A 31-Jul-20 182
PR1230 MEP Equipment Procurement / Delivery 90 03-Aug-20 10-Dec-20 182
Rooftop UnitsRooftop UnitsRooftop UnitsRooftop UnitsRooftop UnitsRooftop Units
PR1440 Shop Drawing Review and Approval (Rooftop Units) 20 05-Jun-20 A 17-Jul-20 42
PR1450 Rooftop Unit Procurement / Delivery 100 20-Jul-20 10-Dec-20 42
ChillerChillerChillerChillerChillerChiller
PR1460 Shop Drawing Review and Approval (Chiller) 20 05-Jun-20 A 17-Jul-20 64
PR1470 Chiller Procurement / Delivery 80 20-Jul-20 10-Nov-20 64
Boiler/PumpsBoiler/PumpsBoiler/PumpsBoiler/PumpsBoiler/PumpsBoiler/Pumps
PR1480 Shop Drawing Review and Approval (Boiler/Pumps) 20 12-Jun-20 A 24-Jul-20 227
PR1490 Boiler/Pumps Procurement / Delivery 50 27-Jul-20 05-Oct-20 227
ElectricalElectricalElectricalElectricalElectricalElectrical
Lighting FixturesLighting FixturesLighting FixturesLighting FixturesLighting FixturesLighting Fixtures
A3210 Prepare & Submit Lighting Fixtures 10 22-Jun-20 A 03-Jul-20 237
A3220 Review & Approve Lighting Fixtures 15 06-Jul-20 24-Jul-20 237
A3230 Fabricate & Deliver Lighting Fixtures 50 27-Jul-20 02-Oct-20 237
Site LightingSite LightingSite LightingSite LightingSite LightingSite Lighting
A3250 Prepare & Submit Site Lighting 10 22-Jun-20 A 03-Jul-20 147
A3260 Review & Approve Site Lighting 15 06-Jul-20 24-Jul-20 147
A3270 Fabricate & Deliver Site Lighting 50 27-Jul-20 02-Oct-20 147
SwitchgearSwitchgearSwitchgearSwitchgearSwitchgearSwitchgear
A3290 Prepare & Submit Switchgear 20 22-Jun-20 A 17-Jul-20 87
A3300 Review & Approve Switchgear 15 20-Jul-20 07-Aug-20 87
A3310 Fabricate & Deliver Switchgear 60 10-Aug-20 30-Oct-20 87
PanelboardsPanelboardsPanelboardsPanelboardsPanelboardsPanelboards
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Review & Approve Punched Windows
Fabricate & Deliver Punched Windows
Prepare & Submit Metal Panels
Review & Approve Metal Panels
Fabricate & Deliver Metal Panels
Fabricate/Construct Mock-Up
Review & Approve Mock-Up
Fabricate & Deliver Glass
Prepare & Submit Stone/Terracotta
Review & Approve Stone/Terracotta
Fabricate & Deliver Stone/Terracotta
Elevator Equipment Procurement / Delivery Elevators 1-3
Elevator Equipment Procurement / Delivery Elevator 4
Shop Drawing Review and Approval (MEP)
MEP Equipment Procurement / Delivery
Shop Drawing Review and Approval (Rooftop Units)
Rooftop Unit Procurement / Delivery
Shop Drawing Review and Approval (Chiller)
Chiller Procurement / Delivery
Shop Drawing Review and Approval (Boiler/Pumps)
Boiler/Pumps Procurement / Delivery
Prepare & Submit Lighting Fixtures
Review & Approve Lighting Fixtures
Fabricate & Deliver Lighting Fixtures
Prepare & Submit Site Lighting
Review & Approve Site Lighting
Fabricate & Deliver Site Lighting
Prepare & Submit Switchgear
Review & Approve Switchgear
Fabricate & Deliver Switchgear
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
A3330 Prepare & Submit Panelboards 10 15-Jun-20 A 26-Jun-20 137
A3340 Review & Approve Panelboards 15 29-Jun-20 17-Jul-20 137
A3350 Fabricate & Deliver Panelboards 25 20-Jul-20 21-Aug-20 137
TransformersTransformersTransformersTransformersTransformersTransformers
A3370 Prepare & Submit Transformer 10 15-Jun-20 A 26-Jun-20 142
A3380 Review & Approve Transformer 15 29-Jun-20 17-Jul-20 142
A3390 Fabricate & Deliver Transformer 20 20-Jul-20 14-Aug-20 142
Fire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire Alarm
A3410 Prepare & Submit Fire Alarm 25 15-Jun-20 A 17-Jul-20 262
A3420 Review & Approve Fire Alarm 15 20-Jul-20 07-Aug-20 262
A3430 Fabricate & Deliver Fire Alarm 15 10-Aug-20 28-Aug-20 262
GeneratorGeneratorGeneratorGeneratorGeneratorGenerator
A3450 Prepare & Submit Generator 20 15-Jun-20 A 10-Jul-20 91
A3460 Review & Approve Generator 15 13-Jul-20 31-Jul-20 91
A3470 Fabricate & Deliver Generator 70 03-Aug-20 06-Nov-20 91
Lightning ProtectionLightning ProtectionLightning ProtectionLightning ProtectionLightning ProtectionLightning Protection
A3530 Prepare & Submit Lightning Protection 15 15-Jun-20 A 03-Jul-20 142
A3540 Review & Approve Lightning Protection 15 06-Jul-20 24-Jul-20 142
A3550 Fabricate & Deliver Lightning Protection 15 27-Jul-20 14-Aug-20 142
StructureStructureStructureStructureStructureStructure
PR1200 Structural Steel Shop Drawings Submit / Approval 10 29-May-20 A 02-Jul-20 0
PR1260 Steel Fabrication 45 06-Jul-20 04-Sep-20 0
GarageGarageGarageGarageGarageGarage
FoundationFoundationFoundationFoundationFoundationFoundation
PR1320 Review and Approve Foundation Shop Drawings 15 15-May-20 A 26-Jun-20 286
PR1340 Fab & Deliver Rebar 10 29-Jun-20 13-Jul-20 286
PrecastPrecastPrecastPrecastPrecastPrecast
PR1330 Review and Approve Precast Shop Drawings 10 12-Jun-20 A 29-Jun-20 251
PR1350 Fab & Deliver Precast 44 30-Jun-20 31-Aug-20 251
Steel CanopySteel CanopySteel CanopySteel CanopySteel CanopySteel Canopy
A1980 Prepare & Submit Steel Canopy 10 29-Jun-20* 10-Jul-20 252
A1990 Review & Approve Steel Canopy 10 13-Jul-20 24-Jul-20 252
A2000 Fabricate & Deliver Steel Canopy 25 27-Jul-20 28-Aug-20 252
Passenger Elevator 5Passenger Elevator 5Passenger Elevator 5Passenger Elevator 5Passenger Elevator 5Passenger Elevator 5
PR1430 Elevator Equipment Procurement / Delivery Elevator 5 100 26-May-20 A 15-Oct-20 4
PanelboardsPanelboardsPanelboardsPanelboardsPanelboardsPanelboards
A3060 Review & Approve Panelboards 15 19-Jun-20 A 09-Jul-20 36
A3070 Fabricate & Deliver Panelboards 25 10-Jul-20 13-Aug-20 36
TransformersTransformersTransformersTransformersTransformersTransformers
A3100 Review & Approve Transformers 15 19-Jun-20 A 09-Jul-20 41
A3110 Fabricate & Deliver Transformers 20 10-Jul-20 06-Aug-20 41
Lighting FixturesLighting FixturesLighting FixturesLighting FixturesLighting FixturesLighting Fixtures
A3140 Review & Approve Lighting Fixtures 15 19-Jun-20 A 09-Jul-20 11
A3150 Fabricate & Deliver Lighting Fixtures 50 10-Jul-20 17-Sep-20 11
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Prepare & Submit Panelboards
Review & Approve Panelboards
Fabricate & Deliver Panelboards
Prepare & Submit Transformer
Review & Approve Transformer
Fabricate & Deliver Transformer
Prepare & Submit Fire Alarm
Review & Approve Fire Alarm
Fabricate & Deliver Fire Alarm
Prepare & Submit Generator
Review & Approve Generator
Fabricate & Deliver Generator
Prepare & Submit Lightning Protection
Review & Approve Lightning Protection
Fabricate & Deliver Lightning Protection
Structural Steel Shop Drawings Submit / Approval
Steel Fabrication
Review and Approve Foundation Shop Drawings
Fab & Deliver Rebar
Review and Approve Precast Shop Drawings
Fab & Deliver Precast
Prepare & Submit Steel Canopy
Review & Approve Steel Canopy
Fabricate & Deliver Steel Canopy
Elevator Equipment Procurement / Delivery Elevator 5
Review & Approve Panelboards
Fabricate & Deliver Panelboards
Review & Approve Transformers
Fabricate & Deliver Transformers
Review & Approve Lighting Fixtures
Fabricate & Deliver Lighting Fixtures
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
Fire AlarmFire AlarmFire AlarmFire AlarmFire AlarmFire Alarm
A3180 Review & Approve Fire Alarm 15 19-Jun-20 A 09-Jul-20 46
A3190 Fabricate & Deliver Fire Alarm 15 10-Jul-20 30-Jul-20 46
MEP CoordinationMEP CoordinationMEP CoordinationMEP CoordinationMEP CoordinationMEP Coordination
Sleeving DrawingsSleeving DrawingsSleeving DrawingsSleeving DrawingsSleeving DrawingsSleeving Drawings
GarageGarageGarageGarageGarageGarage
MPB100 Garage - Submit Sleeving Dwg 12 26-May-20 A 29-Jun-20 13
MPB150 Coordination Sheer Wall Penetrations 12 26-May-20 A 29-Jun-20 13
MPB110 Garage - Approve Sleeving Dwg 3 30-Jun-20 02-Jul-20 13
MPB120 Garage - Revise Sleeving Dwg 4 06-Jul-20 09-Jul-20 13
MPB130 Sign Off Garage Floor Sleeving Drawings 0 09-Jul-20 13
MOBMOBMOBMOBMOBMOB
UnderslabUnderslabUnderslabUnderslabUnderslabUnderslab
MP17270 Underslab - Submit Coordination Dwg 12 26-Jun-20 14-Jul-20 278
MP17280 Underslab - Approve Coordination Dwg 3 15-Jul-20 17-Jul-20 278
MP17290 Underslab - Revise Coordination Dwg 4 20-Jul-20 23-Jul-20 278
MP17300 Sign Off Underslab Coordination Drawings 0 23-Jul-20 278
1st Floor1st Floor1st Floor1st Floor1st Floor1st Floor
MP1100 01 - Submit Sleeving Dwg 12 30-Jun-20 16-Jul-20 49
MP1110 01 - Approve Sleeving Dwg 3 17-Jul-20 21-Jul-20 57
MP1120 01 - Revise Sleeving Dwg 4 22-Jul-20 27-Jul-20 57
MP1130 Sign Off 01 Floor Sleeving Drawings 0 27-Jul-20 57
2nd Floor2nd Floor2nd Floor2nd Floor2nd Floor2nd Floor
MP2100 02 - Submit Sleeving Dwg 12 17-Jul-20 03-Aug-20 49
MP2110 02 - Approve Sleeving Dwg 3 04-Aug-20 06-Aug-20 55
MP2120 02 - Revise Sleeving Dwg 4 07-Aug-20 12-Aug-20 55
MP2130 Sign Off 02 Floor Sleeving Drawings 0 12-Aug-20 55
3rd Floor3rd Floor3rd Floor3rd Floor3rd Floor3rd Floor
MP3100 03 - Submit Sleeving Dwg 12 04-Aug-20 19-Aug-20 49
MP3110 03 - Approve Sleeving Dwg 3 20-Aug-20 24-Aug-20 53
MP3120 03 - Revise Sleeving Dwg 4 25-Aug-20 28-Aug-20 53
MP3130 Sign Off 03 Floor Sleeving Drawings 0 28-Aug-20 53
4th Floor4th Floor4th Floor4th Floor4th Floor4th Floor
MP4100 04 - Submit Sleeving Dwg 12 20-Aug-20 04-Sep-20 49
MP4110 04 - Approve Sleeving Dwg 3 08-Sep-20 10-Sep-20 51
MP4120 04 - Revise Sleeving Dwg 4 11-Sep-20 16-Sep-20 51
MP4130 Sign Off 04 Floor Sleeving Drawings 0 16-Sep-20 51
RoofRoofRoofRoofRoofRoof
MP5100 05 - Submit Sleeving Dwg 12 08-Sep-20 23-Sep-20 49
MP5110 05 - Approve Sleeving Dwg 3 24-Sep-20 28-Sep-20 49
MP5120 05 - Revise Sleeving Dwg 4 29-Sep-20 02-Oct-20 49
MP5130 Sign Off 05 Floor Sleeving Drawings 0 02-Oct-20 49
MEP Coordination DrawingsMEP Coordination DrawingsMEP Coordination DrawingsMEP Coordination DrawingsMEP Coordination DrawingsMEP Coordination Drawings
GarageGarageGarageGarageGarageGarage
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Review & Approve Fire Alarm
Fabricate & Deliver Fire Alarm
Garage - Submit Sleeving Dwg
Coordination Sheer Wall Penetrations
Garage - Approve Sleeving Dwg
Garage - Revise Sleeving Dwg
Sign Off Garage Floor Sleeving Drawings
Underslab - Submit Coordination Dwg
Underslab - Approve Coordination Dwg
Underslab - Revise Coordination Dwg
Sign Off Underslab Coordination Drawings
01 - Submit Sleeving Dwg
01 - Approve Sleeving Dwg
01 - Revise Sleeving Dwg
Sign Off 01 Floor Sleeving Drawings
02 - Submit Sleeving Dwg
02 - Approve Sleeving Dwg
02 - Revise Sleeving Dwg
Sign Off 02 Floor Sleeving Drawings
03 - Submit Sleeving Dwg
03 - Approve Sleeving Dwg
03 - Revise Sleeving Dwg
Sign Off 03 Floor Sleeving Drawings
04 - Submit Sleeving Dwg
04 - Approve Sleeving Dwg
04 - Revise Sleeving Dwg
Sign Off 04 Floor Sleeving Drawings
05 - Submit Sleeving Dwg
05 - Approve Sleeving Dwg
05 - Revise Sleeving Dwg
Sign Off 05 Floor Sleeving Drawings
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
MP2210 Garage - Plumbing Coordination 5 10-Jul-20 16-Jul-20 149
MP2220 Garage - HVAC Coordination 5 17-Jul-20 23-Jul-20 149
MP2230 Garage - Electrical Coordination 5 24-Jul-20 30-Jul-20 149
MP2240 Garage - Final Revisions 5 31-Jul-20 06-Aug-20 149
MP2250 Garage - Submit / Approve Coordination Dwg 10 07-Aug-20 20-Aug-20 149
MP2260 Sign Off Garage Floor Coordination Drawing 0 20-Aug-20 149
MOBMOBMOBMOBMOBMOB
1st Floor1st Floor1st Floor1st Floor1st Floor1st Floor
MP5000 1st Floor - Fire Protection Coordination 10 28-Jul-20 10-Aug-20 57
MP5200 1st Floor - Ductwork Coordination 10 11-Aug-20 24-Aug-20 97
MP5210 1st Floor - Plumbing Coordination 10 25-Aug-20 08-Sep-20 97
MP5220 1st Floor - HVAC Coordination 10 09-Sep-20 22-Sep-20 97
MP5230 1st Floor - Electrical Coordination 15 23-Sep-20 14-Oct-20 97
MP5240 1st Floor - Final Revisions 5 15-Oct-20 21-Oct-20 97
MP5250 1st Floor - Submit / Approve Coordination Dwg 10 22-Oct-20 04-Nov-20 97
MP5260 Sign Off 1st Floor Coordination Drawing 0 04-Nov-20 97
2nd Floor2nd Floor2nd Floor2nd Floor2nd Floor2nd Floor
MP8000 2nd Floor - Fire Protection Coordination 10 13-Aug-20 26-Aug-20 55
MP8200 2nd Floor - Ductwork Coordination 10 27-Aug-20 10-Sep-20 85
MP8210 2nd Floor - Plumbing Coordination 10 11-Sep-20 24-Sep-20 85
MP8220 2nd Floor - HVAC Coordination 10 25-Sep-20 08-Oct-20 85
MP8230 2nd Floor - Electrical Coordination 15 09-Oct-20 30-Oct-20 85
MP8240 2nd Floor - Final Revisions 5 02-Nov-20 06-Nov-20 85
MP8250 2nd Floor - Submit / Approve Coordination Dwg 10 09-Nov-20 23-Nov-20 85
MP8260 Sign Off 2nd Floor Coordination Drawing 0 23-Nov-20 85
3rd Floor3rd Floor3rd Floor3rd Floor3rd Floor3rd Floor
MP11000 3rd Floor - Fire Protection Coordination 10 31-Aug-20 14-Sep-20 53
MP11200 3rd Floor - Ductwork Coordination 10 15-Sep-20 28-Sep-20 73
MP11210 3rd Floor - Plumbing Coordination 10 29-Sep-20 13-Oct-20 73
MP11220 3rd Floor - HVAC Coordination 10 14-Oct-20 27-Oct-20 73
MP11230 3rd Floor - Electrical Coordination 15 28-Oct-20 18-Nov-20 73
MP11240 3rd Floor - Final Revisions 5 19-Nov-20 25-Nov-20 73
MP11250 3rd Floor - Submit / Approve Coordination Dwg 10 27-Nov-20 10-Dec-20 73
MP11260 Sign Off 3rd Floor Coordination Drawing 0 10-Dec-20 73
4th Floor4th Floor4th Floor4th Floor4th Floor4th Floor
MP14000 4th Floor - Fire Protection Coordination 10 17-Sep-20 30-Sep-20 51
MP14200 4th Floor - Ductwork Coordination 10 01-Oct-20 15-Oct-20 61
MP14210 4th Floor - Plumbing Coordination 10 16-Oct-20 29-Oct-20 61
MP14220 4th Floor - HVAC Coordination 10 30-Oct-20 13-Nov-20 61
MP14230 4th Floor - Electrical Coordination 15 16-Nov-20 07-Dec-20 61
MP14240 4th Floor - Final Revisions 5 08-Dec-20 14-Dec-20 61
MP14250 4th Floor - Submit / Approve Coordination Dwg 10 15-Dec-20 29-Dec-20 61
MP14260 Sign Off 4th Floor Coordination Drawing 0 29-Dec-20 61
RoofRoofRoofRoofRoofRoof
MP17000 Roof - Fire Protection Coordination 10 05-Oct-20 19-Oct-20 49
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Garage - Plumbing Coordination
Garage - HVAC Coordination
Garage - Electrical Coordination
Garage - Final Revisions
Garage - Submit / Approve Coordination Dwg
Sign Off Garage Floor Coordination Drawing
1st Floor - Fire Protection Coordination
1st Floor - Ductwork Coordination
1st Floor - Plumbing Coordination
1st Floor - HVAC Coordination
1st Floor - Electrical Coordination
1st Floor - Final Revisions
1st Floor - Submit / Approve Coordination Dwg
Sign Off 1st Floor Coordination Drawing
2nd Floor - Fire Protection Coordination
2nd Floor - Ductwork Coordination
2nd Floor - Plumbing Coordination
2nd Floor - HVAC Coordination
2nd Floor - Electrical Coordination
2nd Floor - Final Revisions
2nd Floor - Submit / Approve Coordination Dwg
Sign Off 2nd Floor Coordination Drawing
3rd Floor - Fire Protection Coordination
3rd Floor - Ductwork Coordination
3rd Floor - Plumbing Coordination
3rd Floor - HVAC Coordination
3rd Floor - Electrical Coordination
3rd Floor - Final Revisions
3rd Floor - Submit / Approve Coordination Dwg
Sign Off 3rd Floor Coordination Drawing
4th Floor - Fire Protection Coordination
4th Floor - Ductwork Coordination
4th Floor - Plumbing Coordination
4th Floor - HVAC Coordination
4th Floor - Electrical Coordination
4th Floor - Final Revisions
4th Floor - Submit / Approve Coordination Dwg
Sign Off 4th Floor Coordination Drawing
Roof - Fire Protection Coordination
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
MP17200 Roof - Ductwork Coordination 10 20-Oct-20 02-Nov-20 49
MP17210 Roof - Plumbing Coordination 10 03-Nov-20 17-Nov-20 49
MP17220 Roof - HVAC Coordination 10 18-Nov-20 02-Dec-20 49
MP17230 Roof - Electrical Coordination 15 03-Dec-20 23-Dec-20 49
MP17240 Roof - Final Revisions 5 24-Dec-20 31-Dec-20 49
MP17250 Roof - Submit / Approve Coordination Dwg 10 04-Jan-21 15-Jan-21 49
MP17260 Sign Off Roof Coordination Drawing 0 15-Jan-21 49
CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION
MOBMOBMOBMOBMOBMOB
MOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & ShellMOB Core & Shell
Site/UtilitiesSite/UtilitiesSite/UtilitiesSite/UtilitiesSite/UtilitiesSite/Utilities
A4860 Network Conduit to MOB 15 22-Jul-20 11-Aug-20 23
A6010 Install Remaining Drainage 15 12-Aug-20 01-Sep-20 23
A6020 Remove Construction Fence 10 15-Mar-21* 26-Mar-21 32
A6030 Grade & Prep Sidewalks 10 29-Mar-21 09-Apr-21 32
A6040 Install Sidewalks 10 12-Apr-21 23-Apr-21 32
A6050 Install Handrails 10 26-Apr-21 07-May-21 32
A6060 Install Loam 10 10-May-21 21-May-21 32
A6070 Install Parking Equipment 10 24-May-21 04-Jun-21 32
A6080 Paving 10 07-Jun-21 18-Jun-21 32
A6090 Install Landscaping Plants and Shrubs 10 21-Jun-21 02-Jul-21 32
A6100 Seed Lawns 10 05-Jul-21 16-Jul-21 32
GeneratorGeneratorGeneratorGeneratorGeneratorGenerator
A6110 Run Duct Bank to CBOC 10 10-Jul-20 23-Jul-20 42
A6120 Run Duct Bank to Garage Addition 15 24-Jul-20 13-Aug-20 42
A4830 Equipment Pads 5 14-Aug-20 20-Aug-20 42
A4840 Set Utility Switch/Transformer 2 02-Nov-20 03-Nov-20 94
A4850 Set Generator/Docking Station 2 09-Nov-20 10-Nov-20 91
A6130 Frade & Prep Generator Pad 5 11-Nov-20 17-Nov-20 91
A6140 Install Grounding 5 18-Nov-20 24-Nov-20 91
A6150 Form Rebar and Place Slab 10 25-Nov-20 08-Dec-20 91
A6160 Install Generator 5 09-Dec-20 15-Dec-20 91
A6170 Connect Genrator 15 16-Dec-20 05-Jan-21 91
A6180 Testing 5 06-Jan-21 12-Jan-21 91
RT 9 Water Tie InRT 9 Water Tie InRT 9 Water Tie InRT 9 Water Tie InRT 9 Water Tie InRT 9 Water Tie In
A6200 Deliver Sleeve 15 26-Jun-20 16-Jul-20 68
A6210 Install Sleeve 10 17-Jul-20 30-Jul-20 68
A2400 Install Road Connection 4 31-Jul-20 05-Aug-20 68
StructureStructureStructureStructureStructureStructure
A6220 Underslab Utilities Columns 5 - 8 (C/S) 10 29-Jun-20 10-Jul-20 5
A6230 Underslab Utilities Columns 5 - 1 (C/S) 10 13-Jul-20 24-Jul-20 8
A3760 Backfill SOG 5 27-Jul-20 31-Jul-20 0
A3770 Vapor Barrier/Insulation at SOG 5 29-Jul-20 04-Aug-20 0
A3780 Pour SOG 3 05-Aug-20 07-Aug-20 0
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Roof - Ductwork Coordination
Roof - Plumbing Coordination
Roof - HVAC Coordination
Roof - Electrical Coordination
Roof - Final Revisions
Roof - Submit / Approve Coordination Dwg
Sign Off Roof Coordination Drawing
Network Conduit to MOB
Install Remaining Drainage
Remove Construction Fence
Grade & Prep Sidewalks
Install Sidewalks
Install Handrails
Install Loam
Install Parking Equipment
Paving
Install Landscaping Plants and Shrubs
Seed Lawns
Run Duct Bank to CBOC
Run Duct Bank to Garage Addition
Equipment Pads
Set Utility Switch/Transformer
Set Generator/Docking Station
Frade & Prep Generator Pad
Install Grounding
Form Rebar and Place Slab
Install Generator
Connect Genrator
Testing
Deliver Sleeve
Install Sleeve
Install Road Connection
Underslab Utilities Columns 5 - 8 (C/S)
Underslab Utilities Columns 5 - 1 (C/S)
Backfill SOG
Vapor Barrier/Insulation at SOG
Pour SOG
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
C1070 Structural Steel / Detailing / Composite Deck 48 10-Aug-20 16-Oct-20 0
A3790 Pour SOD Level 2 3 05-Oct-20 07-Oct-20 0
A3800 Pour SOD Level 3 3 08-Oct-20 12-Oct-20 2
A3810 Pour SOD Level 4 3 13-Oct-20 15-Oct-20 2
A3820 Spray Fireproofing 10 16-Oct-20 29-Oct-20 2
FoundationsFoundationsFoundationsFoundationsFoundationsFoundations
ExcavationExcavationExcavationExcavationExcavationExcavation
A1640 Excavate Interiror Footings 3 20-May-20 A 26-Jun-20 5
A1730 Backfill Foundations West 10 12-Jun-20 A 02-Jul-20 36
A6240 Backfill Foundations South 10 03-Jul-20 16-Jul-20 36
A6250 Backfill Foundations East 10 17-Jul-20 30-Jul-20 36
A6260 Backfill Foundations North 10 31-Jul-20 13-Aug-20 36
Footings & WallsFootings & WallsFootings & WallsFootings & WallsFootings & WallsFootings & Walls
A1700 FRP Interiror Footings & Walls 8 05-Jun-20 A 26-Jun-20 5
A6970 FRP Loading Dock Foundations 10 26-Jun-20 09-Jul-20 42
WaterproofingWaterproofingWaterproofingWaterproofingWaterproofingWaterproofing
A6280 Waterproof Foundations East 10 15-Jun-20 A 26-Jun-20 50
ShaftsShaftsShaftsShaftsShaftsShafts
ElevatorElevatorElevatorElevatorElevatorElevator
A1820 Install Elevators 1, 2, & 3 Shafts 8 01-Jul-20 10-Jul-20 12
A1830 Install Elevator 4 Shaft 8 13-Jul-20 22-Jul-20 12
StairwayStairwayStairwayStairwayStairwayStairway
A1840 Install Stair 1 Shaft 8 01-Jul-20 10-Jul-20 12
A1850 Install Stair 2 Shaft 8 13-Jul-20 22-Jul-20 12
Structural SteelStructural SteelStructural SteelStructural SteelStructural SteelStructural Steel
Floors 2 & 3Floors 2 & 3Floors 2 & 3Floors 2 & 3Floors 2 & 3Floors 2 & 3
A1740 Set Columns & Beams (Line 5 - 13 Rows A - E) 8 10-Aug-20 19-Aug-20 0
A1750 Set Columns & Beams (Line 1 - 4 Rows A - E) 8 20-Aug-20 31-Aug-20 16
A6300 Deck Floor 2 9 20-Aug-20 01-Sep-20 0
A6310 Detail Floor 2 10 02-Sep-20 15-Sep-20 5
A6320 Deck Floor 3 9 16-Sep-20 28-Sep-20 5
A6330 Detail Floor 3 10 29-Sep-20 12-Oct-20 5
Floor 4 & RoofFloor 4 & RoofFloor 4 & RoofFloor 4 & RoofFloor 4 & RoofFloor 4 & Roof
A1770 Set Columns & Beams (Line 5 - 13 Rows A - E) 8 27-Aug-20 07-Sep-20 0
A1780 Set Columns & Beams (Line 1 - 4 Rows A - E) 8 08-Sep-20 17-Sep-20 11
A6340 Deck Floor 4 9 08-Sep-20 18-Sep-20 0
A6350 Detail Floor 4 10 21-Sep-20 02-Oct-20 0
A1810 Deck & Detail Roof 10 05-Oct-20 16-Oct-20 0
FacadeFacadeFacadeFacadeFacadeFacade
A5210 West Elevation 80 16-Oct-20 04-Feb-21 12
A5220 North Elevation 48 27-Oct-20 31-Dec-20 37
A5230 East Elevation 64 04-Nov-20 01-Feb-21 15
A5240 South Elevation 59 16-Nov-20 04-Feb-21 12
C1240 Water Tight 0 04-Jan-21 2
West ElevationWest ElevationWest ElevationWest ElevationWest ElevationWest Elevation
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Structural Steel / Detailing / Composite Deck
Pour SOD Level 2
Pour SOD Level 3
Pour SOD Level 4
Spray Fireproofing
Excavate Interiror Footings
Backfill Foundations West
Backfill Foundations South
Backfill Foundations East
Backfill Foundations North
FRP Interiror Footings & Walls
FRP Loading Dock Foundations
Waterproof Foundations East
Install Elevators 1, 2, & 3 Shafts
Install Elevator 4 Shaft
Install Stair 1 Shaft
Install Stair 2 Shaft
Set Columns & Beams (Line 5 - 13 Rows A - E)
Set Columns & Beams (Line 1 - 4 Rows A - E)
Deck Floor 2
Detail Floor 2
Deck Floor 3
Detail Floor 3
Set Columns & Beams (Line 5 - 13 Rows A - E)
Set Columns & Beams (Line 1 - 4 Rows A - E)
Deck Floor 4
Detail Floor 4
Deck & Detail Roof
West Elevation
North Elevation
East Elevation
South Elevation
Water Tight
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
A3840 Exterior Framing West Elevation 7 16-Oct-20 26-Oct-20 2
A3850 Sheathing West Elevation 8 22-Oct-20 02-Nov-20 2
A3870 AVB West Elevation 10 29-Oct-20 11-Nov-20 2
A3860 Clip Angles/Supports West Elevation 3 03-Nov-20 05-Nov-20 8
A3880 Install Punched Windows West Elevation 20 27-Nov-20 24-Dec-20 17
A3890 Install Curtainwall West Elevation 5 18-Dec-20 24-Dec-20 17
A3920 Install ACM Panels West Elevation 10 25-Dec-20 07-Jan-21 17
A3900 Install Granite Base West Elevation 10 08-Jan-21 21-Jan-21 17
A3910 Install Terra Cotta West Elevation 20 08-Jan-21 04-Feb-21 12
A3930 Caulking West Elevation 5 22-Jan-21 28-Jan-21 17
North ElevationNorth ElevationNorth ElevationNorth ElevationNorth ElevationNorth Elevation
A3940 Exterior Framing North Elevation 6 27-Oct-20 03-Nov-20 3
A3950 Sheathing North Elevation 6 03-Nov-20 10-Nov-20 3
A3960 Clip Angles/Supports North Elevation 5 06-Nov-20 12-Nov-20 8
A3970 AVB North Elevation 5 12-Nov-20 18-Nov-20 2
A3990 Install Curtainwall North Elevation 20 17-Nov-20 14-Dec-20 37
A4020 Install ACM Panels North Elevation 10 01-Dec-20 14-Dec-20 37
A4000 Install Granite Base North Elevation 8 15-Dec-20 24-Dec-20 37
A4030 Caulking North Elevation 10 18-Dec-20 31-Dec-20 37
East ElevationEast ElevationEast ElevationEast ElevationEast ElevationEast Elevation
A4040 Exterior Framing East Elevation 8 04-Nov-20 13-Nov-20 3
A4050 Sheathing East Elevation 8 11-Nov-20 20-Nov-20 3
A4060 Clip Angles/Supports East Elevation 5 13-Nov-20 19-Nov-20 8
A4070 AVB East Elevation 12 19-Nov-20 04-Dec-20 2
A4090 Install Curtainwall East Elevation 25 26-Nov-20 30-Dec-20 26
A4080 Install Punched Windows East Elevation 20 27-Nov-20 24-Dec-20 15
A4120 Install ACM Panels East Elevation 25 11-Dec-20 14-Jan-21 15
A4100 Install Granite Base East Elevation 10 08-Jan-21 21-Jan-21 15
A4130 Caulking East Elevation 12 15-Jan-21 01-Feb-21 15
South ElevationSouth ElevationSouth ElevationSouth ElevationSouth ElevationSouth Elevation
A4140 Exterior Framing South Elevation 6 16-Nov-20 23-Nov-20 8
A4160 Clip Angles/Supports South Elevation 5 20-Nov-20 26-Nov-20 8
A4150 Sheathing South Elevation 6 23-Nov-20 30-Nov-20 6
A4170 AVB South Elevation 10 07-Dec-20 18-Dec-20 2
A4180 Install Punched Windows South Elevation 10 21-Dec-20 01-Jan-21 29
A4190 Install Curtainwall South Elevation 10 21-Dec-20 01-Jan-21 29
A4220 Install ACM Panels South Elevation 10 21-Dec-20 01-Jan-21 24
A4200 Install Granite Base South Elevation 8 04-Jan-21 13-Jan-21 24
A4210 Install Terra Cotta South Elevation 20 08-Jan-21 04-Feb-21 12
A4230 Caulking South Elevation 7 11-Jan-21 19-Jan-21 24
BridgeBridgeBridgeBridgeBridgeBridge
A4240 Exterior Framing Bridge 5 21-Dec-20 25-Dec-20 2
A4250 Sheathing Bridge 5 24-Dec-20 30-Dec-20 2
A4260 Clip Angles/Supports Bridge 3 28-Dec-20 30-Dec-20 21
A4270 AVB Bridge 5 29-Dec-20 04-Jan-21 2
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Exterior Framing West Elevation
Sheathing West Elevation
AVB West Elevation
Clip Angles/Supports West Elevation
Install Punched Windows West Elevation
Install Curtainwall West Elevation
Install ACM Panels West Elevation
Install Granite Base West Elevation
Install Terra Cotta West Elevation
Caulking West Elevation
Exterior Framing North Elevation
Sheathing North Elevation
Clip Angles/Supports North Elevation
AVB North Elevation
Install Curtainwall North Elevation
Install ACM Panels North Elevation
Install Granite Base North Elevation
Caulking North Elevation
Exterior Framing East Elevation
Sheathing East Elevation
Clip Angles/Supports East Elevation
AVB East Elevation
Install Curtainwall East Elevation
Install Punched Windows East Elevation
Install ACM Panels East Elevation
Install Granite Base East Elevation
Caulking East Elevation
Exterior Framing South Elevation
Clip Angles/Supports South Elevation
Sheathing South Elevation
AVB South Elevation
Install Punched Windows South Elevation
Install Curtainwall South Elevation
Install ACM Panels South Elevation
Install Granite Base South Elevation
Install Terra Cotta South Elevation
Caulking South Elevation
Exterior Framing Bridge
Sheathing Bridge
Clip Angles/Supports Bridge
AVB Bridge
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
A4290 Install Curtainwall Bridge 5 05-Jan-21 11-Jan-21 18
A4320 Install ACM Panels Bridge 8 12-Jan-21 21-Jan-21 18
A4330 Caulking Bridge 7 19-Jan-21 27-Jan-21 18
RoofRoofRoofRoofRoofRoof
A5100 Rooftop MEP Openings 8 19-Oct-20 28-Oct-20 44
A5110 Rooftop Mechanical Supports/Curbs 8 23-Oct-20 03-Nov-20 44
A6360 Insulation 8 04-Nov-20 13-Nov-20 44
A6370 Roof Memvrane 8 16-Nov-20 25-Nov-20 44
A6380 Detail 4 26-Nov-20 01-Dec-20 44
C1190 Bulk Water Tight (Roof Drains Tied In) 0 01-Dec-20 41
C1170 Roof Top MEP Equip. Fitup / Trim Out / Start Ups 88 11-Dec-20 19-Apr-21 44
Rigging Rooftop EquipmentRigging Rooftop EquipmentRigging Rooftop EquipmentRigging Rooftop EquipmentRigging Rooftop EquipmentRigging Rooftop Equipment
A5120 RTUs 3 11-Dec-20 15-Dec-20 45
A5130 Chiller 2 16-Dec-20 17-Dec-20 45
A5140 Exhaust Fans 2 18-Dec-20 21-Dec-20 45
Rooftop MEPRooftop MEPRooftop MEPRooftop MEPRooftop MEPRooftop MEP
A6420 HVAC Piping - Mains (CHW/HW) 15 22-Dec-20 11-Jan-21 45
A6430 HVAC Piping - Branch (CHW/HW) 15 12-Jan-21 01-Feb-21 45
A5160 HVAC Risers to RTUs 15 26-Jan-21 15-Feb-21 45
A6440 Rough Electrical - Piping 15 09-Feb-21 01-Mar-21 45
A6450 Rough Electrical - Pull Wires 10 02-Mar-21 15-Mar-21 45
A5180 BAS Controls 20 09-Mar-21 05-Apr-21 45
A5190 Power to Equipment 5 06-Apr-21 12-Apr-21 45
A5200 Fire Alarm Tie-in 5 13-Apr-21 19-Apr-21 45
ElevatorsElevatorsElevatorsElevatorsElevatorsElevators
Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3Passenger Elevators 1-3
A6480 Rails - Passenger Elevators 1-3 13 02-Dec-20 18-Dec-20 44
A6490 Platforms - Passenger Elevators 1-3 13 21-Dec-20 06-Jan-21 44
A6500 Cable - Passenger Elevators 1-3 13 07-Jan-21 25-Jan-21 44
A6510 Raceways - Passenger Elevators 1-3 13 26-Jan-21 11-Feb-21 44
A6520 Sills and Doors - Passenger Elevators 1-3 13 12-Feb-21 02-Mar-21 44
A6530 Controls - Passenger Elevators 1-3 13 03-Mar-21 19-Mar-21 44
A6540 Cab Finishes - Passenger Elevators 1-3 13 22-Mar-21 07-Apr-21 44
A6550 Buttons and Indicators - Passenger Elevators 1-3 14 08-Apr-21 27-Apr-21 44
Service Elevator 4Service Elevator 4Service Elevator 4Service Elevator 4Service Elevator 4Service Elevator 4
A6560 Rails - Service Elevator 4 13 02-Dec-20 18-Dec-20 44
A6570 Platforms - Service Elevator 4 13 21-Dec-20 06-Jan-21 44
A6580 Cable - Service Elevator 4 13 07-Jan-21 25-Jan-21 44
A6590 Raceways - Service Elevator 4 13 26-Jan-21 11-Feb-21 44
A6600 Sills and Doors - Service Elevator 4 13 12-Feb-21 02-Mar-21 44
A6610 Controls - Service Elevator 4 13 03-Mar-21 19-Mar-21 44
A6620 Cab Finishes - Service Elevator 4 13 22-Mar-21 07-Apr-21 44
A6630 Buttons and Indicators - Service Elevator 4 14 08-Apr-21 27-Apr-21 44
InteriorsInteriorsInteriorsInteriorsInteriorsInteriors
RisersRisersRisersRisersRisersRisers
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Install Curtainwall Bridge
Install ACM Panels Bridge
Caulking Bridge
Rooftop MEP Openings
Rooftop Mechanical Supports/Curbs
Insulation
Roof Memvrane
Detail
Bulk Water Tight (Roof Drains Tied In)
Roof Top MEP Equip. Fitup / Trim Out / Start Ups
RTUs
Chiller
Exhaust Fans
HVAC Piping - Mains (CHW/HW)
HVAC Piping - Branch (CHW/HW)
HVAC Risers to RTUs
Rough Electrical - Piping
Rough Electrical - Pull Wires
BAS Controls
Power to Equipment
Fire Alarm Tie-in
Rails - Passenger Elevators 1-3
Platforms - Passenger Elevators 1-3
Cable - Passenger Elevators 1-3
Raceways - Passenger Elevators 1-3
Sills and Doors - Passenger Elevators 1-3
Controls - Passenger Elevators 1-3
Cab Finishes - Passenger Elevators 1-3
Buttons and Indicators - Passenger Elevators 1-3
Rails - Service Elevator 4
Platforms - Service Elevator 4
Cable - Service Elevator 4
Raceways - Service Elevator 4
Sills and Doors - Service Elevator 4
Controls - Service Elevator 4
Cab Finishes - Service Elevator 4
Buttons and Indicators - Service Elevator 4
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
87 Layout C/S Framing 8 08-Oct-20 19-Oct-20 0
88 C/S Frame Shafts/Electric Rooms - North 10 20-Oct-20 02-Nov-20 0
96 Plumbing - Storm Leader 10 27-Oct-20 09-Nov-20 0
101 Fire Protection - Standpipe 10 27-Oct-20 09-Nov-20 15
89 HVAC Piping - CHW 15 27-Oct-20 16-Nov-20 36
92 Electrical Feeders - Normal 15 27-Oct-20 16-Nov-20 31
97 Plumbing - Gas 10 03-Nov-20 16-Nov-20 0
A6460 C/S Frame Shafts/Electric Rooms - South 10 03-Nov-20 16-Nov-20 36
90 HVAC Piping - HW 15 03-Nov-20 23-Nov-20 36
98 Plumbing - CW 10 10-Nov-20 23-Nov-20 0
A6470 Fire Protection - Standpipe 10 10-Nov-20 23-Nov-20 15
91 HVAC - Ductwork 15 10-Nov-20 30-Nov-20 46
93 Electrical Feeders - Emergency 15 10-Nov-20 30-Nov-20 31
95 Tel/Data 10 17-Nov-20 30-Nov-20 36
99 Plumbing - Waste/Vent 10 17-Nov-20 30-Nov-20 15
100 Plumbing - Pump DIscharge 10 24-Nov-20 07-Dec-20 15
102 Fire Protection - Dry System 10 24-Nov-20 07-Dec-20 15
94 Electrical Feeders - Life Safety 15 24-Nov-20 14-Dec-20 31
Level 1Level 1Level 1Level 1Level 1Level 1
RoughRoughRoughRoughRoughRough
Overhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEP
106 Level 1 HVAC Piping - CHW 25 10-Nov-20 14-Dec-20 41
107 Level 1 HVAC Piping - HW 25 17-Nov-20 21-Dec-20 36
110 Level 1 Electrical Power/Lighting Conduit 40 17-Nov-20 11-Jan-21 46
111 Level 1 Fire Protection Mains 15 24-Nov-20 14-Dec-20 41
108 Level 1 HVAC Equipment/Ductwork 30 24-Nov-20 04-Jan-21 46
109 Level 1 Plumbing - CWS/HWS/R 30 24-Nov-20 04-Jan-21 0
MEPMEPMEPMEPMEPMEP
114 Level 1 Electrical Panels/Transformers 15 01-Dec-20 21-Dec-20 36
112 Level 1 HVAC Control Pathways/Panels 25 08-Dec-20 11-Jan-21 46
113 Level 1 Tel/Data 25 08-Dec-20 11-Jan-21 46
116 Level 1 Network Switch - DEMARC RM 10 15-Dec-20 28-Dec-20 31
115 Level 1 Fire Alarm 25 15-Dec-20 18-Jan-21 41
117 Level 1 In-Wall Rough 25 29-Dec-20 01-Feb-21 0
Mechanical Room Level 1Mechanical Room Level 1Mechanical Room Level 1Mechanical Room Level 1Mechanical Room Level 1Mechanical Room Level 1
A4790 Fire Service - Check Valve 10 27-Oct-20 09-Nov-20 51
A4740 Equipment Pads 10 17-Nov-20 30-Nov-20 46
A4760 Install HW/CHW Pump Skids 10 01-Dec-20 14-Dec-20 66
A4780 HVAC Piping/Controllers 40 15-Dec-20 08-Feb-21 66
FinishesFinishesFinishesFinishesFinishesFinishes
124 Level 1 C/S GWB 15 02-Feb-21 22-Feb-21 0
125 Level 1 C/S Tape/Paint 20 16-Feb-21 15-Mar-21 0
126 Level 1 C/S Ceilings 15 02-Mar-21 22-Mar-21 41
128 Level 1 C/S Bathrooms 30 09-Mar-21 19-Apr-21 0
127 Level 1 C/S MEP Finish 15 16-Mar-21 05-Apr-21 41
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Layout C/S Framing
C/S Frame Shafts/Electric Rooms - North
Plumbing - Storm Leader
Fire Protection - Standpipe
HVAC Piping - CHW
Electrical Feeders - Normal
Plumbing - Gas
C/S Frame Shafts/Electric Rooms - South
HVAC Piping - HW
Plumbing - CW
Fire Protection - Standpipe
HVAC - Ductwork
Electrical Feeders - Emergency
Tel/Data
Plumbing - Waste/Vent
Plumbing - Pump DIscharge
Fire Protection - Dry System
Electrical Feeders - Life Safety
Level 1 HVAC Piping - CHW
Level 1 HVAC Piping - HW
Level 1 Electrical Power/Lighting Conduit
Level 1 Fire Protection Mains
Level 1 HVAC Equipment/Ductwork
Level 1 Plumbing - CWS/HWS/R
Level 1 Electrical Panels/Transformers
Level 1 HVAC Control Pathways/Panels
Level 1 Tel/Data
Level 1 Network Switch - DEMARC RM
Level 1 Fire Alarm
Level 1 In-Wall Rough
Fire Service - Check Valve
Equipment Pads
Install HW/CHW Pump Skids
HVAC Piping/Controllers
Level 1 C/S GWB
Level 1 C/S Tape/Paint
Level 1 C/S Ceilings
Level 1 C/S Bathrooms
Level 1 C/S MEP Finish
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
129 Level 1 C/S Lobby Flooring/Wall Tile 30 20-Apr-21 31-May-21 31
130 Level 1 C/S Lobby/Entry Vestibule 20 01-Jun-21 28-Jun-21 31
Level 2Level 2Level 2Level 2Level 2Level 2
RoughRoughRoughRoughRoughRough
Overhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEP
A5310 Level 2 HVAC Piping - CHW 25 17-Nov-20 21-Dec-20 41
A5320 Level 2 HVAC Piping - HW 25 24-Nov-20 28-Dec-20 36
A5330 Level 2 Electrical Power/Lighting Conduit 40 24-Nov-20 18-Jan-21 46
A5350 Level 2 Fire Protection Mains 15 01-Dec-20 21-Dec-20 41
A5340 Level 2 HVAC Equipment/Ductwork 30 01-Dec-20 11-Jan-21 51
A5360 Level 2 Plumbing - CWS/HWS/R 30 01-Dec-20 11-Jan-21 51
MEPMEPMEPMEPMEPMEP
A5370 Level 2 Electrical Panels/Transformers 15 08-Dec-20 28-Dec-20 36
A5380 Level 2 HVAC Control Pathways/Panels 25 15-Dec-20 18-Jan-21 46
A5390 Level 2 Tel/Data 25 15-Dec-20 18-Jan-21 46
A5410 Level 2 Network Switch - DEMARC RM 10 22-Dec-20 04-Jan-21 31
A5400 Level 2 Fire Alarm 25 22-Dec-20 25-Jan-21 41
A5420 Level 2 In-Wall Rough 25 05-Jan-21 08-Feb-21 31
Main Electrical RoomMain Electrical RoomMain Electrical RoomMain Electrical RoomMain Electrical RoomMain Electrical Room
A5500 Equipment Pads 10 24-Nov-20 07-Dec-20 46
A5510 Set Switchgear/ATS 10 08-Dec-20 21-Dec-20 46
A5520 Electrical Panels/Transformers 10 15-Dec-20 28-Dec-20 46
C1160 Electrical Room. Fitup / Trim Out / Start Ups 50 29-Dec-20 11-Mar-21 43
A5530 Fire Alarm Equipment 25 11-Feb-21 17-Mar-21 44
C1270 Permanent Power Available 0 11-Mar-21 49
FinishesFinishesFinishesFinishesFinishesFinishes
A5430 Level 2 C/S GWB 15 09-Feb-21 01-Mar-21 0
A5440 Level 2 C/S Tape/Paint 20 23-Feb-21 22-Mar-21 0
A5450 Level 2 C/S Ceilings 15 09-Mar-21 29-Mar-21 41
A5460 Level 2 C/S Bathrooms 30 16-Mar-21 26-Apr-21 0
A5470 Level 2 C/S MEP Finish 15 23-Mar-21 12-Apr-21 41
A5480 Level 2 C/S Lobby Flooring/Wall Tile 30 27-Apr-21 07-Jun-21 31
A5490 Level 2 C/S Lobby/Entry Vestibule 20 08-Jun-21 05-Jul-21 31
Level 3Level 3Level 3Level 3Level 3Level 3
RoughRoughRoughRoughRoughRough
Overhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEP
A5540 Level 3 HVAC Piping - CHW 25 24-Nov-20 28-Dec-20 41
A5550 Level 3 HVAC Piping - HW 25 01-Dec-20 04-Jan-21 36
A5560 Level 3 Electrical Power/Lighting Conduit 40 01-Dec-20 25-Jan-21 46
A5580 Level 3 Fire Protection Mains 15 08-Dec-20 28-Dec-20 41
A5570 Level 3 HVAC Equipment/Ductwork 30 08-Dec-20 18-Jan-21 51
A5590 Level 3 Plumbing - CWS/HWS/R 30 08-Dec-20 18-Jan-21 51
MEPMEPMEPMEPMEPMEP
A5660 Level 3 Electrical Panels/Transformers 15 15-Dec-20 04-Jan-21 36
A5670 Level 3 HVAC Control Pathways/Panels 25 22-Dec-20 25-Jan-21 46
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2020 2021
Level 1 C/S Lobby Flooring/Wall Tile
Level 1 C/S Lobby/Entry Vestibule
Level 2 HVAC Piping - CHW
Level 2 HVAC Piping - HW
Level 2 Electrical Power/Lighting Conduit
Level 2 Fire Protection Mains
Level 2 HVAC Equipment/Ductwork
Level 2 Plumbing - CWS/HWS/R
Level 2 Electrical Panels/Transformers
Level 2 HVAC Control Pathways/Panels
Level 2 Tel/Data
Level 2 Network Switch - DEMARC RM
Level 2 Fire Alarm
Level 2 In-Wall Rough
Equipment Pads
Set Switchgear/ATS
Electrical Panels/Transformers
Electrical Room. Fitup / Trim Out / Start Ups
Fire Alarm Equipment
Permanent Power Available
Level 2 C/S GWB
Level 2 C/S Tape/Paint
Level 2 C/S Ceilings
Level 2 C/S Bathrooms
Level 2 C/S MEP Finish
Level 2 C/S Lobby Flooring/Wall Tile
Level 2 C/S Lobby/Entry Vestibule
Level 3 HVAC Piping - CHW
Level 3 HVAC Piping - HW
Level 3 Electrical Power/Lighting Conduit
Level 3 Fire Protection Mains
Level 3 HVAC Equipment/Ductwork
Level 3 Plumbing - CWS/HWS/R
Level 3 Electrical Panels/Transformers
Level 3 HVAC Control Pathways/Panels
PROJECT ID: 220031.001
DATA DATE: 26-Jun-20
PRINT DATE: 26-Jun-20
Remaining Level of Effort
Actual Level of Effort
Completed Work
Remainin...
Critical Re...
Milestone
UMass VA
Start Finish Total Float
A5680 Level 3 Tel/Data 25 22-Dec-20 25-Jan-21 46
A5700 Level 3 Network Switch - DEMARC RM 10 29-Dec-20 11-Jan-21 31
A5690 Level 3 Fire Alarm 25 29-Dec-20 01-Feb-21 41
A5710 Level 3 In-Wall Rough 25 12-Jan-21 15-Feb-21 31
FinishesFinishesFinishesFinishesFinishesFinishes
A5780 Level 3 C/S GWB 15 16-Feb-21 08-Mar-21 31
A5790 Level 3 C/S Tape/Paint 20 02-Mar-21 29-Mar-21 31
A5800 Level 3 C/S Ceilings 15 16-Mar-21 05-Apr-21 41
A5820 Level 3 C/S Bathrooms 30 23-Mar-21 03-May-21 31
A5810 Level 3 C/S MEP Finish 15 30-Mar-21 19-Apr-21 41
A5830 Level 3 C/S Lobby Flooring/Wall Tile 30 04-May-21 14-Jun-21 31
A5840 Level 3 C/S Lobby/Entry Vestibule 20 15-Jun-21 12-Jul-21 31
BridgeBridgeBridgeBridgeBridgeBridge
A5920 Bridge MEP Rough 30 29-Dec-20 08-Feb-21 76
A5930 Bridge Ceilings 20 13-Apr-21 10-May-21 41
A5940 Bridge Flooring 20 11-May-21 07-Jun-21 41
A5950 Bridge Finishes 20 08-Jun-21 05-Jul-21 41
Level 4Level 4Level 4Level 4Level 4Level 4
RoughRoughRoughRoughRoughRough
Overhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEPOverhead MEP
A5600 Level 4 HVAC Piping - CHW 25 01-Dec-20 04-Jan-21 41
A5610 Level 4 HVAC Piping - HW 25 08-Dec-20 11-Jan-21 36
A5620 Level 4…