Attachment_D_EOC_Storm_Drain_Location_Areas.pdf

PDF 1 MB Posted

Attached to
Grounds Maintenance Eastside Operations Center
Solicitation number
Solicitation-2025-044
Issued by
Alachua County, Graceville City, Florida

About this file

This file is an attachment document from Gainesville Regional Utilities (GRU) detailing the storm drain location areas at the Eastside Operations Center in Gainesville, Florida. The attachment maps the distribution of 50 stormwater drains across the 50-acre facility, divided into two sections: the northern portion containing eight drain areas with a total of 28 drains serving locations including material storage lots, the north entrance drive, truck shed lot, east lot with recycling facilities, secured lot, main buildings, and overflow lot; and the southern portion containing five drain areas with a total of 18 drains serving the south entrance drive, safety and training building, overflow lot, system control building lot, and training field. The document provides specific drain counts and notation details for each location, including identification of curb inlets, grated inlets, and specialized drain configurations critical to the facility's stormwater management system that the selected grounds maintenance contractor will be responsible for monitoring and maintaining.

The storm drain mapping document serves as essential technical reference material for bidders responding to GRU's grounds maintenance solicitation, which requires comprehensive landscape and environmental infrastructure management over a three-year contract term with two optional one-year renewals. Bidders must understand the complex stormwater system layout, which includes not only the 50 mapped drains but also 7 stormwater ponds and 5 wetland areas requiring specialized maintenance and environmental management. The detailed drain location information enables contractors to develop accurate maintenance schedules, equipment requirements, and cost estimates for the bi-weekly service schedule (March through October) and monthly service schedule (November through February), with work hours between 7:00 am and 6:00 pm.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-1

Eastside Operations Center Storm Drain Location Areas

Table C-1. Storm Drain Location Areas - Northern Portion of Site

Area No. Location Drains Notes

1 Material Storage Lot 6

2 North Entrance Drive

Two Curb Inlets, Two

Grated Inlets at Curb

3 Truck Shed Lot 4

4 Material Storage Lot Drive 2 One Grated Inlet at Curb

5 East Lot and Recycling 5

6 Secured Lot 2

7 Main Building (Buildings 1-3) South Lot 7 One drain east of building

8 Main Building (Buildings 1-3) South Overflow Lot 2

Figure C-1. Storm Drain Location Areas - Northern Portion of Site williamska Typewritten Text

ATTACHMENT "D"

C-2

Table C-2. Storm Drain Location Areas - Southern Portion of Site

Area No. Location Drains Notes

1 South Entrance Drive 4 Curb Inlets Only

2 Safety and Training Building (Building 7) 2

3 Safety and Training Overflow Lot 1

4 System Control Building Lot (Building 8) 3

5 Training Field 8

Figure C-2. Storm Drain Location Areas - Southern Portion of Site

File details come from the government source that posted it. Updated .