Attachment D.1 MOA2-10(20) TJFY21EmergentDD.pdf

PDF 636 KB Posted

Attached to
Emergent Drydock Repairs to NOAA Ship THOMAS JEFFERSON
Solicitation number
1305M220QNMAN01449
Issued by

About this file

This repair specification outlines requirements for emergent drydock repairs to the NOAA Ship THOMAS JEFFERSON. Work includes replacement of the EM2040 transducer furnished by NOAA along with servicing of the bow thruster. Temporary services, drydocking, and coating touch-ups are also specified. The Department of Commerce National Oceanic and Atmospheric Administration is the contracting agency. Offerors must provide all labor, supervision, tools, materials (excluding government furnished items) and equipment to perform repairs. The contractor shall utilize ABS approved welding procedures and ensure the vessel retains ABS classification after repairs. All work must be completed by qualified personnel and meet ABS and USCG requirements to ensure the ship can safely perform its mission.

View the file

Other files

File Type Posted
Attachment D.5 Price Schedule.xlsx XLSX spreadsheet
RFQ FY21 DD Emergent Repairs (TJ).pdf PDF
Attachment D.4 US DOL POSTER.pdf PDF
Attachment D.3 Past Performance Questionnaire.docx DOCX document
Specs.zip ZIP file
Attachment D.2 Past Performance Information Form.rtf RTF text file
References.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Ship Thomas Jefferson

Emergent Drydocking and Repairs

MOA2-10(20)

DATE: August 14, 2020

Revised:

Written by:

Reviewed by:

Marine Engineering Branch - MOA2 Marine Operation Center, Atlantic

439 West York Street Norfolk, VA 23510

Record of Changes

Change Date:

(Changes are highlighted with a single vertical line in the right margin.)

MOA2-10(20)

August 14, 2020 i | P a g e

Table of Contents

1. SCOPE

2. GENERAL

3. BASIC ITEMS

3.1 ITEM NO. 301: Temporary Services

3.2 ITEM NO. 302: Dry Docking

3.3 ITEM NO. 303: EM2040 Transducer Replacement

4. OPTIONAL ITEM 400: ADDITIONAL ITEM REQUESTS

5. OPTIONAL ITEMS

5.1 ITEM NO. 501: Tunnel Thruster Servicing

5.2 ITEM NO. 502: Scuppers and Guards Modifications

REFERENCES

LIST OF ATTACHMENTS

1 | P a g e

1. SCOPE

1.1 These Detail Specifications contain the requirements for

general repairs and piping upgrades on the NOAA Ship Thomas Jefferson (formerly USNS Littlehales T-AGS 52).

1.1.1 The National Oceanic and Atmospheric Administration

(NOAA) operates a fleet of research vessels that supports research and mapping for the National Marine Fisheries Service, National Ocean Service, Office of Atmospheric Research and the National Weather Service, as well as provides support to other Federal agencies. These research missions are time sensitive and therefore the data must be collected at specific times during the sailing season to be meaningful. At the end of each sailing season the vessels enter a repair period (drydock or dockside) to address repairs that have been previously identified, perform upgrades to mission systems or ship systems that either extend the life of the ship or provide new data collection capabilities or for safer operations of ships systems as well as address any emergent work that would adversely affect the ships ability to safely perform its mission on schedule , while meeting all regulatory body requirements (American Bureau of Shipping and United States Coast Guard) and all habitability requirements, including any that may be required as a result of contracts for personnel to augment ship staff.

1.1.2 The work items in the repair specification are

identified well in advance of the performance period in order meet the contracting lead times. Additional work items (emergent work) may arise during the period between the work package submittal, contract award, or even prior to the start of or during the contract performance period. In accordance with Commerce Acquisition Regulation (CAR) clause 1352. 271- 72, the Contracting Officer may order additional changes during the contract period of performance to address any additional work items identified as necessary to ensure the intent of the drydock or dockside repair contract is met; that is, that the vessel shall be able to safely perform its mission, that it will meet all habitability requirements and regulatory body requirements, and that such repairs will be timely performed to ensure to the maximum extent practicable that the ship's schedule is not adversely impacted.

2 | P a g e

2. GENERAL

2.1 References

2.1.1 NOAA Standard Specification MOC-000-1H, “General

Requirements for Ship Repair Contract Work on NOAA Ships”

2.1.2 NOAA Standard Specification AMC-631-2D, “Coating

Systems for Steel Surfaces”

2.1.3 NAVSEA Standard Item 009-32, “Cleaning and Painting

Requirements: Accomplish”

2.1.4 NOAA Ship Thomas Jefferson drawing TJ-085-002, “Booklet of General Plans”

2.1.5 ABS Steel Vessels Under 90 Meters (295 Feet) in Length

2.2 Requirements

2.2.1 Reference 2.1.1 forms a part of these Detail

Specifications. All provisions and requirements contained therein are applicable to all work items, including all additional work items which are authorized by the Contracting Officer.

a. Provide an electronic copy, in Adobe Portable Document Format (PDF), and two hard copies of all Condition Reports.

b. Include in the Safety Plan detailed procedures for the following:

1. Confined and Enclosed Spaces and Other Dangerous Atmospheres – All confined spaces must be considered to have a hazardous atmosphere until demonstrated to be safe via testing by the Competent Person. Confined spaces may contain high concentrations of harmful gases and other environmental conditions that can cause injury, illness, or death. Include in this section the procedures for personnel to enter and work within confined spaces.

2. Control of hazardous energy (lockout/tagout (tags-plus)) – All machines, equipment, and pressurized systems are to be isolated from their energy source and at a minimum tagged out in addition to locking out (if the equipment can be fitted with a locking device) before any servicing or repair work is performed where the unexpected start up or release of energy could cause injury or death. In addition, lockout/tagout

3 | P a g e shall be used whenever personnel are required to remove a guard or other safety device or required to place any part of personnel’s body in a danger zone of any machine, equipment, or system. Include in this section the procedures for lockout/tagout for servicing of machinery, equipment, and systems when the energization or startup of machinery, equipment, or systems, or the release of hazardous energy, could endanger personnel.

3. Hotwork Operations – Include in this section the procedures used for preparing for hotwork including Marine Chemists and Competent Persons requirements, notifications of hotwork operations, fire prevention during hotwork operations and fire prevention after completion of hotwork operations.

4. Fall Protection – The ship is equipped with systems to protect personnel from falls during normal operations. Include in this section temporary safe guards, systems, equipment, restraints and/or procedures used to protect personnel from falls during accomplishment of work required by these Detail Specifications.

c. Definition of terms as related to drawings:

1. As-built drawing – A drawing that reflects the as-constructed conditions of the system. As-built drawings include current and previous undocumented changes to the system.

2. Develop ACAD “As-Built” drawing – Convert the drawing from the provided format and create in an ACAD format.

2.2.2 Prepare and submit daily a Plan of the Day, in Adobe

Portable Document Format (PDF), identifying anticipated work that will be accomplished onboard the ship that day, attending subcontractors, and areas of hotwork broken down by work item.

2.2.3 Maintain a Quality Assurance (QA) Test and Inspection

Plan applicable to all work items, including all additional work items which are authorized by the Contracting Officer. The form shall include the following minimum information for each work item and additional work item:

a. Specification item and paragraph number

b. Component/Equipment name

c. Test or Inspection description

4 | P a g e

d. Acceptance Criteria

e. QA Inspection Report

2.2.4 Maintain a separate Test Schedule.

2.2.5 Develop, in consultation with the local attending ABS

Surveyor, a written ABS Survey Schedule that lists the items to be inspected and the scheduled dates and times of the inspections. The ABS survey schedule shall list all initial inspections required by the ABS Surveyor. Submit the ABS Survey Schedule to the COR within 48 hours after the start of the contract performance period and update weekly at the Progress Meeting.

2.2.6 Provide a copy of ABS approved welding procedures and

active welder certificates prior to starting any work. Update the active welder certificates throughout the contract performance period as changes occur.

2.2.7 Unless otherwise stated in these work items, prepare

and coat all new steel, disturbed, or otherwise required painted surfaces in accordance with reference 2.1.2. If no paint system is identified in the item, apply the appropriate coating system to the area being coated as identified by paragraph 5.2 of this reference except that the topcoat color shall match the surrounding area. Reference 2.1.2 may be amended with reference

2.1.3 when approved by the COR.

a. All surface preparation and coating contractors shall have current and active QP1 certification.

b. Maintain environmental records for days when coating systems are applied. Obtain environmental readings prior to application of any coating and at maximum of 1 hour intervals during application of the coating.

2.2.8 Weight Report: Weigh all materials and items removed, installed, or relocated on the ship. Provide a summary report to the COR indicating the total weight in pounds of the item and a breakdown of their locations by space, deck, frame, distance from centerline, and height off of the deck. A sample form is attached to these specifications.

2.2.9 The cleanliness of the ship at the time of redelivery

to NOAA shall be equal to or better than the cleanliness of the ship at the time of delivery to the contractor.

5 | P a g e

2.2.10 NOAA Ship Thomas Jefferson is ABS Classed. All

fabrication and materials are to be in accordance with reference

2.1.5. so as to retain her ABS Class.

2.3 Deliverables

2.3.1 General - Condition Reports (see requirement in

reference 2.1.1)

2.3.2 General - Progress Reports (see requirement in

reference 2.1.1)

2.3.3 General - List of Contractor’s Supervisors (see

requirement in reference 2.1.1)

2.3.4 General - Safety Plan (see requirement in reference

2.1.1)

2.3.5 General - Gas Free Certifications (see requirement in

reference 2.1.1)

2.3.6 General - Hot Work Notices (see requirement in

reference 2.1.1)

2.3.7 General - Hazardous Material List and MSDS (see

requirement in reference 2.1.1)

2.3.8 General – Plan of the Day (Daily)

2.3.9 General - Quality Assurance (QA) Test and Inspection

Plan(s)

2.3.10 General - Test Schedule(s)

2.3.11 General - ABS Approved Welding Procedure

2.3.12 General - ABS Approved Welder Certificate(s)

2.3.13 General - ABS Survey Schedule(s)

2.3.14 General - QP1 certification(s)

2.3.15 General - Coating Environmental Report(s)

2.3.16 General - Weight Report

6 | P a g e

2.4 Notes

2.4.1 Hazardous Materials:

a. NOAA Ship Thomas Jefferson was constructed between 1988 and 1991. There was no asbestos used during the construction and any asbestos requirements contained in the referenced Standard Specifications do not apply.

b. Several items in this specification require gas freeing of tanks, in order to accomplish the required work.

Prospective bidders should be careful not to duplicate the costs of gas freeing where tank(s) are required to be gas freed to perform work in more than one item.

c. The contractor is responsible for the control, handling, and disposal of any hazardous materials generated during accomplishment of this contract.

2.4.2 Reference 2.1.4 was used in the identification, location, and naming of spaces within these Detail Specifications. Even though reference 2.1.4 has been modified since construction, differences still exist.

2.4.3 Ship’s force may schedule work items to be

accomplished by ship’s force concurrent with these Detail Specifications. Ship’s force work items will be scheduled and coordinated with the contractor to not interfere with the work required in these Detail Specifications.

2.4.4 Ship Safety Procedures. NOAA Ship Thomas Jefferson has

her own safety procedures to include Confined Space Entry Program, Lockout/Tagout, Hotwork Operations, and Marine Operations Fall Protection Program. Ship’s force will continue to use the ship’s safety procedures during accomplishment of ship’s force work items.

2.4.5 Habitability

a. The ship shall be deemed uninhabitable when any one or a combination of the following conditions exist and it is impossible for management to correct the problem in a timely manner (4 hours or as noted below):

1. Heat and/or air conditioning is not furnished.

2. Potable water (hot or cold) is not provided for a period of 12 or more consecutive hours.

7 | P a g e

E

3. When a working toilet shower and sanitary drainage are not furnished.

4. At all times when the vessel is in drydock overnight, unless the ship is fully habitable with all facilities including heat and/or air conditioning, lights, hot and cold running water, shower and sanitary facilities (working toilets and sanitary drainage). Portable toilets do not meet the requirements for sanitary facilities.

5. Work such as chipping, welding, riveting, hammering and/or pounding, or other noises of a similar nature are being performed in or around vessel personnel quarters or noxious fumes are present that disrupts the employees’ ability to rest for more than three (3) hours. Note: Wage mariners not assigned to a watch, are assigned to work during eight (8) hours of duty between 0800 and 1700. Monday through Friday.

6. Flooding of quarters or common areas due to bilge or sewage backup not repaired within 24 hours.

b. When a vessel is in port and declared uninhabitable, no employee will be allowed to live on board. Individual quarters may be deemed uninhabitable when the respective quarters have been painted, the paint is not absolutely dry, and other suitable quarters are not furnished aboard. It is also not intended that any wage mariner shall be assigned to sleep in a flooded berthing area.

2.4.6 The following general characteristics of the ship are

provided for information:

ABS Class Number...9105067 Delivery Date..01 Dec 1991 Length Overall.........208 feet Beam (Molded)...........45 feet Propulsion.............Diesel, single screw Cruising Speed..........12 knots Electric Service.......345 KW, 225/450 volts AC Officer size Crew size ABS Class Notations....✠A1, , ✠AMS, ✠ACCU

End of Section

8 | P a g e

3. BASIC ITEMS

3.1 ITEM NO. 301: Temporary Services

3.1.1 Abstract – This item covers the requirements for

providing services to the ship while at the contractor’s facility.

3.1.2 References

(a) NOAA Standard Specification AMC-000-2, “Temporary Services at Contractor Facilities”

3.1.3 Government-Furnished Material

a. None

3.1.4 Requirements

a. Provide all temporary services required in accordance with reference (a) for the entire performance period. The ship is expected to remain habitable for the entire availability and ship’s force is scheduled to remain onboard. No contractor personnel are allowed onboard during this availability except to connect/disconnect temporary services.

b. The following additional information and requirements apply:

1. Potable Water Service: 45 psig through 1½” NPT connection located centerline 01 Deck weather deck frame 18.

2. Electric: Provide and maintain 400 amps, 60 hz, 460 volts ac, 3 phase electrical shore power services. Estimated demand load is 250 amps average. The ship’s two receptacles are for NATO (Joy type) plugs rated at 400 amps each.

3. Sanitary and Cooling Water Service: 45 psi through a 2” fire hose connection located starboard side lower Engine Room

4. Sewage and Turbid Water Disposal Service: 3” camlok is located port side Main Deck frame 52 and starboard side Main Deck frame 59.

5. Steam: Not required.

6. Temporary Toilet Facilities: Not Required.

9 | P a g e

7. Telephone Service: Not Required.

8. High Speed Internet Service: Not required.

9. Parking Spaces: Provide parking spaces for one vehicle. Provide the follow labels for the parking spaces:

a) One each: “NOAA - COR”

10. Dockside Office Space: Not required.

11. Security Services: Not required.

12. ABS Surveyor: None anticipated. NOAA will pay for all normal ABS surveys and surveys associated with the work required by these specifications. The contractor shall provide a credit for any additional ABS charges associated with rescheduling of surveys and rework surveys which are directly under the control of the contractor.

3.1.5 Quality Assurance

a. No additional requirements.

3.1.6 Deliverables

a. Potable Water Service with Safe Drinking Water Act (SDWA) documentation

3.1.7 Notes

a. None

End of Item

10 | P a g e

3.2 ITEM NO. 302: Dry Docking

3.2.1 Abstract – This item covers the requirements for

hauling and refloating of the ship during repair of the ship’s tunnel thruster (bow thruster).

3.2.2 References

(a) NOAA Standard Specification AMC-997-1B, “Drydocking & Routine Drydock Work”

(b) Transducer Face Coating Procedure

(c) NOAA Ship Thomas Jefferson drawing TJ-161-6634743, “Shaft Strut”

(d) NOAA Ship Thomas Jefferson drawing TJ-562-6634741, “Rudder Arrangement and Details”

(e) NOAA Ship Thomas Jefferson drawing TJ-243-6634740, “Propeller Shafting, Arrangement and Details”

(f) NOAA Ship Thomas Jefferson drawing TJ-801-6634640, “Hull Lines”

(g) NOAA Ship Thomas Jefferson drawing TJ-801-6634641, “Table of Offsets”

(h) NOAA Ship Thomas Jefferson drawing TJ-568-004, “NOAA Ship Thomas Jefferson Bow Thruster Installation”

(i) NOAA Ship Thomas Jefferson drawing TJ-245-6634744, “Propeller Diagram”

(j) NOAA Ship Thomas Jefferson drawing TJ-079-03F, “Trim & Stability Booklet”

3.2.3 Government Furnished Material.

3.2.4 Requirements

a. Provide dry-docking in accordance with GENERAL Section reference 2.1.4 and reference (a).

b. The requirements of reference (a) are modified as follwos:

11 | P a g e

1. Modify paragraph 4.6.2 c. to read “Propeller and bow thruster – clean with non-metallic scrapers and bristle brushes.”

2. Waive paragraphs 4.8.3 b. 2. and 4.8.3 c. 2.;

requirements are accomplished through another item of these detailed specifications.

3. Waive paragraphs 4.9, 4.10, and 4.11 with their subparagraph(s).

c. The minimum acceptable forward and after drafts and corresponding displacement tons permitted to dry-dock the ship consistent with safe stability and structural integrity are as follows:

1. Fwd = 10 feet - 3 inches

2. Aft = 10 feet - 9 inches

3. Displacement ≈ 1440 LT

d. Haul the ship in position 2 at a minimum keel block height of 5 feet.

e. After positioning and before hauling the ship, conduct a diver’s inspection of the underwater keel blocks positions relative to the dome to verify that the keel blocks will not come in contact with the centerline multi-beam dome.

3.2.5 Quality Assurance

a. No additional requirements.

3.2.6 Deliverables

a. Drydock Certificate (see requirements of reference (a)

b. Record inspection results on the attached NOAA DOCKING REPORT S0700/SWB997 in lieu of Docking Report form 2410.

3.2.7 Notes

a. References (c) through (j) are listed as sources for obtaining information.

END OF ITEM

12 | P a g e

3.3 ITEM NO. 303: EM2040 Transducer Replacement

3.3.1 Abstract – This item contains the requirements for

replacing the ship’s EM2040 transducer with GFM.

3.3.2 References

(a) NOAA Ship Thomas Jefferson drawing TJ-490-001, “Booklet of Electronics Drawings”

(b) NOAA Ship Thomas Jefferson drawing TJ-461A-001C, “Transducer Installation”

3.3.3 Government-Furnished Material

a. 1 each: Kongsberg EM2040 multi-beam Echo Sounder Projector Array (est value: $40,000.00)

3.3.4 Requirements

a. General. Perform all work on the EM2040 transducer under the on-site guidance of the OEM.

b. Perform the following on the EM2040 multi-beam transducer

1. Remove all of the epoxy fairing material from the transducer cover plate.

2. Remove the cover plate and retain the fasteners.

3. Assist the OEM with replacing the EM2040 multi-beam Echo Sounder Projector Array with GFM.

4. Close the cover plate and secure using retained fasteners.

5. Cover the fasteners and fill the joint between the cover plate and the gondola with GFM epoxy filler. Sand the epoxy filler flat and smooth, reapply the epoxy filler to fill voids, and resand the epoxy filler flat and smooth.

6. Coat the epoxy filler with a primer compatible with the epoxy filler in the underwater hull coating system.

c. Fair in a 1' perimeter forward and outboard of the EM2040 and EM710 transducers to provide a smooth transition between the structure and the transducers. Coat with the

13 | P a g e underwater hull coating system. Surface finish to match existing.

d. Perform the following on all transducer faces

1. Remove all of the existing paint from the transducer face without damaging the surfaces

2. Coat with two thin coats of GFM Pacifica Plus, Blue using a foam roller to provide a smooth surface.

3.3.5 Quality Assurance

a. No additional requirements.

3.3.6 Deliverables

a. EM-2040 - Environmental reports

3.3.7 Notes

a. Underwater Hull Data:

1. Maintenance system installed August 2019.

a) Primer - International Paint Intertuf 262 epoxy anti-corrosive

b) Antifouling - International Paint Interspeed

6400NA

c) Transducer face antifouling - Interlux Pacifica Plus (Blue) - below waterline antifouling (WestMarine #10392520, Interlux

#YBB260/1)

d) Epoxy Filler - SilverTip QuikFair (System Three Epoxy - with micro-balloons)

b. Transducer OEM Contact Information:

Ned Eliasen Kongsberg Underwater Technology, Inc 19210 33rd Ave West Lynnwood, WA 98036 Tel: 425-712-1107 Email: ned.eliasen@km.kongsberg.com

14 | P a g e

4. OPTIONAL ITEM 400: ADDITIONAL ITEM REQUESTS

4.1 Abstract – This item is a place holder for issuance of

AIRs.

4.2 References

4.2.1 None

4.3 Government-Furnished Material

4.3.1 None

4.4 Requirements

4.4.1 This item is a place holder only. Refer to the

contract clause “NOAA/ERAD ADDITIONAL ITEM REQUESTS LABOR RATE (MARCH 2005)” for all requirements dealing with emergent work and changes associated with this contract.

4.4.2 Schedule B provides an estimate of labor hours and

material growth for emergent work anticipated for this contract

4.5 Quality Assurance

4.5.1 No additional requirements.

4.6 Deliverables

4.6.1 AIR Deliverables identified in each individual AIR

4.7 Notes

4.7.1 None

15 | P a g e

5. OPTIONAL ITEMS

16 | P a g e

5.1 ITEM NO. 501: Tunnel Thruster Servicing

5.1.1 Abstract – This item contains the requirements for the

removal, installation and testing of the ship’s tunnel thruster (bow thruster) lower unit.

5.1.2 References

(a) NOAA Ship Thomas Jefferson manual TJ-568-02, “Mechanical Tunnel Thruster Operator’s Manual”

(b) NOAA Standard Specification MOC-631-3B, “Underwater Body Ablative Coating System”

5.1.3 Government-Furnished Material

a. Tunnel Thruster Lower Housing (est value $100,000)

b. Oil – Envirologic 210 EP (est value $500)

5.1.4 Requirements

a. General:

1. Obtain the services of an Original Equipment Manufacture’s (OEM’s) authorized representative of the tunnel thruster to provide onsite guidance during removal, installation and testing of the tunnel thruster. Obtain a service report from the representative following completion of all associated work.

2. Use reference (a) for guidance.

3. Install temporary guards on either side of the tunnel for the tunnel thruster to preclude materials entering the bilge.

4. Touch up sections of the underwater body coating system damage during accomplishment of this item in accordance with the maintenance coating section of reference (b).

b. Perform the following work on the ship’s tunnel thruster

17 | P a g e

1. Remove the electric motor and store for reuse.

Protect the electric motor from accidental damage and contamination.

2. Drain the system oil and pump all oil out of the lower housing unit.

3. Disconnect the oil head tank piping from the lower unit and cap to prevent contamination.

4. Remove the propeller from the lower unit and retain.

5. Remove the lower unit from the ship, crate for shipping and turn over to the Government.

6. Install the GFM lower unit using new gasket and fasteners with anti-seize lubricant applied to the threads.

7. Install the propeller on the lower unit.

8. Retrieve from storage and install the retained electric motor using new coupling and fasteners with anti-seize lubricant applied to the threads.

9. Modify the head tank piping as follows:

a) Install a quarter turn ball isolation valve at the top plate of the lower unit through the horizontal leg of a vertical tee. All material to match the existing piping material.

b) Install a second quarter turn ball sampling valve on the vertical leg of the new vertical tee with a threaded plug on the open end.

10. Prior to refloating the ship, fill the oil system to capacity with GFM oil.

5.1.5 Quality Assurance

18 | P a g e

a. After installation and refloating of the ship:

1. Perform an operational test of the tunnel thruster in accordance with OEM recommendations. At a minimum the bow thruster shall be cycled four times through all speeds for left and right thrust.

5.1.6 Deliverables

a. Service Report

b. Tunnel Thruster - operational test report

5.1.7 Notes

a. Electric motor is previously disconnected both electrically from the controller and mechanically from the coupling with the lower housing.

b. Ship’s force will be available to run ship’s equipment.

c. Coordinate polishing of the tunnel thruster propeller with requirements of Basic Item “Dry Docking”.

d. Underwater Hull Data:

1. Complete system applied 02/2009. Last maintenance coat applied 12/2016

2. Epoxy anti-corrosive - Intertuf 262 (red and grey)

3. Controlled Depletion Polymer Antifouling - Interclene 245NA (BRA572-Black and BRA570-Red)

e. Motor Information:

MFR: Marathon Electric Model: 900400-001

S/N: WAA017369

HP: 350

RPM 1780

Volt: 460

19 | P a g e

P/N: CVL 505USTDS29031AN W

Frame: 505USDV

f. Bow Thruster Manufacturer information:

Tyson Griffin | Field Service Manager, US Thrustmaster of Texas, Inc.

6900 Thrustmaster Drive | Houston, TX | 77041 T | +1 832 399 5137 M | +1 832 358 6396

PRODUCT SUPPORT CONTACT INFO

24 Hr. Service & Parts Hot Line T | 713-937-6295 Email | service@thrustmastertexas.com mailto:service@thrustmastertexas.com

20 | P a g e

5.2 ITEM NO. 502: Scuppers and Guards Modifications

5.2.1 Abstract – This item contains the requirements to

remove the three scuppers and six associated guards.

5.2.2 References

(a) NAVSEA dwg 506-7514960 Scupper & Boat Guard

5.2.3 Government-Furnished Material

a. None

5.2.4 Requirements

a. Perform the following work on the three (two starboard and one port) scuppers and six associated guards (two each per scupper):

1. Unbolt and remove the scuppers from the ship.

Turn the removed scuppers and bolts over to the government.

a) Bevel all sides of the bolting plates for the scuppers (total of 14).

b) Install corrosive resistant set screws to plug the open bolt holes using an anti-seize lubricant on the threads. The face of the set screws should be flush with the bolting plates.

2. Crop off and retain for modification the tear drop pipe and stiffening plate of the scupper guards as a single unit using a method that does not require removal of interior insulation or a firewatch on the interior of the ship. Keep the cut as close to the doubler plate as possible. Modify the retained scupper guards as follows:

a) Smooth all cut surfaces to make flat.

b) Cap the top and bottom sections of the pipe with ½ inch plate. Include an integral forward and aft bolting cleat in the capping

21 | P a g e plate. Drill bolt holes to fit a ½ inch bolt. Ensure the bolt pattern for all of the guards match each other.

c) Grid smooth the face and bevel all sides of the doubler plates for the guard.

d) Drill and tap four holes in each of the retained guard doubler plates to match the modified guard. Ensure the hull is not damaged during this process.

e) Install corrosive resistant set screws to plug the open bolt holes using an anti-seize lubricant on the threads. The face of the set screw should be flush with the bolting doubler plate.

5.2.5 Quality Assurance

a. Test fit each of the modified bolt guards to ensure standardization of drilling the bolting cleats and sockets.

5.2.6 Deliverables

a. Test fit of modified guards

5.2.7 Notes

22 | P a g e

REFERENCES

STANDARD SPECIFICATIONS

AMC-000-2, “Temporary Services at Contractor Facilities” AMC-631-2D, “Coating Systems for Steel Surfaces” AMC-997-1A, “Drydocking & Routine Drydock Work” MOC-000-1H, “General Requirements for Ship Repair Contract Work on NOAA Ships” MOC-631-3B, “Underwater Body Ablative Coating System”

SHIP'S TECHNICAL MANUALS

NOAA Ship Thomas Jefferson manual TJ-568-02, “Mechanical Tunnel Thruster Operator’s Manual” .. 16

SHIP'S DRAWINGS

TJ-079-03F, “Trim & Stability Booklet” 10 TJ-085-002, “Booklet of General Plans” 2 TJ-161-6634743, “Shaft Strut” 10 TJ-243-6634740, “Propeller Shafting, Arrangement and Details” 10 TJ-245-6634744, “Propeller Diagram” 10 TJ-461A-001C, “Transducer Installation” 12 TJ-490-001, “Booklet of Electronics Drawings” 12 TJ-562-6634741, “Rudder Arrangement and Details” 10 TJ-568-004, “NOAA Ship Thomas Jefferson Bow Thruster Installation” 10 TJ-801-6634640, “Hull Lines” 10 TJ-801-6634641, “Table of Offsets” 10

OTHER

NAVSEA dwg 506-7514960 Scupper & Boat Guard 20 NAVSEA Standard Item 009-32, “Cleaning and Painting Requirements: Accomplish” 2 Transducer Face Coating Procedure 10

REGULATORY

ABS Steel Vessels Under 90 Meters (295 Feet) in Length

23 | P a g e

GOVERNMENT FURNISHED MATERIAL

Kongsberg EM2040 multi-beam Echo Sounder Projector Array 12 Oil – Envirologic 210 EP (est value $500) 16 Tunnel Thruster Lower Housing (est value $100,000) 16

24 | P a g e

DELIVERABLES

Drydock Certificate EM-2040 - Environmental reports General - ABS Approved Welding Procedure General - ABS Approved Welding Procedure and Welder Certification General - ABS Survey Schedule General - Coating Environmental Reports General - Condition Reports General - Gas Free Certifications General - Hazardous Material List and MSDS General - Hot Work Notices General - List of Contractor’s Supervisors General – Plan of the Day (Daily) General - Progress Reports General - QP1 certification(s) General - Quality Assurance General - Safety Plan General - Test Schedule General - Weight Report

NOAA DOCKING REPORT

Potable Water Service with Safe Drinking Water Act (SDWA) documentation Service Report Test fit of modified guards Tunnel Thruster - operational test report

25 | P a g e

LIST OF ATTACHMENTS

∗ Weight Reporting Spreadsheet

WEIGHT REPORTING SPREADSHEET

Ship's Name:

Date:

Page of

ITEM

DESCRIPTION WEIGHT

COMPARTMENT

VERTICAL

LOCATION

LONGITUDINAL

LOCATION

TRANSVERSE

LOCATION

"+" ADD

REMOVE POUNDS DECK

HEIGHT

ABOVE DECK

(FEET)

FRAME

NUMBER

DISTANCE OFF

FRAME

F (FWD) OR

A (AFT)

(FEET)

DISTANCE FROM

CENTERLINE

P (PORT) OR

S (STBD)

(FEET)

1. SCOPE
2. GENERAL
3. BASIC ITEMS
3.1 ITEM NO. 301: Temporary Services
3.2 ITEM NO. 302: Dry Docking
3.3 ITEM NO. 303: EM2040 Transducer Replacement
4. OPTIONAL ITEM 400: ADDITIONAL ITEM REQUESTS
5. OPTIONAL ITEMS
5.1 ITEM NO. 501: Tunnel Thruster Servicing
5.2 ITEM NO. 502: Scuppers and Guards Modifications
REFERENCES
LIST OF ATTACHMENTS

File details come from the government source that posted it. Updated .