Attachment D - Cost Breakdown with Schedule of Values.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Z1DA--Electrical Feeder #2 Replacement Federal contract opportunity
Solicitation number
36C24623B0056
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document contains a cost breakdown template for a federal contract opportunity to replace an electrical feeder at a Veterans Affairs medical center. The template includes line items for labor and material costs by construction division for the base offer and an alternative option. It specifies the project number and title, location, and includes fields for the offeror's information. Percentages for overhead, profit, and bond are also included to calculate additional costs.

The related federal contract opportunity is solicitation number 36C24623B0056 to replace electrical feeder number 2 at the Veterans Affairs Medical Center in Richmond, Virginia under the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. Offerors would use the cost breakdown template to submit pricing for this project.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Electrical Feeder #2 Replacement, newest first.
File Type Posted
BID Opening Agenda AMEND 0004.pdf PDF
36C24623B0056 0004.docx DOCX document
H.H 3 Report.pdf PDF
H.H 5 Arc Flash report.pdf PDF
H.H 4 report.pdf PDF
Vault 2 initial report.pdf PDF
500-E6.pdf PDF
36C24623B0056 0003.docx DOCX document
Vault 1 initial report.pdf PDF
S04 ATTENDANCE LOG Pre-Bid Site Visit.pdf PDF
S04 - Pre-Bid Site Visit Minutes.docx DOCX document
36C24623B0056 0002.docx DOCX document
500-E217.pdf PDF
500-E47.pdf PDF
36C24623B0056 0001.docx DOCX document
500-E218.pdf PDF
500-E216.pdf PDF
500-E37.pdf PDF
500-E36.pdf PDF
500-E215.pdf PDF
500-E219.pdf PDF
500-E38 LL area L floor plan.pdf PDF
500-E33.pdf PDF
Attachment E - Wage Determination VA20230155 Dated 01132023.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment B - Contractor EMR Certification Form 2023.docx DOCX document
Attachment A - RFI Form B0056.doc DOC document
36C24623B0056_IFB.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project TitleReplace Electrical Feeder #2

Edward L Roy: VA assigned Project Title

Project LocationCVVHCS 1201 Broad Rock Blvd. Richmond, VA
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Alternative 1

Alternative 1 Offer Cost Breakdown

Project Number: 0 Edward L Roy: VA assigned project #

Date:
Project TitleReplace Electrical Feeder #2

Edward L Roy: VA assigned Project Title

Project LocationCVVHCS 1201 Broad Rock Blvd. Richmond, VA
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Alt. 1 Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .