This document is an amendment to a solicitation for the replacement of an electrical feeder at a Veterans Affairs medical center. The scope of work includes removing and installing 4/0 copper 15kV cable between manholes and a vault, installing a 1,200 amp medium voltage air circuit breaker, and providing professional engineering stamped plans and firestopping documentation. Bids were due by 4 PM EST on September 8, 2023. The amendment provides responses to contractor questions to clarify scope items such as the requirement to include generators for any work, the need to replace the circuit breaker even with long lead times, and the requirement to complete all work without any energized activities. Drawing attachments include one-line diagrams and manhole layouts to ensure consistent bidding.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Electrical Feeder #2 Replacement, newest first.
File Type Posted
36C24623B0056 0004.docx DOCX document
BID Opening Agenda AMEND 0004.pdf PDF
H.H 5 Arc Flash report.pdf PDF
H.H 4 report.pdf PDF
Vault 2 initial report.pdf PDF
500-E6.pdf PDF
Vault 1 initial report.pdf PDF
H.H 3 Report.pdf PDF
S04 ATTENDANCE LOG Pre-Bid Site Visit.pdf PDF
S04 - Pre-Bid Site Visit Minutes.docx DOCX document
36C24623B0056 0002.docx DOCX document
500-E218.pdf PDF
500-E216.pdf PDF
500-E37.pdf PDF
500-E36.pdf PDF
500-E215.pdf PDF
500-E219.pdf PDF
500-E38 LL area L floor plan.pdf PDF
500-E33.pdf PDF
500-E217.pdf PDF
500-E47.pdf PDF
36C24623B0056 0001.docx DOCX document
Attachment E - Wage Determination VA20230155 Dated 01132023.pdf PDF
Attachment D - Cost Breakdown with Schedule of Values.xlsx XLSX spreadsheet
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment B - Contractor EMR Certification Form 2023.docx DOCX document
Attachment A - RFI Form B0056.doc DOC document
36C24623B0056_IFB.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-28-2023 None 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 To all Offerors/Bidders

36C24623B0056 08-09-2023

X X X

The purpose of this amendment to the solicitation is to provide answers to RFIs and drawings requested through RFI.

See continuation pages and attachments for details.

NICHOLAS RUPPERT

Contracting Officer

AMENDMENT IFB 36C24623B0056 0003

CONTINUATION PAGE

RFI 003

A. Will the Government supply any facility or building-level drawings associated with the specific tasks listed in SOW? Section: Supplement B (SOW), Page 6

RESPONSE: See attached drawings and drawings provided through Amend 0001. The government will not provide drawings specific to this requirement.

B. Does the Government have any specifications on the 1,200 Amp medium voltage air circuit breaker and associated acceptance testing? Section: Supplement B (SOW), Specific Tasks Category, 13th bullet, Page 7

RESPONSE: FEDERAL PACIFIC, PRODUCT: DST-II-15-500-12, DESCRIPTION: DST-II-15-500, 1200-amp medium voltage electrically operated air circuit breaker, 15kV, 500mVA. Brand name or Equivalent.

RFI 004

A. Is it possible to descope the new 15KV breaker from the project? Descoping the breaker will allow the installation to take place within the allotted 120 days. If it is not possible to descope, please provide the contact information for the vender the Owner has already made contact with in sourcing the new breaker.

RESPONSE: The VA will not descope the materials needed to complete the job and we are not able to disclose information found during the government’s market research. Bidders must consider potential delays when bidding on this requirement. The installation work can take place within 120 days.

B. Please upload the electrical drawings showing the vault room layout/locations.

RESPONSE: The electrical Drawing is attached.

C. Based on the conversations today at the site visit regarding access to the manholes and determining these areas as Non-Hot Work Zones, please descope the need for generators while removing and installing cables. The existing vaults are designed to be accessible while cables are energized. The need for generators is not required to comply with OSHA and industry installation standards.

RESPONSE: Please keep generators in the scope of the project, no energized work is allowable.

RFI 005

A. Can we dewater the manholes ahead of time to proof ducts and footages?

· Response: No

B. Can the VA provide the breakers instead of the contractor due to lead times?

· Response: No, please include in contract.

C. With spare conduits you could eliminate the need for temporary generators, thus saving fuel and labor to set up and shut down each day. Would this be acceptable?

· Response: No, no energized work in the manhole is allowable.

D. Can the VA please provide a spec on the cable, so we are all bidding the same type?

· Response: 4 /o copper 15 kV, 133% EPR insulation cable

E. Can the VA please provide the necessary drawing so we can determine footage? Particularly 500.E6

· Response: 500.E6 includes above information.

F. Can the VA please provide the one-line drawings?

· Response: One lines are included in the arc flash studies for each vault (last two pages).

RFI 006

A. The VA kindly provide the electrical survey and information of the existing lines in the shared manholes with the failed electrical line?

RESPONSE: Drawings are attached. (One-line drawings are the last two pages of each vault report) B. For solicitation purposes to assure everyone has the same information to confirm everyone is using the same estimated linear footage of wiring needed for temporary runs and to run new feeders, could the VA kindly provide sheet. 500-E6 that was sitting on the plan table in room BE-102 Switchgear.

RESPONSE: Drawings will be provided as soon as the files are available.

C. For solicitation purposes to assure everyone has the same information to confirm everyone is using the same scope of work, can the failed electrical line currently having a existing ground fault be demoed first? This could be a huge cost savings to the VA by avoiding the need to rent generators, hundreds of thousands in diesel and the enormous effort that the VA would have to endure by hooking up and unhooked on a daily basis.

RESPONSE: No energized work is allowable.

D. Will the GC or Prime be required to be onsite the entire project or can the Electrician of choosing perform the work provide the competent person and oversite for the scope of work for this project?

RESPONSE:

E. Page 1 of the SF 1442 states that bids should be submitted by 4 PM EST on 9/8/23. Although on page 8, it states that bids are due by 4 PM EST on 9/5/23.

Question: Please confirm the due date.

RESPONSE: Duplicate question, see Amend 0001.

F. On page 6 of the solicitation, it states “The contractor shall provide Professional Engineering Stamped Electrical Feed Plans and Fire stopping for the work.” Question: Is this project a design/bid/build?

RESPONSE: This is not a design-build project. Yes, you will still need to provide the PE stamped plans.

G. Can the Superintendent perform a dual role as the SSHO as well?

RESPONSE: Yes.

H. Will any submittals be required for this project?

RESPONSE: Yes.

I. Will any specifications be supplied for this project?

RESPONSE: The only necessary specs are for the cable: 4/0 CU 15KV CABLE 133% EPR J. Can the VA kindly provide all information needed for the breaker required to have rebuilt with a digital throw switch? While it is my understanding Eaton may rebuild this breaker lead times are aberrantly long. This breaker could possibly take more than the 120 days allotted for this project.

RESPONSE: See responses to RFI 004A above.

K. Can the VA kindly provide the VA’s existing site survey and measurements of the length of the existing electrical wire that’s not in use.

RESPONSE: Drawing attached, see 500 E6.

ATTACHMENTS

See attached document: 500-E6.

See attached document: Vault 1 initial report.

See attached document: Vault 2 initial report.

See attached document: H.H 3 Report.

See attached document: H.H 4 report.

See attached document: H.H 5 Arc Flash report.

END OF AMENDMENT 36C24623B0056 0003