Attachment_D_-_Cost_Breakdown.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
NV BCCX Generators
Solicitation number
Event 32918-NV13622
Issued by
Bradley County, Tennessee

About this file

Attachment D is a cost breakdown document from the Tennessee Department of Correction related to a generator maintenance contract for the Bledsoe Correctional Complex (BCCX). The Request for Proposal (RFx) covers a five-year contract for comprehensive maintenance services for multiple generator models, including Caterpillar LC7, Caterpillar SR-4, Kohler 250ROZ71, Kohler KD800, Kohler 750RE0ZMB, Generac 0058870, and Cummins DGDK-5708771. The solicitation requires 160 quarterly and 40 annual inspections for Caterpillar LC7 generators, 20 quarterly and 5 annual inspections for Kohler models, and similar maintenance for other generator types. The bid event is scheduled from May 19, 2025, to June 2, 2025, with maintenance services to be performed at 1045 Horsehead Road in Pikeville, Tennessee.

The contract includes 350 hours of technician regular rate services, 80 hours of technician premium rate services, and 36 trip charges. Pricing terms specify parts and materials will be billed at contractor cost plus 15%, with a requirement for original manufacturer parts and a maximum $30,000 liability for parts. Bidders must be registered with the State of Tennessee, possess a minimum of five years of generator maintenance experience, and complete background checks. Insurance requirements include workers' compensation, commercial general liability, and automobile liability coverage. The State reserves the right to award the contract to the lowest cost respondent meeting all requirements, with potential for negotiation with responsive and responsible bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment D

Instructions: Line Item 15 breakdown - In accordance with the Specifications, use column E (highlighted in yellow) to provide your annual cost breakdown for the third year additional maintenance for each model.

ModelUOMQTYProposed CostExtended Cost
Caterpillar Model LC7Per Year8$ - 0
Caterpillar Model SR-4Per Year1$ - 0

File details come from the government source that posted it. Updated .