Attachment_D_-_CECH_Cost_Estimate_Form.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
HAFC_CECH_AVS
Solicitation number
140P2125R0056
Issued by

About this file

This file is a detailed cost estimate form for an AV system upgrade at Cesar E. Chavez National Monument, prepared for the Department of the Interior National Park Service under solicitation number 140P2125R0056. The comprehensive document itemizes equipment and labor requirements, including specific audio-visual hardware such as a BrightSign HD digital media player, Epson PowerLite projector, Crestron control system, JBL and KEF speakers, Williams Sound accessibility equipment, and Shure microphone systems.

The cost estimate breaks down expenses into three main categories: Materials & Equipment (totaling $0 in the current document), Contractor Labor (including project management, programming, installation, and translation services), and Contractor Mobilization (covering site visits, travel, lodging, and per diem expenses). The document notes that the equipment list represents system requirements and does not guarantee a fully operational system, with the expectation that bidders may need to add or delete items to create a complete working system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GovEst

Project NameCésar E. Chávez National Monument
Preparer Name:
Date Prepared:
MATERIALS & EQUIPMENT (Brand Name or Equal Items Accepted)
Materials & EquipmentManufacturerModelQtyUnitPrice/UnitQty * Price
Theater
Video and Audio Sources
HD Digital Media PlayerBrightSignHD10251ea$ - 0
Micro SD Card, 64GB, Class 10SanDisk3ea$ - 0
AV ReceiverMarantzCinema 60/701ea$ - 0
Blu-Ray playerTascamBD-MP4K1ea$ - 0
HDMI extension KitCrestronHD-TXC/RXC2ea$ - 0
HDMI rack input0ea$ - 0
Video Processing
Projector UHD 6,000 lumensEpsonPowerLite L570U1ea$ - 0
Projection LensEpson0ea$ - 0
Projector mounting hardwareChiefRPAU1ea$ - 0
Projection ScreenElite ScreenER100WH21ea$ - 0
Control System
AV Control ProcessorCrestronCP41ea$ - 0
Wireless controllerAppleiPad1ea$ - 0
Wireless router, control systemNetgear1ea$ - 0
Pushbutton, rackmountCustom1ea$ - 0
Audio Processing
Digital Signal Processor (DSP)BSSBLU1001ea$ - 0
Power AmplifierArtSLA-41ea$ - 0
Speaker, Left/RightJBLCBT 50LA-LS2ea$ - 0
Speaker, CenterKEFT301c1ea$ - 0
Speaker, Rear Left/RightJBLSLP12/T1pair$ - 0
Spekaer, Sub0ea$ - 0
Accessibility
Accessibility Transmitter KitWilliams SoundIR SYS32-002ea$ - 0
Accessibility ReceiversWilliams SoundWIR RX22-4N-NKL6ea$ - 0
HeadphoneWilliams SoundHED 0216ea$ - 0
Induction NeckloopWilliams SoundNKL 0014ea$ - 0
Presentation
Wireless Handheld Microphone SystemShureSLXD141ea$ - 0
Wireless Lavaliere Microphone SystemShureSLXD141ea$ - 0
Power$ - 0
Conditioner + Surge Protection, RackJuicegooseJG91ea$ - 0
Conditioner + Surge Protection, ProjectorJuicegooseRX301ea$ - 0
Uninterruptable Power SupplyAPCBX1500M2ea$ - 0
Lighting Control
House Lighting Interface0ea$ - 0
Hardware
Equipment RackMiddle Atlantic1ea$ - 0
Cables, connectors, accessories1lot$ - 0

Shipping Freight 1 lot $ - 0

MATERIALS & EQUIPMENT TOTAL: $ - 0

CONTRACTOR LABOR
TIMEUNITRATECOST
Project Managerhour$ - 0
Programmerhour$ - 0
Installer 1hour$ - 0
Installer 2hour$ - 0
Installer 3hour$ - 0
Drawingshour$ - 0
Op Manualshour$ - 0
Shop Fabricatorhour$ - 0
TranslationEnglish to Spanishlot$ - 0
Audio DescriptionEnglish to Spanishlot$ - 0
CaptioningEnglish to Spanishlot$ - 0

CONTRACTOR LABOR TOTAL: $ - 0

CONTRACTOR MOBILIZATION
TIMEUNITRATECOST
Site Visit - Post Award MeetingProject Manager
Airfaretrip$ - 0
Lodgingday$ - 0
Per Diemday$ - 0
Laborday$ - 0
Travel Laborday$ - 0
Car Rentalday$ - 0
Gas/Parkinglot$ - 0
$ - 0
Site Visit - Install / ProgrammingProgrammer and two installers
Airfaretrip$ - 0
Lodgingday$ - 0
Per Diemday$ - 0
Car Rentalday$ - 0
Gas/Parkinglot$ - 0
$ - 0

CONTRACTOR MOBILIZATION TOTAL: $ - 0

THE EQUIPMENT LIST ABOVE IS A REPRESENTATION OF SYSTEM REQIREMENTS AND DOES NOT GUARANTEE A FULL AND OPERATIONAL SYSTEM AS CALLED FOR IN THE SPECIFICATIONS, BIDDER SHALL ADD OR DELETE ITEMS AS NEEDED FOR A WORKING SYSTEM.

Page &P of &N

File details come from the government source that posted it. Updated .