This is a set of electrical construction drawings for a federal contract project with the U.S. Department of Veterans Affairs. Project 437-22-108 involves placing chilled water pumps on emergency power at the Fargo VA Health Care System (VISN 23) in Fargo, North Dakota, located at 2101 Elm Street North, Fargo, ND 58102. The project encompasses Buildings 1, 9, and 46, with work including basement, second floor, and third floor modifications across multiple mechanical rooms and equipment spaces.

The scope of work includes installing a new 800-ampere automatic transfer switch (01_AT_EB10E6P) to connect emergency and normal power sources from switchboards 46_SB_46-EE and 46_SB_46-W, routing power to panelboard 01_PB_EB10E6P. The project involves retrofitting 19 chilled water pumps (ranging from 20 to 40 horsepower) with variable frequency drives and circuit protection, with load calculations indicating new demand of 284.2 kilowatts to be added to Generator 46 (600 kW rated capacity, currently 13.3 percent loaded). Demolition work requires disconnecting and removing existing conduit, wire, and breakers from multiple panelboards and switchboards, with installation of new feeders in metallic conduit and fire-caulked wall penetrations. All work must maintain system de-energization per VA specifications, with service interruptions requiring advance COR (Contracting Officer Representative) approval and coordination to minimize downtime during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG. NO.

MC - MOTORCYCLE PARKING

CP - CAR/VAN POOL PARKING

- HANDICAPPED PARKING

RE

D

RI

VE

R

OF

TH

E

NO

RT

H

30W 30E

12 13

CITY

LIFT

STATION

(STORM

SEWER)

MAIN HOSPITAL

BUILDING

1 HOSPITAL

8 FLAGPOLE

9 HOSPITAL

10 BOILER PLANT

11 MAINTENANCE GARAGE

12 WAREHOUSE

13 LAUNDRY

30 OFFICE

39 HIGH VOLTAGE SWITCHGEAR BLDG

40 VBA REGIONAL OFFICE

41 OXYGEN STORAGE TANK

42 UND SCHOOL OF MEDICINE

43 PICNIC SHELTER AND PATIO

44 XCEL ENERGY BLDG (NAT. GAS)

45 GATE WELL

46 HOSPITAL

50 COLD STORAGE BUILDING

51 ADMINISTRATION BUILDING

52 ADMINISTRATION BUILDING

53 HAZMAT STORAGE BUILDING

54 PANDEMIC FLU STORAGE BUILDING

56 CHILLER PLANT

BLDG 46

BLDG 9

BLDG 1

Cover Sheet

VICINITY PLAN1

G-101

SITE

Fargo, North Dakota Project Number: 437-22-108 Fargo VA Health Care System VISN 23

SHEET INDEX

E-101 Buildings 1, 9 and 46 - Basement Floor Plan - New Work

E-601 Buildings 1 and 46 - Electrical Riser Diagrams

Place Chilled Water Pumps on Emergency Power

G-101

ED101

Cover Sheet Buildings 1, 9 and 46 - Basement Floor Plan - Demolition Work

E-102 Buildings 1, 9 and 46 - Second Floor Plan - Demolition & New Work E-103 Buildings 1, 9 and 46 - Third Floor Plan - New Work E-501 Buildings 1, 9 and 46 - Calculations

AT AUTOMATIC TRANSFER SWITCH

BS BUS

BSW BUSWAY

CB CIRCUIT BREAKER

CBL CABLE

CC CONTROL CABINET

EB ENCLOSED CIRCUIT BREAKER

FB FEEDER BREAKER

FD FUSED DISCONNECT

FF FUSE - FEEDER

FS MEDIUM VOLTAGE SWITCH - FEEDER

GN GENERATOR

GP GENERATOR PROTECTIVE DEVICE

LB LOAD BREAK SWITCH

LD LOAD

MB MAIN CIRCUIT BREAKER

MC MOTOR CONTROL CENTER

MO MOTOR

MP MOTOR CIRCUIT PROTECTOR

MR MEDIUM VOLTAGE RELAY - MAIN

MS MEDIUM VOLTAGE SWITCH - MAIN

MT MANUAL TRANSFER SWITCH

NFD NON FUSED DISCONNECT

PB PANELBOARD

SB SWITCHBOARD

SG SWITCHGEAR

SP CABLE SPLICE/TAP

SW SWITCH

TB TIE BREAKER

TX TRANSFORMER

UP UNINTERRUPTIBLE POWER SUPPLY

UT UTILITY

EQUIPMENT IDENTIFICATION

EQUIPMENT TYPE IDENTIFIERS

EQUIPMENT IDENTIFICATION

01_PB_12S1

EXISTING EQUIPMENT NAME

EQUIPMENT TYPE IDENTIFIER

BUILDING NUMBER

THESE DESIGNATORS USED FOR

ARC FLASH LABELS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

G-101

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text 19th AVE. N.

AutoCAD SHX Text 21st AVE. N.

AutoCAD SHX Text

ELM STREET

AutoCAD SHX Text

MC

AutoCAD SHX Text

ELM STREET

BD-70

MECHANICAL

EQUIPMENT

S001

STAIR

C003

COORIDOR

BA-01

MECHANICAL

ROOM

BA-03

EMS

STORAGE

BE-25

MECHANICAL

ROOM

BE-27

MECHANICAL

ROOM

BD-28

LOADING

DOCK

BA-10

BUILDING 9

SWITCHGEAR

ROOM

BA-07A

BUILDING 9

GENERATOR

ROOM

BA-01B

BUILDING 46

GENERATOR

ROOM

BA-01A

BUILDING 46

SWITCHGEAR

ROOM

BA-65A

MECHANICAL

ROOM

SEE PLAN 2

THIS SHEET

SEE PLAN 3

THIS SHEET

SEE PLAN 5

THIS SHEET

SEE PLAN 6

THIS SHEET

SEE PLAN 4

THIS SHEET

BA-10

BUILDING 9

SWITCHGEAR

ROOM

BA-07A

BUILDING 9

GENERATOR

ROOM

BA-01B

BUILDING 46

GENERATOR

ROOM

BA-01A

BUILDING 46

SWITCHGEAR

ROOM

46_SB_46-E

46_SB_46-W

09_SB_9-E

46_SB_46-EE

46_SB_EB-2

MT

MT

MT

BA-01

MECHANICAL

ROOM

BA-03

EMS

STORAGE

46_MC_MCC-46

46_MC_MCC-3B

MO

MO

46_MO_CWP-8

46_MO_CWP-9

BAS PANEL

BA-65A

MECHANICAL

ROOM

BA-65A

MECHANICAL

ROOM

MO

VFD

MO

MO

MO

01_MO_CWP-14

(20 HP)

01_MO_CWP-15

(20 HP)

01_MO_CWP-12

(40 HP)

01_MO_CWP-13

(40 HP)

VFD-14

VFD VFD VFD

VFD-15

VFD-12

VFD-13

2" C - 3#3/0, 1#6G

1-1/4" C - 3#1, 1#8G

09_PB_90S2

TO

09_PB_90S2

TO

09_SB_9-E

BAS PANEL

BE-25

MECHANICAL

ROOM

BE-27

MECHANICAL

ROOM

BD-28

LOADING

DOCK

01_MO_AHU-48-SF 01_MO_CWP-5

(40 HP)

01_MO_CWP-1

(40 HP)

01_MO_CWP-2

(40 HP)

01_MO_CWP-3

(40 HP)

01_MO_CWP-4

(40 HP)

VFD-1

VFD-2

VFD-3

VFD-5

VFD-4

01_PB_10E6P

01_PB_10E7

MO

MO

MO

MO

MO

VFD

VFD VFD

VFD

VFD

BAS PANEL

BD-70

MECHANICAL

EQUIPMENT

S001

STAIR

C003

COORIDOR

01_PB_EB10S2

01_PB_10S4

01_PB_EB10S1

MO

01_MO_CWP-18

MO

01_MO_CWP-19

1-1/4" C - 3#3, 1#8G

TO

01_PB_10S4

1-1/4" C - 3#3, 1#8G

TO

01_PB_10S4

6 6

BAS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

ED101

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

Buildings 1, 9 and 46 - Basement Floor Plan - Demolition Work

ED101

ED101

ED101

ED101

BASEMENT DEMOLITION FLOOR PLAN1

ED101

1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0"

1/8" = 1'-0"

1/32" = 1'-0"

ED101 1/8" = 1'-0"

01, 09, 46

N N

N

N

N

1. DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN

PREPARED BASED ON FIELD OBSERVATION AND EXISTING ELECTRICAL

DRAWINGS. ADDITIONAL CONDITIONS MAY EXIST WHICH DO NOT SHOW

AND SUCH ITEMS SHALL BE DEALT WITH IN A MANNER SIMILAR TO THOSE

ITEMS WHICH DO SHOW.

2. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE

PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION

WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR

(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE

SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING

INTERRUPTION OF OPERATIONS AND SERVICES.

3. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.

4. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN

SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.

5. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE

SLEEVED AND FIRE CAULKED.

6. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE

NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.

CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER

FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING

CONSTRUCTION.

N

GENERAL NOTES

1. DISCONNECT AND REMOVE CONDUIT AND WIRE RUNNING FROM

46_SB_46-W TO 01_PB_10E6P.

2. DISCONNECT AND REMOVE SPARE 30A, 3 POLE BREAKER FROM CIRCUITS

35, 37, 39 IN PANELBOARD 01_PB_10E7.

3. DISCONNECT THE TWO MCC BUCKETS LABELED “M-CWP-8” AND “M-CWP-9”

FROM 46_MC_MCC-46 AND TWO SPARE BUCKETS OF EQUAL SIZE FROM

46_MC_MCC-3B. SEE KEYED NOTES 7 AND 8 ON SHEET E-101 (NEW) FOR

MORE INFORMATION.

4. TURN OFF EXISTING 200A BREAKER THAT PROVIDES POWER TO CHILLED

WATER PUMPS #12 AND #13. RELABEL BREAKER AS “SPARE”. DISCONNECT

AND REMOVE CONDUIT AND WIRE FROM VFD-12 AND VFD-13 BACK TO

SWITCHBOARD 09_SB_9-E.

5. TURN OFF EXISTING 90A BREAKER THAT PROVIDES POWER TO CHILLED

WATER PUMPS #14 AND #15. RELABEL BREAKER AS “SPARE”. DISCONNECT

AND REMOVE CONDUIT AND WIRE FROM VFD-14 AND VFD-15 BACK TO

PANELBOARD 09_PB_90S2.

6. TURN OFF EXISTING 80A BREAKER THAT PROVIDES POWER TO CHILLED

WATER PUMPS #18 AND #19. RELABEL BREAKER AS “SPARE”. DISCONNECT

AND REMOVE CONDUIT AND WIRE FROM DISCONNECT SWITCHES THAT

CONTROL PUMPS #18 AND #19 BACK TO PANELBOARD 01_PB_10S4.

7. DISCONNECT AND REMOVE SPARE 20A, 3 POLE BREAKER IN CIRCUITS 7, 9,

11 FROM PANELBOARD 01_PB_EB10S2.

8. TURN OFF EXISTING 60A, 2 POLE BREAKER THAT PROVIDES POWER TO

BLDG 53 AND RELABEL BREAKER AS "SPARE" IN DIRECTORY. DISCONNECT

WIRES AND PREPARE TO BE RECONNECTED FROM NEW SOURCE.

KEYNOTES

ROOMS BA-01A, BA-01B, BA-07A & BA-10

ENLARGED DEMOLITION FLOOR PLAN

ROOM BA-65A ENLARGED

DEMOLITION FLOOR PLAN

ROOM BE-27 ENLARGED

DEMOLITION FLOOR PLAN

ROOM BA-01 ENLARGED

DEMOLITION FLOOR PLAN

ROOM BD-70 ENLARGED

DEMOLITION FLOOR PLAN

AutoCAD SHX Text

UP

UP

BD-70

MECHANICAL

EQUIPMENT

S001

STAIR

C003

COORIDOR

SEE PLAN 2

THIS SHEET

SEE PLAN 4

THIS SHEET

SEE PLAN 3

THIS SHEET

SEE PLAN 5

THIS SHEET

SEE PLAN 6

THIS SHEET

BA-10

BUILDING 9

SWITCHGEAR

ROOM

BA-07A

BUILDING 9

GENERATOR

ROOM

BA-01B

BUILDING 46

GENERATOR

ROOM

BA-01A

BUILDING 46

SWITCHGEAR

ROOM

46_SB_46-E

46_SB_46-W

46_SB_EB-2

46_SB_46-EE

MT

09_SB_9-E

MT

MT

BA-01

MECHANICAL

ROOM

BA-03

EMS

STORAGE

46_MC_MCC-46

46_MC_MCC-3B

MO

MO

46_MO_CWP-8

46_MO_CWP-9

1-1/4" C - 3#1, 1#8G

TO

46_MC_MCC-3B

1-1/4" C - 3#1, 1#8G

TO

46_MC_MCC-3B

BAS PANEL

BA-65A

MECHANICAL

ROOM

MO

VFD

MO

MO

MO

01_MO_CWP-14

(20 HP)

01_MO_CWP-15

(20 HP)

01_MO_CWP-12

(40 HP)

01_MO_CWP-13

(40 HP)

VFD VFD VFD

VFD-14

VFD-15 VFD-12

VFD-13

09_PB_90S2

BAS PANEL

13 14

TO

46_SB_EB-2

TO

46_SB_EB-2

2" C - 3#3/0, 1#6G

1-1/4" C - 3#1, 1#8G

BE-25

MECHANICAL

ROOM

BE-27

MECHANICAL

ROOM

BD-28

LOADING

DOCK

01_MO_AHU-48-SF

01_PB_EB10E6P

01_PB_10E7

2 01_MO_CWP-5

(40 HP)

01_MO_CWP-1

(40 HP)

01_MO_CWP-2

(40 HP)

01_MO_CWP-3

(40 HP)

01_MO_CWP-4

(40 HP)

VFD-1

VFD-2

VFD-3

VFD-5

VFD-4

MO

MO

MO

MO

MO

VFD

VFD VFD

VFD

VFD

TO

01_AT_EB10E6P

BAS PANEL

BD-70

MECHANICAL

EQUIPMENT

S001

STAIR

C003

COORIDOR

01_PB_EB10S1

MO

01_MO_CWP-18

MO

01_MO_CWP-19

1-1/4" C - 3#3, 1#8G

TO

01_PB_EB10S2

1-1/4" C - 3#3, 1#8G

TO

01_PB_EB10S2

01_PB_10S4

01_PB_EB10S2

BAS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-101

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

Buildings 1, 9 and 46 - Basement Floor Plan - New Work

E-101

E-101

E-101

E-101

BASEMENT FLOOR PLAN1

E-101

1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0"

1/8" = 1'-0"

1/32" = 1'-0"

E-101 1/8" = 1'-0"

01, 09, 46

N N

N

N

N

1. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE

PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION

WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR

(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE

SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING

INTERRUPTION OF OPERATIONS AND SERVICES.

2. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.

3. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN

SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.

4. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE

SLEEVED AND FIRE CAULKED.

5. REFER TO ONE-LINE DIAGRAMS ON SHEET E-601 FOR ADDITIONAL

INFORMATION.

6. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE

NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.

CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER

FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING

CONSTRUCTION.

N

GENERAL NOTES

1. PROVIDE A NEW 60A, 2 POLE BREAKER IN CIRCUITS 35 AND 37. PROVIDE A

SPACE COVER FOR CIRCUIT 39. BREAKER SHALL BE COMPATIBLE WITH

EXISTING PANELBOARD MANUFACTURE.

2. INTERCEPT THE 60A FEEDER THAT POWERS BUILDING 53 FROM

PANELBOARD 01_PB_10E6P AND RE-ROUTE TO BE FED OUT OF

PANELBOARD 01_PB_10E7. TERMINATE FEEDER AT NEW 60A, 2 POLE

BREAKER IN CIRCUITS 35 AND 37. UPDATE PANELBOARD SCHEDULE TO

REFLECT CHANGES.

3. REMOVE ALL PANELBOARD LABELS THAT READ “10E6P” AND REPLACE WITH

NEW LABELS THAT READ “EB10E6P”. PROVIDE NEW PANELBOARD

SCHEDULE THAT CALLS OUT SOURCE OF PANELBOARD AS NEW TRANSFER

SWITCH 01_AT_EB10E6P.

4. PROVIDE NEW 800A FEEDER FROM NEW AUTOMATIC TRANSFER SWITCH

01_AT_EB10E6P TO PANELBOARD 01_PB_EB10E6P. REFER TO 3/E-102 FOR

LOCATION OF ATS.

5. PROVIDE NEW 800A FEEDER FROM BUCKET LABELED “10E6P” IN

46_SB_46-W TO NEW AUTOMATIC TRANSFER SWITCH 01_AT_EB10E6P IN

ROOM 1A-01A (SEE KEYNOTE 15). RELABEL BUCKET AS “PANELBOARD

EB10E6P VIA ATS-EB10E6P”.

6. PROVIDE NEW 800A BREAKER IN SWITCHBOARD 46_SB_EE AND LABEL AS

“PANELBOARD EB10E6P VIA ATS-EB10E6P”. PROVIDE NEW 800A FEEDER

FROM NEW BREAKER TO NEW AUTOMATIC TRANSFER SWITCH

01_AT_EB10E6P IN ROOM 1A-01A (SEE KEYNOTE 15).

7. INSTALL THE BUCKETS “M-CWP-8” AND “M-CWP-9” IN THE TWO AVAILABLE

SPACES IN 46_MC_MCC-3B AND THE TWO SPARE BUCKETS IN THE TWO

AVAILABLE SPACES IN 46_MC_MCC-46. SEE KEYED NOTE 3 ON SHEET

ED-101 (DEMO) FOR MORE INFORMATION.

8. INTERCEPT THE CIRCUITS FOR PUMPS #8 AND #9 (M-CWP-8 AND M-CWP-9)

AND RE-ROUTE THEM TO TERMINATE AT THEIR RESPECTIVE BUCKETS NOW

INSTALLED IN 46_MC_MCC-3B.

9. PROVIDE NEW CONDUIT AND WIRE FROM VFD-12 AND VFD-13 TO

SWITCHBOARD 46_SB_EB-2 IN ROOM BA-01B. TERMINATE CIRCUIT AT 200A

SPARE BREAKER IN 46_SB_EB-2. RELABEL BREAKER AS “CWP #12 AND #13,

ROOM BA-65A”.

10. PROVIDE NEW CONDUIT AND WIRE FROM VFD-14 AND VFD-15 TO

SWITCHBOARD 46_SB_EB-2 IN ROOM BA-01B. TERMINATE CIRCUIT AT 100A

SPARE BREAKER IN 46_SB_EB-2. RELABEL BREAKER AS “CWP #14 AND #15,

ROOM BA-65A”.

11. PROVIDE TWO (2) NEW 80A, 3 POLE CIRCUIT BREAKERS IN PANELBOARD

01_PB_EB10S2 SPACES 1, 3, 5, AND 7, 9, 11. THE NEW BREAKERS SHALL BE

LABELED AS “CWP #18, BD-70” AND “CWP-19, BD-70”.

12. PROVIDE NEW CONDUIT AND WIRE FROM PUMPS CWP #18 AND CWP #19

DISCONNECT SWITCHES TO PANELBOARD 01_PB_EB10S2. TERMINATE

CIRCUITS AT THE CORRESPONDING 80A, 3 POLE CIRCUIT BREAKERS

DESCRIBED IN KEY NOTE 11.

13. PROVIDE EXISTING BAS PANEL WITH NEW UPS. SIZE UPS SO BAS PANEL

CAN STAY OPERATIONAL FOR 30 MINUTES AFTER LOSS OF POWER.

14. CONTRACTOR MUST FIELD VERIFY LOCATION OF BAS PANEL AND ENSURE

BAS PANEL HAS EQUIPMENT BRANCH POWER. IF BAS PANEL DOES NOT

HAVE EQUIPMENT BRANCH POWER, CONTRACTOR MUST PROVIDE 120V

CIRCUIT FROM NEAREST EQUIPMENT BRANCH PANELBOARD.

15. PROVIDE NEW 800 A AUTOMATIC TRANSFER SWITCH ATS-EB10E6P TO

CONNECT 46_SB_46_EE and 46_SB_46-W. SEE KEYNOTES 3, 4, 5, & 6.

KEYNOTES

ROOMS BA-01A, BA-01B, BA-07A & BA-10

ENLARGED FLOOR PLAN

ROOM BA-65A

ENLARGED FLOOR PLAN

ROOM BE-27

ENLARGED FLOOR PLAN

ROOM BA-01

ENLARGED FLOOR PLAN

ROOM BD-70

ENLARGED FLOOR PLAN

AutoCAD SHX Text

UP

UP

SEE PLAN 2

THIS SHEET

EB12S1 (OUT OF

SERVICE)

01_PB_EB12E1

01_PB_12E5P

01_PB_12E5P1

01_PB_12E7

Buildings 1, 9 and 46 - 2nd Floor Plan - Demolition & New Work

SECOND FLOOR PLAN1

E-102 1/32" = 1'-0"

E-102 1/8" = 1'-0"

N

N

1. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE

PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION

WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR

(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE

SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING

INTERRUPTION OF OPERATIONS AND SERVICES.

2. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.

3. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN

SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.

4. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE

SLEEVED AND FIRE CAULKED.

5. REFER TO ONE-LINE DIAGRAMS ON SHEET E-601 FOR ADDITIONAL

INFORMATION.

6. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE

NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.

CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER

FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING

CONSTRUCTION.

GENERAL NOTES

1. DISCONNECT AND REMOVE CONDUIT AND WIRE FROM PANELBOARD

01_PB_12E5P TO NON-FUSED DISCONNECTS FOR CHILLED WATER PUMPS

#16 AND #17 IN ROOM 3E-08 (SEE SHEET E-103). TURN OFF 90A BREAKER

THAT POWERS PUMPS #16 AND #17 AND RELABEL BREAKER AS “SPARE”.

VERIFY WITH COR PRIOR TO CONSTRUCTION TO SEE IF THIS HAS BEEN

AFFECTED BY THE KITCHEN PROJECT.

2. PROVIDE NEW 800A, 208V AUTOMATIC TRANSFER SWITCH 01_AT_EB10E6P,

ALONG WITH 3" CONCRETE HOUSEKEEPING PAD. CONTRACTOR TO VERIFY

FINAL LOCATION WITH COR BEFORE CONSTRUCTION.

3. PROVIDE NEW CONDUIT AND WIRE FROM SWITCHBOARD 46_SB_46-EE IN

ROOM BA-01B (SEE SHEET E-101) TO TRANSFER SWITCH FOR EMERGENCY

SOURCE FEEDER.

4. PROVIDE NEW CONDUIT AND WIRE FROM SWITCHGEAR 46_SB_46-W IN

ROOM BA-01A (SEE SHEET E-101) TO TRANSFER SWITCH FOR NORMAL

SOURCE FEEDER.

5. PROVIDE NEW CONDUIT AND WIRE FROM TRANSFER SWITCH TO

PANELBOARD 01_PB_EB10E6P IN ROOM BE-27 (SEE SHEET E-101).

KEYNOTES

ROOM 2E-40

ENLARGED FLOOR PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-102

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text 2E-41

AutoCAD SHX Text

MECHANICAL

ROOM

SEE PLAN 2

THIS SHEET

BAS PANEL

3E-08

MECH

ROOM01_PB_EB13C1

MO

MO

01_MO_CWP-16

01_MO_CWP-17

TO

01_PB_EB13C12

1-1/4" C - 3#1, 1#8G

TO

01_PB_EB13C1 1-1/4" C - 3#1, 1#8G3

BAS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-103

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

Buildings 1, 9 and 46 - Third Floor Plan - New Work

THIRD FLOOR PLAN1

E-103 1/32" = 1'-0"

E-103 1/8" = 1'-0"

01, 09, 46

N

N

1. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE

PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION

WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR

(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE

SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING

INTERRUPTION OF OPERATIONS AND SERVICES.

2. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.

3. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN

SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.

4. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE

SLEEVED AND FIRE CAULKED.

5. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE

NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.

CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER

FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING

CONSTRUCTION.

GENERAL NOTES

1. PROVIDE (2) NEW 90A CIRCUIT BREAKERS IN EXISTING PANELBOARD

01_PB_EB13C1. UPDATE PANELBOARD SCHEDULE AND LABEL BREAKERS

“CHILLED WATER PUMP #16” AND “CHILLED WATER PUMP #17”.

2. PROVIDE NEW CONDUIT AND WIRE FROM NEW 90A CIRCUIT BREAKER IN

01_PB_EB13C1 TO NON-FUSED DISCONNECT THAT CONTROLS CHILLED

WATER PUMP #16 (01_MO_CWP-16).

3. PROVIDE NEW CONDUIT AND WIRE FROM NEW 90A CIRCUIT BREAKER IN

01_PB_EB13C1 TO NON-FUSED DISCONNECT THAT CONTROLS CHILLED

WATER PUMP #17 (01_MO_CWP-17).

4. PROVIDE EXISTING BAS PANEL WITH NEW UPS. SIZE UPS SO BAS PANEL

CAN STAY OPERATIONAL FOR 30 MINUTES AFTER LOSS OF POWER.

KEYNOTES

ROOM 3E-08

ENLARGED FLOOR PLAN

EXIT

Bus 3Ø Fault Current SLG Fault Current Existing Rating Recommended Rating

01_AT_EB10E6P 17,304 16,277 n/a 22,000 01_PB_EB10E6P 13,355 9,804 42,000 n/a

Cable Voltage (V) Feeder/ Circuit Length

(ft) Upstream Equipment Downstream

Equipment # Parallel Runs Cable Size Voltage Drop (V) Voltage Drop %

46_CBL_EB10E6P (E) 208 85 46_SB_46-EE 01_AT_EB10E6P 3 300 1.73 0.83%

46_CBL_EB10E6P (N) 208 75 46_SB_46-W 01_AT_EB10E6P 3 300 1.52 0.73%

46_CBL_EB10E6P 208 175 01_AT_EB10E6P 01_PB_EB10E6P 3 300 3.56 1.71%

Total 208 260 46_SB_46-EE 01_PB_EB10E6P 3 300 5.28 2.54%

09_CBL_CWP-12-13 208 200 46_SB_EB-2 09_CC_CWP-12,

09_CC_CWP-13 1 3/0 3.60 1.73%

09_CBL_CWP-14-15 208 200 46_SB_EB-2 09_CC_CWP-14,

09_CC_CWP-15 1 1 3.43 1.65%

01_CBL_CWP-16 208 30 01_PB_EB13C1 01_NFD_CWP-16 1 1 0.85 0.41%

01_CBL_CWP-17 208 30 01_PB_EB13C1 01_NFD_CWP-17 1 1 0.85 0.41%

01_CBL_CWP-18 208 100 01_PB_EB10S2 01_NFD_CWP-18 1 3 2.23 1.07%

01_CBL_CWP-19 208 100 01_PB_EB10S2 01_NFD_CWP-19 1 3 2.23 1.07%

Generator 1 Rated Size (kW) 450 Peak Recorded Demand (kW) 167 Peak Recorded Load % 37.1%

Existing Demand * 1.25 (kW) 208.8 New Demand (kW) 41.2 Existing + New Demand (kW) 249.9 New Load % 55.5%

Proposed Added Loads Horsepower (hp) Current (A) Voltage (V) Power Factor* Demand Factor Connected kW Connected kVA Running kW Running kVA Pump #16 20 59.4 208 0.95 1.25 20.31 21.37 25.382214 26.71812 Pump #17 20 59.4 208 0.95 0 20.31 21.37 0 0 Pump #18 15 46.2 208 0.95 1 15.79 16.62 15.7933776 16.624608 Pump #19 15 46.2 208 0.95 0 15.79 16.62 0 0

Total for New Loads 72.20 76.00 41.18 43.34

Generator 9 Rated Size (kW) 370 Peak Recorded Demand (kW) 330 Peak Recorded Load % 89.2%

No load will be added to Generator 9 since it is already loaded close to 90% at peak demand.

Generator 46 Rated Size (kW) 600 Peak Recorded Demand (kW) 80 Peak Recorded Load % 13.3%

Existing Demand * 1.25 (kW) 100.0 New Demand (kW) 284.2 Existing + New Demand (kW) 384.2 New Load % 64.0%

Proposed Added Loads Horsepower (hp) Current (A) Voltage (V) Power Factor* Demand Factor Connected kW Connected kVA Running kW Running kVA

CHWP #1 40 114 208 0.95 1.25 38.97 41.02 48.71334 51.2772

CHWP #2 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176

CHWP #3 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176

CHWP #4 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176

CHWP #5 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176

Pump #8 20 59.4 208 0.95 1 20.31 21.37 20.3057712 21.374496 Pump #9 20 59.4 208 0.95 0 20.31 21.37 0 0 Pump #12 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176 Pump #13 40 114 208 0.95 0 38.97 41.02 0 0 Pump #14 20 59.4 208 0.95 1 20.31 21.37 20.3057712 21.374496 Pump #15 20 59.4 208 0.95 0 20.31 21.37 0 0

Total for New Loads 354.02 372.65 284.18 299.13

*Assume 0.95 power factor for VFD controlled motors

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-501

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

Buildings 1, 9 and 46 - Calculations

01, 09, 46

E-501

SHORT CIRCUIT

E-501

SERVICE LOAD CALCULATIONS FOR GENERATORS

E-501

VOLTAGE DROP

EMERGENCY PANEL BOARD -

46_SB_46-EE

1600A, 208Y/120V

(3) 4#300 kcmil + #2/0 GRD 3" C

0A

-3 P

A- 3P

0A

-3 P

0A

-3 P

0A

-3 P

BLDG 46 SWITCHGEAR

(MAIN DISTRIBUTION CENTER)

(6) 4#600 kcmil + GRD 4" C

KIRK KEY

INTERLOCK

(6) 4#600 kcmil + GRD 4" C

46_SB_46-W

2500A, 208Y/120V

46_SB_46-E

2500A, 208Y/120V

T46-W

750 KVA-4.16 KV-PRI

120/208-SEC

T46-E

750 KVA-4.16 KV-PRI

120/208-SEC

LIGHTNING

ARRESTOR

LIGHTNING

ARRESTOR

KKK

SP

AR

E

0A

-3 P

SP

AR

E

0A -3

P

SP

AR

E

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

SP

AR

E

BASEMENT

FEEDER No. 2

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

A

0A

-3 P

0A

-3 P

2400A-3P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

FEEDER No. 1

2400A-3P

2400A-3P

WATTHOUR METERING WITH A

DEMAND REGISTERED ON EACH

BOARD W/CENTRAL TOTALIZING

WATTHOUR METERING WITH A

DEMAND REGISTERED ON EACH

BOARD W/CENTRAL TOTALIZING

0A

-3 P

A- 3P

0A

-3 P

TO 46_PB_GEN

GENERATOR

CONTROL PANEL

TO

_A T_

FIR

E

PU

MP

TO

_A T_

SU

RG

C

HL

R

TO

_A T_

LS

TO

_A T_

CB

TO

_S P_

4C

TO

_P B_

0N

TO

_P B_

2C

TO

_P B_

1C

TO

_M C_

MC

C-

TO

_P B_

2C

TO

_P B_

0C

TO

_P B_

0C

TO

_A T_

EB

TO

_P B_

2C

TO

_P B_

3C

TO

_P B_

5C

TO

_P B_

3C

TO

_P B_

0S

TO

_A T_

EB

TO

_A T_

SU

RG

C

HL

R

TO

_A T_

FIR

E

PU

MP

TO

_A T_

LS

TO

_A T_

CB

(3) 4#300 kcmil + #2/0 GRD 3" C2

01_PB_

10E7

01_PB_

EB10E6P

01_PB_

10E8

TO PANEL

46_PB_460S2

4 #3/0 + #6 GRD

2" C.

TO

BLDG 53

(3) 4#300 kcmil + #2/0 GRD 3" C

BASEMENT BE-27 BA-01B BA-01A

L

E N

01_AT_EB10E6P

EMERGENCY PANEL BOARD -

46_SB_46-EE

1600A, 208Y/120V

A- 3P

0A

-3 P

0A

-3 P

0A

-3 P

BLDG 46 SWITCHGEAR

(MAIN DISTRIBUTION CENTER)

(6) 4#600 kcmil + GRD 4" C

KIRK KEY

INTERLOCK

(6) 4#600 kcmil + GRD 4" C

46_SB_46-W

2500A, 208Y/120V

46_SB_46-E

2500A, 208Y/120V

T46-W

750 KVA-4.16 KV-PRI

120/208-SEC

T46-E

750 KVA-4.16 KV-PRI

120/208-SEC

LIGHTNING

ARRESTOR

LIGHTNING

ARRESTOR

KKK

SP

AR

E

0A

-3 P

SP

AR

E

0A -3

P

SP

AR

E

0A

-3 P

0A

-3 P

0A

-3 P

SP

AR

E

BASEMENT

FEEDER No. 2

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

A

0A

-3 P

0A

-3 P

2400A-3P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

0A

-3 P

FEEDER No. 1

2400A-3P

2400A-3P

WATTHOUR METERING WITH A

DEMAND REGISTERED ON EACH

BOARD W/CENTRAL TOTALIZING

WATTHOUR METERING WITH A

DEMAND REGISTERED ON EACH

BOARD W/CENTRAL TOTALIZING

0A

-3 P

A- 3P

0A

-3 P

TO

_A T_

FIR

E

PU

MP

TO

_A T_

SU

RG

C

HL

R

TO

_A T_

LS

TO

_A T_

CB

TO

_S P_

4C

TO

_P B_

0N

TO

_P B_

2C

TO

_P B_

1C

TO

_M C_

MC

C-

TO

_P B_

2C

TO

_P B_

0C

TO

_P B_

0C

TO

_A T_

EB

TO

_P B_

2C

TO

_P B_

3C

TO

_P B_

5C

TO

_P B_

3C

TO

_P B_

0S

TO

_A T_

EB

TO

_A T_

SU

RG

C

HL

R

TO

_A T_

FIR

E

PU

MP

TO

_A T_

LS

TO

_A T_

CB

01_PB_

10E7

01_PB_

10E6P

01_PB_

10E8

TO PANEL

46_PB_460S2

4 #3/0 + #6 GRD

2" C.

TO

BLDG 53

BASEMENT

0A

-3 P

3 RUNS OF #300 kcmil + 1/0 GRD

(3) 3" C

5A

-3 P

SP

AR

E

TO 46_PB_GEN

GENERATOR

CONTROL PANEL

BE-27 BA-01B BA-01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

E-601

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Place Chilled Water Pumps on Emergency Power

2101 Elm Street North, Fargo, ND 58102

437-22-108

Revisions: Date:

Bid Documents 04/21/2023

12/10/2025 PAPH TGD

KEY PLAN

BUILDING 1 - ELECTRICAL RISER DIAGRAM - NEW WORK3

E-601 NOT TO SCALE

Buildings 1 and 46 - Electrical Riser Diagrams

1. ADJUST THE LONG-TIME PICKUP SETTING OF THIS EXISTING 800A BREAKER

TO 0.75 (600A).

2. FEEDER UPSIZED FOR VOLTAGE DROP.

KEYNOTES

BUILDING 46 - ELECTRICAL RISER DIAGRAM - NEW WORK4

E-601 NOT TO SCALE

BUILDING 1 - ELECTRICAL RISER DIAGRAM - DEMOLITION WORK1

E-601 NOT TO SCALE

BUILDING 46 - ELECTRICAL RISER DIAGRAM - DEMOLITION WORK2

E-601 NOT TO SCALE

437-22-108-G-101_BID
Sheets and Views
437-22-108-G-101_TGD-G-101
437-22-108-ED101_BID
Sheets and Views
437-22-108-ED101_TGD-ED101
437-22-108-E-101_BID
Sheets and Views
437-22-108-E-101_PAPH-E-101
437-22-108-E-102_BID
Sheets and Views
437-22-108-E-102_TGD-E-102
437-22-108-E-103_BID
Sheets and Views
437-22-108-E-103_TGD-E-103
437-22-108-E-501_BID
Sheets and Views
437-22-108-E-501_TGD-E-501
437-22-108-E-601_BID
Sheets and Views
437-22-108-E-601_TGD-E-601

File details come from the government source that posted it. Updated .