Attachment D- 437-22-108 BID Drawings.pdf
PDF 2 MB Posted
- Attached to
- 437-22-108 Place Chilled Water Pumps on Epower
- Solicitation number
- 36C26326B0013
About this file
Summary
This is a set of electrical construction drawings for a federal contract project with the U.S. Department of Veterans Affairs. Project 437-22-108 involves placing chilled water pumps on emergency power at the Fargo VA Health Care System (VISN 23) in Fargo, North Dakota, located at 2101 Elm Street North, Fargo, ND 58102. The project encompasses Buildings 1, 9, and 46, with work including basement, second floor, and third floor modifications across multiple mechanical rooms and equipment spaces.
The scope of work includes installing a new 800-ampere automatic transfer switch (01_AT_EB10E6P) to connect emergency and normal power sources from switchboards 46_SB_46-EE and 46_SB_46-W, routing power to panelboard 01_PB_EB10E6P. The project involves retrofitting 19 chilled water pumps (ranging from 20 to 40 horsepower) with variable frequency drives and circuit protection, with load calculations indicating new demand of 284.2 kilowatts to be added to Generator 46 (600 kW rated capacity, currently 13.3 percent loaded). Demolition work requires disconnecting and removing existing conduit, wire, and breakers from multiple panelboards and switchboards, with installation of new feeders in metallic conduit and fire-caulked wall penetrations. All work must maintain system de-energization per VA specifications, with service interruptions requiring advance COR (Contracting Officer Representative) approval and coordination to minimize downtime during construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG. NO.
MC - MOTORCYCLE PARKING
CP - CAR/VAN POOL PARKING
- HANDICAPPED PARKING
RE
D
RI
VE
R
OF
TH
E
NO
RT
H
30W 30E
12 13
CITY
LIFT
STATION
(STORM
SEWER)
MAIN HOSPITAL
BUILDING
1 HOSPITAL
8 FLAGPOLE
9 HOSPITAL
10 BOILER PLANT
11 MAINTENANCE GARAGE
12 WAREHOUSE
13 LAUNDRY
30 OFFICE
39 HIGH VOLTAGE SWITCHGEAR BLDG
40 VBA REGIONAL OFFICE
41 OXYGEN STORAGE TANK
42 UND SCHOOL OF MEDICINE
43 PICNIC SHELTER AND PATIO
44 XCEL ENERGY BLDG (NAT. GAS)
45 GATE WELL
46 HOSPITAL
50 COLD STORAGE BUILDING
51 ADMINISTRATION BUILDING
52 ADMINISTRATION BUILDING
53 HAZMAT STORAGE BUILDING
54 PANDEMIC FLU STORAGE BUILDING
56 CHILLER PLANT
BLDG 46
BLDG 9
BLDG 1
Cover Sheet
VICINITY PLAN1
G-101
SITE
Fargo, North Dakota Project Number: 437-22-108 Fargo VA Health Care System VISN 23
SHEET INDEX
E-101 Buildings 1, 9 and 46 - Basement Floor Plan - New Work
E-601 Buildings 1 and 46 - Electrical Riser Diagrams
Place Chilled Water Pumps on Emergency Power
G-101
ED101
Cover Sheet Buildings 1, 9 and 46 - Basement Floor Plan - Demolition Work
E-102 Buildings 1, 9 and 46 - Second Floor Plan - Demolition & New Work E-103 Buildings 1, 9 and 46 - Third Floor Plan - New Work E-501 Buildings 1, 9 and 46 - Calculations
AT AUTOMATIC TRANSFER SWITCH
BS BUS
BSW BUSWAY
CB CIRCUIT BREAKER
CBL CABLE
CC CONTROL CABINET
EB ENCLOSED CIRCUIT BREAKER
FB FEEDER BREAKER
FD FUSED DISCONNECT
FF FUSE - FEEDER
FS MEDIUM VOLTAGE SWITCH - FEEDER
GN GENERATOR
GP GENERATOR PROTECTIVE DEVICE
LB LOAD BREAK SWITCH
LD LOAD
MB MAIN CIRCUIT BREAKER
MC MOTOR CONTROL CENTER
MO MOTOR
MP MOTOR CIRCUIT PROTECTOR
MR MEDIUM VOLTAGE RELAY - MAIN
MS MEDIUM VOLTAGE SWITCH - MAIN
MT MANUAL TRANSFER SWITCH
NFD NON FUSED DISCONNECT
PB PANELBOARD
SB SWITCHBOARD
SG SWITCHGEAR
SP CABLE SPLICE/TAP
SW SWITCH
TB TIE BREAKER
TX TRANSFORMER
UP UNINTERRUPTIBLE POWER SUPPLY
UT UTILITY
EQUIPMENT IDENTIFICATION
EQUIPMENT TYPE IDENTIFIERS
EQUIPMENT IDENTIFICATION
01_PB_12S1
EXISTING EQUIPMENT NAME
EQUIPMENT TYPE IDENTIFIER
BUILDING NUMBER
THESE DESIGNATORS USED FOR
ARC FLASH LABELS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
G-101
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text 19th AVE. N.
AutoCAD SHX Text 21st AVE. N.
AutoCAD SHX Text
ELM STREET
AutoCAD SHX Text
MC
AutoCAD SHX Text
ELM STREET
BD-70
MECHANICAL
EQUIPMENT
S001
STAIR
C003
COORIDOR
BA-01
MECHANICAL
ROOM
BA-03
EMS
STORAGE
BE-25
MECHANICAL
ROOM
BE-27
MECHANICAL
ROOM
BD-28
LOADING
DOCK
BA-10
BUILDING 9
SWITCHGEAR
ROOM
BA-07A
BUILDING 9
GENERATOR
ROOM
BA-01B
BUILDING 46
GENERATOR
ROOM
BA-01A
BUILDING 46
SWITCHGEAR
ROOM
BA-65A
MECHANICAL
ROOM
SEE PLAN 2
THIS SHEET
SEE PLAN 3
THIS SHEET
SEE PLAN 5
THIS SHEET
SEE PLAN 6
THIS SHEET
SEE PLAN 4
THIS SHEET
BA-10
BUILDING 9
SWITCHGEAR
ROOM
BA-07A
BUILDING 9
GENERATOR
ROOM
BA-01B
BUILDING 46
GENERATOR
ROOM
BA-01A
BUILDING 46
SWITCHGEAR
ROOM
46_SB_46-E
46_SB_46-W
09_SB_9-E
46_SB_46-EE
46_SB_EB-2
MT
MT
MT
BA-01
MECHANICAL
ROOM
BA-03
EMS
STORAGE
46_MC_MCC-46
46_MC_MCC-3B
MO
MO
46_MO_CWP-8
46_MO_CWP-9
BAS PANEL
BA-65A
MECHANICAL
ROOM
BA-65A
MECHANICAL
ROOM
MO
VFD
MO
MO
MO
01_MO_CWP-14
(20 HP)
01_MO_CWP-15
(20 HP)
01_MO_CWP-12
(40 HP)
01_MO_CWP-13
(40 HP)
VFD-14
VFD VFD VFD
VFD-15
VFD-12
VFD-13
2" C - 3#3/0, 1#6G
1-1/4" C - 3#1, 1#8G
09_PB_90S2
TO
09_PB_90S2
TO
09_SB_9-E
BAS PANEL
BE-25
MECHANICAL
ROOM
BE-27
MECHANICAL
ROOM
BD-28
LOADING
DOCK
01_MO_AHU-48-SF 01_MO_CWP-5
(40 HP)
01_MO_CWP-1
(40 HP)
01_MO_CWP-2
(40 HP)
01_MO_CWP-3
(40 HP)
01_MO_CWP-4
(40 HP)
VFD-1
VFD-2
VFD-3
VFD-5
VFD-4
01_PB_10E6P
01_PB_10E7
MO
MO
MO
MO
MO
VFD
VFD VFD
VFD
VFD
BAS PANEL
BD-70
MECHANICAL
EQUIPMENT
S001
STAIR
C003
COORIDOR
01_PB_EB10S2
01_PB_10S4
01_PB_EB10S1
MO
01_MO_CWP-18
MO
01_MO_CWP-19
1-1/4" C - 3#3, 1#8G
TO
01_PB_10S4
1-1/4" C - 3#3, 1#8G
TO
01_PB_10S4
6 6
BAS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
ED101
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
Buildings 1, 9 and 46 - Basement Floor Plan - Demolition Work
ED101
ED101
ED101
ED101
BASEMENT DEMOLITION FLOOR PLAN1
ED101
1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0"
1/8" = 1'-0"
1/32" = 1'-0"
ED101 1/8" = 1'-0"
01, 09, 46
N N
N
N
N
1. DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN
PREPARED BASED ON FIELD OBSERVATION AND EXISTING ELECTRICAL
DRAWINGS. ADDITIONAL CONDITIONS MAY EXIST WHICH DO NOT SHOW
AND SUCH ITEMS SHALL BE DEALT WITH IN A MANNER SIMILAR TO THOSE
ITEMS WHICH DO SHOW.
2. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE
PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION
WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR
(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE
SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING
INTERRUPTION OF OPERATIONS AND SERVICES.
3. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.
4. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN
SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.
5. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE
SLEEVED AND FIRE CAULKED.
6. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE
NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.
CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER
FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING
CONSTRUCTION.
N
GENERAL NOTES
1. DISCONNECT AND REMOVE CONDUIT AND WIRE RUNNING FROM
46_SB_46-W TO 01_PB_10E6P.
2. DISCONNECT AND REMOVE SPARE 30A, 3 POLE BREAKER FROM CIRCUITS
35, 37, 39 IN PANELBOARD 01_PB_10E7.
3. DISCONNECT THE TWO MCC BUCKETS LABELED “M-CWP-8” AND “M-CWP-9”
FROM 46_MC_MCC-46 AND TWO SPARE BUCKETS OF EQUAL SIZE FROM
46_MC_MCC-3B. SEE KEYED NOTES 7 AND 8 ON SHEET E-101 (NEW) FOR
MORE INFORMATION.
4. TURN OFF EXISTING 200A BREAKER THAT PROVIDES POWER TO CHILLED
WATER PUMPS #12 AND #13. RELABEL BREAKER AS “SPARE”. DISCONNECT
AND REMOVE CONDUIT AND WIRE FROM VFD-12 AND VFD-13 BACK TO
SWITCHBOARD 09_SB_9-E.
5. TURN OFF EXISTING 90A BREAKER THAT PROVIDES POWER TO CHILLED
WATER PUMPS #14 AND #15. RELABEL BREAKER AS “SPARE”. DISCONNECT
AND REMOVE CONDUIT AND WIRE FROM VFD-14 AND VFD-15 BACK TO
PANELBOARD 09_PB_90S2.
6. TURN OFF EXISTING 80A BREAKER THAT PROVIDES POWER TO CHILLED
WATER PUMPS #18 AND #19. RELABEL BREAKER AS “SPARE”. DISCONNECT
AND REMOVE CONDUIT AND WIRE FROM DISCONNECT SWITCHES THAT
CONTROL PUMPS #18 AND #19 BACK TO PANELBOARD 01_PB_10S4.
7. DISCONNECT AND REMOVE SPARE 20A, 3 POLE BREAKER IN CIRCUITS 7, 9,
11 FROM PANELBOARD 01_PB_EB10S2.
8. TURN OFF EXISTING 60A, 2 POLE BREAKER THAT PROVIDES POWER TO
BLDG 53 AND RELABEL BREAKER AS "SPARE" IN DIRECTORY. DISCONNECT
WIRES AND PREPARE TO BE RECONNECTED FROM NEW SOURCE.
KEYNOTES
ROOMS BA-01A, BA-01B, BA-07A & BA-10
ENLARGED DEMOLITION FLOOR PLAN
ROOM BA-65A ENLARGED
DEMOLITION FLOOR PLAN
ROOM BE-27 ENLARGED
DEMOLITION FLOOR PLAN
ROOM BA-01 ENLARGED
DEMOLITION FLOOR PLAN
ROOM BD-70 ENLARGED
DEMOLITION FLOOR PLAN
AutoCAD SHX Text
UP
UP
BD-70
MECHANICAL
EQUIPMENT
S001
STAIR
C003
COORIDOR
SEE PLAN 2
THIS SHEET
SEE PLAN 4
THIS SHEET
SEE PLAN 3
THIS SHEET
SEE PLAN 5
THIS SHEET
SEE PLAN 6
THIS SHEET
BA-10
BUILDING 9
SWITCHGEAR
ROOM
BA-07A
BUILDING 9
GENERATOR
ROOM
BA-01B
BUILDING 46
GENERATOR
ROOM
BA-01A
BUILDING 46
SWITCHGEAR
ROOM
46_SB_46-E
46_SB_46-W
46_SB_EB-2
46_SB_46-EE
MT
09_SB_9-E
MT
MT
BA-01
MECHANICAL
ROOM
BA-03
EMS
STORAGE
46_MC_MCC-46
46_MC_MCC-3B
MO
MO
46_MO_CWP-8
46_MO_CWP-9
1-1/4" C - 3#1, 1#8G
TO
46_MC_MCC-3B
1-1/4" C - 3#1, 1#8G
TO
46_MC_MCC-3B
BAS PANEL
BA-65A
MECHANICAL
ROOM
MO
VFD
MO
MO
MO
01_MO_CWP-14
(20 HP)
01_MO_CWP-15
(20 HP)
01_MO_CWP-12
(40 HP)
01_MO_CWP-13
(40 HP)
VFD VFD VFD
VFD-14
VFD-15 VFD-12
VFD-13
09_PB_90S2
BAS PANEL
13 14
TO
46_SB_EB-2
TO
46_SB_EB-2
2" C - 3#3/0, 1#6G
1-1/4" C - 3#1, 1#8G
BE-25
MECHANICAL
ROOM
BE-27
MECHANICAL
ROOM
BD-28
LOADING
DOCK
01_MO_AHU-48-SF
01_PB_EB10E6P
01_PB_10E7
2 01_MO_CWP-5
(40 HP)
01_MO_CWP-1
(40 HP)
01_MO_CWP-2
(40 HP)
01_MO_CWP-3
(40 HP)
01_MO_CWP-4
(40 HP)
VFD-1
VFD-2
VFD-3
VFD-5
VFD-4
MO
MO
MO
MO
MO
VFD
VFD VFD
VFD
VFD
TO
01_AT_EB10E6P
BAS PANEL
BD-70
MECHANICAL
EQUIPMENT
S001
STAIR
C003
COORIDOR
01_PB_EB10S1
MO
01_MO_CWP-18
MO
01_MO_CWP-19
1-1/4" C - 3#3, 1#8G
TO
01_PB_EB10S2
1-1/4" C - 3#3, 1#8G
TO
01_PB_EB10S2
01_PB_10S4
01_PB_EB10S2
BAS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
E-101
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
Buildings 1, 9 and 46 - Basement Floor Plan - New Work
E-101
E-101
E-101
E-101
BASEMENT FLOOR PLAN1
E-101
1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0"
1/8" = 1'-0"
1/32" = 1'-0"
E-101 1/8" = 1'-0"
01, 09, 46
N N
N
N
N
1. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE
PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION
WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR
(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE
SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING
INTERRUPTION OF OPERATIONS AND SERVICES.
2. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.
3. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN
SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.
4. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE
SLEEVED AND FIRE CAULKED.
5. REFER TO ONE-LINE DIAGRAMS ON SHEET E-601 FOR ADDITIONAL
INFORMATION.
6. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE
NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.
CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER
FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING
CONSTRUCTION.
N
GENERAL NOTES
1. PROVIDE A NEW 60A, 2 POLE BREAKER IN CIRCUITS 35 AND 37. PROVIDE A
SPACE COVER FOR CIRCUIT 39. BREAKER SHALL BE COMPATIBLE WITH
EXISTING PANELBOARD MANUFACTURE.
2. INTERCEPT THE 60A FEEDER THAT POWERS BUILDING 53 FROM
PANELBOARD 01_PB_10E6P AND RE-ROUTE TO BE FED OUT OF
PANELBOARD 01_PB_10E7. TERMINATE FEEDER AT NEW 60A, 2 POLE
BREAKER IN CIRCUITS 35 AND 37. UPDATE PANELBOARD SCHEDULE TO
REFLECT CHANGES.
3. REMOVE ALL PANELBOARD LABELS THAT READ “10E6P” AND REPLACE WITH
NEW LABELS THAT READ “EB10E6P”. PROVIDE NEW PANELBOARD
SCHEDULE THAT CALLS OUT SOURCE OF PANELBOARD AS NEW TRANSFER
SWITCH 01_AT_EB10E6P.
4. PROVIDE NEW 800A FEEDER FROM NEW AUTOMATIC TRANSFER SWITCH
01_AT_EB10E6P TO PANELBOARD 01_PB_EB10E6P. REFER TO 3/E-102 FOR
LOCATION OF ATS.
5. PROVIDE NEW 800A FEEDER FROM BUCKET LABELED “10E6P” IN
46_SB_46-W TO NEW AUTOMATIC TRANSFER SWITCH 01_AT_EB10E6P IN
ROOM 1A-01A (SEE KEYNOTE 15). RELABEL BUCKET AS “PANELBOARD
EB10E6P VIA ATS-EB10E6P”.
6. PROVIDE NEW 800A BREAKER IN SWITCHBOARD 46_SB_EE AND LABEL AS
“PANELBOARD EB10E6P VIA ATS-EB10E6P”. PROVIDE NEW 800A FEEDER
FROM NEW BREAKER TO NEW AUTOMATIC TRANSFER SWITCH
01_AT_EB10E6P IN ROOM 1A-01A (SEE KEYNOTE 15).
7. INSTALL THE BUCKETS “M-CWP-8” AND “M-CWP-9” IN THE TWO AVAILABLE
SPACES IN 46_MC_MCC-3B AND THE TWO SPARE BUCKETS IN THE TWO
AVAILABLE SPACES IN 46_MC_MCC-46. SEE KEYED NOTE 3 ON SHEET
ED-101 (DEMO) FOR MORE INFORMATION.
8. INTERCEPT THE CIRCUITS FOR PUMPS #8 AND #9 (M-CWP-8 AND M-CWP-9)
AND RE-ROUTE THEM TO TERMINATE AT THEIR RESPECTIVE BUCKETS NOW
INSTALLED IN 46_MC_MCC-3B.
9. PROVIDE NEW CONDUIT AND WIRE FROM VFD-12 AND VFD-13 TO
SWITCHBOARD 46_SB_EB-2 IN ROOM BA-01B. TERMINATE CIRCUIT AT 200A
SPARE BREAKER IN 46_SB_EB-2. RELABEL BREAKER AS “CWP #12 AND #13,
ROOM BA-65A”.
10. PROVIDE NEW CONDUIT AND WIRE FROM VFD-14 AND VFD-15 TO
SWITCHBOARD 46_SB_EB-2 IN ROOM BA-01B. TERMINATE CIRCUIT AT 100A
SPARE BREAKER IN 46_SB_EB-2. RELABEL BREAKER AS “CWP #14 AND #15,
ROOM BA-65A”.
11. PROVIDE TWO (2) NEW 80A, 3 POLE CIRCUIT BREAKERS IN PANELBOARD
01_PB_EB10S2 SPACES 1, 3, 5, AND 7, 9, 11. THE NEW BREAKERS SHALL BE
LABELED AS “CWP #18, BD-70” AND “CWP-19, BD-70”.
12. PROVIDE NEW CONDUIT AND WIRE FROM PUMPS CWP #18 AND CWP #19
DISCONNECT SWITCHES TO PANELBOARD 01_PB_EB10S2. TERMINATE
CIRCUITS AT THE CORRESPONDING 80A, 3 POLE CIRCUIT BREAKERS
DESCRIBED IN KEY NOTE 11.
13. PROVIDE EXISTING BAS PANEL WITH NEW UPS. SIZE UPS SO BAS PANEL
CAN STAY OPERATIONAL FOR 30 MINUTES AFTER LOSS OF POWER.
14. CONTRACTOR MUST FIELD VERIFY LOCATION OF BAS PANEL AND ENSURE
BAS PANEL HAS EQUIPMENT BRANCH POWER. IF BAS PANEL DOES NOT
HAVE EQUIPMENT BRANCH POWER, CONTRACTOR MUST PROVIDE 120V
CIRCUIT FROM NEAREST EQUIPMENT BRANCH PANELBOARD.
15. PROVIDE NEW 800 A AUTOMATIC TRANSFER SWITCH ATS-EB10E6P TO
CONNECT 46_SB_46_EE and 46_SB_46-W. SEE KEYNOTES 3, 4, 5, & 6.
KEYNOTES
ROOMS BA-01A, BA-01B, BA-07A & BA-10
ENLARGED FLOOR PLAN
ROOM BA-65A
ENLARGED FLOOR PLAN
ROOM BE-27
ENLARGED FLOOR PLAN
ROOM BA-01
ENLARGED FLOOR PLAN
ROOM BD-70
ENLARGED FLOOR PLAN
AutoCAD SHX Text
UP
UP
SEE PLAN 2
THIS SHEET
EB12S1 (OUT OF
SERVICE)
01_PB_EB12E1
01_PB_12E5P
01_PB_12E5P1
01_PB_12E7
Buildings 1, 9 and 46 - 2nd Floor Plan - Demolition & New Work
SECOND FLOOR PLAN1
E-102 1/32" = 1'-0"
E-102 1/8" = 1'-0"
N
N
1. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE
PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION
WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR
(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE
SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING
INTERRUPTION OF OPERATIONS AND SERVICES.
2. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.
3. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN
SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.
4. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE
SLEEVED AND FIRE CAULKED.
5. REFER TO ONE-LINE DIAGRAMS ON SHEET E-601 FOR ADDITIONAL
INFORMATION.
6. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE
NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.
CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER
FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING
CONSTRUCTION.
GENERAL NOTES
1. DISCONNECT AND REMOVE CONDUIT AND WIRE FROM PANELBOARD
01_PB_12E5P TO NON-FUSED DISCONNECTS FOR CHILLED WATER PUMPS
#16 AND #17 IN ROOM 3E-08 (SEE SHEET E-103). TURN OFF 90A BREAKER
THAT POWERS PUMPS #16 AND #17 AND RELABEL BREAKER AS “SPARE”.
VERIFY WITH COR PRIOR TO CONSTRUCTION TO SEE IF THIS HAS BEEN
AFFECTED BY THE KITCHEN PROJECT.
2. PROVIDE NEW 800A, 208V AUTOMATIC TRANSFER SWITCH 01_AT_EB10E6P,
ALONG WITH 3" CONCRETE HOUSEKEEPING PAD. CONTRACTOR TO VERIFY
FINAL LOCATION WITH COR BEFORE CONSTRUCTION.
3. PROVIDE NEW CONDUIT AND WIRE FROM SWITCHBOARD 46_SB_46-EE IN
ROOM BA-01B (SEE SHEET E-101) TO TRANSFER SWITCH FOR EMERGENCY
SOURCE FEEDER.
4. PROVIDE NEW CONDUIT AND WIRE FROM SWITCHGEAR 46_SB_46-W IN
ROOM BA-01A (SEE SHEET E-101) TO TRANSFER SWITCH FOR NORMAL
SOURCE FEEDER.
5. PROVIDE NEW CONDUIT AND WIRE FROM TRANSFER SWITCH TO
PANELBOARD 01_PB_EB10E6P IN ROOM BE-27 (SEE SHEET E-101).
KEYNOTES
ROOM 2E-40
ENLARGED FLOOR PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
E-102
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
AutoCAD SHX Text
DN
AutoCAD SHX Text 2E-41
AutoCAD SHX Text
MECHANICAL
ROOM
SEE PLAN 2
THIS SHEET
BAS PANEL
3E-08
MECH
ROOM01_PB_EB13C1
MO
MO
01_MO_CWP-16
01_MO_CWP-17
TO
01_PB_EB13C12
1-1/4" C - 3#1, 1#8G
TO
01_PB_EB13C1 1-1/4" C - 3#1, 1#8G3
BAS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
E-103
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
Buildings 1, 9 and 46 - Third Floor Plan - New Work
THIRD FLOOR PLAN1
E-103 1/32" = 1'-0"
E-103 1/8" = 1'-0"
01, 09, 46
N
N
1. WHEN WORKING ON ELECTRICAL SYSTEMS, ALL WORK SHALL BE
PERFORMED WITH SYSTEMS DE-ENERGIZED. ALL SERVICE INTERRUPTION
WORK SHALL BE SCHEDULED FOR APPROVAL BY THE VA COR
(CONTRACTING OFFICER REPRESENTATIVE) IN ADVANCE. SEE
SPECIFICATION SECTION 01 00 00 FOR EXACT REQUIREMENTS REGARDING
INTERRUPTION OF OPERATIONS AND SERVICES.
2. ALL TEMPORARY FEEDERS SHALL BE INSTALLED IN METALLIC CONDUIT.
3. ALL INTERIOR ELECTRICAL EQUIPMENT SHOWN ON THIS FLOOR PLAN
SHALL HAVE ELECTRICAL CONDUIT SURFACE MOUNTED.
4. ALL ELECTRICAL CONDUITS THAT PASS THROUGH A WALL SHALL BE
SLEEVED AND FIRE CAULKED.
5. DOWNTIME SHOULD BE MINIMIZED. PROVIDE TEMPORARY POWER WHERE
NECESSARY TO KEEP PUMPS UP AND RUNNING DURING CONSTRUCTION.
CONSULT WITH COR 2 WEEKS IN ADVANCE TO CONSULT THE WEATHER
FORECAST TO ESTIMATE THE CHILLED WATER DEMANDS DURING
CONSTRUCTION.
GENERAL NOTES
1. PROVIDE (2) NEW 90A CIRCUIT BREAKERS IN EXISTING PANELBOARD
01_PB_EB13C1. UPDATE PANELBOARD SCHEDULE AND LABEL BREAKERS
“CHILLED WATER PUMP #16” AND “CHILLED WATER PUMP #17”.
2. PROVIDE NEW CONDUIT AND WIRE FROM NEW 90A CIRCUIT BREAKER IN
01_PB_EB13C1 TO NON-FUSED DISCONNECT THAT CONTROLS CHILLED
WATER PUMP #16 (01_MO_CWP-16).
3. PROVIDE NEW CONDUIT AND WIRE FROM NEW 90A CIRCUIT BREAKER IN
01_PB_EB13C1 TO NON-FUSED DISCONNECT THAT CONTROLS CHILLED
WATER PUMP #17 (01_MO_CWP-17).
4. PROVIDE EXISTING BAS PANEL WITH NEW UPS. SIZE UPS SO BAS PANEL
CAN STAY OPERATIONAL FOR 30 MINUTES AFTER LOSS OF POWER.
KEYNOTES
ROOM 3E-08
ENLARGED FLOOR PLAN
EXIT
Bus 3Ø Fault Current SLG Fault Current Existing Rating Recommended Rating
01_AT_EB10E6P 17,304 16,277 n/a 22,000 01_PB_EB10E6P 13,355 9,804 42,000 n/a
Cable Voltage (V) Feeder/ Circuit Length
(ft) Upstream Equipment Downstream
Equipment # Parallel Runs Cable Size Voltage Drop (V) Voltage Drop %
46_CBL_EB10E6P (E) 208 85 46_SB_46-EE 01_AT_EB10E6P 3 300 1.73 0.83%
46_CBL_EB10E6P (N) 208 75 46_SB_46-W 01_AT_EB10E6P 3 300 1.52 0.73%
46_CBL_EB10E6P 208 175 01_AT_EB10E6P 01_PB_EB10E6P 3 300 3.56 1.71%
Total 208 260 46_SB_46-EE 01_PB_EB10E6P 3 300 5.28 2.54%
09_CBL_CWP-12-13 208 200 46_SB_EB-2 09_CC_CWP-12,
09_CC_CWP-13 1 3/0 3.60 1.73%
09_CBL_CWP-14-15 208 200 46_SB_EB-2 09_CC_CWP-14,
09_CC_CWP-15 1 1 3.43 1.65%
01_CBL_CWP-16 208 30 01_PB_EB13C1 01_NFD_CWP-16 1 1 0.85 0.41%
01_CBL_CWP-17 208 30 01_PB_EB13C1 01_NFD_CWP-17 1 1 0.85 0.41%
01_CBL_CWP-18 208 100 01_PB_EB10S2 01_NFD_CWP-18 1 3 2.23 1.07%
01_CBL_CWP-19 208 100 01_PB_EB10S2 01_NFD_CWP-19 1 3 2.23 1.07%
Generator 1 Rated Size (kW) 450 Peak Recorded Demand (kW) 167 Peak Recorded Load % 37.1%
Existing Demand * 1.25 (kW) 208.8 New Demand (kW) 41.2 Existing + New Demand (kW) 249.9 New Load % 55.5%
Proposed Added Loads Horsepower (hp) Current (A) Voltage (V) Power Factor* Demand Factor Connected kW Connected kVA Running kW Running kVA Pump #16 20 59.4 208 0.95 1.25 20.31 21.37 25.382214 26.71812 Pump #17 20 59.4 208 0.95 0 20.31 21.37 0 0 Pump #18 15 46.2 208 0.95 1 15.79 16.62 15.7933776 16.624608 Pump #19 15 46.2 208 0.95 0 15.79 16.62 0 0
Total for New Loads 72.20 76.00 41.18 43.34
Generator 9 Rated Size (kW) 370 Peak Recorded Demand (kW) 330 Peak Recorded Load % 89.2%
No load will be added to Generator 9 since it is already loaded close to 90% at peak demand.
Generator 46 Rated Size (kW) 600 Peak Recorded Demand (kW) 80 Peak Recorded Load % 13.3%
Existing Demand * 1.25 (kW) 100.0 New Demand (kW) 284.2 Existing + New Demand (kW) 384.2 New Load % 64.0%
Proposed Added Loads Horsepower (hp) Current (A) Voltage (V) Power Factor* Demand Factor Connected kW Connected kVA Running kW Running kVA
CHWP #1 40 114 208 0.95 1.25 38.97 41.02 48.71334 51.2772
CHWP #2 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176
CHWP #3 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176
CHWP #4 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176
CHWP #5 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176
Pump #8 20 59.4 208 0.95 1 20.31 21.37 20.3057712 21.374496 Pump #9 20 59.4 208 0.95 0 20.31 21.37 0 0 Pump #12 40 114 208 0.95 1 38.97 41.02 38.970672 41.02176 Pump #13 40 114 208 0.95 0 38.97 41.02 0 0 Pump #14 20 59.4 208 0.95 1 20.31 21.37 20.3057712 21.374496 Pump #15 20 59.4 208 0.95 0 20.31 21.37 0 0
Total for New Loads 354.02 372.65 284.18 299.13
*Assume 0.95 power factor for VFD controlled motors
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
E-501
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
Buildings 1, 9 and 46 - Calculations
01, 09, 46
E-501
SHORT CIRCUIT
E-501
SERVICE LOAD CALCULATIONS FOR GENERATORS
E-501
VOLTAGE DROP
EMERGENCY PANEL BOARD -
46_SB_46-EE
1600A, 208Y/120V
(3) 4#300 kcmil + #2/0 GRD 3" C
0A
-3 P
A- 3P
0A
-3 P
0A
-3 P
0A
-3 P
BLDG 46 SWITCHGEAR
(MAIN DISTRIBUTION CENTER)
(6) 4#600 kcmil + GRD 4" C
KIRK KEY
INTERLOCK
(6) 4#600 kcmil + GRD 4" C
46_SB_46-W
2500A, 208Y/120V
46_SB_46-E
2500A, 208Y/120V
T46-W
750 KVA-4.16 KV-PRI
120/208-SEC
T46-E
750 KVA-4.16 KV-PRI
120/208-SEC
LIGHTNING
ARRESTOR
LIGHTNING
ARRESTOR
KKK
SP
AR
E
0A
-3 P
SP
AR
E
0A -3
P
SP
AR
E
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
SP
AR
E
BASEMENT
FEEDER No. 2
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A
0A
-3 P
0A
-3 P
2400A-3P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
FEEDER No. 1
2400A-3P
2400A-3P
WATTHOUR METERING WITH A
DEMAND REGISTERED ON EACH
BOARD W/CENTRAL TOTALIZING
WATTHOUR METERING WITH A
DEMAND REGISTERED ON EACH
BOARD W/CENTRAL TOTALIZING
0A
-3 P
A- 3P
0A
-3 P
TO 46_PB_GEN
GENERATOR
CONTROL PANEL
TO
_A T_
FIR
E
PU
MP
TO
_A T_
SU
RG
C
HL
R
TO
_A T_
LS
TO
_A T_
CB
TO
_S P_
4C
TO
_P B_
0N
TO
_P B_
2C
TO
_P B_
1C
TO
_M C_
MC
C-
TO
_P B_
2C
TO
_P B_
0C
TO
_P B_
0C
TO
_A T_
EB
TO
_P B_
2C
TO
_P B_
3C
TO
_P B_
5C
TO
_P B_
3C
TO
_P B_
0S
TO
_A T_
EB
TO
_A T_
SU
RG
C
HL
R
TO
_A T_
FIR
E
PU
MP
TO
_A T_
LS
TO
_A T_
CB
(3) 4#300 kcmil + #2/0 GRD 3" C2
01_PB_
10E7
01_PB_
EB10E6P
01_PB_
10E8
TO PANEL
46_PB_460S2
4 #3/0 + #6 GRD
2" C.
TO
BLDG 53
(3) 4#300 kcmil + #2/0 GRD 3" C
BASEMENT BE-27 BA-01B BA-01A
L
E N
01_AT_EB10E6P
EMERGENCY PANEL BOARD -
46_SB_46-EE
1600A, 208Y/120V
A- 3P
0A
-3 P
0A
-3 P
0A
-3 P
BLDG 46 SWITCHGEAR
(MAIN DISTRIBUTION CENTER)
(6) 4#600 kcmil + GRD 4" C
KIRK KEY
INTERLOCK
(6) 4#600 kcmil + GRD 4" C
46_SB_46-W
2500A, 208Y/120V
46_SB_46-E
2500A, 208Y/120V
T46-W
750 KVA-4.16 KV-PRI
120/208-SEC
T46-E
750 KVA-4.16 KV-PRI
120/208-SEC
LIGHTNING
ARRESTOR
LIGHTNING
ARRESTOR
KKK
SP
AR
E
0A
-3 P
SP
AR
E
0A -3
P
SP
AR
E
0A
-3 P
0A
-3 P
0A
-3 P
SP
AR
E
BASEMENT
FEEDER No. 2
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A
0A
-3 P
0A
-3 P
2400A-3P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
FEEDER No. 1
2400A-3P
2400A-3P
WATTHOUR METERING WITH A
DEMAND REGISTERED ON EACH
BOARD W/CENTRAL TOTALIZING
WATTHOUR METERING WITH A
DEMAND REGISTERED ON EACH
BOARD W/CENTRAL TOTALIZING
0A
-3 P
A- 3P
0A
-3 P
TO
_A T_
FIR
E
PU
MP
TO
_A T_
SU
RG
C
HL
R
TO
_A T_
LS
TO
_A T_
CB
TO
_S P_
4C
TO
_P B_
0N
TO
_P B_
2C
TO
_P B_
1C
TO
_M C_
MC
C-
TO
_P B_
2C
TO
_P B_
0C
TO
_P B_
0C
TO
_A T_
EB
TO
_P B_
2C
TO
_P B_
3C
TO
_P B_
5C
TO
_P B_
3C
TO
_P B_
0S
TO
_A T_
EB
TO
_A T_
SU
RG
C
HL
R
TO
_A T_
FIR
E
PU
MP
TO
_A T_
LS
TO
_A T_
CB
01_PB_
10E7
01_PB_
10E6P
01_PB_
10E8
TO PANEL
46_PB_460S2
4 #3/0 + #6 GRD
2" C.
TO
BLDG 53
BASEMENT
0A
-3 P
3 RUNS OF #300 kcmil + 1/0 GRD
(3) 3" C
5A
-3 P
SP
AR
E
TO 46_PB_GEN
GENERATOR
CONTROL PANEL
BE-27 BA-01B BA-01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
E-601
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Place Chilled Water Pumps on Emergency Power
2101 Elm Street North, Fargo, ND 58102
437-22-108
Revisions: Date:
Bid Documents 04/21/2023
12/10/2025 PAPH TGD
KEY PLAN
BUILDING 1 - ELECTRICAL RISER DIAGRAM - NEW WORK3
E-601 NOT TO SCALE
Buildings 1 and 46 - Electrical Riser Diagrams
1. ADJUST THE LONG-TIME PICKUP SETTING OF THIS EXISTING 800A BREAKER
TO 0.75 (600A).
2. FEEDER UPSIZED FOR VOLTAGE DROP.
KEYNOTES
BUILDING 46 - ELECTRICAL RISER DIAGRAM - NEW WORK4
E-601 NOT TO SCALE
BUILDING 1 - ELECTRICAL RISER DIAGRAM - DEMOLITION WORK1
E-601 NOT TO SCALE
BUILDING 46 - ELECTRICAL RISER DIAGRAM - DEMOLITION WORK2
E-601 NOT TO SCALE
| 437-22-108-G-101_BID |
| Sheets and Views |
| 437-22-108-G-101_TGD-G-101 |
| 437-22-108-ED101_BID |
| Sheets and Views |
| 437-22-108-ED101_TGD-ED101 |
| 437-22-108-E-101_BID |
| Sheets and Views |
| 437-22-108-E-101_PAPH-E-101 |
| 437-22-108-E-102_BID |
| Sheets and Views |
| 437-22-108-E-102_TGD-E-102 |
| 437-22-108-E-103_BID |
| Sheets and Views |
| 437-22-108-E-103_TGD-E-103 |
| 437-22-108-E-501_BID |
| Sheets and Views |
| 437-22-108-E-501_TGD-E-501 |
| 437-22-108-E-601_BID |
| Sheets and Views |
| 437-22-108-E-601_TGD-E-601 |
File details come from the government source that posted it. Updated .