Attachment D 007956_Magazine_BidSchedule.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Magazine Refuse Fire Construction
- Solicitation number
- AS25-33
- Issued by
- Utah
About this file
This document is an Attachment D - Bid Schedule for the "Magazine Refuse Fire" construction project, which is being solicited by the Utah Division of Oil, Gas and Mining. The project involves site mobilization, access road improvements, excavation and quenching of hot or burning coal, cleaning and transporting material for coal quenching, water usage, and fire fighting foam procurement, as well as regrading hillsides and installing erosion control. Bidders are required to provide lump sum pricing for the various tasks, as well as unit pricing for variations in estimated quantities. The total bid price entered must match the online bid form submission. Award will be based on the base "Bid Price." Contractors are cautioned that verified quantities may increase or decrease by more than 15% from the estimated quantities, and the "Variation in Quantity Unit Price" will be used to adjust the contract amount accordingly.
The bid schedule includes details on the use of the "Variation in Contract Bond Rate" to adjust the lump sum amount for bonds when the contract amount changes. Bidders are advised that the owner reserves the right to negotiate unit prices down to a reasonable amount, regardless of the quoted prices, if they appear high at the time of any change order.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Summary Summary Bid Schedule
| Magazine Refuse Fire | |
| Project Number: AMR/007/956 | |
| Name of Bidder: | |
| Bid Item | Lump Sum Amount |
| Construction Subtotal |
(carried over from Detailed Bid Schedule)
| INSURANCE | |
| BONDS (see note below) | |
| TOTAL BID PRICE | 0 |
| Variation in Contract Bond Rate |
Total Bid Price Written:
By submitting a bid under this solicitation, I/we acknowledge that I/we have examined the site conditions and have made the measurments and evaluations necessary to plan and bid the WORK.
Notes:
The Total contract bid price entered here MUST match the total bid price entered in the item section on Purchasing's online bid form. If the amounts are different, the bid price entered in the item section of the online bid form will be considered the correct bid and will be considered the official bid to be evaluated with other bids received.
The "Variation in Quantity Unit Price" on the Bid Schedule will be used for adjustments to the CONTRACT amount where the actual WORK quantity varies by more than 15% from the estimated quantity listed in the Bid Schedule (See Supplemental General Condition No. 26: Variation in Estimated Quantities). The "Variation in Quantity Unit Price" will also be used as the basis for determining costs for tasks not currently specified in the WORK that may be added in the future by change order.
Award of CONTRACT will be based on the base "Bid Price." Contractors are cautioined to submit accurate unit prices for any variations in quantities. Verified quantities can go either up or down from the original estimated quantities. If a unit price appears high at the time of any change order, the OWNER reserves the right to negotiate that unit price down to a reasonable amount regardless of the unit prices quoted in this section.
The "Variation in Contract Bond Rate" will be used to adjust the Lump Sum Amount for bonds when the CONTRACT amount changes (see Section 0200, Part 5.01.D).
Bid Schedule
| Magazine Refuse Fire | |||||
| Project Number: AMR/007/956 | |||||
| Name of Bidder: | |||||
| Task | Item | Estimated Quantity | Units | Bid Price Amount | Variation in Unit Quantity Amount |
| 1 | Site Mobilization | 1 | ls | ||
| 2 | Access Road Improvement: Soil, Transport and Culvert Installation | 1 | ls | ||
| 3 | Excavate and Quench hot or burning coal | 1,500 | cy | ||
| 4 | Clean fill and transport for quenching coal | 150 | cy | ||
| 5 | Water for Quench and Dust Control | 7,500 | gal | ||
| 6 | Fire fighting Foam | 38 | gal | ||
| 7 | Regrade Hillside and Excavation areas | 0.5 | ac | ||
| 8 | Erosion control blankets | 300 | lf | ||
| CONSTRUCTION SUBTOTAL |
(Carry over to Bid Schedule Summary)