Attachment C2 -Pricing Sheet MRC OM 251102.xlsx
XLSX spreadsheet 41 KB Posted
- Attached to
- FDA Solicitation Notice for: MRC Operations and Maintenance Support Services, Laurel, MD.
- Solicitation number
- 75F40126R00006
About this file
This is a pricing sheet template (Attachment C2) for the FDA's Muirkirk Road Complex (MRC) Operations and Maintenance Support Services contract (Solicitation 75F40126R00006). The template is Service Contract Labor Standards (SCLS)-compliant and requires offerors to complete multiple tabs to submit their pricing proposal for this Indefinite Delivery, Indefinite Quantity (IDIQ) contract.
The pricing model encompasses several service categories: routine operations and maintenance (Tab C) priced on a Fixed Price basis across a transition period, 10-month base period, and four optional periods; snow and ice removal services (Tab D) with unit prices for plowing, pre-treatment, post-treatment, sidewalk clearing, and support activities across multiple temperature bands; and non-standard repair services for transformers (Tab F). Offerors must complete Tab B with labor catalog entries and fully-burdened rates for 24 labor categories including project managers, engineers, licensed trades (electricians, plumbers, HVAC technicians), equipment operators, and support personnel. All labor rates must meet or exceed SCLS minimum wage and health & welfare requirements. The submission requires completion of Tab E (assumptions), Tab G (basis of estimate cross-referencing the Performance Work Statement), and a PDF printout of all tabs. The template includes automated calculations for extended prices and totals, with gray cells locked to prevent modification and yellow cells designated for required offeror inputs.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE MODEL — INSTRUCTIONS (SCLS-compliant) | |||
| How to complete | Fill only the yellow cells. Blue cells are optional inputs. Gray cells are calculated and locked. Complete tabs in order: Summary, Tab B (Labor Catalog & Rates), Tab C (TO: Routine O&M FFP), Tab D (TO: Snow & Ice), Tab E (Assumptions), Tab F (TO: NSR Transformer), Tab G (Basis of Estimate), EQs/Scenario (locked for Government use). | ||
| SCLS (formerly 'SCA') compliance | Where Service Contract Labor Standards (SCLS) apply, the WD base wage and H&W are MINIMUMS, not caps. You may propose higher wages/benefits. If duties do not match a WD classification, indicate 'Conformance Needed (SF-1444)'. Enter SCLS code/title and rates on Tab B. | ||
| Submission checklist | • All tabs complete; • No protected cells altered; • All Ordering Periods priced on Tab B; • Snow unit prices entered on Tab D; • BOE filled on Tab G; • PDF printout of all tabs included. | ||
| Color legend | Yellow = required input | Blue = optional input | Gray = calculated / do not edit | ||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
Summary
| SUMMARY & CERTIFICATIONS | |
| Offeror Name (input) | — |
Model: Enter value UEI (input) — Model: Enter value CAGE (input) — Model: Enter value
| Certification | By submitting this workbook, the Offeror certifies that prices are current, accurate, and complete for this submission. | ||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
B_LaborCatalog
| TAB B — LABOR CATALOG & RATES (Ordering Periods) — SCLS mapping included | ||||||||||
| Internal Labor Category | SCLS Applicable? (Yes/No/Exempt-541/Exempt-Computer) | SCLS Occupation Code | SCLS Occupation Title | SCLS Base Wage ($/hr) | Health & Welfare ($/hr) | Actual Base Hourly Rate Paid ($/hr) | Actual Fringe/Indirects ($/hr) | Actual Fully Burdened Rate ($/hr, auto) | Overtime Multiplier | Holiday Multiplier |
| Project Manager (Key) |
Model: Select SCLS applicability Model: Enter SCLS Occupation Code from WD Model: Enter SCLS Occupation Title from WD Model: Enter WD base wage (you may propose higher) Model: Enter H&W rate; must be ≥ WD H&W Model: Proposed Base Hourly Rate (may exceed WD)
| Model: Fringe/Indirects per hour | 1.5 | 1 | |||
| Alternate Project Manager | 1.5 | 1 | |||
| Quality Control Manager (Key) | 1.5 | 1 | |||
| Safety Manager (Key) | 1.5 | 1 | |||
| CMMS Planner/Scheduler / Work Control Dispatcher | 1.5 | 1 | |||
| Chief Engineer / Operations Supervisor | 1.5 | 1 | |||
| Stationary/Boiler Operator (licensed) | 1.5 | 1 | |||
| Chiller Plant Operator (seasonal/shift) | 1.5 | 1 | |||
| BAS Operator | 1.5 | 1 | |||
| Electrician (Licensed) | 1.5 | 1 | |||
| Plumber (Licensed) | 1.5 | 1 | |||
| HVAC Technician (EPA 608) | 1.5 | 1 | |||
| General Maintenance Technician (Multi-trade) | 1.5 | 1 | |||
| Controls Technician (incl. Phoenix/Aircuity) | 1.5 | 1 | |||
| Water Treatment Technician | 1.5 | 1 | |||
| Wastewater Pre-Treatment Operator | 1.5 | 1 | |||
| Laboratory Support Technician (hoods/gases/env controls) | 1.5 | 1 | |||
| NETA-Certified Electrical Testing Technician | 1.5 | 1 | |||
| TAB Technician / Balancer | 1.5 | 1 | |||
| Fire Alarm / Life Safety Systems Technician | 1.5 | 1 | |||
| Snow Supervisor / Dispatcher | 1.5 | 1 | |||
| Equipment Operator (plow/loader) | 1.5 | 1 | |||
| Truck Driver (CDL, spreader) | 1.5 | 1 | |||
| Sidewalk Crew / Laborer | 1.5 | 1 | |||
| Mechanic (snow equipment readiness) | 1.5 | 1 | |||
| 1.5 | 1 | ||||
| 1.5 | 1 | ||||
| 1.5 | 1 | ||||
| 1.5 | 1 | ||||
| 1.5 | 1 | ||||
| Legend: | Yellow = required input | Gray = calculated / do not edit |
C_TORoutine
| TAB C — TO: ROUTINE O&M (FFP by Period: Transition, 10-month Base, OP1–OP4) | |||||||||||||||||||||||
| Helper: | FFP Grand Total (auto) | For monthly items, use Qty = 10 for BASE (10 mo) and Qty = 12 for each Option Period (OP1–OP4). Transition Qty as applicable. | |||||||||||||||||||||
| Category | 0 | CLIN / Description | Unit | ||||||||||||||||||||
| Model: Choose a standard unit: MO (month), EA (each), LOT, LS (lump sum), HR (hour). | TRANS Qty | ||||||||||||||||||||||
| Model: TRANS Qty: enter count for transition period only (0 if not applicable). | TRANS Unit Price ($) | ||||||||||||||||||||||
| Model: Enter unit price for the specified period. | TRANS Extended ($, auto) | BASE (10 mo) Qty | |||||||||||||||||||||
| Model: BASE Qty: for monthly items, enter 10 (10-month base). | BASE Unit Price ($) | ||||||||||||||||||||||
| Model: Enter unit price for the specified period. | BASE Extended ($, auto) | OP1 Qty | |||||||||||||||||||||
| Model: OP1 Qty: for monthly items, enter 12. | OP1 Unit Price ($) | ||||||||||||||||||||||
| Model: Enter unit price for the specified period. | OP1 Extended ($, auto) | OP2 Qty | |||||||||||||||||||||
| Model: OP2 Qty: for monthly items, enter 12. | OP2 Unit Price ($) | ||||||||||||||||||||||
| Model: Enter unit price for the specified period. | OP2 Extended ($, auto) | OP3 Qty | |||||||||||||||||||||
| Model: OP3 Qty: for monthly items, enter 12. | OP3 Unit Price ($) | ||||||||||||||||||||||
| Model: Enter unit price for the specified period. | OP3 Extended ($, auto) | OP4 Qty | |||||||||||||||||||||
| Model: OP4 Qty: for monthly items, enter 12. | OP4 Unit Price ($) | ||||||||||||||||||||||
| Model: Enter unit price for the specified period. | OP4 Extended ($, auto) | Line Total ($, auto) | |||||||||||||||||||||
| Sample - Transition | PWS §Phase-In / Transition | Transition / Phase-In (mobilization, onboarding, coordination) | LS | 1.00 | - 0 | ||||||||||||||||||
| Sample - Program Mgmt & Admin | PWS §Program Admin | Project Management (monthly) | MO | 10.00 | 12.00 | 12.00 | 12.00 | 12.00 | - 0 | ||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| - 0 | |||||||||||||||||||||||
| TO-Routine FFP Totals by Period: | TRANS Total | - 0 | BASE (10 mo) Total | - 0 | OP1 Total | - 0 | OP2 Total | - 0 | OP3 Total | - 0 | OP4 Total | Grand Total | - 0 | ||||||||||
| TO-Routine FFP Totals by Period: | TRANS Total | - 0 | BASE (10 mo) Total | - 0 | OP1 Total | - 0 | OP2 Total | - 0 | OP3 Total | - 0 | OP4 Total | Grand Total | - 0 |
D_Snow
| TAB D — TO: SNOW & ICE PRICING CATALOG | |
| Unit Item (e.g., lane-mile plowed) | |
| Model: Describe the unit item (e.g., lane-mile plowed, lot push, sidewalk segment). | Measure |
| Model: Enter the weather band / temperature range (e.g., 0–15°F, 16–25°F, 26–32°F). | Your Unit Price ($) |
Model: Enter your unit price. Scenario units come from the locked ScenarioS tab.
| ROADS & LOTS — PLOWING (priced per snowfall band) | |
| Lane-mile plowed (roads) | Trace–2" |
| Lane-mile plowed (roads) | >2–6" |
| Lane-mile plowed (roads) | >6–12" |
| Lane-mile plowed (roads) | >12" |
| Subtotal — Roads/Lots Plowing |
| ROADS & LOTS — PRE-TREATMENT (anti-icing; per lane-mile application) | |
| Pre-treatment brine application (lane-mile) | ≤15°F |
| Pre-treatment brine application (lane-mile) | 16–25°F |
| Pre-treatment brine application (lane-mile) | 26–32°F |
| Subtotal — Roads/Lots Pre-Treatment |
| ROADS & LOTS — POST-TREATMENT (de-icer; per ton applied) | |
| De-icer application (per ton applied) | ≤15°F |
| De-icer application (per ton applied) | 16–25°F |
| De-icer application (per ton applied) | 26–32°F |
| Subtotal — Roads/Lots Post-Treatment |
| SIDEWALKS & ENTRIES — CLEARING | |
| Sidewalk segment cleared (per 100 LF) | ≤15°F |
| Sidewalk segment cleared (per 100 LF) | 16–25°F |
| Sidewalk segment cleared (per 100 LF) | 26–32°F |
| Entry/landing cleared (each) | All bands |
| Subtotal — Sidewalks/Entries Clearing | Yellow = required input |
| SIDEWALKS & ENTRIES — PRE/POST-TREATMENT | |
| Sidewalk pre-treatment (per 100 LF) | ≤15°F |
| Sidewalk pre-treatment (per 100 LF) | 16–25°F |
| Sidewalk pre-treatment (per 100 LF) | 26–32°F |
| Sidewalk de-icer application (per 100 LF) | ≤15°F |
| Sidewalk de-icer application (per 100 LF) | 16–25°F |
| Sidewalk de-icer application (per 100 LF) | 26–32°F |
| Subtotal — Sidewalks/Entries Treatment | |
| SUPPORT / READINESS | |
| Mobilization per event (each) | All bands |
| Loader stack/relocate snow (hour) | All bands |
| Hauling & disposal (truckload) | All bands |
| Refreeze treatment within 24 hrs (per application) | All bands |
| Subtotal — Support/Readiness |
E_Assumptions
| TAB E — ASSUMPTIONS (1 page max) |
| Assumptions / Clarifications |
| Enter concise assumptions that do not change requirements. |
Legend: Yellow = required input Blue = optional input Gray = calculated / do not edit
F_NSR
| TAB F — TO: NON-STANDARD REPAIR — Transformer (FFP) | ||||
| CLIN / Description | 0 | Unit | Unit Price ($) | Extended ($, auto) |
| NSR (Transformer) FFP Total: | 0 | ||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
G_BOE
| TAB G — BASIS OF ESTIMATE (BOE) & Cross-Volume Consistency |
| Coverage/shift model (tie to Factor 3 Team Structure & Staffing) |
PM scope basis (tie to Factor 4 PM matrix excerpt)
Method-driven durations/assumptions (tie to Factor 4 methods)
Snow scenario interpretation notes (if any)
Major cost drivers / references (drawings counts, sidewalk segments, etc.)
Legend: Yellow = required input Blue = optional input Gray = calculated / do not edit
Lists
| Units | PWS Refs |
| MO | PWS §Program Admin |
| EA | PWS §Work Control |
| LOT | PWS §Boiler Plant |
| LS | PWS §Chiller Plant |
| HR | PWS §Water Plant |
| PWS §Emergency Power | |
| PWS §HVAC PM | |
| PWS §Electrical PM | |
| PWS §Plumbing PM | |
| PWS §Controls PM | |
| PWS §Lab Devices | |
| PWS §Life Safety | |
| PWS §Sewage Pre-Treat | |
| PWS §Aquaculture | |
| PWS §BSL-3/Vivarium | |
| PWS §PM Matrix | |
| PWS §Reporting/KPI |
File details come from the government source that posted it. Updated .