Attachment C Table for Factor 1 Experience.docx

DOCX document 10 KB Posted

Attached to
ESPC NDER 7 Federal contract opportunity
Solicitation number
GSANDER72023
Issued by
General Services Administration Public Buildings Service Central Office

View the file

Other files for this federal contract opportunity

Other files attached to ESPC NDER 7, newest first.
File Type Posted
ESPC NDER 7 NOO Amendment 0004.pdf PDF
Attachment A EOI Supplemental Data Revised.xlsx XLSX spreadsheet
ESPC NDER 7 NOO Amendment 0003.pdf PDF
NOO Amendment 0003 Questions and Answers.pdf PDF
NDER 7 - NOO Questions (1).pdf PDF
ESPC NDER 7 NOO Amendment 0002.pdf PDF
ESPC NDER 7 NOO - Amendment 0001 2023 05 09.pdf PDF
Attachment B Past Performance Questionnaire.docx DOCX document
ESPC NDER 7 NOO.pdf PDF
Attachment A EOI Supplemental Data .xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C - Table of Experience ESPC NDER Round 7

Factor 1 – Past Experience Table Complete this table for each of the 5 projects submitted for Factor 1 (remove text in red). Table can be modified as needed, but please do not delete categories. If a category does not apply to the project mark it as N/A (do not leave it blank.)

Contract/Task Order #

Project Name:

Award Date: (Identify award date by phase, if applicable):
Contract/Task Order Term (# Yrs)
Most Recently Completed Performance Year (e.g. Performance Year #3)
ESPC or UESC Contract/Task Order? (yes/no If yes, indicate whether ESPC or UESC)

If ESPC or UESC: Did contract/task order include a savings guarantee? (yes/no or N/A)

Agency/Owner Point of Contact (Name)
POC Title
Phone Number
Email Address
Location of Project

(city & state)

Project Details

Deep Energy Retrofit Goals
Did the project achieve deep energy retrofit goals reduction of at least 30% energy use intensity (EUI)? Provide the % of overall energy savings for the project (Mbtu % reduction) and indicate whether the savings has been verified.
Building Types
Include a brief description of the facilities including types, occupancy, and approximate age of buildings. Buildings that consist primarily of one or more of the following will be considered for Round 7: National Register of HIstoric Places, office buildings; laboratory space; data centers; prisons; courthouses and military bases.
Multiple Locations or Campuses
Provide the proximity of each location to the other locations under the contract/task order.
Project Gross Square Footage
Provide total gsf for the project and list gsf for primary buildings (small buildings do not need to be itemized).
ECMs
Indicate if the project included any of the following ECMs: heating and cooling systems, building envelope upgrades (including insulation and infiltration reduction), metering and submetering systems, building automation system controls, lighting and lighting controls, energy storage, variable frequency drives (VFDs), geothermal heat pumps, water or air source heat pumps, and photovoltaic (PV) or onsite renewable technologies.
ESCO obtained financing and was borrower of record.
yes/no
Were any of the facilities on the National Historic Building Registry?
Yes/no if yes include building names and addresses.
Building(s) eliminating scope 1 emissions as defined in the Federal Building Performance Standard (BPS)
Yes/no if yes include building names and addresses and summary of projects planned/executed to meet this objective.

Annual Energy Data (totals for the entire project)

Energy Usage Intensity
Pre-Retrofit (Mbtu/sf/yr)
Post Retrofit (Mbtu/sf/yr)
Annual Energy Consumption
EUI (Mbtu/yr)
ESCO’s must demonstrate it meets the annual savings guarantee through the most recently completed performance year. Show the estimated savings (project level), guaranteed savings, and contractual savings. Savings should be stated in Mbtu/yr and in dollars. If savings fell short, provide a brief explanation of the reasons why (government delay, mission impact, etc.)
Annual Water Consumption
(Kgal/yr)
ESCO’s must demonstrate it meets the annual savings guarantee through the most recently completed performance year. Show the estimated savings (project level), guaranteed savings, and contractual savings. Savings should be stated in Kgal/yr and in dollars. If savings fell short, provide a brief explanation of the reasons why (government delay, mission impact, etc.)

File details come from the government source that posted it. Updated .