Attachment C - Table of Experience ESPC NDER Round 7
Factor 1 – Past Experience Table Complete this table for each of the 5 projects submitted for Factor 1 (remove text in red). Table can be modified as needed, but please do not delete categories. If a category does not apply to the project mark it as N/A (do not leave it blank.)
Contract/Task Order #
Project Name:
| Award Date: (Identify award date by phase, if applicable): |
| Contract/Task Order Term (# Yrs) |
| Most Recently Completed Performance Year (e.g. Performance Year #3) |
| ESPC or UESC Contract/Task Order? (yes/no If yes, indicate whether ESPC or UESC) |
If ESPC or UESC: Did contract/task order include a savings guarantee? (yes/no or N/A)
| Agency/Owner Point of Contact (Name) |
| POC Title |
| Phone Number |
| Email Address |
| Location of Project |
(city & state)
Project Details
| Deep Energy Retrofit Goals |
| Did the project achieve deep energy retrofit goals reduction of at least 30% energy use intensity (EUI)? Provide the % of overall energy savings for the project (Mbtu % reduction) and indicate whether the savings has been verified. |
| Building Types |
| Include a brief description of the facilities including types, occupancy, and approximate age of buildings. Buildings that consist primarily of one or more of the following will be considered for Round 7: National Register of HIstoric Places, office buildings; laboratory space; data centers; prisons; courthouses and military bases. |
| Multiple Locations or Campuses |
| Provide the proximity of each location to the other locations under the contract/task order. |
| Project Gross Square Footage |
| Provide total gsf for the project and list gsf for primary buildings (small buildings do not need to be itemized). |
| ECMs |
| Indicate if the project included any of the following ECMs: heating and cooling systems, building envelope upgrades (including insulation and infiltration reduction), metering and submetering systems, building automation system controls, lighting and lighting controls, energy storage, variable frequency drives (VFDs), geothermal heat pumps, water or air source heat pumps, and photovoltaic (PV) or onsite renewable technologies. |
| ESCO obtained financing and was borrower of record. |
| yes/no |
| Were any of the facilities on the National Historic Building Registry? |
| Yes/no if yes include building names and addresses. |
| Building(s) eliminating scope 1 emissions as defined in the Federal Building Performance Standard (BPS) |
| Yes/no if yes include building names and addresses and summary of projects planned/executed to meet this objective. |
Annual Energy Data (totals for the entire project)
| Energy Usage Intensity |
| Pre-Retrofit (Mbtu/sf/yr) |
| Post Retrofit (Mbtu/sf/yr) |
| Annual Energy Consumption |
| EUI (Mbtu/yr) |
| ESCO’s must demonstrate it meets the annual savings guarantee through the most recently completed performance year. Show the estimated savings (project level), guaranteed savings, and contractual savings. Savings should be stated in Mbtu/yr and in dollars. If savings fell short, provide a brief explanation of the reasons why (government delay, mission impact, etc.) |
| Annual Water Consumption |
| (Kgal/yr) |
| ESCO’s must demonstrate it meets the annual savings guarantee through the most recently completed performance year. Show the estimated savings (project level), guaranteed savings, and contractual savings. Savings should be stated in Kgal/yr and in dollars. If savings fell short, provide a brief explanation of the reasons why (government delay, mission impact, etc.) |