Attachment C - Specifications - Pages 1-2.docx

DOCX document 17 KB Posted

Attached to
Rebid* Fire Hydrant Replacement&Repair Bid Cancelled: 10/31/2025 - Addendum No. 1 – CANCELLATION Date Issued: 10/31/2025 Your reference
Solicitation number
3000025508
Issued by
Allen Parish, Louisiana

About this file

This document is a Specifications Attachment for RFx 3000025508, issued by the Louisiana Department of Corrections (DOC) for fire hydrant replacement and repair services at the Allen Correctional Center in Kinder, Louisiana. The scope of work requires a contractor to supply all labor, rentals, permits, and materials to replace and repair fire hydrants, with specific requirements including replacing a fire hydrant behind the maintenance shop and repairing a leaking fire hydrant in front of travel trailers. The project involves detailed technical specifications, including using Mueller Super Centurion Fire Hydrant Series or an equivalent model with 6" nominal pipe size and 250-350 PSI pressure rating.

The contractor will be responsible for comprehensive site work, including water shut-offs, excavation, hydrant removal and replacement, leak verification, backfilling, and site cleanup. Additional contractual responsibilities include scheduling water outages with facility maintenance, providing material delivery and pickup, and disposing of all materials and debris. No specific pricing, funding sources, or contract term details are provided in the document. The site visit contact is Taylor Maricle, who can be reached at 337-375-6611 or Taylor.Maricle@la.gov for additional project information.

View the file

Other files

File Type Posted
3000025508-1.pdf PDF
Attachment A - Special Terms and Conditions Pages 1-12.docx DOCX document
3000025508.pdf PDF
Attachment B - Job Site Verification Form - Page 1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000025508

**If bidding other than specified, please provide manufacturer’s specs for “or equal” items. ** Scope of Work The Contractor shall supply all labor, rentals, permits and materials to replace and repair fire hydrants for the Department of Corrections (DOC).

Location:

DOC Allen Correctional Center 3751 Lauderdale Woodyard Rd.

Kinder, La. 70648

Site Visit Contact:

Taylor Maricle 337-375-6611 Taylor.Maricle@la.gov

The Contractor shall be responsible for the following:

Fire hydrant replacement:

Brand/Model: Mueller Super Centurion Fire Hydrant Series or Equal Nominal Pipe Size: 6” Pressure Rating: A423 (250 PSI), A423HP (350 PSI) A-2361-23 Mechanical Joint Ends

Specify Brand/Model Bidding: _____________

· Replace fire hydrant behind maintenance shop

· Shut water off to fire hydrant

· Dig down to fire main

· Remove piping and fire hydrant from valve in the ground

· Turn water back on

· Verify no leaks are present

· Backfill and pack dirt with proper kickers in place

· Verify proper operation

· Cleaning of general work area

Fire hydrant repair:

· Investigate and repair leaking fire hydrant in front of travel trailers

· Shut water off to fire hydrant

· Dig down and investigate what is causing fire hydrant to leak from the ground

· Attempt to close drain check and fire hydrant will need to be replaced if drain check is unable to be closed.

· Install repair kit if needed.

· Verify no leaks are present and proper operation of fire hydrant

· Cleaning of general work area

General Terms:

· The Contractor shall schedule any water outages with facility maintenance and provide an estimation for the period of time the water will be off.

· The Contractor shall be responsible for delivery and pickup of materials/supplies needed to complete project.

· Disposal of all materials, and debris shall be the responsibility of the contractor.

File details come from the government source that posted it. Updated .