Attachment_C_-_Price_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
OGS Evaporative & Drift Media Upgrade
Solicitation number
PR8579
Issued by
Polk County, Florida

About this file

This is a Price Schedule attachment for a state and local contract opportunity issued by OUC (Orlando Utilities Commission) in Florida for the replacement of Evaporative and Drift Media at Osceola Generation Station's three GE 7FA.03 Gas Turbine units located in St. Cloud, Florida. The price schedule is structured to accommodate bidding for three separate units, with each unit line item requesting cost breakdowns for mobilization, parts and materials, labor costs per hour, and optional upgrade and improvements, along with a total cost calculation for each unit.

The pricing structure requires bidders to provide firm rates for mobilization on an each (EA) basis, materials costs, hourly labor rates, and any optional upgrade costs, with all extended costs calculated by multiplying quantity by rate. If the total project cost exceeds $200,000, a Payment and Performance Bond covering 100 percent of the project value will be required. The schedule also requires bidders to provide markup percentages for materials and rental equipment used in time and material extra work scenarios, along with submission of a standard rate sheet with all-inclusive rates that remain firm through project completion. These rates must encompass labor, supervision, payroll taxes, employee benefits, insurance, taxes, permits, licenses, personal protective equipment, small tools, consumables, test equipment, vehicles, travel expenses, office equipment and supplies, communications, overhead, and profit.

View the file

Other files

File Type Posted
8579_PR_-_Selection_Meeting_PUBLIC_NOTICE.pdf PDF
PR8579_Addendum_1.docx DOCX document
Compliance_-_Submittal_Forms.pdf PDF
PR8579_RFP_OGS_Evaporative_&_Drift_Media.pdf PDF
Attachment_B_-_Company_Qualifications_Form.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Attachment 'B' Price Sheet for 8579

Unit 1
Description:UnitQuanityRateExtended Cost
MobilizationEA$ - 0$ - 0
Parts/Materials$ - 0$ - 0
Labor CostPer HR$ - 0$ - 0
Option 1 Upgrade & Improvements$ - 0$ - 0
Total Cost$ - 0
Unit 2
Description:UnitQuanityRateExtended Cost
MobilizationEA$ - 0$ - 0
Parts/Materials$ - 0$ - 0
Labor CostPer HR$ - 0$ - 0
Option 1 Upgrade & Improvements$ - 0$ - 0
Total Cost$ - 0
Unit 3
Description:UnitQuanityRateExtended Cost
MobilizationEA$ - 0$ - 0
Parts/Materials$ - 0$ - 0
Labor CostPer HR$ - 0$ - 0
Option 1 Upgrade & Improvements$ - 0$ - 0
Total Cost$ - 0
Bond Cost
If total costs exceedsz $200,000 a Payment & Performance Bond will be required to cover 100% of the value of the project.$ - 0
TIME & MATERIAL EXTRA WORK
Provide Mark-up percentage on Materials if applicable __________%
Provide Mark-up percentage on Rental Equipment if applicable_____%

Time and Material Rates provided by the Supplier as part of its proposal will be used as the basis for invoicing by the Supplier. Payments will be based on actual work requested by OUC’s Designated Representative and performed by the Supplier.

Supplier Shall provide their Standard Rate Sheet: Rates shall remain firm through project completion. Rates shall be all inclusive covering all labor, supervision, payroll taxes, employee benefits, insurance, taxes, permits, licenses, personal protection equipment, small tools, consumables, test equipment, vehicles, travel expenses, office equipment and supplies, voice communications, overhead and profit, per diem, etc.

File details come from the government source that posted it. Updated .