ATTACHMENT C Price Cost Schedule Grounds Maintenance Services Ft McClellan POW Cemetery.pdf

PDF 288 KB Posted

Attached to
S208--Ft McClellan POW Cemetery Grounds Maintenance Services |Amendment to Post Missing Documents from Original Solicitation Post on 7/28/20
Solicitation number
36C78620Q0299
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C: PRICE/COST SCHEDULE

Ft. McClellan POW Cemetery

BASE YEAR (SEP 01, 2020- AUG 31, 2021)

CLIN

ITEM

EST

QTY

UNIT

PRICE

TOTAL PRICE

0001 Headstone Maintenance-cleaning and routine alignment correction (bump and run)

EA

0002 Headstone Maintenance- Raise, Lower and realign

0003 Headstones – receiving shipments, storage, initial setting, replacing (setting R2’s) and destroying replaced headstones.

0004 Sunken Grave Repair (Grade correction and replace turf)

0005 Trim headstones and markers in conjunction with every mowing.

34 times approx. 30 headstones

JB

0005A Other Ground maintenance to include sweeping, blowing of the roadways, walkways, trash and debris pickup, removal of floral and wreaths as needed.

Remove debris, flagpole assembly area, aluminum benches, clean aluminum benches.

0006 Turfgrass – mowing, 1 acres mowed and trimmed

0007 Edging – walks, curbs 34 EA $ $ 0008 Turfgrass - pre-emergence herbicide application (2 acres;

April & June)

0009 Turfgrass - post-emergence herbicide spray (2 acres; Oct. & May).

0010 Turfgrass – fertilization (2 acres;

Oct., June, & Sep.)

0011 Turfgrass – aerification (1 X year)

0012 Turfgrass – over seeding. (1 X

0013 Shrub maintenance (pruning) 3 JB $ $ 0013A Leaf Collection and removing and removal of pinecones and debris.

0014 Trees - structural training (pruning). 1st year under warranty

0015 Mulched bed maintenance – maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings, ornamental beds, perimeter buffer strip –estimated sq. feet)

0016 Mulch – reapply/refresh mulch in planting beds, tree rings, and permanent perimeter buffer strip

0017 Mulch – Snapshot herbicide (or equal) application to all mulched surface

0018 Disease application and pest control

0019 Sod removal & placement on casketed sites.

0020 Snow Removal per event (All CLINs)

0020A Snow Removal Only - Streets and Parking Lots

0020B Snow Removal Only Sidewalks/Walkways/Specialty Areas

0020C Ice Melt Application Only -

0021 Grave excavation Casket Remains/ Grave excavation cremains/ Backfilling remains

0021A Transportation of Casketed remains and Floral Arrangements

0022 Paint concrete, block walls, archways, metal fence and metal handrails); all whitewashed surfaces shall be repainted annually to preserve the appearance and structure

0023 Emergency on call for storm damage

0024 Placement and Removal of Flags and Avenue of Flags

0025 Support Services for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed. Manpower and equipment for high priority events and services at the cemetery

Total Estimated Price Base Year:

OPTION YEAR #1 (SEP 01, 2021- AUG 31, 2022)

1001 Headstone Maintenance-

1002 Headstone Maintenance- Raise, Lower and realign

30 EA

1003 Headstones – receiving shipments, storage, initial setting, 1004 Sunken Grave Repair (Grade

1005 Trim headstones and markers in

1005A Other Ground maintenance to include sweeping and blowing of the roadways and walkways, trash and debris pickup and removal of floral and wreaths as needed.

Remove debris, flagpole assembly area, aluminum benches and clean

1006 Turfgrass – mowing, 1 acres

1007 Edging – walks, curbs 34 EA $ $ 1008 Turfgrass - pre-emergence

1009 Turfgrass - post-emergence

1010 Turfgrass – fertilization (2 acres;

1011 Turfgrass – aerification (1 X

1012 Turfgrass – over seeding. (1 X

1013 Shrub maintenance (pruning) 3 JB $ $ 1013A Leaf Collection and removing and

1014 Trees - structural training

1015 Mulched bed maintenance – maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings, ornamental beds, perimeter buffer strip –estimated sq. feet)

1016 Mulch – reapply/refresh mulch in

1017 Mulch – Snapshot herbicide (or

1018 Disease application and pest

1019 Sod removal & placement on casketed sites.

1020 Snow Removal per event (All

1020A Snow Removal Only - Streets

1020B Snow Removal Only

1020C Ice Melt Application Only -

1021 Grave excavation Casket Remains/

1021A Transportation of Casketed

1022 Paint concrete, block walls, archways, metal fence and metal handrails); all whitewashed surfaces shall be repainted

1023 Emergency on call for storm

1024 Placement and Removal of Flags

1025 Support Services for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed.

Manpower and equipment for high priority events and services

Total Estimated Price Option #1:

OPTION YEAR #2 (SEP 01, 2022- AUG 31, 2023)

2001 Headstone Maintenance-

2002 Headstone Maintenance- Raise, Lower and realign

2003 Headstones – receiving shipments, storage, initial setting, 2004 Sunken Grave Repair (Grade

2005 Trim headstones and markers in

2005A Other Ground maintenance to include sweeping, blowing of the roadways, walkways, trash and debris pickup, removal of floral and wreaths as needed.

Remove debris, flagpole assembly area, aluminum benches, clean

2006 Turfgrass – mowing, 2 acres

2007 Edging – walks, curbs 34 EA $ $ 2008 Turfgrass - pre-emergence

2009 Turfgrass - post-emergence

2010 Turfgrass – fertilization (2 acres;

2011 Turfgrass – aerification (1 X

2012 Turfgrass – over seeding. (1 X

Shrub maintenance (pruning) 3

JB $ $

2013A Leaf Collection and removing and

2014 Trees - structural training

2015 Mulched bed maintenance – maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings, ornamental beds, perimeter buffer strip –estimated sq feet)

2016 Mulch – reapply/refresh mulch in

2017 Mulch – Snapshot herbicide (or

2018 Disease application and pest

2019 Sod removal & placement on

2020 Snow Removal per event (All

2020A Snow Removal Only - Streets

2020B Snow Removal Only

2020C Ice Melt Application Only -

2021 Grave excavation Casket Remains/

2021A Transportation of Casketed

2022 Paint concrete, block walls, archways, metal fence and metal handrails); all whitewashed surfaces shall be repainted

2023 Emergency on call for storm

2024 Placement and Removal of Flags

2025 Support Services for Memorial Day, Veteran’s Day, Wreaths

Across America, and other weekend special events as needed.

Manpower and equipment for

Total Estimated Price Option #2:

OPTION YEAR #3 (SEP 01, 2023- AUG 31, 2024)

3001 Headstone Maintenance-

3002 Headstone Maintenance- Raise, 3003 Headstones – receiving shipments, storage, initial setting, 3004 Sunken Grave Repair (Grade

3005 Trim headstones and markers in

34 times approx. 355 headstones

3005A Other Ground maintenance to include sweeping and blowing of the roadways and walkways, trash and debris pickup and removal of floral and wreaths as needed.

Remove debris, flagpole assembly

3006 Turfgrass – mowing, 2 acres

3007 Edging – walks, curbs 34 EA $ $ 3008 Turfgrass - pre-emergence

3009 Turfgrass - post-emergence

3010 Turfgrass – fertilization (2 acres;

3011 Turfgrass – aerification (1 X

3012 Turfgrass – over seeding. (1 X

3013 Shrub maintenance (pruning) 3 EA $ $ 3013A Leaf Collection and removing and

3014 Trees - structural training

3015 Mulched bed maintenance – maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings, ornamental beds, perimeter buffer strip –estimated square feet)

3016 Mulch – reapply/refresh mulch in

3017 Mulch – Snapshot herbicide (or

3018 Disease application and pest

3019 Sod removal & placement on

3020 Snow Removal per event (All

3020A Snow Removal Only - Streets

3020B Snow Removal Only

3020C Ice Melt Application Only -

3021 Grave excavation Casket Remains/

3021A Transportation of Casketed

3022 Paint concrete, block walls, archways, metal fence and metal handrails); all whitewashed surfaces shall be repainted

3023 Emergency on call for storm

3024 Placement and Removal of Flags

3025 Support Services for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed.

Manpower and equipment for

Total Estimated Price Option #3

OPTION YEAR #4 (SEP 01, 2024- AUG 31, 2025)

4001 Headstone Maintenance-

4002 Headstone Maintenance- Raise, 4003 Headstones – receiving shipments, storage, initial setting, 4004 Sunken Grave Repair (Grade

4005 Trim headstones and markers in

4005A Other Ground maintenance to include sweeping and blowing of the roadways and walkways, trash and debris pickup and removal of floral and wreaths as needed.

Remove debris, flagpole assembly

4006 Turfgrass – mowing, 2 acres

4007 Edging – walks, curbs 34 EA $ $ 4008 Turfgrass - pre-emergence

4009 Turfgrass - post-emergence

4010 Turfgrass – fertilization (2 acres;

4011 Turfgrass – aerification (1 X

4012 Turfgrass – over seeding. (1 X

4013 Shrub maintenance (pruning) 3 JB $ $ 4013A Leaf Collection and removing and

4014 Trees - structural training

4015 Mulched bed maintenance – maintain weed-free with nonselective herbicide and/or hand weeding (all mulched surface, including tree rings, ornamental beds, perimeter buffer strip –estimated square feet)

4016 Mulch – reapply/refresh mulch in

4017 Mulch – Snapshot herbicide (or

4018 Disease application and pest

4019 Sod removal & placement on

4020 Snow Removal per event (All

4020A Snow Removal Only - Streets

4020B Snow Removal Only

4020C Ice Melt Application Only -

4021 Grave excavation Casket Remains/

4021A Transportation of Casketed

4022 Paint concrete, block walls, archways, metal fence and metal handrails); all whitewashed surfaces shall be repainted

4023 Emergency on call for storm

4024 Placement and Removal of Flags

4025 Support Services for Memorial Day, Veteran’s Day, Wreaths Across America, and other weekend special events as needed.

Manpower and equipment for

Total Estimated Price Option #4:

TOTALS:

BASE YEAR PROPOSED PRICING: ________________________________

OPTION YEAR #1 PROPOSED PRICING: __________________________

OPTION YEAR #2 PROPOSED PRICING: __________________________

OPTION YEAR #3 PROPOSED PRICING: __________________________

OPTION YEAR #4 PROPOSED PRICING: __________________________

GRAND TOTAL ALL PROPOSED PRICING: ________________

File details come from the government source that posted it. Updated .