This file is an Attachment C detailing permit requirements for the Castle Point Wastewater Treatment Plant (WWTP) under New York State Department of Environmental Conservation (NYS DEC) SPDES Permit NY0020087. The document specifies comprehensive monitoring and effluent limitation requirements for the facility, including monthly testing for biochemical oxygen demand (BOD), total suspended solids (TSS), nitrogen/ammonia, and periodic coliform testing.

The permit outlines specific discharge parameters for the Hudson River, including daily and monthly limits for effluent concentration, with monitoring frequencies and sample types for various water quality indicators. Key requirements include maintaining BOD and TSS levels within 15% of influent concentrations, managing pH between 6.0-9.0 SU, and implementing seasonal disinfection from May 1st to October 1st. The document is directly related to the VA's solicitation for water and wastewater treatment plant operation and maintenance services at the Castle Point Campus, providing critical technical background for potential service providers.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C – PERMIT REQUIREMENTS CASTLE POINT WWTP

Meet Current Castle Point WWTP NYS DEC SPDES Permit NY0020087 requirements including but not limited to:

Coliform P/A 44 annually. They are scheduled periodically throughout the year.

Heterotrophic plate count 44 annually. Sites same as above coliform test

In accordance with page 6 of SPDES permit NY0020087 attached. Use the list from the attachment for this section. There are more tests required then outlined below.

BOD5 Influent and Effluent monthly

TSS Influent and Effluent monthly

Nitrogen/Ammonia N monthly

ATTACHMENT – PERMIT LIMITS, LEVEL AND MONITORING CASTLE POINT

SPDES PERMIT NUMBER NY0020087 (PAGE 6)

OUTFALL

No.

LIMITATIONS

APPLY:

RECEIVING WATER EFFECTIVE EXPIRING

001 All year unless otherwise noted

Hudson River EDPM ExDP

PARAMETER

EFFLUENT LIMIT MONITORING REQUIREMENTS FN

TYPE LIMIT UNITS LIMIT UNITS SAMPLE

FREQUENCY

SAMPLE

TYPE

LOCATION

INF. EFF.

Flow Monthly Average

0.40 MGD Continuous Recorder X

BOD 30-Day Arithmetic Mean mg/l 100 lbs./day 1/month 6 hr.

Composite

X X 1

BOD 7-Day Arithmetic Mean

45 mg/l 150 lbs./day 1/month 6 hr.

Composite

Solids, Suspended

30-Day Arithmetic Mean

30 mg/l 100 lbs./day 1/month 6 hr.

Composite

X X 1

Solids, Suspended

7-Day Arithmetic Mean

45 mg/l 150 lbs./day 1/month 6 hr.

Composite

X

Solids, Settleable

Daily Maximum

0.3 ml/l Daily Grab X pH Range 6.0-9.0 SU Daily Grab X

Nitrogen, Ammonia (as N)

Daily Maximum

Monitor mg/l 1/month Grab X

Temperature Daily Maximum

Monitor Deg C Daily Grab X X

Effluent Disinfection Required:[ ] All Year [X] Seasonal from May 1st to October 1st

Coliform, Fecal

30-Day Geometric Mean

200 1/month Grab X

Coliform 7-Day Geometric Mean

400 1/month Grab X

Coliform 6 Hr.

Geometric Mean

800 See Footnote See Footnote

X 2

Coliform Individual Sample

2400 See Footnote See Footnote

X 2

Coliform Daily Maximum

.375 Daily Grab X 3,4

CASTLE POINT FOOTNOTES:

(1) AND EFFLUENT SHALL NOT EXCEED 15% AND 15% OF INFLUENT CONCENTRATION

VALUES FOR

BOD & TSS RESPECTIVELY.

(2) THIS IS AN INTERSTATE ENVIRONMENT COMMISSION (IEC) REQUIREMENT. THE

PERMITTEE IS

NOT REQUIRED TO PERFORM THIS SAMPLING BUT SHALL BE REQUIRED TO MEET THE

PERMIT

LIMIT AT ALL TIMES. EPA, DEC OR IEC MAY PERFORM SAMPLING.