Attachment C_FSSS Package_NFSR 462 and 462A_20260612.docx
DOCX document 68 KB Posted
- Solicitation number
- 127EAX26Q0079
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Forest Service Supplemental Specifications (FSSS) document that modifies the FP-24 standard specifications for construction of National Forest System Roads. The FSSS package applies to NFSR 462 and 462A contracts and establishes technical requirements, measurement standards, and payment procedures for forest road construction and maintenance work.
The document revises FP-24 specifications across multiple sections covering site preparation, excavation, material handling, and aggregate placement. Key modifications include: definitions specific to Forest Service operations (such as Pioneer Road, Protected Streamcourse, and Road Order); clearing and grubbing requirements with merchantable timber utilization standards and disposal procedures; excavation specifications for rock cuts, earth cuts, and drainage features with 6-inch subgrade depths and compaction requirements; structure excavation and backfill protocols for culverts with approval thresholds based on pipe diameter and stream course location; riprap gradation testing using the size method with D85 and D15 measurements; and untreated and crushed aggregate course specifications requiring written approval before placement. Payment measurement precision is defined in detailed tables (e.g., 0.01 acre, 1 cubic foot, 0.1 linear foot for timber/steel/concrete piles). The specifications incorporate references to MSHA, NESC, AFPA standards and establish that excess materials from Government lands become Government property. This FSSS package is designed for Region 3 Forest Engineering and Roads Maintenance (FERM) BPA holders in New Mexico and replaces all TAR (Transportation Acquisition Regulations) references with AGAR (Agriculture Acquisition Regulations) applicability.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| PREFACE | 2 |
| Section 101. – TERMS, FORMAT, AND DEFINITIONS | 2 |
| Section 101. – TERMS, FORMAT, AND DEFINITIONS | 2 |
| Section 101. – TERMS, FORMAT, AND DEFINITIONS | 3 |
| Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT | 6 |
| Section 103. – SCOPE OF WORK | 6 |
| Section 104. – CONTROL OF WORK | 6 |
| Section 104. – CONTROL OF WORK | 6 |
| Section 105. – CONTROL OF MATERIAL | 6 |
| Section 106. – ACCEPTANCE OF WORK | 7 |
| Section 108. - PROSECUTION AND PROGRESS | 7 |
| Section 109. - MEASUREMENT AND PAYMENT | 7 |
| Section 109. - MEASUREMENT AND PAYMENT | 7 |
| Section 109. - MEASUREMENT AND PAYMENT | 8 |
| Section 201. - CLEARING AND GRUBBING | 9 |
| Section 201. - CLEARING AND GRUBBING | 10 |
| Section 204. – EXCAVATION AND EMBANKMENT | 10 |
| Section 204. – EXCAVATION AND EMBANKMENT | 11 |
| Section 209. - STRUCTURE EXCAVATION AND BACKFILL | 11 |
| Section 251. – RIPRAP | 11 |
| Section 301. - UNTREATED AGGREGATE COURSES | 12 |
| Section 301. - UNTREATED AGGREGATE COURSES | 12 |
| Section 302. - CRUSHED AGGREGATE | 12 |
| Section 302. - CRUSHED AGGREGATE | 13 |
| Section 302. - CRUSHED AGGREGATE | 13 |
| Section 703. - AGGREGATE | 13 |
PREFACE
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-24 for construction of National Forest System Roads. The Forest Service Supplemental Specifications (FSSS) shall be incorporated in the FP-24. The applicable specifications for the project will be the FP-24 as modified by the FSSS.
Section 101. – TERMS, FORMAT, AND DEFINITIONS Add the following paragraph to Subsection 101.01 Meaning of Terms:
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
Section 101. – TERMS, FORMAT, AND DEFINITIONS Add the following to Subsection 101.03 Abbreviations:
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FSSS – Forest Service Supplemental Specifications MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau
(d) Miscellaneous unit abbreviations.
| MP - milepost | location | ||
| ppm - parts per million | volume | ||
| STA – station | location | ||
| MFBM - thousand feet board measure | volume |
Section 101. – TERMS, FORMAT, AND DEFINITIONS Make the following changes to Subsection 101.04 Definitions:
Delete these definitions and replace with the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings —Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work. (Timber Contracts) does not apply, replace NTP with Contract Award.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Forest Service Supplemental Specifications – The Forest Service uses supplemental specifications to modify the FP-24 to meet the agency needs and intents. FSSS revise the FP-24 by adding, deleting, replacing, revising, replacing part of entire sections or subsections or adding new sections to the FP..
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and stewardship contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms
Section 102. - BID, AWARD, AND EXECUTION OF CONTRACT Delete Section 102 Bid, Award, and Execution of Contract in its entirety.
Section 103. – SCOPE OF WORK Delete all of Section 103 Scope of Work except Subsection 103.01 Intent of Contract.
Section 104. – CONTROL OF WORK Delete Subsection 104.07 Coordination of Contract Documents.
Section 104. – CONTROL OF WORK Add the following Subsection 104.12 Use of Roads by Contractor:
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Section 105. – CONTROL OF MATERIAL Delete second paragraph and subparagraphs (a) and (b) in Subsection 105.05 Use of Material Found in the Work and replace it with the following:
The right to use and process material found in the work excludes the use and processing of material for nongovernment contract work, except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material at government-approved agreed to location(s), at no additional cost to government.
Section 106. – ACCEPTANCE OF WORK Delete the 3rd and 4th paragraphs in Subsection 106.01 Conformity with Contract Requirements.
Section 108. - PROSECUTION AND PROGRESS Delete Section 108 Prosecution and Progress in its entirety.
Section 109. - MEASUREMENT AND PAYMENT Delete Subsections 109.06 Pricing and Adjustments, 109.07 Estimated Work, 109.08 Progress Payments, and 109.09 Final Payment.
Section 109. - MEASUREMENT AND PAYMENT Delete Table 109-1 of Subsection 109.01 Measurement of Work and replace with the following:
Table 109-1 Decimal Accuracy of Quantities for Payment
| Pay Item |
| Level of Precision |
| Acre |
| 0.01 |
| Cubic Foot |
| 1 |
| Cubic Yard |
| 1 |
| Cubic Yard Exception - Structure Excavation; Sheathing; Materials; Bedding, Bed Course, and Backfill, Materials; Gabions; |
| 0.1 |
| Cubic Yard Exception – Concrete; Masonry |
| 0.01 |
| Day |
| 1 |
| Each |
| 1 |
| Gallon |
| 1 |
| Hour |
| 0.1 |
| Linear Foot |
| 1 |
| Linear Foot Exception - Timber, Steel, and Concrete Piles |
| 0.1 |
| M-Gallon |
| 0.1 |
| Mile |
| 0.01 |
| Month |
| 0.1 |
| Pound |
| 1 |
| Square Foot |
| 0.1 |
| Square Yard |
| 0.1 |
| Station |
| 0.1 |
| Thousand Board Feet Measure |
| 0.01 |
| Ton |
| 0.1 |
| Ton Exception - Calcium Chloride; Sodium Chloride; Hydrated Lime; Bituminous Materials; Pavements; Bed Course Materials |
| 0.01 |
| Week |
| 0.1 |
Section 109. - MEASUREMENT AND PAYMENT Delete Subsection 109.02(c) Measurement Terms and Definitions, Contract quantity and replace with:
(c) Contract quantity. The quantity to be paid is the quantity listed in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity when that error exceeds 15% or more. If there is evidence that a quantity specific as a contract quantity is incorrect by 15% or more, submit calculations, drawings, or other evidence indicating why the quantity is in error and request in writing that the quantity be adjusted.
Section 201. - CLEARING AND GRUBBING Delete paragraph (c) in Subsection 201.04(c) Clearing and replace with the following:
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to maximum stump height shown in table below.
Fall and buck the merchantable material at lengths longer than the minimum lengths listed, or in multiples thereof (i.e. 8 ft, 16 ft, 24 ft, 32 ft), not to exceed (fill-in) feet in length to allow for transportation of the material. Merchantable timber shall be decked at designated location(s).
Forest Products Utilization Standards:
| Species |
| Product |
| Max. Stump Height |
| Minimum Specifications |
Piece Required to be Removed
Length (feet) Diameter Inside Bark at Small End (inches)
1/
| (fill-in) |
| (fill-in) |
| (fill-in) |
| (fill-in) |
| (fill-in) |
| (fill-in) |
1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.
Section 201. - CLEARING AND GRUBBING Delete Subsection 201.06 Disposal and replace with the following:
201.06 Disposal. Merchantable timber is Government property. Dispose of clearing and grubbing debris according to Subsection 203.07.
Section 204. – EXCAVATION AND EMBANKMENT Delete Subsection 204.06 Roadway Excavation and replace with the following:
204.06 Roadway Excavation. Excavate as follows:
(a) Rock cuts. Verify the top portion of the rock cuts during pioneer access or initial excavation. Construct the final soil cut before starting drilling for rock blasting or other rock excavation methods unless approved. Blast rock according to Forest Service Supplemental Specification Section 205 if approved by the CO. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with select borrow. Compact the material according to Subsection 204.11.
(b) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.
(c) Drainage Feature. Drainage feature includes construction of all ditches, minor channel changes, drainage dips, catch basins, surface water deflectors, and other minor drainage structures. Compact the material according to Subsection 204.11. Excavate on a uniform grade between control points.
Remove snow or ice in advance of the work and deposit beyond the roadway limits in a manner to prevent resource damage.
Conserve 6-inch minus material from the roadway excavation to use for finishing the roadbed. Dispose of unsuitable or excess excavation material according to Subsection 204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.
At the end of each day’s operations, shape to drain and compact the work area to a uniform cross-section.
Section 204. – EXCAVATION AND EMBANKMENT Delete 204.16(a)(1)(a) Measurement, Roadway Excavation and replace with the following:
(a) Roadway prism excavation;
Add the following to Subsection 204.16(g) Measurement:
(g) Drainage features. Measurement includes all excavation, embankment, shaping, and grading necessary for a completed drainage feature.
Section 209. - STRUCTURE EXCAVATION AND BACKFILL Add the following to Subsection 209.09(a) Backfill, General:
Backfill without damaging or displacing the culvert or structural plate structure. Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved by the CO:
· Installation in a protected stream course.
· Round pipe with a diameter of 48 inches or greater.
· Pipe arches with a span of 50 inches or greater.
· Any box culvert or structure other than pipe culverts.
Section 251. – RIPRAP Delete and replace Subsection 251.07 Riprap Gradation with the following:
Size method. For source and production approval, test individual riprap using the size method, by confirming that the largest rocks have an intermediate dimension greater than the upper limit of the D85 size range shown and the smallest accessible rocks have an intermediate dimension within the lower D15 size range as shown in Table 705-1.
Delete “FLH T 521” and “Subsection 251.07(b)” and replace both with “Subsection 251.07” in Table 251-1 Sampling, Testing, and Acceptance Requirements.
Section 301. - UNTREATED AGGREGATE COURSES Add the following to Subsection 301.02 Material:
Soil 704
Section 301. - UNTREATED AGGREGATE COURSES Add the following to Subsection 301.03 General:
Written approval of the roadbed is required before placing aggregate.
For pit run material, furnish material smaller than the maximum size identified in the plans, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.
Provide additives or binder, if required, at the proportions specified.
Develop and use Government furnished sources according to Section 105.
If the aggregate is produced and stockpiled before placement, handle and stockpile according to Section 314.
Section 302. - CRUSHED AGGREGATE Add the following to Subsection 302.02 Material:
Soil 704
Section 302. - CRUSHED AGGREGATE Add the following to Subsection 302.04 Mixing and Spreading:
Written approval of the surface is required before placing aggregate.
Section 302. - CRUSHED AGGREGATE Add the following to Subsection 302.04(a) Mixing and Spreading, Roadway Aggregate:
For pit run material, furnish material smaller than the maximum size identified in the plans, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.
Section 703. - AGGREGATE Delete Subsection 703.09(e) Chip Seal Aggregate and Replace with the following:
(e) Los Angeles abrasion, AASHTO T 96 30 percent maximum.
image1.png