Attachment A_SOI_NFSR 462 and 462A_20260610.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 127EAX26Q0079
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) for a road and drainage reconditioning project on the Cibola National Forest in New Mexico under USDA Forest Service contract number NFSR 462/462A. The project, titled Chamiso Canyon and Sandia Heliport Road and Drainage Reconditioning, is restricted to current Region 3 Forest Engineering and Roads Maintenance (FERM) BPA holders in New Mexico and is solicited under Solicitation Number 127EAX26Q0079.
The SOI specifies seven line items with estimated quantities and unit pricing requirements: mobilization and bonding (1 lump sum), Class 1 Rip Rap material placement of 4 tons, Class A subbase material placement of 810 tons, road reconditioning for 2 miles, and three culvert-related tasks including replacement of 24-inch diameter (283 linear feet) and 36-inch diameter (32 linear feet) corrugated metal pipe, culvert removal of 24-inch diameter pipe (30 linear feet with no replacement), and guardrail installation (1 lump sum). Contractors must provide unit prices for each item, with a subtotal and New Mexico Gross Receipts Tax (NMGRT) to be calculated for the total amount payable. The project location is listed as 2113 Osuna Road NE, Albuquerque, NM 87113-1001.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| Schedule of Items: NFSR 462/462A Chamiso Canyon and Sandia Heliport Road and Drainage Reconditioning | ||
| Contractor: | From: | Cibola National Forest |
| Name: | 2113 Osuna Road NE | |
| Email: | Albuquerque, NM 87113-1001 | |
| Phone: | ||
| Contract Number: | ||
| SAM UEI # |
| BASE: NFSR 462/462A – Chamiso Canyon and Sandia Heliport Road and Drainage Reconditioning | |||||
| ITEM NO. | SCHEDULE OF SUPPLIES/SERVICES | EST. QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| PAYABLE SUB ITEM | |||||
| 151 | Mobilization and Bonding | 1 | LUMP | ||
| 251 | Material Placement - Class 1 Rip Rap (Purchase, haul, place) | 4 | TON | ||
| 301 | Material Placement - Class A subbase (Purchase, haul, place) | 810 | TON | ||
| 303 | Road reconditioning | 2 | MILE | ||
| 602 (1) | Culvert replacement - 16 gauge 24" dia. CMP | 283 | LF | ||
| 602 (2) | Culvert replacement - 16 gauge 36" dia. CMP | 32 | LF | ||
| 602 (3) | Culvert removal (no replacement) - 16 gauge 24" dia. CMP | 30 | LF | ||
| 617 | Guardrail installation | 1 | LS | ||
| SUBTOTAL | |||||
| NMGRT | |||||
| TOTAL |
File details come from the government source that posted it. Updated .