ATTACHMENT C - Excel Spreadsheet for 1470-Bid Schedule-Schedule of Values.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- BUILDING 1470 2nd FLOOR VAULT EXPANSION Federal contract opportunity
- Solicitation number
- N4008020R3414
- Issued by
- Department of the Navy
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT B - Building 1470 2nd Floor Vault Expansion - Final RFP SOW.pdf | ||
| ATTACHMENT A - BLDG 1470 2ND FLOOR VAULT EXPANSION RFP.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
| PRIME CONTRACTOR |
| SUB-CONTRACTOR LIST: |
| BASE BID: Building 1470 2nd Floor Vault Expansion : | ||||
| ITEM DESCRIPTION | MATERIAL | LABOR COST | EQUIPMENT COST | ENGINEERING ESTIMATE |
| TOTAL | TOTAL | TOTAL | TOTAL | |
| DIV 1 GENERAL REQUIREMENTS | $0.00 | |||
| DIV 2 SITE CONSTRUCTION | $0.00 | |||
| DIV 3 CONCRETE | $0.00 | |||
| DIV 4 MASONRY | $0.00 | |||
| DIV 5 METALS | $0.00 | |||
| DIV 6 WOOD AND PLASTICS | $0.00 | |||
| DIV 7 THERMAL AND MOISTURE PROTECTION | $0.00 | |||
| DIV 8 DOORS AND WINDOWS | $0.00 | |||
| DIV 9 FINISHES | $0.00 | |||
| DIV 10 SPECIALTIES | $0.00 | |||
| DIV 11 EQUIPMENT | $0.00 | |||
| DIV 12 FURNISHINGS | $0.00 | |||
| DIV 21 FIRE SUPPRESSION | $0.00 | |||
| DIV 22 PLUMBING | $0.00 | |||
| DIV 23 HVAC | $0.00 | |||
| DIV 26 ELECTRICAL | $0.00 | |||
| DIV 27 COMMUNICATIONS | $0.00 | |||
| DIV 28 ELECTRONIC SAFETY AND SECURITY | $0.00 | |||
| DIV 31 EARTHWORK | $0.00 | |||
| DIV 32 EXTERIOR IMPROVEMENTS | $0.00 | |||
| DIV 33 UTILITIES | $0.00 |
TOTAL: 1470 2nd floor addition $0.00
| BID OPTION #1: Bldg. 1470 -BUS DUCT | ||||
| ITEM DESCRIPTION | MATERIAL | LABOR COST | EQUIPMENT COST | ENGINEERING ESTIMATE |
| TOTAL | TOTAL | TOTAL | TOTAL | |
| DIV 26 ELECTRICAL | $0.00 |
SUBTOTAL: BID OPTION #1: $0.00
| BID OPTION #2: Bldg 1470 - PDU | ||||
| ITEM DESCRIPTION | MATERIAL | LABOR COST | EQUIPMENT COST | ENGINEERING ESTIMATE |
| TOTAL | TOTAL | TOTAL | TOTAL | |
| DIV 26 ELECTRICAL | $0.00 |
SUBTOTAL: BID OPTION #2: $0.00
| COST ESTIMATE SUMMARY | |
| ITEM DESCRIPTION | COST |
| BASE BID - Bldg. 1470 2nd FLOOR | $0.00 |
| BID OPTION #1 | $0.00 |
| BID OPTION #2 | $0.00 |
| ESTIMATE BASE BID ONLY | |
| SUBTOTAL | $0.00 |
| SALE TAX 5.4% | $0.00 |
| CONTRACTOR'S OVERHEAD 10% | $0.00 |
| CONTRACTOR'S PROFIT 10% | $0.00 |
| CONTRACTOR'S BOND | $0.00 |
| PROJECT Estimate COST | $0.00 |
&"Arial,Bold"&12Schedule of Values Building 1470 2nd Floor Vault Expansion
Sheet2
Sheet3