ATTACHMENT C.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C24723Q1095
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a contract to provide inspection and testing of fire protection equipment at three Veterans Health Administration facilities in South Carolina. The contractor will be responsible for performing annual fire alarm testing and certification at the Ralph H. Johnson VA Medical Center in Charleston, the Fisher House in Charleston, and the Myrtle Beach Primary Care Clinic. Performance will be monitored monthly by the Contracting Officer's Representative to ensure the equipment is properly inspected and tested on schedule and as needed. The acceptable level of quality is 95% as determined by direct observation, periodic inspection, and validated user complaints. There are no incentives or disincentives included in the plan. The performance ratings will be positive for 100% performance, neutral for 95%, and negative for 90% to determine outcomes. Any deficiencies will be documented in a Contract Discrepancy Report.
This QASP is associated with solicitation number 36C24723Q1095 to provide inspection and testing of fire protection equipment through the Department of Veterans Affairs Veterans Health Administration VISN 7.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24723Q1095 0002_1.docx | DOCX document | |
| Fire Alarm and Sprinkler Inventory Sheet 10-2023 .docx | DOCX document | |
| 36C24723Q1095 0001_1.docx | DOCX document | |
| 36C24723Q1095 0001.docx | DOCX document | |
| Attachment A WD Veterans Health Administration.docx | DOCX document | |
| 36C24723Q1095_1.docx | DOCX document | |
| 36C24723Q1095 Provide inspection and testing of Fire Protection Equipment Service 02.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR INSPECTION AND TESTING OF FIRE PROTECTION EQUIPMENT
Contract Number: Upon award, Government will enter contract number
Contract Description: The Contractor shall provide all plant, labor, equipment, materials, supervision, necessary to perform annual fire alarm testing and certification at the Veterans Health Administration, Ralph H. Johnson, Medical Center in Charleston, South Carolina, Fisher House in Charleston, SC, and the Myrtle Beach Primary Care Clinic, in Myrtle Beach, SC.
Contractor’s name: Upon award, Government will enter contract number
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
*Note. The QASP is not a part of the contract. Its sole use is to monitor contractor performance.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: <Upon award, Government will enter name.> Organization or Agency: Department of Veterans Affairs, Charlie Norwood VA Medical Center
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Upon award, Government will enter name
c. Other Key Government Personnel - Upon award, Government will enter name, if applicable. This may include Performance Monitors, Clinical Quality experts, etc. who act on behalf of the COR to monitor performance
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – Completed upon award
b. Other Contractor Personnel - Enter name(s) of the providers.
4. PERFORMANCE MEASURES
Performance measures are comprised of performance indicators (some characteristic of a deliverable that can be measured) and performance measures (a mark, measure or benchmark that government personnel use as a point of comparison when evaluating contractor performance). The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these measures.
The Performance Requirements Summary Matrix, paragraph <enter number> in the Performance Work Statement (PWS), includes performance measures. The Government shall use these measures to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Indicators |
| PWS Ref |
| Performance Measure |
| Acceptable Level of Quality |
| Method of Assessment |
| Incentive |
Maintain Inspection and Testing of Fire Protection Equipment.
| Para 6 |
| Provide all Inspection and Testing of Fire Protection Equipment at the RHJ VAMC campus 109 Bee Street, Charleston SC, 29401, Fisher House, 150 Wentworth St., Charleston, SC 29401, Myrtle Beach Clinic, 3381 Phillips Blvd., Myrtle Beach, SC 29577 |
| 95% |
| Check by the COTR or Designee on a monthly basis to ensure fire protection equipment are in good shape and inspected and tested on time and when called. |
| Positive Past Performance |
5. INCENTIVES AND DISINCENTIVES
There are no incentives or disincentives. The Government shall use the scoring methods above for continuing contract performance.
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE
Various methods exist to monitor performance. The COR may use any surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION: The COR can perform periodically or through 100% surveillance.
b. PERIODIC INSPECTION. The COR evaluates outcomes on a periodic basis. Inspections may be scheduled daily, weekly, monthly, quarterly, or annually or use unscheduled inspections.
c. USER SURVEY: This method combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. The COR may also generate inspections and sampling.
d. VALIDATED USER/CUSTOMER COMPLAINTS. This method relies on the patient to identify deficiencies. Complaints are then investigated and validated.
e.100% INSPECTION. The COR may evaluate all outcomes.
f. RANDOM SAMPLING. This is designed to evaluate performance by randomly selecting and inspecting a sample of cases.
g. Progress reports or status meetings. The COR will analyze contractor's progress reports. (Evaluate cost, schedule, etc.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral or negative outcome. The following ratings shall be used: 100% is positive, 95% is neutral, and 90% is negative.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE (100% RATING)
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE (90% RATING)
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor and a copy to the Contracting Officer.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the Contracting Officer.