Attachment C - Bid Drawings.pdf
PDF 23 MB Posted
- Attached to
- Y1ND--Sanitary Sewer Construction Federal contract opportunity
- Solicitation number
- 36C24625B0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24625B0025 0003.docx | DOCX document | |
| MH2 INTERIOR.jpg | JPG image | |
| MH25 INVERT.jpg | JPG image | |
| Geotechnical Report 3 of 3.pdf | ||
| Geotechnical Report 2 of 3.pdf | ||
| Geotechnical Borings Report.pdf | ||
| 36C24625B0025 0002.docx | DOCX document | |
| Geotechnical Report 1 of 3.pdf | ||
| 36C24625B0025_1 - page numbers corrected.docx | DOCX document | |
| Site.Visit.Log.06.24.2025.pdf | ||
| 36C24625B0025 0001.docx | DOCX document | |
| Attachment A - Wage Determination va198.txt | TXT text file | |
| Attachment B - Bid Specifications.pdf | ||
| Attachment D - Site Visit.docx | DOCX document | |
| 36C24625B0025_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
HAMPTON VA MEDICAL CENTER
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
VA CONTRACT NUMBER 36C24623C0014
CITY OF HAMPTON, COMMONWEALTH OF VIRGINIA
VICINITY MAP
U.S. Department of Veterans AffairsVA
0' 2000' 4000' 6000'
SURVEY NOTES:
1. EXISTING TOPOGRAPHIC CONDITIONS ON THIS PLAN HAVE BEEN ESTABLISHED THROUGH FIELD SURVEY AND REMOTE SENSING BY HONOR ENGINEER CO. PERFORMED NOVEMBER 3, 2021
THROUGH FEBRUARY 18, 2022, AND SUPPLEMENTED FROM APRIL 8TH TO APRIL 11TH 2024.
2. THIS SURVEY HORIZONTALLY REFERENCES THE NORTH AMERICAN DATUM OF 1983 (NAD 83-2011)(EPOCH:2010:0000) VIRGINIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE (4502) GRID, ESTABLISHED VIA OPUS.
3. CONTOURS ARE SHOWN AT 1' INTERVALS FROM REMOTE SENSING SURVEY & SUPPLEMENTED BY FIELD SURVEY. THE VERTICAL DATUM REFERENCED IS THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) ESTABLISHED VIA OPUS. ADDITIONALLY, NGS PASSIVE BENCH MARKS "F 312" AND "D 312" WERE LOCATED AS VERTICAL VERIFICATION.
4. ROAD RIGHTS-OF-WAY HAVE BEEN ESTABLISHED FROM INFORMATION PROVIDED BY VIRGINIA DEPARTMENT OF TRANSPORTATION AND OTHER PLANS OF RECORD.
5. THIS PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND MAY BE SUBJECT TO EASEMENTS AND OTHER RESTRICTIONS, EITHER RECORDED OR UNRECORDED. THE SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR EASEMENTS OF RECORD, ENCUMBRANCES, RESTRICTIVE COVENANTS, OWNERSHIP TITLE EVIDENCE OR ANY OTHER FACTS THAT AN ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE OTHER THAN WHAT IS SHOWN ON THIS PLAN.
6. THE LOCATIONS OF UTILITIES AS SHOWN HEREON ARE BASED ON ABOVE GROUND FEATURES, FIELD OBSERVATIONS/SURVEY, AND RECORD DRAWINGS PROVIDED BY UTILITY COMPANIES.
LOCATIONS OF UNDERGROUND UTILITIES/STRUCTURES MAY VARY FROM LOCATIONS SHOWN HEREON. ADDITIONAL BURIED UTILITIES/STRUCTURES MAY BE ENCOUNTERED. NO EXCAVATIONS WERE MADE DURING THE PROCESS OF THIS SURVEY TO LOCATE BURIED UTILITIES/STRUCTURES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION AND
DEPTH OF ALL UTILITY LINES PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES.
7. ALL UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE A COMPILATION OF ACTUAL FIELD LOCATIONS AND DATA FURNISHED FROM INFORMATION SUPPLIED BY OTHERS. A VA811 MISS UTILITY NOTIFICATION WAS PERFORMED PRIOR TO FIELD SURVEYING, NO UTILITY FIELD MARKINGS WERE PRESENT AS A RESULT OF TICKET A200501741-00A HONOR ENGINEER CO. ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF ANY UNDERGROUND UTILITIES AS DEPICTED ON THIS DRAWING. ANY REQUESTS FOR ADDITIONAL UNDERGROUND UTILITY INFORMATION SHOULD BE
DIRECTED TO THAT RESPECTIVE UTILITY COMPANY.
8. DURING THE PERFORMANCE OF THE PHOTOGRAMMETRIC, REMOTE SENSING AND SUPPLEMENTAL CONVENTIONAL SURVEY, SEVERAL AREAS WITHIN THE FACILITY WERE UNDER CONSTRUCTION, BEING UTILIZED AS STAGING OR MATERIALS STORAGE AND RESTRICTED OR OBSTRUCTED. FACILITIES, INFRASTRUCTURE AND MAPPING WITHIN THESE AREAS ARE SUBJECT TO THOSE
ACTIVITIES, RESTRICTIONS AND OBSTRUCTIONS.
9. DURING THE PERFORMANCE OF THE SURVEY PERSONNEL WERE RESTRICTED FROM ACCESS, INTERNAL TO BUILDINGS, COURTYARDS AND OTHER AREAS THAT REQUIRED INGRESS OR EGRESS THROUGH BUILDINGS. FACILITIES, INFRASTRUCTURE AND MAPPING WITHIN THESE AREAS IS SUBJECT TO THOSE RESTRICTIONS.
10. PARKING INFORMATION:
10.1. 1,755 STANDARD PARKING SPACES
10.2. 137 ACCESSIBLE PARKING SPACES
10.3. 1,892 TOTAL PARKING SPACES
11. PORTIONS OF THE PROJECT AREA EXIST WITHIN THE VE, AE, AND X FLOOD ZONES PER THE FLOOD INSURANCE RATE MAP (FIRM) FOR THE CITY OF HAMPTON, VIRGINIA. MAP NUMBER
5155270026H, REVISED MAY 16, 2016, PANEL NUMBER 0026H.
12. THE PROJECT AREA EXISTS WITHIN THE HUC-12 020802080303 FRONTAL HAMPTON ROADS-HAMPTON RIVER WATERSHED PER THE VIRGINIA HYDROLOGIC UNIT EXPLORER DEPARTMENT OF
CONSERVATION AND RECREATION WEBSITE.
13. SITE ADDRESS: 100 EMANCIPATION DRIVE, HAMPTON, VA 23667
14. ALL DIMENSION SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS WITHOUT PRIOR WRITTEN AUTHORIZATION BY THE ENGINEER.
DRAWING INDEX
GI001
COVER SHEET
DWG 1 OF 28
PROJECT DATA
DESCRIPTION:
SANITARY SEWER SYSTEM SURVEY & REPAIRS PROJECT TO ADDRESS AND REDUCE INFILTRATION/INFLOW IN THE HAMPTON VETERAN AFFAIRS MEDICAL CENTER (HVAMC) SEWER SYSTEM. THIS PROJECT IS COMPLETED UNDER THE I/I ORDER BETWEEN HVAMC AND HAMPTON ROADS SANITATION DISTRICT (HRSD).
PERTINENT PREVIOUS STUDIES:
1. HYDROSTRUCTURES, HVAMC MILESTONE 6 - SSES PLAN, DECEMBER 2020.
2. HYDROSTRUCTURES, HVAMC MILESTONE 8 CONDITION ASSESSMENT REPORT & REHABILITATION PLAN, FEBRUARY 2022
DESIGN CONDITIONS (SOURCE HYDROSTRUCTURES, 2020):
HYDRAULIC FLOW MODEL RESULTS:
· ESTIMATED 10-YEAR PEAK HOUR FLOW RECURRENCE = 1,268.5 GPM
· ANNUAL AVERAGE FLOW (AAF), BASED ON 11/5/18 THROUGH 10/6/19 = 86.8 GPM
· 6 X AAF = 520.8 GPM
· PEAK FLOW COMMITMENT (WITH 10-YEAR PEAK HOUR FLOW RECURRENCE > 6 X AAF): 1,268.5 GPM - [(1,268.5 GPM - 86.8 GPM) X 60%] = 559.5 GPM
EXISTING UTILITIES:
1. CHT486 = HAMPTON CITY-TRAFFIC (HMP)
2. COH425 = HAMPTON CITY-SEWER (HMP)
3. DOM409 = DOMINION EAST DISTRIBUTIO(DOM)
4. HRSD80 = HAMPTON ROADS SEWER (HRS)
5. LMS578 = LUMOS DBA SEGRA (LMS)
6. NPN076 = NEWPORT NEWS CITY-WATER (NPN)
7. VNG115 = VIRGINIA NATURAL GAS (VNG)
8. VZN757 = VERIZON (VZN)
UTILITY RESPONSE FROM TICKET A200501741-00A:
1. HMP HAMPTON CITY-TRAFFIC (CHT486) 01/07/22 08:19 AM 30
1.1. NO CONFLICT; UTILITY IS OUTSIDE OF STATED WORK AREA.
1.2. FIELD CONTACT: STEVE MANAGO (757)846-3280
1.3. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (757)846-3280
2. HMP HAMPTON CITY-SEWER (COH425) 01/05/22 02:38 PM 32
2.1. NO CONFLICT; PRIVATELY OWNED UTILITY ON PROPERTY.
CONTACT PRIVATE
2.2. UTILITY OWNER FOR LOCATE.
2.3. FIELD CONTACT: DAVID WHITLEY (757)726-2985
2.4. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (757)727-8311
3. DOM DOMINION EAST DISTRIBUTIO (DOM409) 01/07/22 04:35 PM 30
3.1. NO CONFLICT; UTILITY IS OUTSIDE OF STATED WORK AREA.
3.2. FIELD CONTACT: UTILIQUEST (804)286-1721
3.3. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (866)366-4357
4. HRS HAMPTON ROADS SEWER (HRSD80) 01/06/22 02:42 PM 30
4.1. NO CONFLICT; UTILITY IS OUTSIDE OF STATED WORK AREA.
4.2. FIELD CONTACT: RAY FIEDLER (757)284-9705
4.3. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (757)874-3979
5. LMS LUMOS DBA SEGRA (LMS578) 01/06/22 07:48 AM 30
5.1. NO CONFLICT; UTILITY IS OUTSIDE OF STATED WORK AREA.
5.2. FIELD CONTACT: STAKE CENTER LOCATING (801)364-1063
5.3. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (877)411-6930
6. NPN NEWPORT NEWS CITY-WATER (NPN076) 01/06/22 08:39 AM 96
6.1. NO RESPONSE REQUIRED FROM THIS TERMINAL
6.2. FIELD CONTACT: THERESA BARKA (757)234-4892
6.3. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (757)234-4800
7. VNG VIRGINIA NATURAL GAS (VNG115) 01/07/22 01:10 PM 50
7.1. INSTALLATION RECORDS, MAPS OR OTHER DOCUMENTS HAVE
BEEN PROVIDED
7.2. FIELD CONTACT: LISA OLSON (757)951-7211
7.3. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (877)572-3342
8. VZN VERIZON (VZN757) 01/07/22 04:35 PM 30
8.1. NO CONFLICT; UTILITY IS OUTSIDE OF STATED WORK AREA.
8.2. FIELD CONTACT: UTILIQUEST (757)315-8119
9. IN THE EVENT OF DAMAGE TO A FACILITY CALL: (888)483-1233
EXISTING UTILITY RESPONSE INFORMATION
ZONING INFORMATION
R-13 DISTRICT - ONE FAMILY RESIDENTIAL WITHIN THE INTENSELY DEVELOPED AREA & RESOURCE MANAGEMENT OVERLAY
· MAXIMUM BUILDING HEIGHT = 35'
· MAXIMUM BUILDING HEIGHT = 35'
· MINIMUM LOT AREA = 12,000 S.F. WITH A MINIMUM FRONTAGE OF 80'
· MINIMUM DWELLING AREA = 2,000 S.F
· MINIMUM BUILDING SETBACK REGULATIONS:
· FRONT YARD = 30' MINIMUM & 60' MAXIMUM
· SIDE YARD = 25% OF THE LOT WIDTH (BOTH SIDES TOTAL)
· REAR YARD = 20' MINIMUM & 35' MAXIMUM
*NOTE:SPECIAL EXCEPTIONS MAY APPLY, REFER TO THE CITY OF HAMPTON ZONING ORDINANCE FOR COMPLETE INFORMATION REGARDING SPECIAL CASES AND EXISTING NONCONFORMITY.
SHEET
NO. DWG NO. DRAWING TITLE
1 GI001 Cover Sheet
2 GI002 Key Map / Manhole Location Plan
3 GI003 Existing Conditions Plan
4 GI004 General Notes
5 RP001 Repair Location Plan
6 PP001-E Plan & Profile
7 PP001-P Plan & Profile
8 PP002 Plan & Profile
9 PP003 Plan & Profile
10 PP004 Plan & Profile
11 PP005 Plan & Profile
12 PP006 Plan & Profile
13 PP007 Plan & Profile
14 PP008 Plan & Profile
15 PP009 Plan & Profile
16 PP010 Plan & Profile
17 PP011 Plan & Profile
18 PP012 Plan & Profile
19 PP013 Plan & Profile
20 RD001 Repair Details & Methods I
21 RD002 Repair Details & Methods II
22 RD003 Repair Details & Methods III
23 ES000 DEQ Plan Checklist
24 ES001 E&S Control Notes
25 ES002 E&S Control Plan with Restoration
26 ES003 E&S Control Details
27 TP001 Traffic Control Plan I
28 TP002 Traffic Control Plan II
APPROVAL SIGNATURES
COR - ILSM & ICRA COMPLETED DATE:
REVIEWED: AFGE DATE:
REVIEWED: NAGE DATE:
APPROVED: INFECTION CONTROL DATE:
APPROVED: CONSTRUCTION SAFETY MANAGER DATE:
APPROVED: SAFETY MANAGER DATE:
APPROVED: INDUSTRIAL HYGIENEST DATE:
APPROVED: SAFE PATIENT HANDLING AND MOBILITY FACILITY COORDINATOR DATE:
APPROVED: FIRE INSPECTOR DATE:
APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:
APPROVED: CHIEF, POLICE & SECURITY DATE:
APPROVED: PHYSICAL SECURITY SPECIALIST DATE:
APPROVED: OFFICE OF INFORMATION & TECHNOLOGY DATE:
APPROVED: WOMEN'S VETERAN PROGRAM MANAGER DATE:
APPROVED: CONTRACTING DATE:
APPROVED: PATIENT SAFETY MANAGER DATE:
APPROVED: HAMPTON ENERGY MANAGER DATE:
APPROVED: SUPERVISORY PROJECT ENGINEER DATE:
APPROVED: ASSISTANT CHIEF, ENGINEERING DATE:
APPROVED: CHIEF, ENGINEERING DATE:
APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:
APPROVED: CHIEF OF STAFF DATE:
APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:
APPROVED: EXECUTIVE DIRECTOR, HAMPTON VA MEDICAL CENTER DATE:
APPROVED: ENVIRONMENTAL MANAGEMENT SERVICE DATE:
3/25/2025 lup80795 April 10
HARRIS AVENUE
AVERILL AVENUE AM
ES
S
TR
EE
T
HARRIS AVENUE
JONES CREEK
SHORE DRIVE
SHORE DRIVE
EM
AN
CI
PA
TI
O
N
DR
IV
E
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
AVERILL AVENUE
M C
C
LE
LL
AN
A
VE
N U
E
BLACK AVENUE
HARRIS AVE.
SEW
EL AVENUE
TH
O
M
PS
O N
S
TR
EE
T
FR
AN
KL
IN
B O
UL
EV
AR
D
MARTIN LUTHER KING JR. BOULEVARD
SOUTH MALLORY STREET
STR
AW
BER
R
Y BAN
KS
BO
U
LEVAR
D
M
AR
TIN
LU
TH
ER
KIN
G
JR
. BO
U
LEVAR
D
FR
AN
KL
IN
B O
U
LE
VA
R
D
KN
OX
S
TR
EE
T
SEWEL AVENUE
SANITARY
SEWER
PUMP
IN
BASEMENT
INFERRED PIPE
JO
HN
'S C
RE
EK
HAMPTON ROADS HARBOR
H
AM
PT
O
N C
R
EE
K
EXISTING PUMP
STATION #211
INFERRED 8" CIP
SANITARY
LATERAL
INFERRED SANITARY
SEWER PIPE
DROP TEE
SANITARY PUMP
MH 14
MH 13
MH 12
MH 58
MH 15
MH19
MH 20
MH 21
MH 23
MH 24
MH 32
MH 34
MH 35
MH 36
MH 37
MH 49
MH 53
MH 55
MH 54
MH 63
MH 64
MH 66
MH 67
MH 70
MH 72
MH 73
MH 56
MH 57
MH 60
MH 33
MH 42
MH 46
MH 71
MH 22
MH 8
MH 7
MH 2
MH-NG-211-15345
MH 31
MH 52
MH 59
MH 61
MH 62
MH 16
MH 17
MH 3
MH4
MH 5
MH 6
MH 25
MH 38
MH 69
MH 65
MH 9
MH 50
MH 44
MH 40
MH 63A
SANITARY PUMP SANITARY PUMP
MH 11
7-9
10-11
13-W
138-A
137-B
137-C
110-B
110-A
110135
113-A
146-B
146-A
148-T
148-A
148-S
148-C44
173-A
148-D
148-B
137-A
137-D
110-C
110-D
PP001-E
PP010
PP001-E
PP001-E
PP011
PP002
PP009
PP002
PP003
PP012
PP004
PP007
PP006
PP005
PP008
PP001-P
PP001-P
PP013-P
0+00
1+00
2+00
37+58
31+29 32+00 33+00 34+00
35+00 36+00
37+00
0+
1+
2+
2+
4+69
0+00
1+
2+
3+
4+00
10+00
11+00
11+95
10+00
11+00
+0
+0
+0
2+45
0+00 1+00
2+00
10+00
11+00
+0
+7
+0
11+00
12+00
13+00
14+00
+0
+0
+0
+0
10+00
+0
+0
+0
+0
15+00
16+00
17+00
29+49
14+57 15+00
16+00
17+00
+0
+0
20+00
21+00 22+00
23+00 24+00 25+00 26+00 27+00
+0
+0
10+00
+0
+0
+0
+0
DEMOLISHED
52T
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
GI002
DWG 2 OF 28
KEY MAP/MANHOLE
LOCATION PLAN
0 100' 200'
KEY MAP/MANHOLE
LOCATION PLAN
1"=100'
LEGEND
EXISTING PLAN & PROFILE ALIGNMENT
EXISTING SANITARY MANHOLE
EXISTING FORCEMAIN
EXISTING FORCEMAIN MANHOLE
EXISTING GREASE TRAP
INFERRED SANITARY SEWER PIPE
EXISTING SANITARY SEWER
APPROXIMATE PARKING LOT LOCATION BASED UPON
VAMC PROJECT NO. 590-20-103 RECORD DRAWINGS,
NOT SURVEYED
PROPOSED PLAN & PROFILE ALIGNMENT
NO. DESCRIPTION
7-9 ENGINEER SHOPS
110-D MECHANICAL BUILDING
10-11 ENGINEER SHOPS
113-A 113-A
13-W WOMEN'S CLINIC
113 HEMODIALYSIS
14 OEF/OIF
114 PALLIATIVE CARE
15 BOILER PLANT
116 NUTRITION & FOOD PRODUCTION SERVICE
17 CANTEEN
135 EXEC. OFFICES/BUSINESS FINANCE
18 STORAGE
136 TESTILE OPERATIONS
27 SERVICE & ELECTRIC SHOP
137-A MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
28 MECHANICAL SHOP
137-B MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
31 CARPENTER SHOP
137-C MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
33 NAT.CHAPLIN SERVICE
137-D SCI DINING
35 POLICE SERVICE/ENGINEERING
138-A PSYCHIATRY WARDS
36 ENGINEERING/POLICE/SECURITY
138 MENTAL HEALTH TRAILERS
37 ENGINEERING PROJECTS
144 BEHAVIORAL HEALTH
43 IRM
146-A EXTENDED CARE/REHAB
48 CHAPEL
146-B EXTENDED CARE/REHAB
50 STORAGE
148-A DOMICILIARY
52 SALVATION ARMY
148-B DOMICILIARY
52-T 52-T
148-C DOMICILIARY
66 OUTPATIENT/HR/REG. COUNCEL/MAS
148-D DOMICILIARY
71 VOLUNTARY SVC, HUDVASH/VRT, PT RECORDS
148-S DOMICILIARY
83 AUDIO VISUAL TRAINING CENTER
148-T DOMICILIARY TREATMENT POD
110 HOSPITAL/DENTAL/SURGICAL IMAGING
169 WATER TOWER
110-A SPS, PATH & LAB, RADIOLOGY, SURG.
171 EMERGENCY CENTER
110-B EMERGENCY DEPT., PRIMARY CARE CLINICS, PHARMACY, REHAB
173 CWT & WHEELCHAIR REPAIR
110-C MRI
173-A CWT PRODUCTION
BUILDING REFERENCE KEY
3/25/2025
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
XX
X
X X
X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X X
X
X X
X
X X
X X
X X
XX
X
XX
X
X
X
X
X
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
X
X X X
XX
X X
X
XX
X
X X
X
X
X X
X X X
X
X
X X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X
X
X
X
X
X
X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXX
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X X
X X
X X
XXXXXX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X X
X X
XXXXXXXXX
XXXX
XXXXXXXXXX
X
XXX
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X X
X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X X
X X X
X
X
X X
X
X
XX
X
X X
X X
X X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X X
X X
X
X X
X
X X
X X
X
X X
X
X
X
X
X
X
X
X X X
X
X
XX
X X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
XX X XX
X
X
X
X
X
X
X
X
X
X
HARRIS AVENUE
AVERILL AVENUE AM
ES
S
TR
EE
T
HARRIS AVENUE
JONES CREEK
SHORE DRIVE
SHORE DRIVE
EM
AN
CI
PA
TI
O
N
DR
IV
E
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
AVERILL AVENUE
M C
C
LE
LL
AN
A
VE
N U
E
BLACK AVENUE
HARRIS AVE.
SEW
EL AVENUE
TH
O
M
PS
O N
S
TR
EE
T
FR
AN
KL
IN
B O
UL
EV
AR
D
MARTIN LUTHER KING JR. BOULEVARD
SOUTH MALLORY STREET
STR
AW
BER
R
Y BAN
KS
BO
U
LEVAR
D
M
AR
TIN
LU
TH
ER
KIN
G
JR
. BO
U
LEVAR
D
FR
AN
KL
IN
B O
U
LE
VA
R
D
KN
OX
S
TR
EE
T
SEWEL AVENUE
SANITARY
SEWER
PUMP
IN
BASEMENT
INFERRED PIPE
JO
HN
'S C
RE
EK
HAMPTON ROADS HARBOR
H
AM
PT
O
N C
R
EE
K
EXISTING PUMP
STATION #211
INFERRED 8" CIP
SANITARY
LATERAL
INFERRED SANITARY
SEWER PIPE
DROP TEE
SANITARY PUMP
MH 14
MH 13
MH 12
MH 58
MH 15
MH19
MH 20
MH 21
MH 23
MH 24
MH 32
MH 34
MH 35
MH 36
MH 37
MH 49
MH 53
MH 55
MH 54
MH 63
MH 64
MH 66
MH 67
MH 70
MH 72
MH 73
MH 56
MH 57
MH 60
MH 33
MH 42
MH 46
MH 71
MH 22
MH 8
MH 7
MH 2
MH-NG-211-15345
MH 31
MH 52
MH 59
MH 61
MH 62
MH 16
MH 17
MH 3
MH4
MH 5
MH 6
MH 25
MH 38
MH 69
MH 65
MH 9
MH 50
MH 44
MH 40
MH 63A
SANITARY PUMP SANITARY PUMP
MH 11
7-9
10-11
13-W
138-A
137-B
137-C
110-B
110-A
110135
113-A
146-B
146-A
148-T
148-A
148-S
148-C44
173-A
148-D
148-B
137-A
137-D
110-C
110-D
0+00
1+00
2+00
37+58
31+29 32+00 33+00 34+00
35+00 36+00
37+00
0+
1+
2+
2+
4+69
0+00
1+
2+
3+
4+00
10+00
11+00
11+95
10+00
11+00
+0
+0
+0
10+00
11+00
+0
+7
+0
11+00
12+00
13+00
14+00
+0
+0
+0
+0
10+00
+0
+0
+0
+0
15+00
16+00
17+00
29+49
14+57 15+00
16+00
17+00
+0
+0
20+00
21+00 22+00
23+00 24+00 25+00 26+00 27+00
+0
+0
DEMOLISHED
52T
SANITARY SEWER PUMP
IN BASEMENT
INFERRED PIPE
INFERRED SANITARY
SEWER PIPE
TREAT AS
SOIL TYPE 26
W
W
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LODLOD
LODLOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LODLO
D
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
GI003
EXISTING CONDITIONS PLAN
DWG 3 OF 28
GAS METER
GAS VALVE
GAS UTILITY LINE
LIGHT POLE
ELECTRIC BOX
ELECTRIC MANHOLE
SQUARE ELEC. MANHOLE
GROUND LIGHT
OVERHEAD ELEC. LINE
UNDERGROUND ELEC.
FORCE MAIN LINE
SANITARY MANHOLE
GREASE TRAP MANHOLE
FORCE MAIN LAMP HOLE
FORCE MAIN MANHOLE
SANITARY CLEANOUT
SANITARY SEWER LINE
STEAM UTILITY LINE
STEAM MANHOLE
STORM SEWER LINE
STORM DRAIN WITH METAL LID
STORM INLET WITH CURB CUT
STORM MANHOLE
STORM INLET
TYPE "C" STORM INLET
TYPE "M" STORM INLET
LAWN DRAIN
COMMUNICATIONS BOX
COM. MANHOLE
UNDERGRND TELECOM
FIRE HYDRANT
WATER METER
SPIGOT
WATER VALVE
FIRE HYDRANT - FIRE LINE
WATER MANHOLE
WATER LINE
FLAG POLE
SIGN
BOLLARD
EMERGENCY BEACON
GUY WIRE
UTILITY POLE
HANDICAP SIGN
TRAFFIC DELINEATOR POST
GENERAL POST
FENO SPIKE BENCHMARK
DRIVEN ROD BENCHMARK
DECIDUOUS TREE
CONIFEROUS TREE
SHRUBS/SMALL TREES
GAS PUMP
FUEL TANK
VENT
NO. DESCRIPTION
7-9 ENGINEER SHOPS
110-D MECHANICAL BUILDING
10-11 ENGINEER SHOPS
113-A 113-A
13-W WOMEN'S CLINIC
113 HEMODIALYSIS
14 OEF/OIF
114 PALLIATIVE CARE
15 BOILER PLANT
116 NUTRITION & FOOD PRODUCTION SERVICE
17 CANTEEN
135 EXEC. OFFICES/BUSINESS FINANCE
18 STORAGE
136 TESTILE OPERATIONS
27 SERVICE & ELECTRIC SHOP
137-A MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
28 MECHANICAL SHOP
137-B MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
31 CARPENTER SHOP
137-C MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
33 NAT.CHAPLIN SERVICE
137-D SCI DINING
35 POLICE SERVICE/ENGINEERING
138-A PSYCHIATRY WARDS
36 ENGINEERING/POLICE/SECURITY
138 MENTAL HEALTH TRAILERS
37 ENGINEERING PROJECTS
144 BEHAVIORAL HEALTH
43 IRM
146-A EXTENDED CARE/REHAB
48 CHAPEL
146-B EXTENDED CARE/REHAB
50 STORAGE
148-A DOMICILIARY
52 SALVATION ARMY
148-B DOMICILIARY
52-T 52-T (DEMOLISHED)
148-C DOMICILIARY
66 OUTPATIENT/HR/REG. COUNCEL/MAS
148-D DOMICILIARY
44 VOLUNTARY SVC, HUDVASH/VRT, PT RECORDS
148-S DOMICILIARY
83 AUDIO VISUAL TRAINING CENTER
148-T DOMICILIARY TREATMENT POD
110 HOSPITAL/DENTAL/SURGICAL IMAGING
169 WATER TOWER
110-A SPS, PATH & LAB, RADIOLOGY, SURG.
171 EMERGENCY CENTER
110-B EMERGENCY DEPT., PRIMARY CARE CLINICS, PHARMACY, REHAB
173 CWT & WHEELCHAIR REPAIR
110-C MRI
173-A CWT PRODUCTION
0 100' 200'1"=100'
BUILDING REFERENCE KEY
EXISTING CONDITIONS PLAN
EXISTING FEATURES LEGEND
INFERRED SANITARY SEWER
APPROXIMATE PARKING LOT AND FORCE MAIN
LOCATION BASED UPON VAMC PROJECT NO.
590-20-103 RECORD DRAWINGS, NOT SURVEYED
100-YEAR FLOOD PLAIN
SOIL BOUNDARY
No. Description Expected Impacts Plans/Measures to Address Impacts
1 Plumbing Outages No outages anticipated All interruptions must be coordinated with the COR two weeks in advance. Written approval from the COR is required in additional to informing all users affected by the outage
2 Mechanical Outages No outages anticipated All interruptions must be coordinated with the COR two weeks in advance. Written approval from the COR is required in additional to informing all users affected by the outage
3 Electrical Outages No outages anticipated All interruptions must be coordinated with the COR two weeks in advance. Written approval from the COR is required in additional to informing all users affected by the outage
4 Misc. Utilities Local Sewer Outage (<2-4 Hours) Construction Phase Pump Arounds
5 Fire Alarm No outages anticipated n/a
6 Vibrations Minor vibration will occur due to trench work and construction vehicle movement
Vibrations will only occur during work hours. Prior to vibration activities work will be coordinated and approved by the COR to ensure minimal interruptions
7 Dust (Infection Control)/Air Quality Minor dust may be created during construction Control dust using water or other methods as necessary
8 Noise Noise will occur at various levels Noise will only occur during work hours.
9 Equipment No outages anticipated n/a
10 Creation or Spread of Contaminates
Sewage Pumping Proper Disposal Per Applicable Local, State & Fed Regulations, All Work Being Conducted outside Away From Hospital Staff And Patients
11 Traffic Flow Patterns, Visitors, Staff, Contract Personnel
Localized Temporary Disruption Localized Traffic Control is required in all areas where work impedes upon normal traffic operations
12 Limits of Construction, Barrier Location
Work area will have fencing and barricades to separate work area from typical VAMC operations
All affected staff will be notified and signs noting construction zone will be placed where applicable
13 HVAMC Annual TB Risk Assessment Level is Low
Project Location: Hampton VAMC Risk Assessment Required Based on Vicinity of Patient Care Areas? (Y/N)
"Subject to Change During Construction Phase:
PPD/TB Risk Assessment Completed: (Y/N) Non-Patient Care Areas No TB Screening: (Y/N)"
MH MANHOLE
CO CLEAN OUT
PVC POLYVINYL CHLORIDE
CONC CONCRETE
CIP CAST IRON PIPE
DIP DUCTILE IRON PIPE
SLCPP SMOOTH LINED CORRUGATED PIPE
CPP CORRUGATED PLASTIC PIPE
VCP VITRIFIED CLAY PIPE
FM FORCE MAIN
INV INVERT
APPROX APPROXIMATE
TYP TYPICAL
N/A INACCESSIBLE
SQ FT SQUARE FEET
RF ROOF
FH FIRE HYDRANT
WV WATER VALVE
CBOX COMMUNICATION BOX
S SOUTH
E EAST
W WEST
N NORTH
1. REFER TO SHEET GI001 SURVEY NOTES FOR IMPORTANT INFORMATION ABOUT THE BASE MAPPING PRESENTED IN
THESE DRAWINGS.
2. CONTRACTOR MUST PROVIDE UTILITY LOCATING SERVICE TO LOCATE UTILITIES ON GOVERNMENT PROPERTY
PRIOR TO BEGINNING CONSTRUCTION.
3. THE CONTRACTOR MUST FIELD VERIFY UNDERGROUND STRUCTURES .
4. CONTRACTOR WILL MAINTAIN REQUIRED SEPARATION BETWEEN UTILITIES AND OBSTRUCTIONS. IN NO CASE SHALL CONSTRUCTION ACTIVITIES INTERFERE WITH BUILDING/STRUCTURE FOOTERS AND FOUNDATIONS.
5. CONTRACTOR IS TO NOTIFY UTILITY OWNERS REGARDING DAMAGE TO ANY UTILITIES IMMEDIATELY AS INDICATED
IN THE SPECIFICATIONS.
6. CONTRACTOR SHALL PROTECT AND RESTORE TREES, PLANTS AND LANDSCAPING IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CLEARING HEAVY DEBRIS AND OBSTRUCTIONS PRIOR TO SANITARY
SEWER REHABILITATION AND/OR REPAIR.
8. THE CONTRACTOR IS RESPONSIBLE TO CUT GRASS WITHIN FENCED IN CONSTRUCTION ZONES
9. CONTRACTOR MUST PROVIDE TRAFFIC CONTROL, SIGNAGE, FLAGGERS OR OTHER SERVICES WHEN WORK IS OBSTRUCTING OR PARTIALLY OBSTRUCTING A ROADWAY. TRAFFIC CONTROL PLANS MUST BE SUBMITTED TWO WEEKS BEFORE WORK IS TO BEGIN AND MUST BE APPROVED BY THE COR AND ENGINEER PRIOR TO WORK IN OR
NEAR THE ROADWAY. THIS MUST BE COORDINATED WITH THE COR PRIOR TO CLOSURE.
10. CONTRACTOR MUST COMPLETELY ENCLOSE ENTIRE WORK AREAS WITH 6' TEMPORARY FENCING, THIS MUST
OCCUR BEFORE CONSTRUCTION BEGINS. THE SITE MUST BE SECURED AT ALL TIMES.
11. CONTRACTOR TO PLACE DO NOT ENTER SIGNS IN ADDITION TO A CHAIN AND LOCK AROUND CONSTRUCTION SITE. A
DAISY CHAIN LOCKS MUST BE PROVIDED TO INCLUDE A VA LOCK.
12. CONTRACTOR MUST NOTIFY THE VA TWO WEEKS IN ADVANCE FOR ALL NOTICES BEFORE ANY CONSTRUCTION, LINING, OR ANY OTHER WORK IS TO OCCUR.
13. CONTRACT MUST FOLLOW SAFETY PROCEDURES IN THE HAMPTON VAMC CONSTRUCTION SAFETY HANDBOOK.
14. CONTRACTOR TO PROVIDE A CONFINED SPACE ENTRY PLAN, PRIOR TO WORK COMMENCING EVEN IF CONFINED
SPACE ENTRY IS NOT PLANNED.
15. CONTRACTOR SHALL ENSURE FIRE DEPARTMENT ROAD ACCESS IS NOT RESTRICTED DURING CONSTRUCTION AND ENSURE THAT FREE ACCESS FROM THE STREET FOR FIRE HYDRANTS AND SPRINKLER SYSTEM FIRE DEPARTMENT
CONNECTIONS IS MAINTAINED AT ALL TIMES.
16. CONDITION COMMENTS SHOWN ON PLAN AND PROFILES ARE A RESULT OF EVALUATION PERFORMED BY
HYDROSTRUCTURES AND HONOR,
GENERAL NOTES
EXISTING FEATURES LEGEND
GAS METER
GAS VALVE
GAS UTILITY LINE
LIGHT POLE
ELECTRIC BOX
ELECTRIC MANHOLE
SQUARE ELECTRIC MANHOLE
GROUND LIGHT
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC LINE
FORCE MAIN LINE
SANITARY MANHOLE
GREASE TRAP MANHOLE
FORCE MAIN LAMP HOLE
FORCE MAIN MANHOLE
SANITARY CLEANOUT
SANITARY SEWER LINE
STEAM UTILITY LINE
STEAM MANHOLE
STORM SEWER LINE
STORM DRAIN WITH METAL LID
STORM INLET WITH CURB CUT
STORM MANHOLE
STORM INLET
TYPE "C" STORM INLET
TYPE "M" STORM INLET
LAWN DRAIN
COMMUNICATIONS BOX
COMMUNICATIONS MANHOLE
UNDERGROUND TELECOMMUNICATIONS
FIRE HYDRANT
WATER METER
SPIGOT
WATER VALVE
FIRE HYDRANT - FIRE LINE
WATER MANHOLE
WATER LINE
FLAG POLE
SIGN
BOLLARD
EMERGENCY BEACON
GUY WIRE
UTILITY POLE
HANDICAP SIGN
TRAFFIC DELINEATOR POST
GENERAL POST
FENO SPIKE BENCHMARK
DRIVEN ROD BENCHMARK
DECIDUOUS TREE
CONIFEROUS TREE
SHRUBS/SMALL TREES
GAS PUMP
FUEL TANK
VENT
ABBREVIATIONS
GENERAL NOTES
SEQUENCE OF CONSTRUCTION
PRE-CONSTRUCTION RISK ASSESSMENT
MANHOLE WORK SUMMARY TABLE
1. MANHOLE INSERTS TO BE INSTALLED ON ALL OF THE ABOVE REFERENCED MANHOLES. ALL
NEW INSERTS TO BE MEASURED FOR EACH MANHOLE FRAME
2. MH36 INSERT TO BE RATED FOR HIGH TEMPERATURES
MANHOLE WORK NOTES
Clean Out Repairs
MH 55 to 52 Install C.O cap (2)
Lateral P2 to 54 Install C.O cap (2)
Misc Install C.O cap (2)
Total 6
Pipe Repairs/Replacement
Manhole Run Pipe Type Pipe Diameter (") Repair
1* to 2 PVC 18 Replace
2 to 7-PROPOSED PVC 18 Replace
7-EXISTING to 8 RCP 15 Abandon
7-PROPOSED to 8A PVC 18 New
8A to 8 PVC 18 New
8 to 9 RC/CP 15 Line
9 to 15 RC/CP 15 Line
15 to 17 RC/CP 15 Line
17 to 19 RC/CP 15 Line
19 to 20 RC/CP 15 Line
20 to 31 RC/CP 15 Line
42 to 46 PVC 8 Line
35 to 36 RC/CP 15 Line
34 to 35 RC/CP 15 Line
32 to 34 RC/CP 15 Line
31 to 32 RC/CP 15 Line
36 to 37 VCP 15 Line
55 to 56 CIP 12 Line
49 to 53 CIP 12 HV Heavy Cleaning & Line
53 to 52 CIP 12 Line
52 to 55 CIP 12 Line
56 to 57 VCP 12 Line
15 to 16 CIP 12 Line
21 TO 20 VCP 8 Line
22 to 21 RC/CP 8 Line
22 to 23 RC/CP 8 Line
23 to 24 RC/CP 8 Line
60 to 57 VCP 12 Line
61 to 60 VCP 12 Line
11 to 9 CIP 6 Line
49 to 50 PVC 10 HV Cleaning
25 to 20 PVC 8 New 25 to EAST VCP 8 Replace 50' w/ PVC
Bldg 15 to MH7 PVC 8 Replace
FM to 11 VCP 6 Replace w/ PVC
Manhole Manhole Rehabiltation Method Epoxy Count Reset F/C Pipe Seal Channel Rebuild
1 N/A - - - -
2 REPLACE - - - -
3 N/A - - - -
4 N/A - - - -
5 Epoxy 1 - - -
6 Epoxy 1 1 - -
7 REPLACE - - - -
8A New - - - -
8 Epoxy 1 - - -
9 Epoxy 1 - - -
11 Replace 1 - - -
15 Epoxy 1 - - -
16 Epoxy 1 - - -
17 Epoxy 1 - - -
19 Epoxy 1 - - -
20 Epoxy 1 - - -
21 Epoxy 1 - - -
22 Epoxy 1 - - -
23 Epoxy 1 - - -
24 Epoxy 1 - - -
25 Epoxy 1 1 - -
31 Epoxy 1 - - -
32 Epoxy 1 - - -
33 N/A - - - -
34 Epoxy 1 - - -
35 Epoxy 1 - - -
36 Epoxy 1 - - -
37 Epoxy 1 - - -
Manhole Manhole Rehabiltation Method Epoxy Count Reset F/C Pipe Seal Channel Rebuild
38 Epoxy 1 - - 1
42 N/A - - - -
44 Epoxy 1 - - -
46 N/A - - - -
49 Epoxy 1 - - -
52 Epoxy 1 1 3 -
53 Epoxy 1 - - 1
54 N/A - - - -
55 Epoxy 1 - - -
56 Epoxy 1 - - -
57 Epoxy 1 - - -
58 N/A - - - -
59 N/A - - - -
60 N/A - - - -
61 N/A - - - -
62 Epoxy 1 - - -
63 N/A - - - -
63A Raise Lid to Ground Level - - - -
64 N/A - - - -
65 N/A - - - -
66 N/A - - - -
67 N/A - - - -
69 Epoxy 1 - - -
70 N/A - - - -
71 N/A - - - -
72 N/A - - - -
73 Epoxy 1 - - 1
TOTAL 32 3 3 3
PIPE WORK SUMMARY TABLE
CLEAN OUT CAP WORK SUMMARY TABLE
Miscellaneous Repairs TOTAL
8-Inch Spot Repair: 5 to 12-Feet in Length, Including By-Pass Pumping and All Excavation, Backfill and All Restoration 2
MISCELLANEOUS REPAIRS
1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SUBMITTALS TO THE VA AND ENGINEER A MINIMUM OF TWO WEEKS BEFORE ANY WORK RELATED TO THOSE SUBMITTALS. IN ADDITION TO PRODUCTS RELATED TO THE PROJECT THE
CONTRACTOR SHALL PROVIDE THE FOLLOWING:
a. CONSTRUCTION SCHEDULE
b. EROSION AND SEDIMENT CONTROL MATERIALS
c. TRAFFIC CONTROL PLAN
d. CONSTRUCTION SAFETY PLAN
e. SITE SAFETY PLAN
f. CONFINED SPACE ENTRY PLAN (CONTINGENCIES)
g. CONSTRUCTION SHORING AND DEWATERING PLAN
2. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL FIELD VERIFY UNDERGROUND UTILITIES WHICH MAY BE IMPACTED BY THE SCOPE OF CONSTRUCTION. THESE MARKINGS SHALL BE ESTABLISHED ON THE GROUND AND
SURVEYED IMMEDIATELY FOR RECORDKEEPING. THIS INCLUDES BUT IS NOT LIMITED TO:
a. UNDERGROUND FUEL STORAGE TANK AND ASSOCIATED PIPING
b. ELECTRICAL DUCT BANKS
c. UNDERGROUND TELECOMMUNICATION LINES
d. STORMWATER STRUCTURES AND PIPING
3. CONDUCT A PRE-CONSTRUCTION MEETING WITH THE VA AND THE ENGINEER TO REVIEW SCOPE OF WORK, SCHEDULE, CONSTRUCTION SURVEY, E&S CONTROLS, SAFETY PLAN, SITE LAYDOWN AND STOCKPILE AREAS, CONSTRUCTION SHORING AND DEWATERING, AND OTHER PROJECT REQUIREMENTS. COORDINATE WITH THE VA AND ENGINEER A MINIMUM OF TWO WEEKS AHEAD OF THE START OF CONSTRUCTION TO COORDINATE THIS
MEETING.
4. THE PROJECT CONSISTS OF TWO MAJOR COMPONENTS LISTED BELOW. THE WORK FOR EACH MAY BE CONDUCTED SIMULTANEOUSLY OR SEQUENTIALLY. HOWEVER, THE PLAN FOR ALL WORK SHALL BE SUBMITTED WITH THE PROJECT SCHEDULE. SEQUENCE OF WORK FOR EACH SCOPE OF THE PROJECT SHALL CONFORM TO THE
FOLLOWING:
a. SANITARY SEWER MANHOLE AND PIPE REPLACEMENT
i. ESTABLISH EROSION AND SEDIMENT CONTROL MEASURES ON SITE
ii. ESTABLISH SITE SAFETY FENCING, SIGNAGE, AND OTHER CONSTRUCTION SAFETY CONTROLS AS REQUIRED IN
THE DRAWINGS, SPECIFICATIONS, AND HAMPTON VAMC SITE SPECIFIC CONSTRUCTION SAFETY PLAN. AT NO POINT SHALL EXCAVATION OR WORK INVOLVING ANY HAZARDS BE CONDUCTED OUTSIDE OF THE RESTRICTED
SITE SAFETY AREA.
iii. ESTABLISH LAYDOWN AREA AND STOCKPILE AREAS
iv. CONDUCT EXCAVATION
v. ESTABLISH DEWATERING AND SHORING AS NECESSARY
vi. COMPLETE WORK AS DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS
vii. BACKFILL AND PROVIDE TEMPORARY RESTORATION AS SOON AS POSSIBLE
b. SANITARY SEWER MANHOLE LINING, MANHOLE FRAME AND LID REHABILITATION, AND PIPE LINING
i. ALL WORK SHALL BE CONDUCTED IN ONE WORKING SESSION. AT NO POINT SHALL PIPE OR MANHOLE LINING BE
CONDUCTED AND THERE BE NO CONTRACTOR ON SITE MANAGING TRAFFIC, SITE SAFETY, AND ENSURING
PROPER COMPLETION OF THE WORK.
ii. IT IS ANTICIPATED THAT ALL LINING WORK WILL BE COMPLETED IN ONE WORKING SHIFT AND THE SITE RESTORED BY THE END OF THE SHIFT WITH EQUIPMENT REMOVED TO THE SITE LAYDOWN AREA OR OFFSITE.
iii. COMPLETE PIPE LINING ACTIVITIES OR MANHOLE RESTORATION ON A SHIFT BY SHIFT BASIS AS DESCRIBED IN
THE CONTRACT SPECIFICATIONS.
iv. ANY TEMPORARY SITE RESTORATION NECESSARY SHALL BE COMPLETED BEFORE THE CONTRACTOR LEAVES
THE PROJECT SITE.
v. AT NO POINT SHALL ANY WORK AREAS BE LEFT UN-RESTORED OR PROVIDE ANY SAFETY RISKS (HOLES, TRAFFIC OBSTRUCTIONS, ETC.) WITHOUT SITE CONTRACTOR PERSONNEL BEING PRESENT ONSITE TO MANAGE THE
PUBLIC.
vi. AT NO POINT SHALL LINING OPERATION PREVENT COMPLETE PASSAGE OF ANY ROADS. AT A MINIMUM PROVIDE ONE LANE OF TRAFFIC DURING THESE WORK PERIODS WITH CONTRACTOR FLAG PERSONS PLACED TO MANAGE
TRAFFIC AND ENSURE PUBLIC SAFETY.
5. RESTORE THE PROJECT SITE AS DESCRIBED IN THE RESTORATION DRAWINGS AND AS DETAILED IN THE
SPECIFICATIONS.
6. CONDUCT A PROJECT RESTORATION AND COMPLETION REVIEW WITH THE VA AND THE ENGINEER TO DEVELOP A
PUNCH LIST PRIOR TO JOB CLOSEOUT.
*MH 1 REPRESENTS HRSD'S MH-ZG-211-15345
TO BE USED AS NECESSARY
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
GI004
DWG 4 OF 28
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X
X
XX
XX
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X
X X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X X X X
X X
X X
X X
X
X X
X X
X X
X X
XXX
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X
X X
X
X
X
X
X
X X
X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X
X
X X
X
X
XXXX
X X X X X
XX
X X
X X
XXX
X X
X
X
X
X
X X
X
X X X X
X
X
X X
X X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X
X X
X
X
X
X
X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
XXXXXX
X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X X
X X
X
XXXXXXXXXXX
X
XXXX
XX
XXXXXXXXXXX
X X
XXX
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X
X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X X X X
X X X
X X X X
X
X
X
X
X X
X
X
X
X X
X X
X X
X X
X X
X
X X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X X
X X
X
X
X X
X
X X
X X
X
X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X X
X
XXX
X X
X
X
X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X
X
XX X XXX
X
X
X
X
X
X X
X X
X
X
X
X
SANITARY PUMP
MH 14
MH 13
MH 12
MH 58
MH 15
MH19
MH 20
MH 21
MH 23
MH 24
MH 32
MH 34
MH 35
MH 36
MH 37
MH 49 MH 53
MH 55
MH 54
MH 63
MH 64
MH 66
MH 67MH 70
MH 72
MH 73
MH 56
MH 57
MH 60
MH 33
MH 42
MH 46
MH 71
MH 22
MH 8
MH 7
MH 2
MH-NG-211-15345
MH 31
MH 52
MH 59
MH 61
MH 62
MH 16
MH 17
MH 3 MH4
MH 5
MH 6
MH 25
MH 38
MH 69
MH 65
MH 9
MH 50
MH 44
MH 40
MH 63A
SANITARY PUMP
SANITARY PUMP
MH 11HARRIS AVENUE
AVERILL AVENUE AM
ES
S
TR
EE
T
HARRIS AVENUE
JONES CREEK
SHORE DRIVE
SHORE DRIVE
EM
AN
CI
PA
TI
O
N
DR
IV
E
FRANKLIN BOULEVARD
FRANKLIN BOULEVARD
AVERILL AVENUE
M C
C
LE
LL
AN
A
VE
N U
E
BLACK AVENUE
HARRIS AVE.
SEW
EL AVENUE
TH
O
M
PS
O N
S
TR
EE
T
FR
AN
KL
IN
B O
UL
EV
AR
D
MARTIN LUTHER KING JR. BOULEVARD
FR
AN
KL
IN
B O
U
LE
VA
R
D
KN
OX
S
TR
EE
T
SEWEL AVENUE
JO
HN
'S C
RE
EK
HAMPTON ROADS HARBOR
H
AM
PT
O
N C
R
EE
K
7-9
10-11
13-W
138-A
137-B
137-C
110-B
110-A
110135
113-A
146-B
146-A
148-T
148-A
148-S
148-C44
173-A
148-D
148-B
137-A
137-D
110-C
110-D
0+00
1+00
2+00
37+58
31+29 32+00 33+00
34+00
35+00
36+00
37+00
0+
1+
2+
2+
4+69
0+00
1+
2+
3+
4+00
10+00
11+00
11+95
10+00
11+00
+0
+0
+0
2+45
0+00
1+00
2+00
10+00
11+00
+0
+7
+0
11+00
12+00
13+00
14+00
+0
+0
+0
+0
10+00
+0
+0
+0
+0
15+00
16+00
17+00
29+49
14+57 15+00
16+00
17+00
+0
+0
20+00
21+00
22+00
23+00 24+00 25+00 26+00
27+00
+0
+0
10+00
+0
+0
+0
+0
52T
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
SANITARY SEWER PUMP
IN BASEMENT
INFERRED PIPE
EXISTING PUMP
STATION #211
INFERRED SANITARY
SEWER PIPE
DROP TEE
SEE HAMPTON ROAD SANITARY DISTRICT
PLAN TITLED "NORTH SHORE GRAVITY SEWER
IMPROVEMENTS PHASE I, (GN014900)"
PREPARED BY TETRA TECH, DATED 8/25/2022
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
ABANDONMENT
NEW SANITARY
MANHOLE, MH7
REMOVE SANITARY
MANHOLE
REMOVE AND
REPLACE 8" CIP
LATERAL WITH 8" DIP
REMOVE AND
REPLACE MH 11
REMOVE AND REPLACE
50' OF EXISTING PIPE
WITH 8" PVC PIPE
NEW SANITARY
MANHOLE 8A
CHANNEL REBUILD
& MANHOLE LINING
MANHOLE
LINING
MANHOLE
LINING
MANHOLE
LINING
MANHOLE
LINING
PIPE LINING
PIPE LINING
PIPE LINING
NEW 18" PVC
SANITARY SEWER PIPE
REPLACE
MANHOLE
MANHOLE
LINING
MANHOLE LINING, RESET FRAME
& COVER, RESTORE CONC.
RESTORE AS NEEDED
CONCRETE & GRASS
RESTORE
PAVEMENT
RESTORE PAVEMENT
RESTORE CONCRETE
MH LINING & RESET
FRAME COVER
PIPE
LINING
PIPE LINING
MANHOLE LINING
MANHOLE LINING
MANHOLE
LINING
MANHOLE
LINING
MANHOLE
LINING
MANHOLE LINING
PIPE LINING
PIPE LINING
PIPE LINING
PIPE LININGMANHOLE
LINING
MANHOLE LINING
CHANNEL REBUILD,
MANHOLE LINING,
CONC. RESTORATION
CHANNEL REBUILD
& MANHOLE LINING
RESTORE GRASS
& CONCRETE
PIPE LINING
SANITARY PUMP
MODIFICATIONS, SEE
SHEET REPAIR DETAILS &
METHODS II, DETAIL 8 HEAVY CLEANING
FROM MH49-MH50
HEAVY CLEANING &
LINING FROM MH50-MH53
±200 LF OF NEW 8" PVC
SANITARY SEWER PIPE
ESTABLISH DEWATERING
AND SHORING AS
NECESSARY
MANHOLE
LINING, PIPE
SEAL, RESET
FRAME COVER,
GRASS
RESTORATION
REMOVE AND
REPLACE IN
INSTITUTE
WITH 6" PVC
LO
D
LOD
LOD
LOD
X X
X X
TEMPORARY AST 2,200 GAL GASOLINE
AND 1,000 GAL DIESEL FUELING
EQUIPMENT LOCATION WITH
SECONDARY CONTAINMENT SEE NOTE 2.
PROVIDE TRAFFIC RATED BARRIER
BETWEEN TANKS, ROADWAYS AND
PEDESTRIANS
LODLO
D
X
X
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
REPAIR LOCATION PLAN
RP001
DWG 5 OF 28
0 80' 160'1"=80'
REPAIR LOCATION PLAN
NO. DESCRIPTION
7-9 ENGINEER SHOPS 110-D MECHANICAL BUILDING
10-11 ENGINEER SHOPS 113-A 113-A
13-W WOMEN'S CLINIC 113 HEMODIALYSIS
14 OEF/OIF 114 PALLIATIVE CARE
15 BOILER PLANT 116 NUTRITION & FOOD PRODUCTION SERVICE
17 CANTEEN 135 EXEC. OFFICES/BUSINESS FINANCE
18 STORAGE 136 TESTILE OPERATIONS
27 SERVICE & ELECTRIC SHOP 137-A MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
28 MECHANICAL SHOP 137-B MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
31 CARPENTER SHOP 137-C MENTAL HEALTH & BEHAVIORAL/SCI/INPATIENT PSYCH WARDS
33 NAT.CHAPLIN SERVICE 137-D SCI DINING
35 POLICE SERVICE/ENGINEERING 138-A PSYCHIATRY WARDS
36 ENGINEERING/POLICE/SECURITY 138 MENTAL HEALTH TRAILERS
37 ENGINEERING PROJECTS 144 BEHAVIORAL HEALTH
43 IRM 146-A EXTENDED CARE/REHAB
48 CHAPEL 146-B EXTENDED CARE/REHAB
50 STORAGE 148-A DOMICILIARY
52 SALVATION ARMY 148-B DOMICILIARY
52-T 52-T (DEMOLISHED) 148-C DOMICILIARY
66 OUTPATIENT/HR/REG. COUNCEL/MAS 148-D DOMICILIARY
44 VOLUNTARY SVC, HUDVASH/VRT, PT RECORDS 148-S DOMICILIARY
83 AUDIO VISUAL TRAINING CENTER 148-T DOMICILIARY TREATMENT POD
110 HOSPITAL/DENTAL/SURGICAL IMAGING 169 WATER TOWER
110-A SPS, PATH & LAB, RADIOLOGY, SURG. 171 EMERGENCY CENTER
110-B EMERGENCY DEPT., PRIMARY CARE CLINICS, PHARMACY, REHAB 173 CWT & WHEELCHAIR REPAIR
110-C MRI 173-A CWT PRODUCTION
BUILDING REFERENCE KEY
NO. DESCRIPTION
1. REFER TO E&S DRAWINGS FOR EROSION & CONTROL MEASURES AND
CONTRACTOR STAGING LOCATION.
2. CONTRACTOR TO TAKE SPECIAL PRECAUTIONS WHEN EXCAVATING WITHIN 10
FEET OF THE UNDERGROUND FUEL STORAGE TANKS. PRIOR TO CONSTRUCTION
COORDINATE WITH THE OWNER TO REMOVE ANY REMAINING FUEL FROM THE
TANKS. BEFORE EXCAVATION, THE CONTRACTOR SHALL CONFIRM HORIZONTAL
AND VERTICAL POSITION OF THE TANK(S) AND SUPPORTING PIPING, WIRING, AND
ASSOCIATED COMPONENTS THE CONTRACTOR IS RESPONSIBLE FOR RETURNING
THE FUEL OIL TANK SYSTEM TO EXISTING CONDITIONS PRIOR TO SITE
RESTORATION. THE OWNER SHALL REVIEW THE CONDITION OF THE FUEL OIL
SYSTEM PRIOR TO SUBSTANTIAL COMPLETION ON THE PROJECT.
3. ADHERE TO ALL SAFETY NOTES AND REQUIREMENTS INCLUDING THE VHA
PRE-CONSTRUCTION RISK ASSESSMENT DOCUMENT AND VAMC CONSTRUCTION
SAFETY PAMPHLET
NOTES
PROPOSED PIPE
PROPOSED MANHOLE LINING
PROPOSED RESET FRAME COVER
PROPOSED CHANNEL REBUILD
PROPOSED PIPE LINING
PROPOSED PIPE SEAL
PROPOSED CONCRETE RESTORATION
PROPOSED PAVEMENT REPLACEMENT
TEMPORARY WORK AREA
PROPOSED MANHOLE REPLACEMENT
PROPOSED PIPE ABANDONMENT
LIMIT OF DISTURBANCELOD
PROPOSED FEATURES LEGEND
PROPOSED SAFETY FENCEX
PROPOSED HEAVY CLEAN
PROPOSED PERMANENT SEEDING
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X
X X
X X
X X
X
X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
MH 8
MH 3
MH 9
+0
+0
+0
15+00
16+00
17+00
MH 7
-10
-5
-10
-5
159+75 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+50
9+75 10+00
1.
1.
3.
3.
3.
3.
2.
2.
11+00
2.
2.
2.
2.
3.
3.
4.
4.
12+00
4.
4.
4.
4.
5.
5.
4.
4.
13+00
5.
5.
6.
6.
7.
7.
8.
8.
14+00
7.
7.
9.
9.
9.
9.
8.
8.
15+00 9.
9.
9.
9.
8.
8.
7.
7.
16+00
6.
6.
6.
6.
5.
5.
4.
4.
17+00
5.
5.
5.
5.
17+50
15" CONC15" CONC
15" CIP15" CIP
18" CIP18" CONC
MH08
STA: 14+35.92
RIM: 8.23
INV. IN: -4.55
INV. OUT: -4.57
MH09
STA: 17+06.42
RIM: 4.60
INV. IN: -4.70
INV. OUT: -4.70
MH07
STA: 12+41.27
RIM: 4.21
INV. IN: -5.64
INV. OUT: -5.66
MH-NG-211-15345
STA: 10+79.66
RIM: 3.51
INV. IN: -5.05
INV. OUT: -5.07
MH02
STA: 11+47.12
RIM: 2.84
INV. IN: -4.99
INV. OUT: -5.00
PUMP STATION #211
STA: 10+00
RIM: 0.86
INV. IN: -5.07
HRSD HAMPTON INSTITUTE
PUMP STATION - MMPS-137
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
EXISTING PUMP
STATION #211
SEE HAMPTON ROAD SANITARY
DISTRICT PLAN TITLED "NORTH SHORE
GRAVITY SEWER IMPROVEMENTS
PHASE I, (GN014900)" PREPARED BY
TETRA TECH, DATED 8/25/2022
MH 2
MH-NG-211-15345
(MH1)
MH 3
MH 4
MH 5
MH 6
10+00
+0
+0
+0
MH 7
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
PP001-E
PLAN & PROFILE
EXISTING PROFILE VIEW P001
DWG 6 OF 28
NOT TO SCALE
KEY MAP
PP001-E
PP001-P
0 30 60
EXISTING PLAN VIEW PP001
1"=30'2
EXISTING PLAN VIEW PP001
1"=30'1
MATCH LINE
SEE THIS SHEET
MATCH LINE
SEE THIS SHEET
-10
-5
-10
-5
159+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00
9+50 10+00
1.
1.
3.
3.
3.
3.
2.
2.
11+00
2.
2.
2.
2.
3.
3.
4.
4.
12+00
4.
4.
4.
4.
4.
4.
4.
4.
13+00
5.
5.
6.
6.
7.
7.
7.
7.
14+00
7.
7.
8.
8.
9.
9.
9.
9.
15+00
8.
8.
9.
9.
9.
9.
8.
8.
16+00
7.
7.
6.
6.
6.
6.
5.
5.
17+00
4.
4.
18+00
PROPOSED 18" SDR26 (PS115) PVC PIPE 0.131% 170'
PROPOSED
18" SDR26
(PS115)
PVC PIPE
0.132% 31'
15" CONCPROPOSED 18" SDR26 (PS115) PVC PIPE
0.120% 109'PROPOSED 18" SDR26 (PS115)
PVC PIPE 0.119% 67'18" PVC PIPE
HRSD HAMPTON INSTITUTE
PUMP STATION - MMPS-137
PUMP STATION #211
STA: 10+00
RIM: 0.00
INV. IN: -5.07
MH-01
STA: 10+79.66
RIM: 3.51
INV. IN: -5.05 INV.
OUT: -5.07
MH-02
DIA: 6' SANITARY MANHOLE
STA: 11+47.12
RIM: 2.84
INV. IN: -4.96
INV. OUT: -5.00
MH-07
DIA: 4' SANITARY MANHOLE
STA: 12+55.70
RIM: 4.18
INV. IN: -4.82
INV. OUT: -4.83
MH-08A
DIA: 4' SANITARY MANHOLE
STA: 14+25.34
RIM: 7.76
INV. IN: -4.59
INV. OUT: -4.60
MH-08
DIA: 4' SANITARY MANHOLE
STA: 14+56.90
RIM: 8.24
INV. IN: -4.55
INV. OUT: -4.55
MH - 09
STA: 17+27.22
RIM: 4.60
INV. IN: -4.70
INV. OUT: -4.70
15" CONC
15" CONC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
EXISTING PUMP
STATION #211
SEE HAMPTON ROAD SANITARY
DISTRICT PLAN TITLED "NORTH SHORE
GRAVITY SEWER IMPROVEMENTS
PHASE I, (GN014900)" PREPARED BY
TETRA TECH, DATED 8/25/2022
X X
X X
X X
X
X
X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X
MH 2
MH-NG-211-15345
(MH1)
MH 3
MH 4
MH 5
MH 6
10+00
11+00
+0
10+00
+0
+0
+0
10+00
+0
+0
+0
NEW SANITARY
MANHOLE, MH7
REMOVE SANITARY
MANHOLE
REMOVE AND
REPLACE LATERAL
TO BUILDING 15
REPLACE
MANHOLE
MANHOLE
LINING
MANHOLE LINING,
RESET FRAME &
COVER, RESTORE
CONC.
RESTORE AS NEEDED
CONCRETE & GRASS
RESTORE
PAVEMENT
CONTRACTOR TO FIELD
VERIFY LOCATION OF
UNDERGROUND FUEL TANKS
PRIOR TO CONSTRUCTION
SEE NOTE 1.
MH 7
NEW
MH 7
ESTABLISH DEWATERING
AND SHORING AS
NECESSARY
X X
X X
X X
X
X X
X
X X
X X
X X
X
X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
X X
X X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X
XX
X
X
MH 15
MH 8
MH 16
MH 9
2+00
+0
+0
15+00
16+00
17+00
14+57
15+00
16+00
17+00
+0
+0
+0
ABANDONMENT
NEW SANITARY
MANHOLE 8A
PIPE LINING
NEW SANITARY
SEWER PIPE
RESTORE
PAVEMENT
MANHOLE
LINING
MANHOLE LINING
MANHOLE
LINING
PIPE LINING
CONTRACTOR TO FIELD
VERIFY LOCATION OF
UNDERGROUND FUEL TANKS
PRIOR TO CONSTRUCTION
SEE NOTE 1.
225 Grandview Avenue Suite 403 Camp Hill, PA 17011 www.ghd.com 717-541-0622 Josiah.Bair@ghd.com CAF01/10/2025 JB/JVG/MB
DESIGNER OF RECORD CONSULTANT
A - 30% DESIGN DOCUMENTS
B - 50% DESIGN DOCUMENTS
01/12/2024 05/13/2024
ISSUE FOR BID
C - 95% COSTING SET 07/30/2024
D - 95% DESIGN DOCUMENTS 09/10/2024
10/29/2024E - 100% COSTING SET
11/18/2024F - 100% DESIGN DOCUMENTS
03/24/2025G - ISSUE FOR BID
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
Station #590
590-23-102
Project Director
Revisions: Date:
1100 North Mountain Road Harrisburg, pa 17112 www.honorengineer.com 717-533-9077 jvangehuchten@honorengineer.com
HONOR
ENGINEER CO.
SANITARY SEWER SYSTEM
SURVEY & REPAIRS
A
B
C
D
E
F
PP001-P
PLAN & PROFILE
DWG 7 OF 28
PROPOSED PROFILE VIEW P001
PROPOSED
MANHOLE
PROPOSED
MANHOLE
MHL
ABANDON EXISTING SANITARY SEWER LINE
AND FIELD CORE FOR THE PROPOSED
SANITARY SEWER
NOT TO SCALE
PROPOSED FEATURES LEGEND
PROPOSED MANHOLE LININGMHL
PROFILE SYMBOLS
KEY MAP
PROPOSED PIPE
PROPOSED MANHOLE LINING
PROPOSED RESET FRAME COVER
PROPOSED CHANNEL REBUILD
PROPOSED PIPE LINING
PROPOSED PIPE SEAL
PROPOSED CONCRETE RESTORATION
PROPOSED PAVEMENT RESTORATION
PROPOSED PERMANENT SEEDING
PROPOSED MANHOLE REPLACEMENT
PROPOSED PIPE ABANDONMENT
LIMIT OF DISTURBANCELOD
PROPOSED SAFETY FENCEX
PROPOSED HEAVY CLEAN
PP001-E
PP001-P
MATCH LINE
SEE THIS SHEET
0 30 60
PROPOSED PLAN VIEW PP001
1"=30'2PROPOSED PLAN VIEW PP001
1"=30'1
PROPOSED
MANHOLE MHL
MATCH LINE
SEE THIS SHEET
MA
TC
H
LIN
E
SE
E
SH
EE
T P
P0
MATCH LINE
SEE SHEET PP002
MATC
H LI
NE
SEE SHEET P
P01
KEYED NOTES
INSTALL 18" SDR26 PVC PIPE1
INSTALL NEW MANHOLE 2 AND RECONNECT LATERALS2
INSTALL NEW MANHOLE 7 AND RECONNECT LATERALS3
NEW MANHOLE 8A4
PROPOSED PIPE LININGPL
PL
5 CONFIRM OPERATIONAL STATUS OF 12" PIPE. IF ABANDONED FILL
WITH GROUT. IF ACTIVE CONSULT WITH ENGINEER.
PROPOSED PIPE LINING
RECONNECT
LATERAL
REDIRECT FLOW CHANNEL TO NEW MH 8A
CONNECT TO
EXISTING BELL
1. CONTRACTOR TO TAKE SPECIAL PRECAUTIONS WHEN EXCAVATING WITHIN 10
FEET OF THE UNDERGROUND FUEL STORAGE TANKS. PRIOR TO
CONSTRUCTION COORDINATE WITH THE OWNER TO REMOVE ANY REMAINING
FUEL FROM THE TANKS. BEFORE EXCAVATION, THE CONTRACTOR SHALL
CONFIRM HORIZONTAL AND VERTICAL POSITION OF THE TANK(S) AND
SUPPORTING PIPING, WIRING, AND ASSOCIATED COMPONENTS THE
CONTRACTOR IS RESPONSIBLE FOR RETURNING THE FUEL OIL TANK SYSTEM
TO EXISTING CONDITIONS PRIOR TO SITE RESTORATION. THE OWNER SHALL
REVIEW THE CONDITION OF THE FUEL OIL SYSTEM PRIOR TO SUBSTANTIAL
COMPLETION ON THE PROJECT.
2. ADHERE TO ALL SAFETY NOTES AND REQUIREMENTS INCLUDING THE VHA
PRE-CONSTRUCTION RISK ASSESSMENT DOCUMENT AND VAMC
CONSTRUCTION SAFETY PAMPHLET
NOTES
-10
-5
1517+00 18+00 19+00 20+00 21+00 22+00 23+00 23+50
4.
4.
17+00
5.
5.
5.
5.
6.
6.
7.
7.
18+00
8.
8.
.3
.3
.6
.6
.2
.2
19+00
9.
9.
9.
9.
.2
.2
.2
.2
20+00
.0
.0
9.
9.
9.
9.
9.
9.
21+00
9.
9.
9.
9.
9.
9.
9.
9.
22+00
9.
9.
9.
9.
.3
.3
9.
9.
23+00
9.
9.
9.
9.
23+50
15" CONC15" CONC
15" CONC
15" CONC
15" CONC
15" CONC
MH20
STA: 19+93.49
RIM: 10.29
INV. IN: -3.62
INV. OUT: -3.62
MH31
STA: 22+60.46
RIM: 10.00
INV. IN: -3.20
INV. OUT: -3.22
MH19
STA: 19+23.56
RIM: 9.62
INV. IN: -3.57
INV. OUT: -3.57
MH17
STA: 18+05.39
RIM: 7.71
INV. IN: -4.04
INV. OUT: -4.04
MH15
STA: 17+65.56
RIM: 6.59
INV. IN: -4.27
INV. OUT: -4.34
MH09
STA: 17+06.42
RIM: 4.60
INV. IN: -4.70
INV. OUT: -4.70
X X
X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .