Attachment C Arcadia Beach SRS Plans and Drawings.pdf

PDF 5 MB Posted

Attached to
12580 ITB ARCADIA BEACH STATE RECREATION SITE IMPROVEMENTS AT ARCADIA BEACH SRS
Solicitation number
S-63400-00013311
Issued by
Clatsop County, Canyonville City, Oregon

About this file

The document is a set of engineering and site improvement plans for the Arcadia Beach State Recreation Site (SRS) prepared by the Oregon Parks and Recreation Department for site upgrades located in Clatsop County, Oregon. The project involves site improvements including a new parking lot with designated accessible and compact parking spaces, installation of a double gate, pavement markings, signage, landscaping, and erosion control measures. The project is situated on two tax lots (41007CB00400 & 41007CB001000) adjacent to Oregon Coast Highway 101, with a total combined site area of 1.6 acres.

The plans detail specific construction requirements such as work hours (7 AM to 5 PM, Monday through Friday), utility coordination, soil management, reseeding disturbed areas, and adherence to safety regulations. The project includes installing inductive vehicle loops, directional signage, wheel stops, striping, and landscaping with native plant species like Gaultheria shallon (salal) and restoration seed mix. The contractor will be responsible for protecting existing utilities, maintaining emergency access, and coordinating with ODOT District 1 for highway right-of-way permits. The design emphasizes environmental sensitivity and integration with the existing coastal landscape.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OREGON

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

EXPIRES: 6/30/2025

ARCADIA BEACH SRS

OREGON PARKS AND RECREATION DEPARTMENT

T4N R10W NW 14 SW 14 SECTION 7, WM

TAX LOT: 41007CB00400 & 41007CB001000

SITE IMPROVEMENTS

ST. HELENS

ASTORIA

TILLAMOOK

MCMINNVILLE

ALBANYNEWPORT

CORVALLIS

HOOD

RIVER

DALLES

THE

MADRAS

PRINEVILLE

BEND

COQUILLE

GRANTS

PASS

ASHLAND

BURNS

KLAMATH

FALLS

CONDON

MORO

PENDLETON

LA GRANDE

ENTERPRISE

VALE ONTARIO

PORTLAND

SALEM

MEDFORD

EUGENE

ROSEBURG

ATHENA

N. POWDER

UNITYDAYVILLE

SISTERS

JUNTURA

FRENCHGLEN

BURNS JCT.

MCDERMITT

PAISLEY

LA PINE

CRESCENT

BIGGS

LEXINGTON

HERMISTON

BOARDMAN

UKIAH

ARLINGTON

MALIN

BROOKINGS

COOS BAY

DRAIN

CANYONVIL LE

REEDSPORT

OAKRIDGE

GOSHENFLORENCE

LINCOLN CITY

WALDPORT

HOME

SWEET

DETROIT

ANTELOPE

MAUPIN

FOREST

GROVE

HEBO

CANNON BEACH

SEASIDE

RAINIER

MILTON-FREEWATER

W

26 35 197

3951926

3953197

I-5

BONANZA

JUNCTION CITY

BAKER CITY

HEPPNER

COPPERFIELD

LAKE

SILVER

JUNCTION

CAVEBEACH

GOLD

ORFORD

PORT

LAKEVIEW

CANYON

CITY

DAY

JOHN

CITY

OREGON

HILLSBORO

DALLAS

REDMOND

VAL LEY

JORDAN

I-5

I-5

I-5

PROJECT

LOCATION

VICINITY MAP

N.T.S

PROJECT MAP

N.T.S

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

CALIFORNIA

AutoCAD SHX Text

NEVADA

AutoCAD SHX Text

WASHINGTON

AutoCAD SHX Text

IDAHO

AutoCAD SHX Text

PACIFIC OCEAN

AutoCAD SHX Text COLOR CODES: RED - ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES - ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES YELLOW - GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. - GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. ORANGE - COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. - COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. BLUE - WATER, IRRIGATION, AND SLURRY LINES. - WATER, IRRIGATION, AND SLURRY LINES. WATER, IRRIGATION, AND SLURRY LINES. GREEN - SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. - SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. WHITE - PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE - PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE CENTERLINE AND WIDTH OF PROPOSED LINEAL INSTALLATIONS OF BURIED FACILITIES. PINK - TEMPORARY SURVEY MARKINGS - TEMPORARY SURVEY MARKINGS TEMPORARY SURVEY MARKINGS PURPLE - SLURRY AND RECLAIMED- SLURRY AND RECLAIMEDSLURRY AND RECLAIMED

AutoCAD SHX Text ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES : OREGON LAW REQUIRES YOU TO FOLLOW RULES OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE ADMINSTRATIVE (NOTE: THE ADMINSTRATIVE : THE ADMINSTRATIVE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987).

AutoCAD SHX Text

LAT. 45.846570 LONG. -123.960189

AutoCAD SHX Text T4N R10W NW SW Section 7 WM. 14 SW Section 7 WM. 14 Section 7 WM. TAXLOT 41007CB0400 & 41007CB01000

AutoCAD SHX Text

COMBINED TAXLOT SIZE:

AutoCAD SHX Text

1.8 ACRES

AutoCAD SHX Text

PROJECT COORDINATES:

AutoCAD SHX Text

LEGAL DESCRIPTION:

AutoCAD SHX Text Arcadia Beach State Park, Arch Cape, OR 97102

AutoCAD SHX Text

PROPERTY ADDRESS:

AutoCAD SHX Text

CONTACTS

AutoCAD SHX Text OWNER/APPLICANT: OREGON PARKS & RECREATION DEPT. 725 SUMMER ST. NE, STE C SALEM, OR 97301-1271 OFFICE: (503) 986-0794 FAX: (503) 986-0792 PROJECT MANAGER: OREGON PARKS & RECREATION DEPT. BLAINE KAPHAMMER BLAINE.KAPHAMMER@OPRD.OREGON.GOV MOBILE: (503) 910-4324 PARK MANAGER: BEN COX BEN.COX@OPRD.OREGON.GOV PHONE: (503) 791-7969

AutoCAD SHX Text

PROJECT DATA

AutoCAD SHX Text CIVIL ENGINEER: PARAMETRIX, INC. BARRY JOHNSON, PE BJOHNSON@PARAMETRIX.COM OFFICE: (541) 508-7819 MOBILE: (541) 420-2032

AutoCAD SHX Text

AREA OF GROUND DISTURBANCE:

AutoCAD SHX Text

0.47 ACRES

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text C1.0

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

LEGEND (EXISTING)

ABBREVIATIONS

EG = EXISTING GRADE

ELEV = ELEVATION

EX = EXISTING

FF= FINISHED FLOOR

FG = FINISH GRADE

FL = FLOW LINE

MAX = MAXIMUM

MIN = MINIMUM

OPRD = OREGON PARKS AND RECREATION DEPARTMENT

PC = POINT OF CURVATURE

PT = POINT OF TANGENCY

TC - TOP OF CURB

SIGN

CONIFER TREE

SEWER CLEAN OUT

MANHOLE SEWER

GATE POST

STEEL POST

WOOD POST

1. CONSTRUCTION SCHEDULE: CONSTRUCTION HOURS ARE LIMITED TO 7 A.M. UNTIL 5

P.M. MONDAY THROUGH FRIDAY. NO WORK SHALL OCCUR ON WEEKENDS OR

HOLIDAYS. MINOR ADJUSTMENTS TO THIS SCHEDULE MAY BE ALLOWED FOR MINOR

WORK AT THE DISCRETION OF THE PARK MANAGER. APPROVAL IN WRITING FROM THE

PARK MANAGER WILL BE REQUIRED FOR ANY DEVIATION TO THE SCHEDULE ABOVE.

2. CONTRACTOR SHALL COORDINATE WITH PROJECT MANAGER ON METHODS FOR

EXCAVATION AND UTILITY INSTALLATIONS ACCORDING TO PENDING INADVERTENT

DISCOVERY PLAN INCLUDED IN PROJECT SPECIFICATIONS.

3. CONTRACTOR SHALL CLEAR AND GRUB ALL NEW CONSTRUCTION AREAS BY

REMOVING AND DISPOSING OF TREES AND PLANTS AND REMOVING SOIL WITH

ORGANIC MATERIAL, AS REQUIRED AND APPROVED BY THE PROJECT MANAGER.

STOCKPILE APPROVED SOIL IN A LOCATION APPROVED BY THE PARK MANAGER AND

RE-USE THIS SOIL TO COVER DISTURBED AREAS, AS SHOWN ON PLANS. NO OTHER

DUMPSITE IS AVAILABLE OR PROVIDED BY THE OWNER FOR ANY OTHER TYPE OF

MATERIAL.

4. CONTRACTOR SHALL RESEED ALL DISTURBED AREAS WITH AN APPROVED SEED MIX

AND BRING ALL EXCAVATIONS AND DAMAGED AREAS TO A SMOOTH LEVEL SURFACE

PRIOR TO SEEDING.

5. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE CONSTRUCTION MEANS AND

METHODS.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SAFETY AND

SECURITY OF THE SITE WHILE THE WORK IS IN PROGRESS AND UNTIL CONTRACT

COMPLETION.

7. LOCATIONS AND SCALES ON THE OWNER PROVIDED PLANS ARE APPROXIMATE.

CONTRACTOR SHALL CONFIRM ALL LOCATIONS AND DISTANCES IN THE FIELD PRIOR

TO BID.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES

AND GOVERNMENTAL AGENCIES WHO MIGHT HAVE UTILITY LINES ON OR ACROSS THE

PREMISES, OR WHO MIGHT BE AFFECTED BY THE CONSTRUCTION. THE CONTRACTOR

SHALL COORDINATE CONSTRUCTION ACTIVITIES WITH THE UTILITY COMPANIES TO

ENSURE COMPLIANCE WITH THE PROJECT SCHEDULE ESTABLISHED BY PROJECT

MANAGER. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PROTECT EXISTING

UTILITY LINES, AND SHALL REPAIR ANY DAMAGES AT THE CONTRACTORS OWN

EXPENSE.

9. THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER OF ANY PROBLEM IN

CONFORMING TO THE APPROVED PLANS FOR ANY ELEMENT OF THE PROPOSED

IMPROVEMENTS PRIOR TO ITS CONSTRUCTION.

10. CONTRACTOR SHALL VERIFY ALL CONDITIONS ON THE JOB SITE INCLUDING BUT NOT

LIMITED TO, ALL DIMENSIONS, GRADES, ELEVATIONS, AND THE COMPATIBILITY OF THE

WORK DESCRIBED ON THE ENGINEER'S DRAWINGS TO THE EXISTING SITE CONDITIONS.

ANY DISCREPANCIES OR UNEXPECTED CONDITIONS THAT AFFECT OR CHANGE THE

WORK DESCRIBED IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE

PROJECT MANAGER'S ATTENTION IMMEDIATELY. CONTRACTOR SHALL NOT PROCEED

WITH ANY OF THE WORK IN THE AREA OF DISCREPANCIES UNTIL ALL SUCH

DISCREPANCIES ARE RESOLVED. IF THE CONTRACTOR CHOOSES TO DO SO, THEN IT IS

UNDERSTOOD THAT THE CONTRACTOR IS CHOOSING TO PROCEED AT THE

CONTRACTOR'S OWN RISK AND SHALL INCUR ALL COSTS, IF ANY TO RESOLVE THE

ISSUES TO THE SATISFACTION OF THE ENGINEER.

11. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE INDUSTRY SAFETY REGULATIONS.

CLATSOP COUNTY AND THEIR OFFICIALS, THE ENGINEER, AND THE OWNER SHALL NOT

BE RESPONSIBLE FOR ENFORCING SAFETY REGULATIONS.

12. ACCESS TO EXISTING PROPERTIES/RESIDENCES AFFECTED BY CONSTRUCTION

ACTIVITIES SHALL BE MAINTAINED AT ALL TIMES BY THE CONTRACTOR. EMERGENCY

ACCESS AND COORDINATION OF EMERGENCY SERVICES SHALL BE REQUIRED.

13. CONTRACTOR SHALL CONTACT ODOT DISTRICT 1 AND SECURE ALL PERMITTING TO DO

WORK IN THE HIGHWAY RIGHT-OF-WAY.

14. SURVEY CONTROL FILE IS AVAILABLE UPON REQUEST.

GENERAL NOTES DEMOLITION AND EROSION CONTROL NOTES

1. SURVEY MONUMENTS, CONTROLS OR PROPERTY CORNERS WHICH ARE DISTURBED

OR DESTROYED BY CONSTRUCTION ACTIVITIES SHALL BE RE-ESTABLISHED,

RESTORED AND/OR REPLACED AT THE CONTRACTOR'S EXPENSE.

2. PERMANENT OR TEMPORARY SOIL STABILIZATION MEASURES SHALL BE APPLIED TO

ALL DISTURBED AREAS AND SOIL STOCKPILES WITHIN 30 DAYS TO ALL AREAS

INCLUDING AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 60 DAYS.

3. THE PHYSICAL FEATURES AND EXISTING UTILITIES WITHIN THE LIMITS OF THE

PROJECT HAVE BEEN SHOWN BASED ON THE INFORMATION MADE AVAILABLE TO THE

PROJECT MANAGER AND ENGINEER AT THE TIME OF DESIGN. THE CONTRACTOR

SHALL VERIFY ALL FEATURES AND EXISTING UTILITIES PRIOR TO BEGINNING ANY

WORK AND SHALL NOTIFY PROJECT MANAGER OF ANY CONFLICTS.

4. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING

UTILITIES, INFRASTRUCTURE, AND IMPROVEMENTS IN PLACE. ANY DAMAGE TO

EXISTING FACILITIES OR IMPROVEMENTS, RESULTING FROM THE CONTRACTOR'S

OPERATION, SHALL BE REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE.

5. CONTRACTOR TO PREVENT TRACKING OF DIRT AND DEBRIS ONTO PUBLIC ROADWAYS

IN ACCORDANCE WITH SPECIFICATIONS AND APPLICABLE REQUIREMENTS FROM

LOCAL JURISDICTIONS.

6. ALL UTILITIES SHOWN ARE ACCURATE TO THE EXTENT OF THE ENGINEER'S

KNOWLEDGE. NO POTHOLING TO VERIFY LOCATIONS AND ELEVATIONS WAS

AUTHORIZED BY THE OWNER. THE CONTRACTOR HAS THE TOTAL RESPONSIBILITY TO

VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES AND TO NOTIFY THE

UTILITY COMPANIES WHEN WORKING IN THEIR PROXIMITY. CONTRACTOR TO VERIFY

LOCATION OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. OREGON LAW REQUIRES

YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER.

THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY

OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. THE TELEPHONE NUMBER

FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503)232-2987.

7. WOODY MATERIAL, STUMPS, AND EXCESS SAND CAN BE DISPOSED ON SITE.

CONCRETE, ASPHALT, AND OTHER RUBBISH TO BE HAULED AND DISPOSED OF

LEGALLY. STRIPPED UPPER SOIL LAYER WITH DUFF SHOULD BE STOCKPILED FOR

REDISTRIBUTION AT PLANTING PER SHEET C4.0.

SHEET INDEX

SHEET NUMBER SHEET NAME

C1.0 COVER SHEET

C1.1 GENERAL NOTES

C2.0 DEMOLITION & EROSION CONTROL

C2.1 CIVIL SITE & CHANNELIZATION PLAN

C2.2 SITE GRADING & DRAINAGE PLAN

C3.0 CIVIL DETAILS

C3.1 CIVIL DETAILS

C3.2 CIVIL DETAILS

C3.3 CIVIL DETAILS

C4.0 LANDSCAPE PLAN

CO

WOOD FENCE

WOOD POST

VEGETATION EDGE

BUILDING

ASPHALT

GRAVEL

CONCRETE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

GENERAL NOTES

C1.1

OREGON COAST

HWY 101

OREGON

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

LEGEND

CONSTRUCTION NOTES

1. REMOVE AND SALVAGE SIGN FOR REINSTALLATION.

2. PRESERVE, PROTECT, AND REINSTALL EXISTING WOOD

FENCE, UNLESS APPROVED FOR REMOVAL BY

PROJECT MANAGER.

1. PERMANENT OR TEMPORARY SOIL STABILIZATION

MEASURES SHALL BE APPLIED TO ALL DISTURBED

AREAS AND SOIL STOCKPILES WITHIN 30 DAYS TO ALL

AREAS INCLUDING AREAS WHICH WILL BE LEFT

DORMANT FOR MORE THAN 60 DAYS.

2. CONTRACTOR SHALL NOT REMOVE TREES OTHER

THAN THOSE NOTED FOR REMOVAL WITHOUT PRIOR

APPROVAL OF THE PROJECT MANAGER.

3. CONTRACTOR TO PREVENT TRACKING OF DIRT AND

DEBRIS ONTO PUBLIC ROADWAYS IN ACCOIRDANCE

WITH SPECIFICATIONS.

4. ALL UNSUITABLE SOILS MATERIALS, RUBBISH, AND

DEBRIS RESULTS FROM GRADING OPERATIONS SHALL

BE REMOVED FROM THE JOB SITE AND DISPOSED OF

PROPERLY.

5. CONTRACTOR SHALL STRIP AND STOCKPILE 2" OF

NATIVE DUFF, FREE ROCKS AND BRANCHES, WITHIN

CLEARING LIMITS PRIOR TO STRIPPING AND

STOCKPILING TOPSOIL RESPECTIVELY.

6. TAX LOT LINES ARE BASED ON CLATSOP COUNTY

GEOGRAPHIC INFORMATION SYSTEMS DIVISION

DATABASE.

AutoCAD SHX Text

GRAVEL PARKING AREA

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SHEET NOTES

AutoCAD SHX Text

DEMOLITION & EROSION CONTROL

AutoCAD SHX Text C2.0

AutoCAD SHX Text

SAWCUT LINE

AutoCAD SHX Text

CLEARING AND GRUBBING

AutoCAD SHX Text

ASPHALT AREA TO BE REMOVED

AutoCAD SHX Text

WATTLE FIBER ROLL

AutoCAD SHX Text

TREE PROTECTION FENCING

AutoCAD SHX Text

GRAVEL AREA TO BE REMOVED

AutoCAD SHX Text

TREE TO BE REMOVED

AutoCAD SHX Text CONTRACTOR TO INSTALL AND CONTROL ACCESS BARRICADES. COORDINATION AND APPROVAL WITH ODOT PRIOR TO INSTALLATION OF BARRICADES IN R.O.W.

AutoCAD SHX Text

TAXLOT LINE, TYP.

CONTRACTOR TO REMOVE EXISTING CAR COUNTER BOX AND RETURN TO OPRD PROJECT MANAGER.

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

OREGON

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

CONSTRUCTION NOTES

1. CONSTRUCT ADA ANGLE ACCESSIBLE PARKING

LAYOUT PER DETAIL 1/C3.0.

2. CONSTRUCT SWALE PER DETAIL 8/C3.0.

3. INSTALL DOUBLE GATE PER OPRD STANDARD

DETAIL 1/C3.1.

4. INSTALL EVERLAST LOOPS MODEL P16 INDUCTIVE

LOOPS WITH 24 GAUGE WIRE OR APPROVED

EQUIVALENT. CONNECT TO SALVAGED CAR

COUNTER. SEE DETAIL 2/C3.2.

5. CONSTRUCT ASPHALT PAVEMENT PER DETAIL

4/C3.0.

6. INSTALL CONCRETE WHEEL STOP PER DETAIL

6/C3.0.

7. WHITE NO PARKING ZONE STRIPING PER DETAIL

3/C3.0.

8. WHITE 4" PARKING STRIPE.

9. CONTRACTOR TO RESURFACE EXISTING TRAIL

SURFACE WITH COMPACTED 3

8" MINUS GRAVEL TO 4"

MINIMUM THICKNESS.

10. WHITE STRAIGHT ARROW MARKING PER DETAIL

7/C3.0.

11. CONSTRUCT ENTRYWAY ASPHALT PAVEMENT PER

DETAIL 9/C3.0. CONTRACTOR TO SEAL SAWCUT

JOINT WITH TACK MATERIAL AND SAND.

12. WHITE 6" COMPACT PARKING STRIPING PER DETAIL

11 /C3.0.

1. CONTRACTOR SHALL NOT REMOVE TREES OTHER

THAN THOSE NOTED FOR REMOVAL WITHOUT

PRIOR APPROVAL OF THE PROJECT MANAGER.

2. CAMPSITE FURNISHINGS ARE SHOWN FOR

REFERENCE AND FOR SITE LAYOUT. THESE ITEMS

WILL BE FURNISHED AND INSTALLED BY THE

OWNER.

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

SHEET NOTES

AutoCAD SHX Text

CIVIL SITE & CHANNELIZATION PLAN

AutoCAD SHX Text C2.1

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PRESERVE SPRUCE TREE

AutoCAD SHX Text

GRADE BREAK FOR DRAINAGE

AutoCAD SHX Text

RE-LOCATED STOP SIGN

AutoCAD SHX Text

ORPD WELCOME SIGN ONE-WAY CIRCULATION SIGN

AutoCAD SHX Text

CANNON BEACH

AutoCAD SHX Text

ARCH CAPE

AutoCAD SHX Text

SEE SHEET C2.2 C2.2 FOR GRADING & DRAINAGE DETAILS

AutoCAD SHX Text

PRESERVE SPRUCE TREE

AutoCAD SHX Text

CONTRACTOR TO COORDINATE RELOCATING EXISTING SIGN AS REQUESTED BY PARK STAFF

APPROXIMATE LOCATION OF RE-LOCATED OPRD ENTRY SIGN. CONTRACTOR TO COORDINATE FINAL LOCATION WITH PARK STAFF.

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

48.91 48.29

48.21

52.90

53.85 54.94

54.85 ±

51.26 51.11 51.19

52.17

49.99

49.25 49.15

48.87

48.40

48.32 48.51

46.7146.51

46.47

47.13

51.98

52.79 53.40

54.11±

54.28 ±

48.67

50.63

49.70 48.72

51.79

5152535456575859

5152 52

-1.1%

-0.3%

-1.5%

-0.8%

-0.6%

OREGON

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

SITE GRADING & DRAINAGE PLAN

AutoCAD SHX Text C2.2

AutoCAD SHX Text POINT DESCRIPTIONS: NONE FINISH GRADE ± MATCH EXISTING GRADE MATCH EXISTING GRADE

AutoCAD SHX Text

ELEVATION AT POINT

AutoCAD SHX Text

NEW ASPHALT DRIVE/PARKING

AutoCAD SHX Text

GRADE BREAK

AutoCAD SHX Text

SHEET LEGEND

AutoCAD SHX Text

GRADING LABEL LEGEND

AutoCAD SHX Text

EXISTING GROUND (1-FOOT CONTOUR), TYP

AutoCAD SHX Text

PROPOSED GRADE (1-FOOT CONTOUR), TYP

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONTRACTOR TO FIELD FIT SWALE TO PROVIDE MINIMUM 175 LF.

AutoCAD SHX Text

RE-SURFACED GRAVEL PATH. COMPACTED " MINUS.38" MINUS.

AutoCAD SHX Text

TOE OF SLOPE

AutoCAD SHX Text

CONTRACTOR TO COORDINATE TRAIL RESTORATION LIMITS WITH OPRD PROJECT MANAGER.

CONTRACTOR TO COORDINATE TRAIL RESTORATION LIMITS WITH OPRD PROJECT MANAGER.

RESERVED

PARKING

RESERVED

PARKING

NO

PARKING

ACCESS AISLE

ACCESSIBLE

VAN

NOPARKING

NO

PARKING

NO

PARKING

NO

PARKING

RESERVED

PARKING

ACCESSIBLE

VAN

SLOPE PER PLAN

SLOPE PER PLAN

COMPACT

OREGON

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

ANGLED ACCESSIBLE

PARKING LAYOUT 1

C3.0N.T.S

PAVEMENT

MARKING STENCIL 2

C3.0N.T.S

PAVEMENT

MARKING LEGEND 3

C3.0N.T.S

TYPICAL ASPHALT

PAVEMENT SECTION 4

C3.0N.T.S

PAVEMENT

MARKING STENCIL 5

C3.0N.T.S

PRECAST CONCRETE

WHEEL STOP 6

C3.0N.T.S

SWALE 8

C3.0N.T.S

ENTRYWAY

ASPHALT PAVEMENT

SECTION 9

C3.0N.T.S

DIRECTIONAL ARROW (WHITE) 7

C3.0N.T.S

COMPACT PARKING STRIPING 11

C3.0N.T.S

AutoCAD SHX Text

ANGLE ACCESSIBLE PARKING LAYOUT

AutoCAD SHX Text

CURB RAMP (SHALL NOT EXTEND INTO ACCESS AISLE)

AutoCAD SHX Text

PRECAST CONCRETE WHEEL STOP SEE DETAIL 8/C3.0C3.0

AutoCAD SHX Text

ACCESS AISLE

AutoCAD SHX Text

PAVEMENT MARKING REQUIRED. SEE DETAIL 2/C3.0C3.0

AutoCAD SHX Text

SIGN R7-8

AutoCAD SHX Text

SIGN R7-8P

AutoCAD SHX Text

SIGN OR7-9A

AutoCAD SHX Text

SIGN R7-8

AutoCAD SHX Text

SIGN OR7-9

AutoCAD SHX Text

ACCESSIBLE ROUTE

AutoCAD SHX Text

PAVEMENT MARKING STENCIL

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

PAVEMENT MARKING STENCIL WHITE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text

DIMENSIONS (INCHES)

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text THE PAVEMENT MARKING STENCIL SHALL BE USED TO DESIGNATE AN ACCESSIBLE PARKING AREA RESERVED FOR VEHICLES WITH DMV PERMITS.

AutoCAD SHX Text

COMPACT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PAVEMENT MARKING LEGEND

AutoCAD SHX Text

PAVEMENT MARKING LEGEND: WHITE OR YELLOW, RETROFLECTIVE

AutoCAD SHX Text THE "NO PARKING" PAVEMENT MARKING IS USED TO DESIGNATE AN ACCESS AISLE RESERVED FOR PERSONS USE PARKING WITH A DMV PERMIT. THIS MARKING SHALL BE REQUIRED FOR ALL ACCESS AISLES NEXT TO ACCESSIBLE PARKING SPACES. ENGINEERING JUDGEMENTS SHOULD BE USED FOR PLACEMENTS LOCATION TO GIVE BEST VISUAL LOCATION TO PREVENT ILLEGAL USE OF ACCESS AISLE. YELLOW MAY BE USED INSTEAD OF WHITE TO INCREASE CONTRAST BETWEEN ACCESS AISLE WHITE LINES AND THE "NO PARKING: LEGEND.

AutoCAD SHX Text

FOR ADA PARKING STENCIL

AutoCAD SHX Text

PRECAST CONCRETE WHEEL STOP

AutoCAD SHX Text

FOR ADA LOADING ZONE STRIPING SEE DETAIL 3/C3.0C3.0

AutoCAD SHX Text

CURB RAMP (SHALL NOT EXTEND INTO ACCESS AISLE)

AutoCAD SHX Text

SIGN R7-8

AutoCAD SHX Text

SIGN R7-8P

AutoCAD SHX Text

WHITE 4' WIDE LINES

AutoCAD SHX Text NOTES: 1. GRADE AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN GRADE AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN TO ACHIEVE NO VISIBLE DEFLECTION WHEN TO ACHIEVE NO VISIBLE DEFLECTION WHEN ACHIEVE NO VISIBLE DEFLECTION WHEN ACHIEVE NO VISIBLE DEFLECTION WHEN NO VISIBLE DEFLECTION WHEN NO VISIBLE DEFLECTION WHEN VISIBLE DEFLECTION WHEN VISIBLE DEFLECTION WHEN DEFLECTION WHEN DEFLECTION WHEN WHEN WHEN PROOF ROLLED WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING ROLLED WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING ROLLED WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING LOADED TRUCK PER ODOT DEFLECTION TESTING LOADED TRUCK PER ODOT DEFLECTION TESTING TRUCK PER ODOT DEFLECTION TESTING TRUCK PER ODOT DEFLECTION TESTING PER ODOT DEFLECTION TESTING PER ODOT DEFLECTION TESTING ODOT DEFLECTION TESTING ODOT DEFLECTION TESTING DEFLECTION TESTING DEFLECTION TESTING TESTING TESTING METHOD TM 158. 2. PAVE TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX PAVE TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX LEVEL 2, " DENSE, PG 64-22 HOT MIX LEVEL 2, " DENSE, PG 64-22 HOT MIX 2, " DENSE, PG 64-22 HOT MIX 2, " DENSE, PG 64-22 HOT MIX " DENSE, PG 64-22 HOT MIX 12" DENSE, PG 64-22 HOT MIX DENSE, PG 64-22 HOT MIX DENSE, PG 64-22 HOT MIX PG 64-22 HOT MIX PG 64-22 HOT MIX 64-22 HOT MIX 64-22 HOT MIX HOT MIX HOT MIX MIX MIX ASPHALT CONCRETE. COMPACT TO 95% MAX DENSITY. 3. GRADE CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. GRADE CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. (H:V) SLOPE TO MATCH EXISTING GROUND. (H:V) SLOPE TO MATCH EXISTING GROUND. SLOPE TO MATCH EXISTING GROUND. SLOPE TO MATCH EXISTING GROUND. TO MATCH EXISTING GROUND. TO MATCH EXISTING GROUND. MATCH EXISTING GROUND. MATCH EXISTING GROUND. EXISTING GROUND. EXISTING GROUND. GROUND. GROUND. COMPACT AND TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE AND TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE AND TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ALL VERTICAL DROPS AND ELIMINATE VERTICAL DROPS AND ELIMINATE VERTICAL DROPS AND ELIMINATE DROPS AND ELIMINATE DROPS AND ELIMINATE AND ELIMINATE AND ELIMINATE ELIMINATE ELIMINATE TRIPPING HAZARDS.

AutoCAD SHX Text 4-1/2"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6'-0"

AutoCAD SHX Text 9"

AutoCAD SHX Text 6"

AutoCAD SHX Text 5"

AutoCAD SHX Text

2-1"%%C HOLES

AutoCAD SHX Text 5"

AutoCAD SHX Text 2"

AutoCAD SHX Text 3"

AutoCAD SHX Text 2"

AutoCAD SHX Text 9"

AutoCAD SHX Text

SEAL 1/2" DEEP

AutoCAD SHX Text

HOLE W/ MORTAR

AutoCAD SHX Text

2-#3 REBARS

AutoCAD SHX Text #6 @ 2'-6"

AutoCAD SHX Text

LONG

AutoCAD SHX Text

SECTION

AutoCAD SHX Text NOTE: RECYCLED RUBBER WHEEL STOPS MAY BE SUBMITTED TO OWNER FOR REVIEW AND APPROVAL FOR USE INSTEAD OF CONCRETE WHEEL STOPS.

AutoCAD SHX Text NON-WOVEN GEOTEXTILE FILTER FABRIC, MIRAFI 140N, OR PRE-APPROVED EQUAL, WRAPPED WRAPPED AROUND ALL SIDES OF OVER EXCAVATION PRIOR TO TOPSOIL PLACEMENT (TYP.)

AutoCAD SHX Text

8" THICK AMENDED TOPSOIL, SEE LANDSCAPING PLAN FOR SEED MIX DETAILS.

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text 3:1 (H:V)

AutoCAD SHX Text NOTES: 1. GRADE AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN GRADE AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AND COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN COMPACT BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN BASE AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN AGGREGATE TO ACHIEVE NO VISIBLE DEFLECTION WHEN TO ACHIEVE NO VISIBLE DEFLECTION WHEN TO ACHIEVE NO VISIBLE DEFLECTION WHEN ACHIEVE NO VISIBLE DEFLECTION WHEN ACHIEVE NO VISIBLE DEFLECTION WHEN NO VISIBLE DEFLECTION WHEN NO VISIBLE DEFLECTION WHEN VISIBLE DEFLECTION WHEN VISIBLE DEFLECTION WHEN DEFLECTION WHEN DEFLECTION WHEN WHEN WHEN PROOF ROLLED WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING ROLLED WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING ROLLED WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING WITH A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING A FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING FULLY LOADED TRUCK PER ODOT DEFLECTION TESTING LOADED TRUCK PER ODOT DEFLECTION TESTING LOADED TRUCK PER ODOT DEFLECTION TESTING TRUCK PER ODOT DEFLECTION TESTING TRUCK PER ODOT DEFLECTION TESTING PER ODOT DEFLECTION TESTING PER ODOT DEFLECTION TESTING ODOT DEFLECTION TESTING ODOT DEFLECTION TESTING DEFLECTION TESTING DEFLECTION TESTING TESTING TESTING METHOD TM 158. 2. PAVE TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX PAVE TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX TWO SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX SEPARATE 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX 2" LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX LIFT(S) MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX MAX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX OF LEVEL 2, " DENSE, PG 64-22 HOT MIX LEVEL 2, " DENSE, PG 64-22 HOT MIX LEVEL 2, " DENSE, PG 64-22 HOT MIX 2, " DENSE, PG 64-22 HOT MIX 2, " DENSE, PG 64-22 HOT MIX " DENSE, PG 64-22 HOT MIX 12" DENSE, PG 64-22 HOT MIX DENSE, PG 64-22 HOT MIX DENSE, PG 64-22 HOT MIX PG 64-22 HOT MIX PG 64-22 HOT MIX 64-22 HOT MIX 64-22 HOT MIX HOT MIX HOT MIX MIX MIX ASPHALT CONCRETE. COMPACT TO 95% MAX DENSITY. 3. GRADE CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. GRADE CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. CUTS AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AND FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. FILLS AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. AT 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. 2:1 (H:V) SLOPE TO MATCH EXISTING GROUND. (H:V) SLOPE TO MATCH EXISTING GROUND. (H:V) SLOPE TO MATCH EXISTING GROUND. SLOPE TO MATCH EXISTING GROUND. SLOPE TO MATCH EXISTING GROUND. TO MATCH EXISTING GROUND. TO MATCH EXISTING GROUND. MATCH EXISTING GROUND. MATCH EXISTING GROUND. EXISTING GROUND. EXISTING GROUND. GROUND. GROUND. COMPACT AND TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE AND TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE AND TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TAKE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE CARE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE TO ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ALL VERTICAL DROPS AND ELIMINATE ALL VERTICAL DROPS AND ELIMINATE VERTICAL DROPS AND ELIMINATE VERTICAL DROPS AND ELIMINATE DROPS AND ELIMINATE DROPS AND ELIMINATE AND ELIMINATE AND ELIMINATE ELIMINATE ELIMINATE TRIPPING HAZARDS.

AutoCAD SHX Text

PAVEMENT MARKING LEGEND: WHITE OR YELLOW, RETROFLECTIVE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

CIVIL DETAILS

AutoCAD SHX Text C3.0

ALL STENCILS WILL BE PROVIDED BY OWNER. CONTRACTOR TO RETURN TO PARK MANAGER CLEAN FOLLOWING USE.

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

DOUBLE GATE

(STANDARD) 1

C3.1N.T.S

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

DOUBLE GATE (STANDARD)

AutoCAD SHX Text

11/16" WIDE, 4' LONG TOP TO BOTTOM

AutoCAD SHX Text

TOP VIEW

AutoCAD SHX Text

SIDE VIEW

AutoCAD SHX Text

GATE ARM HOLDER WHILE IN OPEN POSITION (TYP.)

AutoCAD SHX Text

CONSTRUCTION NOTES:

AutoCAD SHX Text

1. INSTALL 12" CONCRETE FOUNDATION, 3'-6" DEEP. INSTALL 12" CONCRETE FOUNDATION, 3'-6" DEEP. 2. INSTALL 3'-6" CONCRETE FOUNDATION, 3'-8" DEEP. INSTALL 3'-6" CONCRETE FOUNDATION, 3'-8" DEEP. 3. PAINT ALL STEEL WITH 2 COATS EXTERIOR ENAMEL PAINT, UNLESS GALVANIZED. CONFIRM PAINT ALL STEEL WITH 2 COATS EXTERIOR ENAMEL PAINT, UNLESS GALVANIZED. CONFIRM COLOR WITH PARK MANAGER. 4. ALL STEEL AND ANCHOR BOLTS SUPPLIED BY OTHERS, INSTALLED BY CONTRACTOR. ALL STEEL AND ANCHOR BOLTS SUPPLIED BY OTHERS, INSTALLED BY CONTRACTOR. CONTRACTOR SHALL ASSEMBLE GATE USING PINS AND ANCHOR BOLTS PROVIDED. 5. OBTAIN OWNER APPROVAL OF GATE LOCATION PRIOR TO BEGINNING WORK.OBTAIN OWNER APPROVAL OF GATE LOCATION PRIOR TO BEGINNING WORK.

AutoCAD SHX Text

GATE AND POST FULLY FABRICATED AND SUPPLIED BY OTHERS, INSTALLED BY CONTRACTOR

AutoCAD SHX Text APPROX. 3' ADJUST HEIGHT OF BAR HOLDER TO HOLD GATE ARM HORIZONTAL WHEN GATE IS IN OPEN POSITION. LOCATE 1' FROM END OF BAR

AutoCAD SHX Text

GATE ARM HOLDER

AutoCAD SHX Text

DETAIL-A

AutoCAD SHX Text

NOTE: 2 REQUIRED FOR DOUBLE GATE

AutoCAD SHX Text

SIDE VIEW

AutoCAD SHX Text

FRONT VIEW

AutoCAD SHX Text

4" SQUARE TUBE PRIMED STEEL

AutoCAD SHX Text

SLOPE TO DRAIN

AutoCAD SHX Text

EDGE OF BASE PLATE

AutoCAD SHX Text

8"X8" STEEL TUBE POST

AutoCAD SHX Text

34" BASE PLATE

AutoCAD SHX Text

EDGE OF ROAD

AutoCAD SHX Text

PRIMED STEEL

AutoCAD SHX Text

LOCKING MECHANISM IN 1 TUBE OF GATE

AutoCAD SHX Text

CENTER OF GATE

AutoCAD SHX Text

PRIMED STEEL

AutoCAD SHX Text

3/4" CHAMFER (TYP.)

AutoCAD SHX Text

EDGE OF ROAD

AutoCAD SHX Text

EDGE OF BASE PLATE

AutoCAD SHX Text

3/4" DIA. A.B. SUPPLIED BY OTHERS, INSTALLED BY CONTRACTOR

AutoCAD SHX Text

34" BASE PLATE

AutoCAD SHX Text

7/8" DIA. HOLES FOR A.B. (4)

AutoCAD SHX Text

LOCKING HASP

AutoCAD SHX Text

CONCRETE 3000 PSI MIN.

AutoCAD SHX Text

POST FULLY FABRICATED AND SUPPLIED BY OTHERS, INSTALLED BY CONTRACTOR

AutoCAD SHX Text

CONCRETE FOOTING 3000 PSI MIN.

AutoCAD SHX Text

CIVIL DETAILS

AutoCAD SHX Text C3.1

AutoCAD SHX Text

GATE ARM HOLDER WHILE IN OPEN POSITION (TYP.)

AutoCAD SHX Text

CONTRACTO TO VERIFY POST INSTALLATION LOCATION PER OPRD GUIDANCE.

AutoCAD SHX Text

CONTRACTO TO VERIFY POST INSTALLATION LOCATION PER OPRD GUIDANCE.

POST & HINGE SHOWN FOR REFERENCE. CONTRACTOR TO INSTALL TO PROVIDE 180°± SWING ARM OPENING PER THEGENERAL ORIENTATION SHOWN IN THE PLAN VIEW BELOW.

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

VEHICLE COUNTER SYSTEM 2

C3.2N.T.S

THERMOPLASTIC STOP BAR 4

C3.2N.T.S

PAVEMENT MARKING SCHEDULE 3

C3.2N.T.S

AutoCAD SHX Text VEHICLE COUNTER CONSTRUCTION NOTES: 1. COORDINATE VEHICLE COUNTER SYSTEM LOCATION WITH PROJECT MANAGER COORDINATE VEHICLE COUNTER SYSTEM LOCATION WITH PROJECT MANAGER VEHICLE COUNTER SYSTEM LOCATION WITH PROJECT MANAGER VEHICLE COUNTER SYSTEM LOCATION WITH PROJECT MANAGER COUNTER SYSTEM LOCATION WITH PROJECT MANAGER COUNTER SYSTEM LOCATION WITH PROJECT MANAGER SYSTEM LOCATION WITH PROJECT MANAGER SYSTEM LOCATION WITH PROJECT MANAGER LOCATION WITH PROJECT MANAGER LOCATION WITH PROJECT MANAGER WITH PROJECT MANAGER WITH PROJECT MANAGER PROJECT MANAGER PROJECT MANAGER MANAGER MANAGER BEFORE STARTING WORK. 2. INSTALL INDUCTIVE LOOP (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. INSTALL INDUCTIVE LOOP (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. INDUCTIVE LOOP (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. INDUCTIVE LOOP (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. LOOP (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. LOOP (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. (OFCI) IN CENTER OF ROADWAY BEFORE PAVING. IN CENTER OF ROADWAY BEFORE PAVING. IN CENTER OF ROADWAY BEFORE PAVING. CENTER OF ROADWAY BEFORE PAVING. CENTER OF ROADWAY BEFORE PAVING. OF ROADWAY BEFORE PAVING. OF ROADWAY BEFORE PAVING. ROADWAY BEFORE PAVING. ROADWAY BEFORE PAVING. BEFORE PAVING. BEFORE PAVING. PAVING. PAVING. RECESS INTO AGGREGATE SO LOOP IS FLUSH TO TOP OF AGGREGATE BASE . 3. INSTALL PVC CONDUIT (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL INSTALL PVC CONDUIT (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL PVC CONDUIT (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL PVC CONDUIT (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL CONDUIT (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL CONDUIT (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL (OFCI) TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL TO HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL HOUSE AND PROTECT INDUCTIVE LOOP PIGTAIL AND PROTECT INDUCTIVE LOOP PIGTAIL AND PROTECT INDUCTIVE LOOP PIGTAIL PROTECT INDUCTIVE LOOP PIGTAIL PROTECT INDUCTIVE LOOP PIGTAIL INDUCTIVE LOOP PIGTAIL INDUCTIVE LOOP PIGTAIL LOOP PIGTAIL LOOP PIGTAIL PIGTAIL PIGTAIL LEAD RUNNING TO STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' RUNNING TO STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' RUNNING TO STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' TO STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' TO STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' STAINLESS STEEL EQUIPMENT BOX. BURY CONDUIT 12' STEEL EQUIPMENT BOX. BURY CONDUIT 12' STEEL EQUIPMENT BOX. BURY CONDUIT 12' EQUIPMENT BOX. BURY CONDUIT 12' EQUIPMENT BOX. BURY CONDUIT 12' BOX. BURY CONDUIT 12' BOX. BURY CONDUIT 12' BURY CONDUIT 12' BURY CONDUIT 12' BURY CONDUIT 12' CONDUIT 12' CONDUIT 12' CONDUIT 12' 12' 12' BELOW GRADE. 4. INSTALL SS (OFCI) EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE INSTALL SS (OFCI) EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE SS (OFCI) EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE SS (OFCI) EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE (OFCI) EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE (OFCI) EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE EQUIPMENT BOX. SET BOX LID 12" ABOVE EXISTING GRADE BOX. SET BOX LID 12" ABOVE EXISTING GRADE BOX. SET BOX LID 12" ABOVE EXISTING GRADE SET BOX LID 12" ABOVE EXISTING GRADE SET BOX LID 12" ABOVE EXISTING GRADE SET BOX LID 12" ABOVE EXISTING GRADE BOX LID 12" ABOVE EXISTING GRADE BOX LID 12" ABOVE EXISTING GRADE LID 12" ABOVE EXISTING GRADE LID 12" ABOVE EXISTING GRADE 12" ABOVE EXISTING GRADE 12" ABOVE EXISTING GRADE ABOVE EXISTING GRADE ABOVE EXISTING GRADE EXISTING GRADE EXISTING GRADE GRADE GRADE AND POUR 18" X 18" X 18" CONCRETE BALLAST. 5. PAVE OVER INDUCTIVE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE PAVE OVER INDUCTIVE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE OVER INDUCTIVE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE OVER INDUCTIVE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE INDUCTIVE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE INDUCTIVE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE LOOP AND CONDUIT AS NORMAL PAVING OPERATION. TAKE AND CONDUIT AS NORMAL PAVING OPERATION. TAKE AND CONDUIT AS NORMAL PAVING OPERATION. TAKE CONDUIT AS NORMAL PAVING OPERATION. TAKE CONDUIT AS NORMAL PAVING OPERATION. TAKE AS NORMAL PAVING OPERATION. TAKE AS NORMAL PAVING OPERATION. TAKE NORMAL PAVING OPERATION. TAKE NORMAL PAVING OPERATION. TAKE PAVING OPERATION. TAKE PAVING OPERATION. TAKE OPERATION. TAKE OPERATION. TAKE TAKE TAKE TAKE CARE TO LEAVE ASSEMBLY UNDISTURBED DURING PAVING OPERATION.

AutoCAD SHX Text

PAVEMENT MARKING SCHEDULE

AutoCAD SHX Text

MARKING TYPE

AutoCAD SHX Text Qty.

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

4" WHITE LINE

AutoCAD SHX Text

AutoCAD SHX Text

FEET

AutoCAD SHX Text

ADA LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

EACH

AutoCAD SHX Text

NO PARKING LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

EACH

AutoCAD SHX Text

ARROW LEGEND

AutoCAD SHX Text

AutoCAD SHX Text

EACH

AutoCAD SHX Text

THERMOPLASTIC STOP BAR

AutoCAD SHX Text

AutoCAD SHX Text

EACH

AutoCAD SHX Text

COMPACT STALL

AutoCAD SHX Text

AutoCAD SHX Text

EACH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

CIVIL DETAILS

AutoCAD SHX Text C3.2

ALL STENCILS WILL BE PROVIDED BY OWNER. CONTRACTOR TO RETURN TO PARK MANAGER CLEAN FOLLOWING USE.

14972ENG I NEER

JULY 25 , 1990BARRY C . J OHNSON

RE

G

IS

TERED PROFESSIONAL

WOODEN SIGN POST 1

C3.3N.T.S

SIGN SCHEDULE 3

C3.3N.T.S

STEEL TUBE SIGN POST 2

C3.3N.T.S

AutoCAD SHX Text

NEW SIGNS

AutoCAD SHX Text

SIGN TYPE

AutoCAD SHX Text Qty.

AutoCAD SHX Text

DESC.

AutoCAD SHX Text

ADA PARKING SIGN

AutoCAD SHX Text

AutoCAD SHX Text R7-8

AutoCAD SHX Text

ADA NO PARKING SIGN

AutoCAD SHX Text

AutoCAD SHX Text

OR7-9

AutoCAD SHX Text

ONE WAY CIRCULATION SIGN

AutoCAD SHX Text

AutoCAD SHX Text R6-2

AutoCAD SHX Text

GATE SIGNAGE

AutoCAD SHX Text

AutoCAD SHX Text

RELOCATED SIGNS

AutoCAD SHX Text

SIGN TYPE

AutoCAD SHX Text Qty.

AutoCAD SHX Text

ARCADIA BEACH SIGN

AutoCAD SHX Text

AutoCAD SHX Text

STOP SIGN

AutoCAD SHX Text

AutoCAD SHX Text

DAY USE ONLY

AutoCAD SHX Text

AutoCAD SHX Text

PROTECT-IN-PLACE SIGNS

AutoCAD SHX Text

SIGN TYPE

AutoCAD SHX Text Qty.

AutoCAD SHX Text

PARK SHIELD ON HIGHWAY

AutoCAD SHX Text

AutoCAD SHX Text

NO PARKING ON HIGHWAY

AutoCAD SHX Text

AutoCAD SHX Text

DAY USE ONLY

AutoCAD SHX Text

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

CIVIL DETAILS

AutoCAD SHX Text C3.3

AutoCAD SHX Text

CONTRACTOR TO INSTALL SIGNS ON WOODEN POST IN LANDSCAPED AREAS.

CONTRACTOR TO INSTALL SIGNS ON STEEL POST IN HARDSCAPED AREAS.

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

TYP

DETAIL

NO SCALE

CONTAINER SHRUB PLANTING

M

IN

PLANT AT SAME LEVEL AS GROWN. TOP

OF ROOTBALL TO BE LEVEL WITH FINISH

GRADE.

FINISHED GRADE

PLANTING HOLE TO

BE 2 X DIA

OF ROOTBALL

6"

SHREDDED BARK MULCH. KEEP

MULCH OFF OF STEMS

CUT OR LOOSEN CIRCLING

ROOTS PRIOR TO PLANTING

EXISTING SOIL

REPLACE NATIVE SOIL WITH

PLANTING BACKFILL MIX PER

SPECS. WATER THOROUGHLY

TO REMOVE AIR POCKETS

NOTES:

1. PLANT SHRUBS IN SINGLE SPECIES

GROUPS OF 5 TO 10 PLANTS EACH.

PLANT TREES IN SINGLE SPECIES

GROUPS OF 1 TO 5 PLANTS EACH.

2. ADJUST PLANT LOCATIONS SLIGHTLY

SO PLANTINGS APPEAR TO BE IN A

MORE RANDOM ARRANGEMENT AND

NOT IN STRAIGHT ROWS.

EDGE OF PLANTING AREALOW SHRUBS

X

X 60°

X

MEDIUM SHRUBTALL SHRUB

TYP

DETAIL

NO SCALE

PLANT LAYOUT SPACING

SYMBOL CODE QTY BOTANICAL / COMMON NAME CONT SPACING

GROUND COVERS

GS 62 GAULTHERIA SHALLON / SALAL #2 60" o.c.

5,364 SF RESTORATION SEED

AE 5 SF AGROSTIS EXARATA / SPIKE BENTGRASS SEED 0.1%

BC 260 SF BROMUS CARINATUS / CALIFORNIA BROME SEED 4.75%

EG 231 SF ELYMUS GLAUCUS / BLUE WILDRYE SEED 4.22%

FR 63 SF FESTUCA RUBRA / RED FESCUE SEED 1.15%

GW 66 SF GLYCERIA OCCIDENTALIS / WESTERN MANNA GRASSSEED 1.2%

389 SF WATER QUALITY SEED

PLANT_SCHEDULE

LA 1121

Dylan S. Bailey

OREGON

09/30/25

REGI STERED

LANDSCAPE ARCHI TEC

T

AutoCAD SHX Text

3' WOOD FENCE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

PROJECT#:

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

PARKS

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text

STATE

AutoCAD SHX Text

ARCADIA BEACH SITE IMPROVEMENTS

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 2/4/2025

AutoCAD SHX Text

KMF

AutoCAD SHX Text 12580

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

B. JOHNSON

AutoCAD SHX Text

Z. GARRARD

AutoCAD SHX Text 37400

AutoCAD SHX Text

SHEET NOTES

AutoCAD SHX Text

LANDSCAPE PLAN

AutoCAD SHX Text C4.0

AutoCAD SHX Text

1. INSTALL SOIL AMENDMENT IN INSTALL SOIL AMENDMENT IN ACCORDANCE WITH DETAILS AND TECHNICAL SPECIFICATIONS. 2. INSTALL 3" WOOD CHIP MULCH IN INSTALL 3" WOOD CHIP MULCH IN PLANT WATERING WELLS PER DETAILS AND TECHNICAL SPECIFICATIONS. 3. INSTALL SHRUBS AND GROUNDCOVERS INSTALL SHRUBS AND GROUNDCOVERS IN ACCORDANCE WITH DETAILS AND TECHNICAL SPECIFICATIONS. 4. ALL RESTORATION AREAS SHOWN ALL RESTORATION AREAS SHOWN DIAGRAMMATICALLY ONLY. FIELD ADJUST AS NECESSARY TO MATCH ADJACENT EXISTING CONDITIONS. ALL AREAS DISTURBED BY CONSTRUCTION TO BE RESTORED.

AutoCAD SHX Text

1. ALL WORK SHALL BE PERFORMED TO ALL WORK SHALL BE PERFORMED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE. 2. CONTRACTOR IS REQUIRED TO VERIFY CONTRACTOR IS REQUIRED TO VERIFY EXISTING UTILITY LOCATIONS PRIOR TO CONSTRUCTION. 3. CONTRACTOR IS RESPONSIBLE FOR A CONTRACTOR IS RESPONSIBLE FOR A THOROUGH CLEAN-UP OF THEIR RESPECTIVE WORK, DAILY AND AT PROJECT CLOSE-OUT. 4. CONTRACTOR IS RESPONSIBLE FOR CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING IMPROVEMENTS NOT NOTED FOR REMOVAL ON THESE PLANS. DAMAGE TO EXISTING IMPROVEMENTS BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AND/OR QUALIFIED INSTALLERS/TRADES ACCEPTABLE TO THE SOLE SATISFACTION OF THE OWNER'S REPRESENTATIVE AND AT NO COST TO THE OWNER. 5. PLANT MATERIALS SHALL MEET PLANT MATERIALS SHALL MEET STANDARDS SET FORTH IN THE LATEST EDITION OF THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARD (ANSI Z60.1). ALL PLANT MATERIALS SHALL HAVE SUFFICIENT ROOT DEVELOPMENT TO ASSURE SURVIVAL AND HEALTHY GROWTH. CONTAINER GROWN PLANT MATERIALS ARE REQUIRED TO HAVE SUFFICIENT ROOT GROWTH TO HOLD THE SOIL INTACT WHEN REMOVED FROM THE CONTAINER, BUT SHALL NOT BE ROOT BOUND. 6. PLANT LIST QUANTITIES ARE SHOWN PLANT LIST QUANTITIES ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL QUANTITIES IN LIST WITH PLAN CALL-OUTS AND INSTALLING PLANTINGS PER THE LANDSCAPE PLAN. GROUNDCOVER QUANTITIES SHALL BE ADJUSTED AS REQUIRED FOR FIELD CONDITIONS AT THE SPECIFIC SPACING. 7. NO SUBSTITUTIONS SHALL BE NO SUBSTITUTIONS SHALL BE CONSIDERED FOR PLANTS OR OTHER MATERIALS DURING THE BIDDING PROCESS. 8. INSTALL RESERVED DUFF OR MULCH AS INSTALL RESERVED DUFF OR MULCH AS REQUIRED BY PROJECT MANAGER WITHIN ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES THAT ARE NOT OTHERWISE TREATED IN THESE PLANS.

GENERAL LANDSCAPE NOTES