Attachment C - 533 Attach All IDIQ.pdf

PDF 263 KB Posted

Attached to
NASA/GSFC Omnibus Multidiscipline Engineering Services (OMES) III
Solicitation number
80GSFC21R0046-dRFP
Issued by

View the file

Other files

File Type Posted
OMES III Draft RFP QA (Batch 2) 4-20-22.pdf PDF
OMES III Draft RFP QA (Batch 1) 3-23-22.pdf PDF
Enclosure DD - Contract Historical Data.pdf PDF
Exhibit 13 - OMESIII PastPerfQues.pdf PDF
OMES III Draft RFP Cover Letter 1-21-22 Signed.pdf PDF
Exhibits 1A-1C All IDIQ w. GPM.pdf PDF
Exhibits 2 -12 All IDIQ by CY.pdf PDF
Attachment D - List of IAGP.pdf PDF
Enclosure BB - RTOs.pdf PDF
Attachment M - Quality Assurance Plan.pdf PDF
OMES III Draft Request for Proposal 1-21-22.pdf PDF
Attachment B - IDIQ Cost-Type Rate Mat.pdf PDF
Attachment F -S_H Plan Cover Page.pdf PDF
Attachment H - Contract Hist Data.pdf PDF
Enclosure CC - Gov Pricing Model.pdf PDF
Enclosure FF - GSFC Sample S_H Plan.pdf PDF
SF33-14c.pdf PDF
Attachment K - IT Security Mgmt Plan.pdf PDF
Attachment L - Form DD254 OMES III.pdf PDF
Attachment J - IT Security Appl Doc List.pdf PDF
Enclosure EE - IT Security Mgmt Plan.pdf PDF
Enclosure AA - Gov QASP Plan.pdf PDF
Attachment E - GFP MASTER LISTING.pdf PDF
Attachment G - SB Sub Plan Cover Page.pdf PDF
OMES III Draft RFP Cover Letter 1-21-22.pdf PDF
Attachment A - DRAFT SOW 5-13-2021.pdf PDF
Attachment I -OCI Plan Cover Page.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

FINANCIAL MANAGEMENT REPORTING

REQUIREMENTS

RFP 80GSFC21R0046

CONTRACT TBD

Contract TBD Attachment C

(06/2014) 2

FINANCIAL MANAGEMENT REPORTING REQUIREMENTS

Financial Management Reports shall be submitted by the Contractor on the NASA 533 series reports, in accordance with the instructions on the reverse of the forms, NASA Procedural Requirements NPR 9501.2E entitled "NASA Contractor Financial Management Reporting,” dated May 27, 2011, and additional instructions issued by the Contracting Officer.

a. Level of Detail

An individual 533 Report shall be provided for each Task Order in addition to a cumulative 533 Report summarizing all Task Orders issued. The reports shall contain a breakdown of hours and costs by the elements of cost categories listed in Section d below.

b. Variance Narrative Reporting

In accordance with Section 3.6 of NPR 9501.2, the Contractor shall include a narrative explanation for variances exceeding plus or minus 5 percent (+/- 5%) between the Total Direct Labor Hours (prime and subcontractors) and/or Total Estimated Cost amount shown in the prior month and the Actual Total Direct Labor Hours and/or Actual Total Cost amount shown in the current month for each individual task order. (For example, the Total Estimated Cost amount shown for June in column 8a in the May NF 533M and the Actual June Total Cost amount shown in column 7a in the June NF 533M.)

Each variance narrative shall explain the: (1) reason for the variance, (2) impact(s) on the individual task order, and (3) specific corrective action(s) being taken or to be taken.

c. Distribution

The Contractor shall distribute 533 reports to each addressee indicated in the contract clause entitled, "Financial Management Reporting." The Contractor shall submit an initial report in the NF 533Q format within 30 working days after contract award.

After the initial report, the NF 533M reports shall be distributed not later than the tenth (10th) working day following the close of the contractors' monthly accounting period.

The 533Q reports shall be distributed not later than the fifteenth (15th) day of the month preceding the quarter being reported. The NF 533M need not be submitted in months in which an NF 533Q is submitted.

d. Reporting Requirements

Each individual report shall, at a minimum, provide cost data by the following elements of cost categories:

1. Prime Direct Labor Hours:

(06/2014) 3

Prime Direct Labor Hours - Onsite (List applicable labor categories)

Prime Direct Labor Hours – Offsite

Total Prime Direct Labor Hours

2. Subcontractor Direct Labor Hours:

Subcontractor A Direct Labor Hours – Onsite

Subcontractor A Direct Labor Hours – Offsite (List applicable labor categories)

Subcontractor B Direct Labor Hours – Onsite (List applicable labor categories) Subcontractor B Direct Labor Hours – Offsite (List applicable labor categories)

Subcontractor C Direct Labor Hours – Onsite (List applicable labor categories) Subcontractor C Direct Labor Hours – Offsite

Total Subcontractors Direct Labor Hours

3. Total Prime and Subcontractors Direct Labor Hours:

Total Prime and Subcontractors Hours – Onsite Total Prime and Subcontractors Hours – Offsite

Total Prime and Subcontractors Direct Labor Hours

4. Prime Direct Labor Costs:

Prime Direct Labor Costs - Onsite

Prime Direct Labor Costs – Offsite

Total Prime Direct Labor Costs

5. Prime Overhead Expenses:

(06/2014) 4

Onsite Overhead

Offsite Overhead

Total Prime Overhead

6. Other Direct Costs (ODCs):

a. Subcontracts (list separately, Subcontractor A, B, C, etc.)

b. Material

c. Travel

d. Other (specify)

Total ODCs

7. Subtotal (Direct Labor, Overhead & ODCs)

8. G&A Expense

9. Total Estimated Cost

10. Fixed Fee

11. Total Cost-Plus-Fixed-Fee (CPFF)