Attachment B - IDIQ Cost-Type Rate Mat.pdf

PDF 191 KB Posted

Attached to
NASA/GSFC Omnibus Multidiscipline Engineering Services (OMES) III
Solicitation number
80GSFC21R0046-dRFP
Issued by

View the file

Other files

File Type Posted
OMES III Draft RFP QA (Batch 2) 4-20-22.pdf PDF
OMES III Draft RFP QA (Batch 1) 3-23-22.pdf PDF
Enclosure DD - Contract Historical Data.pdf PDF
Exhibit 13 - OMESIII PastPerfQues.pdf PDF
OMES III Draft RFP Cover Letter 1-21-22 Signed.pdf PDF
Exhibits 1A-1C All IDIQ w. GPM.pdf PDF
Exhibits 2 -12 All IDIQ by CY.pdf PDF
Attachment D - List of IAGP.pdf PDF
Enclosure BB - RTOs.pdf PDF
Attachment M - Quality Assurance Plan.pdf PDF
OMES III Draft Request for Proposal 1-21-22.pdf PDF
Attachment F -S_H Plan Cover Page.pdf PDF
Attachment H - Contract Hist Data.pdf PDF
Enclosure CC - Gov Pricing Model.pdf PDF
Enclosure FF - GSFC Sample S_H Plan.pdf PDF
SF33-14c.pdf PDF
Attachment K - IT Security Mgmt Plan.pdf PDF
Attachment L - Form DD254 OMES III.pdf PDF
Attachment J - IT Security Appl Doc List.pdf PDF
Enclosure EE - IT Security Mgmt Plan.pdf PDF
Enclosure AA - Gov QASP Plan.pdf PDF
Attachment E - GFP MASTER LISTING.pdf PDF
Attachment G - SB Sub Plan Cover Page.pdf PDF
OMES III Draft RFP Cover Letter 1-21-22.pdf PDF
Attachment A - DRAFT SOW 5-13-2021.pdf PDF
Attachment I -OCI Plan Cover Page.pdf PDF
Attachment C - 533 Attach All IDIQ.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

INDEFINITE DELIVERY INDEFINITE QUANTITY

(IDIQ)

DIRECT LABOR RATES, INDIRECT RATES AND

FEE MATRICES

RFP 80GSFC21R0046

Contract TBD Attachment B

(03/2015)

IDIQ DIRECT LABOR RATES, INDIRECT RATES

AND FEE MATRICES

Task Plan proposals must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued in accordance with the “Task Ordering Procedure” and “Supplemental Task Ordering Procedures” clauses of the contract. All Task Orders issued will be applied to the guaranteed minimum quantity and maximum quantity as provided in “Minimum/Maximum Amount of Supplies or Services” clause.

1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the direct labor rates as specified below for pricing all task orders:

**Labor Categories

*CY 1

^HR Rate

CY 2

HR Rate

CY 3

HR Rate

CY 4

HR Rate

CY 5

HR Rate

CY 6

HR Rate

**Labor Categories - The Offeror shall provide Prime direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.

*CY = Contract Year

^HR = Hourly Rate: These are not-to-exceed rates to be used for task order pricing purposes only for the Prime Contractor direct labor hours. The Contractor may propose lower rates when pricing task orders.

(03/2015)

2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders):

The Prime Contractor shall not exceed the cost estimating relationships (CERs) rates or factors as specified below for deriving/pricing Other Direct Costs (ODCs), if applicable, on all task orders:

****CERs Base of

Application

CY 1 CY 2 CY 3 CY 4 CY 5 CY 6

****CERs – If applicable, the Offeror shall complete all Prime ODC categories and rates/factors that are proposed using a CER, such as management percentages or computer/IT fees. Clearly delineate the base of application. If not applicable, insert

“NONE”.

3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the indirect rates as specified below for pricing all task orders:

***Indirect Rate

Categories

Base of

CY 1 CY 2 CY 3 CY 4 CY 5 CY 6

***Indirect Rate Categories - The Offeror shall complete all Prime indirect rate categories and rates that may be applied against direct and indirect costs under a task order in accordance with the contractor’s accounting and estimating procedures. Clearly delineate the base of application and onsite versus offsite rates.

(03/2015)

4. PRIME FIXED FEE RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the fixed fee rate specified below for pricing all Cost-Plus-Fixed-Fee (CPFF) task orders:

*****Fixed Fee

Rate

Base of

CY 1 CY 2 CY 3 CY4 CY 5 CY 6

*****The Offeror shall complete the Prime’s fixed fee rate that shall be used to calculate the fixed fee dollars for all task orders issued under the resultant contract. Clearly delineate the base of application.

5. SUBCONTRACTOR (Name-TBP) FULLY-LOADED LABOR RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the fully-loaded direct labor rates as specified below for pricing the subcontractor direct labor hours on all task orders:

++Labor Categories

*CY 1

^HR Rate

CY 2

HR Rate

CY 3

HR Rate

CY 4

HR Rate

CY 5

HR Rate

CY 6

HR Rate

++Labor Categories - The Offeror shall provide fully-loaded subcontractor direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.

Clearly delineate onsite versus offsite rates.

*CY = Contract Year

^HR = Hourly Rate: These are not-to-exceed fully-load rates to be used for pricing purposes only for the Subcontractor direct labor hours. The Contractor may propose lower rates when pricing task orders.

(03/2015)

6. POSITION QUALIFICATIONS (For All Prime and Subcontractor Direct Labor Categories):

NOTE: TO BE PROPOSED (TBP) – A Position Qualification shall be proposed for each individual Prime Direct Labor Category included in Section 1 and each individual Subcontractor Direct Labor Category included in Section 5.

File details come from the government source that posted it. Updated .