This is a bid drawing document for the 1st Bend Road Drainage Improvements project in Dorchester County, South Carolina, funded through the South Carolina Rural Infrastructure Authority (SC RIA #S-25-1409). The project encompasses comprehensive drainage improvements including the installation of three reinforced concrete pipe (RCP) culverts (50-foot 60" RCP twin culverts, 59-foot 54" RCP culvert, and various smaller diameter pipes ranging from 15" to 18"), three custom headwall structures with concrete baffles, riffle grade control structures, Class B/C riprap placement, and approximately 0.53 acres of disturbed area requiring erosion control. The scope of work includes removal of existing infrastructure (36" RCP pipes, 30" corrugated plastic pipe, 15" poly pipes, and 18" CPP), relocation of water and sanitary sewer utilities (6" and 4" diameter lines with steel casing), pavement removal and replacement (approximately 305-420 square yards), clearing and grubbing of wooded areas, and complete restoration with erosion control matting and riparian plantings in two designated plant zones. Traffic control measures requiring temporary lane closures on 1st Bend Road and coordination with South Carolina Department of Transportation (SCDOT) standards are mandated throughout construction.
The project requires adherence to all Dorchester County and SCDES regulations, with particular emphasis on sediment and erosion control compliance per NPDES permit requirements, weekly inspection protocols, and maintenance of stormwater detention facilities by property owners through recorded operating and maintenance agreements. Contractors must obtain all necessary permits, conduct utility locates through SC811 with minimum 72-hour advance notice, and submit shop drawings for precast structures sealed by a South Carolina professional engineer for approval prior to installation. All work must conform to SCDOT standard specifications and details, including 4000 PSI concrete compressive strength, Class III RCP pipe with watertight geotextile-wrapped joints, and restrained joint water main pipe. The contractor bears full responsibility for utility damage repairs, erosion control maintenance through project completion, as-built certifications, and submission of a Notice of Termination to SCDES upon achieving 70 percent site stabilization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
V E
R
1ST BEND ROAD DRAINAGE
FOR THE
DORCHESTER COUNTY, SC
OCTOBER 2025
Know what'sbelow.
before you digCallcommunity infrastructure consultants
NOTICE TO CONTRACTOR
1) CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TWO (2) WEEKS PRIOR TO
CONSTRUCTION TO OWNER AND NEIGHBORHOOD RESIDENTS.
2) PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT
MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER
INDICATED ON THE PLANS OR NOT. CALL "811" A MINIMUM OF 72 HOURS PRIOR TO
DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM
CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3) UNLESS OTHERWISE NOTED, EXISTING CONDITION INFORMATION PROVIDED BY AARON
KNIGHT OF CORNERSTONE SURVEYING, & ENGINEERING INC., SC PLS #30771.
NOT TO SCALE
VICINITY MAP
Survey Prepared By:
CORNERSTONE
WK DICKSON PROJECT NO.: 20231200.00.CH
PROJECT AREA
HOR. DATUM: SC GRID
NAD 83 (US FOOT)
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ C
O V
E R
N
O
TE
S .d w gZ
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ C
O V
E R
N
O
TE
S .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:5
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
WWW.WKDICKSON.COM
OWNER/DEVELOPER:
DORCHESTER COUNTY
CONTACT: MICHAEL GOLDSTON, P.E.
ENGINEERING MANAGER
2120 EAST MAIN STREET
DORCHESTER, SC 29437
843-832-0070 (PHONE)
MGOLDSTON@DORCHESTERCOUNTYSC.GOV (EMAIL)
WWW.DORCHESTERCOUNTYSC.GOV
PROJECT MANAGER:
ARDURRA
CONTACT: YESIM YAZGAN, P.E.,
PROJECT MANAGER
4105 FABER PLACE DRIVE, SUITE 410
NORTH CHARLESTON, SC 29405
843-867-2027 (PHONE)
YYAZGAN@ARDURRA.COM (EMAIL)
WWW.ARDURRA.COM
ENGINEER OF RECORD:
ARDURRA
CONTACT: JASON SESLER, P.E.,
DESIGN ENGINEER
4105 FABER PLACE DRIVE, SUITE 410
NORTH CHARLESTON, SC 29405
843-867-2027 (PHONE)
JSESLER@ARDURRA.COM (EMAIL)
WWW.ARDURRA.COM
WATER/SEWER:
TOWN OF HARLEYVILLE
CONTACT: AMANDA CHILDERS
CLERK/TREASURER
TOWN OF HARLEYVILLE
843-462-7676 (PHONE)
AMANDA.HARLEYVILLE@YAHOO.COM (EMAIL)
SCDES:
CONTACT: DAGNY JACOBS
COASTAL STORMWATER PERMIT COORDINATOR
BUREAU OF WATER
843-953-0694 (PHONE)
DAGNY.JACOBS@DES.SC.GOV (EMAIL)
WWW.DES.SC..GOV
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION:
CONTACT: WADE GROOMS
ASSISTANT DISTRICT PERMIT ENGINEER (ADPE)
6355 FAIN ST, N CHARLESTON, SC 29406
843-277-4108 (PHONE)
GROOMSRW@SCDOT.ORG (EMAIL)
WWW.SCDOT.ORG
INDEX OF SHEETS
Sheet
Number Sheet Title
1 COVER
2 NOTES AND LEGEND
X1 1ST BEND ROAD SURVEY (BY OTHERS)
D1 1ST BEND ROAD DEMOLITION PLAN
RW1 1ST BEND ROAD ROADWAY PLAN AND PROFILE
S1 1ST BEND ROAD GRADING AND DRAINAGE PLAN
S2 1ST BEND ROAD GRADING XSEC
SD1 STORM STRUCTURAL DETAILS.
SD2 DRAINAGE DETAILS-SCDOT 1ST BEND RD
SD3 DRAINAGE DETAILS 1ST BEND RD
SD4 DRAINAGE DETAILS 1ST BEND RD
SD5 HEADWALL (HW-11) DETAILS
SD6 HEADWALL (HW-12-13) DETAILS
AD1 SITE DETAILS
U1 1ST BEND ROAD UTILITY PLAN & PROFILE
UD1 UTILITY DETAILS
UD2 UTILITY DETAILS
SEC1 1ST BEND ROAD SEDIMENT & EROSION CONTROL NOTES
SEC2 1ST BEND ROAD SEDIMENT AND EROSION CONTROL PLAN
SECD1 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD
SECD2 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD
SECD3 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD
SECD4 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD
P1 1ST BEND ROAD PLANTING PLAN
PD1 PLANTING DETAILS
TC1 1ST BEND ROAD TRAFFIC CONTROL NOTES
TC2 1ST BEND ROAD TRAFFIC CONTROL PLAN
TCD1 TRAFFIC CONTROL DETAILS 1ST BEND ROAD
TCD2 TRAFFIC CONTROL DETAILS 1ST BEND ROAD
DESIGNER CERTIFICATION
" I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN
DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT
RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I
CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE
DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48,
CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED,
PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN
ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000."
CEPSCI / SWPPP INSPECTIONS
THE CONTRACTOR IS RESPONSIBLE FOR ALL CEPSCI
(SWPPP) INSPECTIONS AND MAINTENANCE OF ALL
EROSION CONTROL MEASURES, PER THE PERMIT
REQUIREMENTS, FOR THE FULL DURATION OF THE
PROJECT THROUGH APPROVAL OF THE NOTICE OF
TERMINATION AND PROJECT CLOSEOUT.
10/10/2025
1. DORCHESTER COUNTY SHALL NOT MAINTAIN STORMWATER DETENTION OR RETENTION PONDS, OR DRAINAGE DITCHES AND SWALES. THE PROPERTY OWNER SHALL MAINTAIN ALL STORMWATER DETENTION FACILITIES SHOWN HEREON. THE OPERATING AND MAINTENANCE AGREEMENT WILL BE RECORDED WITH THE DORCHESTER COUNTY REGISTER OF DEEDS.
2. AN “AS-BUILT” PLAN CERTIFIED THAT THE FACILITIES HAVE BEEN CONSTRUCTED AS SHOWN AND THAT THE FACILITY MEETS THE APPROVED STORM WATER PLAN AND SPECIFICATION OR ACHIEVES THE FUNCTION FOR WHICH THEY WERE DESIGNED, SHALL BE SUBMITTED PRIOR TO: THE USE OR OCCUPANCY OF ANY COMMERCIAL OR INDUSTRIAL SITE, FINAL ACCEPTANCE OF ANY ROAD INTO THE OFFICIAL COUNTY ROAD INVENTORY, RELEASE OF ANY FINANCIAL GUARANTEES HELD BY THE COUNTY, AND/OR APPROVAL AND/OR ACCEPTANCE FOR RECORDING OF MAPS, PLATS, OR DRAWINGS, THE INTENT OF WHICH
IS TO CAUSE A DIVISION OF A SINGLE PARCEL OF LAND INTO TWO OR MORE PARCELS
3. A CERTIFIED STORMWATER AS-BUILT MUST BE SUBMITTED TO DCPW PRIOR TO LETTER OF OCCUPANCY, CLOSEOUT
PACKAGE, AND TO SCDES PRIOR TO RECEIVING A NOTICE OF TERMINATION.
4. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING
CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE.
5. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK
HAS CEASED, EXCEPT AS STATED BELOW:
A. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS
STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE.
B. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE
INITIATED ON THAT PORTION OF THE SITE.
6. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP
WITHIN 48 HOURS OF IDENTIFICATION.
7. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED.
IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE
BEING PUMPED BACK INTO ANY WATERS OF THE STATE.
8. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION.
ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.
9. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM
PAVEMENT, AS MAY BE REQUIRED.
10. SWPPP SHOULD INCLUDE A CONCRETE WASHOUT STAGING AREA FOR SITE AND BUILDING CONSTRUCTION AND ALL OTHER
PURPOSES OF THE DEVELOPMENT TO INCLUDE BUT NOT BE LIMITED TO PAINTERS.
11. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C. REG. 72-300 ET SEQ. AND SCR100000.
12. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE
OUTLETS.
13. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF
SILT FENCE AND ALL WOS.
14. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES.
15. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF
CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED.
16. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.
17. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
18. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES
EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE;
19. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES
ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).
20. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:
A. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;
B. WASTEWATER FROM WASHOUT AND CLEANOUTS OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND
OTHER CONSTRUCTION MATERIALS;
C. FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND
D. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
21. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION
SITE.
22. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC'S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS
REASONABLY POSSIBLE.
23. THE PROJECT/SITE MUST BE BUILT ACCORDING TO APPROVED COUNTY AND SCDES PLANS UNLESS SWPPP DOCUMENTS ARE UPDATED BY THE ORIGINAL SWPPP PREPARER, OTHERWISE PERMITS AND APPROVALS WILL BE INVALIDATED.
24. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.
GENERAL NOTES
1. REFERENCE IS MADE TO THE FOLLOWING:
A. TOPOGRAPHIC SURVEY FOR FIRST BEND ROAD PERFORMED BY CORNERSTONE SURVEYING & ENGINEERING INC, DATED 07/2024; REVISED 07/29/2024.
B. GEOTECHINAL EVALUATION PREPARED FOR WK DICKSON BY ECS SOUTHEAST, LLC. DATED 05/23/2025.
2. ALL ELEVATIONS SHOWN REFER TO NAVD 88 DATUM.
3. HORIZONTAL COORDINATES REFER TO NAD 83 SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM.
4. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. VERIFY ALL FIELD CONDITIONS AND THE EXACT LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING DEMOLITION AND CONSTRUCTION. IF CONDITIONS ARE DIFFERENT FROM THAT SHOWN ON THE PLANS, STOP IMPACTED WORK, NOTIFY THE
ENGINEER, AND UPDATE WORKPLAN ACCORDINGLY WITH THE ENGINEER.
5. ALL WORK FOR THE PROJECT SHALL CONFORM TO THE PROJECT SPECIFICATIONS FOUND IN THE PROJECT MANUAL
(CONTRACT DOCUMENTS AND SPECIFICATIONS).
6. CONTRACTOR IS RESPONSIBLE FOR THE LAYOUT AND STAKING OF THE PROPOSED SITE AND LIMITS OF WORK.
7. ALL WATER MAIN AND SANITARY SEWER RELOCATION WORK SHALL BE PERFORMED PER DORCHESTER COUNTY STANDARDS
AND REQUIREMENTS.
8. ANY UTILITIES OR FACILITIES DAMAGED DURING THE PROJECT BY THE CONTRACTOR'S PERSONNEL OR EQUIPMENT SHALL BE PROMPTLY REPAIRED AT THE CONTRACTOR'S EXPENSE. HAND DIGGING TO PROTECT UTILITIES FROM DAMAGE SHOULD
BE ANTICIPATED.
9. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING WORK IN ACCORDANCE WITH THE LATEST REQUIREMENTS AND
REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
10. ALL DEMOLITION DEBRIS, INCLUDING CLEARING AND GRUBBING SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH ALL
LOCAL, STATE AND FEDERAL REGULATIONS AND SPECIFICATIONS, LATEST REVISION.
11. PROMPTLY INFORM THE ENGINEER OF ANY ERROR OR DISCREPANCIES DISCOVERED IN THE DRAWINGS OR SPECIFICATIONS OR CONFLICTS BETWEEN THE DRAWING AND SPECIFICATIONS IN ORDER FOR CORRECTIONS TO BE MADE.
12. ALL WORK AND MATERIALS MUST CONFORM WITH DORCHESTER COUNTY AND SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES (SCDES) REGULATIONS AND SPECIFICATIONS, LATEST REVISIONS AT THE BEGINNING OF
CONSTRUCTION.
13. KEEP ALL ADJACENT AREAS TO THE LIMITS OF WORK CLEAN AND FREE OF DEBRIS/MATERIALS/EQUIPMENT AT ALL TIMES.
14. CONTRACTOR RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL OF ALL TRAFFIC CONTROL PLANS AND LAYOUT AS
REQUIRED FOR THE DURATION OF THE PROJECT.
15. ANY POSSIBLE STOCKPILES, OFFSITE MATERIAL, WASTE, BORROW, OR CONSTRUCTION EQUIPMENT STORAGE / LAYDOWN
AREAS SHALL BE LOCATED WITHIN THE LIMITS OF DISTURBANCE.
16. THE CONCRETE WASHOUT SHALL BE LOCATED WITHIN THE LIMITS OF DISTURBANCE.
17. ALL ASPECTS OF CONSTRUCTION WILL MEET OR EXCEED THE REQUIREMENTS OF THE DORCHESTER COUNTY STORMWATER
MANAGMENT DESIGN MANUAL LATEST EDITION, UNLESS OTHERWISE NOTED.
18. THE CONTRACTOR SHALL NOTIFY "SC811" AT 1-888-721-7877 AT LEAST FIVE (5) WORKING DAYS PRIOR TO ANY EXCAVATION
WORK BEING DONE.
19. PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES, PHOTOGRAPHS OF THE PROPOSED WORK AREA AND ACCESS SHALL
BE TAKEN.
20. EXISTING AND PROPOSED WATER AND SEWER ARE PUBLIC UTILITIES.
21. THE CONTRACTOR SHALL EXERCISE CARE IN ALL ACTIVITIES INVOLVING EITHER CUT AND FILL OR GRADING IN THE VICINITY OF TREES AND WETLANDS THAT ARE TO REMAIN. ALL EARTH CUTS AND ACTIVITIES IN THE VICINITY OF TREES TO REMAIN SHALL BE MADE IN A MANNER THAT MINIMIZES DISTURBANCES IN OR AROUND THE CRITICAL ROOT ZONE OR WITHIN THE DRIPLINE OF THE TREE. TREE PROTECTION BARRICADE SHALL BE INSTALLED AROUND THE PERIMETER OF THE CRITICAL ROOT ZONE PRIOR TO CONSTRUCTION. THE LOCATION OF THE TREE PROTECTION BARRICADE SHALL BE APPROVED BY THE
ENGINEER OR THEIR REPRESENTATIVE PRIOR TO CONSTRUCTION.
22. ALL NORTH ARROWS REFERENCE GRID NORTH.
GRADING AND EROSION CONTROL NOTES:
1. EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED PRIOR TO INSTALLATION OF ANY NEW PIPE LINES OR GRADING
OPERATIONS.
2. WHEN GRADING BETWEEN CONTOURS AND BETWEEN POINTS OF SPOT ELEVATIONS, GRADE ON A UNIFORM SLOPE.
PROPOSED GRADES SHOWN ARE FINAL SURFACE ELEVATIONS.
3. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE ON ALL FINISHED GRADE SURFACES.
4. EACH SECTION OF STORM DRAINAGE PIPE SHALL BE LAID TO SPECIFIED GRADE AND LAID UPGRADE.
5. ALL VEGETATION TOPSOIL SHALL BE STRIPPED AND STOCKPILED PRIOR TO PLACING FILL, PROTECT STOCKPILE FROM
EROSION.
6. CONTRACTOR SHALL, FOR ALL GRASSED AREAS, BE RESPONSIBLE FOR REPLACING ERODED SOIL AND GRASS SEED UNTIL
AN APPROVED STAND OF GRASS IS ESTABLISHED.
7. PROPOSED FILL SOILS SHALL BE SUITABLE MATERIAL AND FREE OF ORGANIC MATERIAL, RUBBLE, DEBRIS, AND HIGHLY
PLASTIC CLAYS OR SILTS.
8. REMOVE ALL ORGANIC AND UNSUITABLE MATERIAL (MUCK AND/OR NON-COMPACTABLE MATERIAL) FROM AREAS TO BE
FILLED.
9. CONTRACTOR SHALL, BEFORE BEGINNING GRADING WORK ON SITE, STAKE SILT FENCE AND INSTALL ALL PERIMETER
EROSION CONTROLS AS SHOWN IN THESE PLANS.
10. CONTRACTOR SHALL BE AWARE OF EXISTING UTILITY LINES DURING PIPE LINE INSTALLATION. CONTRACTOR SHALL NOTIFY UTILITY COMPANIES SUCH AS THE LOCAL ELECTRIC COMPANY, AT&T, COMCAST, ETC. FOR LOCATION OF OTHER UTILITIES NOT SHOWN ON PLAN. CALL PALMETTO UTILITIES PROTECTION SERVICES (SC811) FOR UNDERGROUND UTILITY LINES LOCATION. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
11. ALL NEWLY CONSTRUCTED SLOPES WHICH ARE STEEPER THAN OR EQUAL TO 2.5 TO 1 MUST BE STABILIZED BY INSTALLATION OF EROSION CONTROL MATTING. OTHER AREAS SUCH AS CHANNEL BOTTOMS, CHANNEL SIDE SLOPES, AND SLOPES NEAR SENSITIVE WETLAND AREAS MAY ALSO REQUIRE EROSION CONTROL MATTING WHERE SHOWN ON PLANS.
EQUAL PRODUCTS MUST BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.
12. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES AS MAY BE REQUIRED TO CONTROL SOIL EROSION DURING CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER
THE SITE IMPROVEMENTS ARE COMPLETED.
13. DO NOT DISTURB LAND OUTSIDE OF THE LIMITS OF WORK AS SHOWN IN THE CONTRACT DOCUMENTS. ANY AREAS OUTSIDE OF THE LIMITS OF WORK THAT ARE DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE SEEDED AT NO ADDITIONAL
EXPENSE TO THE OWNER.
14. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG-TERM EROSION PROTECTION MEASURES OR STRUCTURES AS
SOON AS PRACTICAL IN THE DEVELOPMENT PROCESS.
15. ALL DISTURBED AREAS NOT PAVED SHALL BE GRASSED OR LANDSCAPED. USE TEMPORARY PLANT COVER, MULCHING, AND/OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREA SUBJECT TO EROSION DURING CONSTRUCTION.
16. ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24-HOUR PERIOD. MAINTENANCE OF SEDIMENT TRAPPING DEVICES SHALL BE PERFORMED AS NECESSARY PER THESE INSPECTIONS. DAMAGED OR INEFFECTIVE
DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY.
17. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION TO CONTROL EROSION AND/OR OFF SITE SEDIMENTATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE STABILITY OF ALL GRADED AND/OR CLEARED AREAS UNTIL PERMANENT GROUND COVER IS ESTABLISHED. ANY AREAS DAMAGED BY EROSION SHALL BE REPAIRED TO ITS ORIGINAL CONDITION AND PROTECTED FROM FURTHER EROSION AT NO ADDITIONAL COST TO THE OWNER.
18. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ALL TEMPORARY
CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETED AND THE SITE STABILIZED.
19. ALL EROSION CONTROL METHODS SHALL BE IN ACCORDANCE WITH "SCDES STORM WATER MANAGEMENT & SEDIMENT
CONTROL BMP HANDBOOK FOR LAND DISTURBANCE ACTIVITY".
20. ALL DISTURBED AREAS, INCLUDING THE CONTRACTORS STAGING AREA, HAUL ROUTES, GRADING LIMITS, ETC., SHALL BE RESTORED TO A SMOOTH LINE AND GRADE WITH POSITIVE DRAINAGE. THE CONTRACTOR SHALL PERMANENTLY SEED ALL
DISTURBED AREAS.
21. CONTRACTORS ARE REQUIRED TO HAVE RAIN GAUGES AT THE CONSTRUCTION SITE AND THE RAIN TOTALS DOCUMENTED
FOR REVIEW BY SCDES.
22. THE INSTALLATIONS OF UTILITIES (CABLE, ELECTRICAL, NATURAL GAS, WATER, SEWER, ETC.) ARE TO BE WITHIN THE PERMITTED LIMITS OF DISTURBANCE AND THAT INSTALLATION OUTSIDE OF THESE AREAS WILL REQUIRE A MODIFICATION TO
THE PERMIT.
23. THE STABILIZATION OF CONVEYANCE CHANNELS ARE TO BE COMPLETED WITHIN 7 DAYS OF CHANNEL CONSTRUCTION (IF
THERE ARE CHANNELS).
SCDOT NOTES & STATEMENTS:
SCDOT NOTES:
1. SCDOT STANDARD DRAWINGS HAVE BEEN INCLUDED IN THE PLAN SET;
HOWEVER, CONTRACTOR SHALL REFER TO THE MOST CURRENT EDITION OF THE
SCDOT STANDARD DRAWINGS.
SCDOT STATEMENTS:
1. THE PROJECT MEETS THE AUTOMATIC PERMIT COVERAGE PROVISIONS FOR
LAND DISTURBANCE FOUND IN SECTION 1.3.1.B OF THE SOUTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL SERVICES (SCDES) NPDES CONSTRUCTION
GENERAL PERMIT; THEREFORE, SELF-INVOKING COVERAGE IS BEING PURSUED.
2. WATER QUALITY AND DRAINAGE CERTIFICATION STATEMENT:
ALL ITEMS IN SECTION 10D OF THE CURRENT ARMS MANUAL FOR BOTH
CONSTRUCTION AND POST CONSTRUCTION DESIGN HAVE BEEN STUDIED AND
ADDRESSED. ALL NECESSARY BMPs HAVE BEEN IMPLEMENTED FOR BOTH
PHASES (CONSTRUCTION AND POST-CONSTRUCTION) TO AVOID NEGATIVELY
IMPACTING IMPAIRED WATERS OF THE SCDOT SYSTEM AND/OR ITS DISCHARGES.
ALL REQUIREMENTS IN SECTION 10B OF THE CURRENT ARMS MANUAL FOR POST
DEVELEPMENT RELEASE RATES HAVE BEEN MET.
3. THERE WILL BE ZERO RELEASE TO THE SCDOT RIGHT-OF-WAY.
4. PROPOSED PIPE BEDDING DESIGN WILL ACCOMMODATE THE PROPOSED PIPE
AND HEADWALLS.
5. THE HEADWALLS MEET THE CLEAR ZONE REQUIREMENT.
6. THE 25-YR POST DEVELOPMENT HGL IS BEING IMPROVED OVER THE
PRE-DEVELOPMENT 25-YR HGL.
5-FOOT CONTOUR
1-FOOT CONTOUR
STORM DRAINAGE PIPE
RIP RAP
STORM DRAINAGE STRUCTURE
TREE LINE
ROADWAY SIGN
SANITARY SEWER GRAVITY LINESS
SANITARY SEWER MANHOLE
POWER/UTILITY POLE
OVERHEAD UTILITY LINE
WATER LINE
MAIL BOX
WATER VALVE
FIRE HYDRANT
LEGEND
PROPOSEDEXISTING
LIMITS OF DISTURBANCE LOD
PROPERTY LINE
ORDINARY HIGH WATER MARK
FENCE LINE
RIGHT-OF-WAY
CONCRETE PAVEMENT
ROADWAY CENTERLINE
ASPHALT PAVEMENT
CONCRETE CURB AND GUTTER REMOVAL
STORM DRAINAGE REMOVAL
18" RCP
FULL DEPTH MILLING
SS
W
OHW
R/W
X
N O
TE
S
A N
D L
E G
E N
D
CUSTOM HEADWALL
TEMPORARY CONSTRUCTION EASEMENT TCE
CLEARING AND GRUBBING
SEDIMENT DEPOSIT REMOVAL LIMITS
UNDERGROUND UTILITY LINEUT
STORM DRAINAGE EASEMENTSDE
OHW OHW
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ C
O V
E R
N
O
TE
S .d w gZ
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ C
O V
E R
N
O
TE
S .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:5
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
WWW.WKDICKSON.COM
PROFESSIONAL SEAL FOR
SCDOT STATEMENTS
DORCHESTER COUNTY EROSION AND SEDIMENT CONTROL NOTES:
DEED BK./PG.: 14357/053
PLAT BK./PG.: 21/161
T.M.S. #036-12-04-004
STEVEN GRIFFITH
PROPERTY OF
& JILL M. GRIFFITH
DEED BK./PG.: 4135/147
PLAT BK./PG.: K/100
T.M.S. #036-00-00-071
C. S. CARTER
PROPERTY OF
DEED BK./PG.: 7430/001
PLAT BK./PG.: 4/117
T.M.S. #036-00-00-063
MILLIFORD BAKER
PROPERTY OF
& PEARLE-LIFE & ROY WOOD
SD
xSD x
S D x
EX SSMH-1
RIM: 81.94
INV IN: 73.16 (6" SW)
INV OUT: 73.33 (6" NW)
EX SSMH-2
RIM: 82.80
INV OUT: 73.00 (6" NE)
W
W
78 80
80 7878 79
7778747475
787979
77 78
797777
78 7978
80 80
80 80
80 7982
81 80
W
W
W
W
W
O
HW
O
HW
O
HW
OHW
OHWOHW
OHW
OHW
OH
W
O
HW
O
HW
OHW
OHW
OH
W
O
HW
O
HW
OHW
OHW
O H
W
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OH
WOHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D LO
D
LO
D LO
D
LO
D
LOD
LOD
EXISTING TOP OF CHANNEL BANK
EXISTING TOP OF CHANNEL BANK
LITTLE WALNUT BRANCH
LITTLE WALNUT BRANCH
SD
xSD x
S D x
EX. 36" RCP TO NOT BE DISTURBED
50 LF EX. 36" RCP
TO BE REMOVED
25 LF EX 18" CPP
TO BE REMOVED
56 LF EX. 30" CPP
TO BE REMOVED
46 LF EX. 36" RCP
TO BE REMOVED
EX. UTILITY TO BE
RELOCATED. CONTRACTOR TO
COORDINATE RELOCATION WITH
UTILITY PROVIDER.
EX. ROAD SIGN TO BE REPLACED
305 SY OF FULL DEPTH ASPHALT
PAVEMENT REPAIR WITHIN
TRENCHING LIMITS
PER DETAIL 1/AD1
MILL & RESURFACE 52 SY
PAVEMENT PER DETAIL 2/AD1
EXISTING WOODED AREA AND
VEGETATION SHALL BE CLEARED
AND GRUBBED (SHADED AREA)
MILL & RESURFACE 42 SY
PAVEMENT PER DETAIL 2/AD1
MILL & RESURFACE 20 SY
PAVEMENT PER DETAIL 2/AD1
EX. 2" WATER LINE W/ 4"
CASING TO BE
REMOVED AND
RELOCATED
EX. SANITARY MH TO BE
PROTECTED DURING
CONSTRUCTION
19 LF EX. 15" POLY TO
BE REMOVED.
25 LF EX. 15" POLY
TO BE REMOVED
20 LF EX. 6" CLAY SANITARY LINE
TO BE REMOVED
EX. (2)WATER VALVES TO BE
REMOVED
EX. OVERHEAD ELECTRIC LINE TO BE
PROTECTED DURING CONSTRUCTION
EX. WATER VALVE MONUMENTS
TO BE REMOVED AND RETURNED
TO DORCHESTER COUNTY
EX. GATE
REGRADE CHANNEL PER
GRADING PLAN S1 (TYP)
REMOVE APPROX. 2 CY (AREA:
67 SQ FT; 4 LF STREAM IMPACTS)
DEBRIS, STONE MATERIAL AND
VEGETATION WITHIN MAIN
CHANNEL
PROTECT EXISTING
UTILITY POLE
REMOVE APPROX. 4 CY (AREA:
220 SQ FT; 36 LF STREAM
IMPACTS) SEDIMENT DEPOSITS
WITHIN MAIN CHANNEL
35+00
36+00
37+00
38+00
REMOVE DEBRIS, STONE
MATERIAL AND VEGETATION
WITHIN MAIN CHANNEL
EX. OVERHEAD ELECTRIC LINE TO BE
PROTECTED DURING CONSTRUCTION
REMOVE APPROX. 4 CY (AREA:
164 SQ FT; 30 LF STREAM
IMPACTS) DEBRIS, STONE
MATERIAL AND VEGETATION
WITHIN MAIN CHANNEL
REMOVE APPROX. 21 CY
(AREA:555 SQ FT; 45 LF STREAM
IMPACTS) SEDIMENT DEPOSITS
WITHIN MAIN CHANNEL
IMPACT B:
391 SF, 0.0090 AC, 31 LF
IMPACT B:
164 SF, 0.0038 AC, 14 LF
*PER THE 03-14-2025 PRE-APPLICATION
MEETING, IMPACTS WITHIN 30'
UPSTREAM AND DOWNSTREAM OF
CULVERT REPLACEMENT DO NOT NEED
TO BE REPORTED
IMPACT A:
164 SF, 0.0038 AC, 30 LF
*PER THE 03-14-2025 PRE-APPLICATION
MEETING, IMPACTS WITHIN 30'
UPSTREAM AND DOWNSTREAM OF
CULVERT REPLACEMENT DO NOT NEED
TO BE REPORTED
IMPACT A:
67 SF, 0.0015AC, 4 LF
EX. WATER VALVE TO BE
REMOVED AND REPLACED
EX. 77 LF OF 6" WATER
LINE TO BE REMOVED
AND RELOCATED
25 LF EX. 15" POLY
TO BE REMOVED
D1
1S T
B E
N D
R O
A D
D E
M O
LI
TI
O N
P
LA
N
GENERAL NOTES:
1. SEE DRAINAGE PLAN AND PROFILE SHEETS FOR PROPOSED STORMWATER
DRAINAGE PLAN.
2. ALL DEBRIS SHALL BE DISPOSED OF OFF-SITE AT AN APPROPRIATE FACILITY.
3. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE TO APPROPRIATE EROSION
CONTROL MEASURES THROUGHOUT ALL PHASES OF DEMOLITION.
4. ALL PAVEMENT/CONCRETE CUTS SHALL BE DONE BY SAW CUTTING
5. FINAL MILL AND OVERLAY SHALL BE 5' ON EACH SIDE OF ROAD CUT AND EXTEND
THE FULL LANE WIDTH. IF CUT ENCROACHES ON MORE THAN ONE LANE, THEN FINAL
MILL AND OVERLAY WILL EXTEND THE FULL WIDTH OF SECOND LANE. IF ROAD CUT
IS IN THE INTERSECTION, THE ENTIRE INTERSECTION SHALL BE MILLED AND
OVERLAID RADIUS TO RADIUS.
CLEARING AND
GRUBBING
SHEET LEGEND
LIMITIS OF SEDIMENTS
DEPOSIT REMOVAL
AREA
STORM PIPE REMOVAL
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ D
E M
O .d w gZ
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ D
E M
O .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:1
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
FO
R
P E
R M
IT
TI
N G
-N O
T
FO
R C
O N
S
TR
U C
TI
O
N
YY
JS
JMQ
JUL 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
WWW.WKDICKSON.COM
DEED BK./PG.: 14357/053
PLAT BK./PG.: 21/161
T.M.S. #036-12-04-004
STEVEN GRIFFITH
PROPERTY OF
& JILL M. GRIFFITH
DEED BK./PG.: 7430/001
PLAT BK./PG.: 4/117
T.M.S. #036-00-00-063
MILLIFORD BAKER
PROPERTY OF
& PEARLE-LIFE & ROY W
OOD
S D x
S D x
SDx
S S x
S S x
S S x
S S x
SSx SSx
SSx
W W
777880
787879
807979 80
79 78
8078 79 77 7875
8077 78
787980
80 81
80 7879
W W
W W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLOD
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD LOD
LODLOD
LO
D
LO
D
LITTLE W
ALNUT BRANCH
LITTLE W
ALNUT BRANCH
TC
E
TCE
TC
E
TCE
TCE
TC
E
TC
E
TCE
TCE
2+74.36
-0+00
1+00 2+00
SSx SSx
SSx
SDx
EX. 2" WATERLINE W/ 4"
CASING PIPE TO BE
REMOVED AND RELOCATED
EX SSMH-2
1+00
1+49.09
EX. FH
PROP. 6" DIP SEWER LINE
S D x
S D x
SDx
+0
+0
+0
D
YH
0+
1+00
2+00 2+02.41
2+
.0
1+00
2+00
W
0+
1+
W
W
INSTALL GUARDRAIL ON TOP OF CULVERT.
SEE NOTE 5
EX SSMH-1
PROP. 6" DIP
WATERLINE
SEE SHEET U1
PROP. 4" DIP
WATERLINE
SEE SHEET U1
PROP. 50 LF 60" RCP
CULVERT (1' BURIED) PROP. 50 LF 60" RCP
CULVERT (1' BURIED)
PROP. 59 LF 54" RCP
CULVERT (1' BURIED)
PROP. 16 LF 15" RCP
PROP. 23 LF 15" RCP
PROP. 25 LF 18" RCP
EX. 36" RCP
TO BE REMOVED
EX. 15" POLY PIPE
TO BE REMOVED
EX. 15" POLY PIPE
TO BE REMOVED
EX. 18" CPP
TO REMOVED
EX. 36" RCP
EX. 36" RCP
TO BE REMOVED
EX. 30" CPP
TO BE REMOVED
HW-12
HW-13
HW-11
SECTION A-A'
SECTION B-B'
EX. 6" CLAY
SANITARY PIPE
TO NOT BE DISTURBED
EX. 6" CLAY SANITARY
SECTION A-A' OF 1st BEND ROAD
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00
EX. 6" CLAY SANITARY SEWER PIPE
STA: 0+92
TO REMAIN AND BE PROTECTED
.2
.2
.1
.1
1.
.9
1.
.8
1.
.8
1.
.7
EX. 36" RCP PIPE
STA: 1+62
TO BE REMOVED
EX. 36" RCP PIPE
STA: 1+55
TO BE REMOVED 3.62'
PROP 60" CULVERT
(1' BURIED)
STA: 1+56.35
PROP 60" CULVERT
(1' BURIED)
STA: 1+64.47
3.29'
ST
A
0+
.0
EL
EV
2.
ST
A
0+
.2
EL
EV
2.
ST
A
1+
.2
EL
EV
1.
ST
A
2+
.3
EL
EV
1.
PROP 54" CULVERT
(1' BURIED)
STA: 1+23.85
SECTION B-B' OF HILTON STREET
-0+25 0+00 0+50 1+00 1+50 1+75
1.
.7
1.
.5
EX. 30" CPP PIPE
STA: 1+20
TO BE REMOVED
ST
A
0+
.4
EL
EV
1.
ST
A
1+
.5
EL
EV
1.
ST
A
1+
.9
EL
EV
1.
PROP 54" CULVERT
(1' BURIED)
STA: 1+48.58
PROP. 4" DIP WATERLINE
RW1
1S T
B E
N D
R O
A D
R O
A D
W A
Y P
LA
N
A N
D P
R O
FI
LE
NOTES:
1. REFER TO SHEET S1 FOR PROFILES OF PROPOSED CULVERTS.
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ R
W A
Y -S
IT
E
.d w gZ :\P ro je ct s\
D or ch es te r
C ou nt y\
C
H
R ic e M ill D riv e
D ra in ag e\ C
A D
D \P la n
S et
\S he et s\
.0 0.
C H
-R ic eM ill
_C _S
H T_
R W
A Y
-S
IT
E .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:1
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
SD
x SD x
S D x
EX SSMH-1
RIM: 81.94
INV IN: 73.16 (6" SW)
INV OUT: 73.33 (6" NW)
W
W
W
W
W
W
W
O
HW
O
HW
O
HW
OHW
OHW OHW
OHW
OHW
OHW
O
HW
O
HW
OHW
OHW
OHW
O
HW
O
HW
OHW
OHW
O H
W
OHW
OHW
OHW
OHW
OHW
OHW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SD
x SD x
S D x
DY
H
0+00
1+
2+
2+
.41
2+95.01
2+
W
0+00
1+00
2+00
W
WSD
x SD x
S D x
35+00
36+00
37+00
38+00
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
DLO
D
LO
DLO
D
LO
D
LOD
LOD
LIT
TLE WALN
UT BRANCH
LIT
TLE WALN
UT BRANCH
TCE TCE
TCE
TC
E
TC
E
TC
E
TCE
TCE
TCE
TCE
TCE
TCE
PROPERTY OF
MILLIFORD BAKER
& PEARLE-LIFE & ROY WOOD
DEED BK./PG.: 7430/001
PLAT BK./PG.: 4/117
T.M.S. #036-00-00-063
T.M.S. #036-00-00-071
DEED BK./PG.: 4135/147
PLAT BK./PG.: K/100
C. S. CARTER
PROPERTY OF T.M.S. #036-12-04-004
PLAT BK./PG.: 21/161
DEED BK./PG.: 14357/053
& JILL M. GRIFFITH
STEVEN GRIFFITH
PROPERTY OF
PROP. 20 LF 6" DIP
SANITARY SEWER LINE
HW-12
HW-11
HW-13
PROP. 30 LF (AREA: 288 SQ FT
STREAM IMPACTS) RIFFLE
GRADE CONTROL STRUCTURE
SEE DETAIL 1/SD4
+3
+3
+1
+1
PROP. 40 LF (AREA: 285 SQ FT
STREAM IMPACTS) RIFFLE
GRADE CONTROL STRUCTURE
SEE DETAIL 1/SD4
SEE SHEET S2 FOR
CROSS SECTIONS
PROP. 45 LF (AREA: 650 SQ FT
STREAM IMPACTS) RIFFLE
GRADE CONTROL STRUCTURE
SEE DETAIL 1/SD4 79
79 77
APPROX. OHWM
80 79
2+
.41
0+00 1+
2+
1+10
1+10
PROP. 13 SY (AREA: 72 SQ FT; VOLUME:
108 CF; 26 LF STREAM IMPACTS) CLASS
B RIP RAP FROM RIFFLE TO HEADWALL
AND ALONG SLOPES UP TO ELEV. 76'
SEE SCDOT DETAIL 804-310-00/SD2
PROP. 4 SY CLASS B RIP
RAP FROM RIFFLE TO
HEADWALL ALONG SLOPES
PROP. 3 SY (AREA: 8 SQ FT; VOLUME:
12 CF; 10 LF STREAM IMPACTS)
CLASS B RIP RAP FROM RIFFLE
ALONG SLOPES UP TO ELEV. 76'
SEE SCDOT DETAIL 804-310-00/SD2
PROP. REALIGNMENT OF
1ST BEND ROAD DITCH
EX. FH.
REMOVE APPROX. 21 CY (AREA:
555 SQ FT; 45 LF STREAM
IMPACTS) SEDIMENT DEPOSITS
WITHIN MAIN CHANNEL
REMOVE APPROX. 4 CY (AREA:
220 SQ FT; 36 LF STREAM
IMPACTS) SEDIMENT DEPOSITS
WITHIN MAIN CHANNEL
PROP. 3 SY CLASS B RIP
RAP FROM RIFFLE ALONG
SLOPES UP TO ELEV. 76'
SEE SCDOT DETAIL
804-310-00/SD2
TEMPORARY
CONSTRUCTION
EASEMENT
TEMPORARY
CONSTRUCTION
EASEMENT
IMPACT C:
650 SF, 0.0149 AC, 45 LF
IMPACT A:
220 SF, 0.0050 AC, 36 LF
IMPACT B:
285 SF, 0.0065 AC, 40 LF
IMPACT D:
288 SF, 0.0066 AC, 30 LF
IMPACT E:
16 SF, 0.0004 AC, 10 LF
W
PROP. 7 SY CLASS
B RIP RAP
SEE SCDOT DETAIL
804-310-00/SD2
PROP. 6" DIP WATERLINE
SEE SHEET U1
EX. 2" WATERLINE
W/ 4" CASING PIPE
TO BE REMOVED AND RELOCATED
EX. 30" CPP TO
BE REMOVED
EX. 15" POLY PIPE
TO BE REMOVED
EX. 18" CPP
TO BE REMOVED
EX. 36" RCP
TO BE REMOVED
EX. 36" RCP
TO BE REMOVED
EX. 36" RCP
EX. 15" POLY PIPE
TO BE REMOVED
PROP. 16 LF 15" RCP
SEE PROFILE 4 SHEET S5
PROP. 50 LF 60" RCP
CULVERT (1' BURIED) @0.60%
PROP. 50 LF 60" RCP
CULVERT (1' BURIED) @0.60%
PROP. 25 LF 18" RCP
SEE PROFILE 5 SHEET S5
PROP. 23 LF 15" RCP
SEE PROFILE 3 SHEET S5
PROP. 59 LF 54" RCP
CULVERT (1' BURIED)
@3.55%
W
W PROP. 4" DIP WATERLINE
SEE SHEET U1
H: 1"=20' V: 1"=4'
LITTLE WALNUT BRANCH
35+50 35+75 36+00 36+25 36+50 36+75 37+00 37+25 37+50 37+75 38+00
PR
O
P.
H
W -1
W
/ W
IN
G W
AL
LS
ST
A:
7+
.1
IN
V
O U
T:
T
W
IN
2.
(6
0" S
E)
TO
P:
0.
EX. GRADE
EX. 50 LF 36" RCP
TO BE REMOVED
3.63' 2.94'
TWIN 50 LF 60" RCP
(1' BURIED) @ 0.60%
EX. 46 LF 36" RCP
TO BE REMOVED
PR
O
P.
H
W -1
W
/ W
IN
G W
AL
LS
ST
A:
6+
.9
IN
V
IN
: T
W
IN
2.
(6
0" N
W
TO
P:
0.
PROP. CHANNEL
ELEV 73.50
PROP. CHANNEL
ELEV 73.80
PROP GRADE
PROP. GRADE
PROP. CONCRETE BAFFLE
SEE DETAIL 1/SD1
RIFFLE GRADE
CONTROL SEE
DETAIL 1/ SD4
RIFFLE GRADE CONTROL
SEE DETAIL 1/ SD4
-2.16%
4:1 -11:1
21.00'
EX. TRAVEL LANE
5:1
R /W
R /W
R /W
R /W
R /W
R /W
66' RIGHT-OF-WAY
SEE SCDOT DETAIL
714-005-00/SD2 & DETAIL 1/SD3
FOR TRENCHING
17.90' 10.91'
PROP. 4" DIP W/ 10" STEEL CASING
25 YR HGL
H: 1"=20' V: 1"=4'
PROP. REALIGMENT HILTON STREET
-0+20 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00
59 LF 54" RCP
(1' BURIED) @ 3.55%
PR
O
P.
H
W -1
W
/ W
IN
G W
AL
LS
ST
A:
+3
3.
IN
V
IN
: 7
2.
(5 4"
W
TO
P:
0.
PR
O
P.
H
W -1
W
/ W
IN
G W
AL
LS
ST
A:
+9
2.
IN
V
O U
T:
4.
(5 4"
E
TO
P:
1.
EX. 36" RCP
1.98'
EX. 6" CLAY SANITARY SEWER PIPE
STA: 1+04 TO BE REMOVED
AND REPLACED WITH DIP
1.86'
EX. GRADE
PROP. CHANNEL
ELEV 73.50
PROP. CHANNEL
ELEV 75.60
3.46%
PROTECT PROP. 6" DIP
SEWER LINE
PROP. CONCRETE BAFFLE
SEE DETAIL 1/SD1
PROP. GRADE
RIFFLE GRADE CONTROL
SEE DETAIL 1/ SD4
RIFFLE GRADE CONTROL
SEE DETAIL 1/ SD4
4.18'
R /W
R /W
R /W
66' RIGHT-OF-WAY
R /W
R /W
R /W
34.00'
EX. TRAVEL LANE
4:1
PROP. GRADE
PROP. GRADE
SEE SCDOT DETAIL
714-005-00/SD2 & DETAIL 1/SD3
FOR TRENCHING
20.51' 4.63'
PROP. 6" DIP WATERLINE
W/ 12" STEEL CASING
25 YR HGL
S1
1S T
B E
N D
R O
A D
G R
A D
IN
G
A N
D D
R A
IN
A
G E
P
LA
N
NOTES:
1. CONTRACTOR SHALL VERIFY UTILITY SIZES, MATERIALS AND
LOCATION PRIOR TO ANY UTILITY WORK.
2. CONTRACTOR TO PROTECT EXISTING WATER LINE, SEWER LINE AND
OTHER UTILITIES DURING CULVERT CONSTRUCTION.
3. NOT ALL TREES SURVEYED/SHOWN. PLEASE REFER TO EROSION
CONTROL SHEETS FOR TREE REMOVAL.
4. CONTRACTOR TO SUBMIT SHOP DRAWINGS OF PRE-CAST DRAINAGE
STRUCTURES, SEALED BY AN ENGINEER LICENSED IN THE STATE OF
SOUTH CAROLINA.
5. UNLESS OTHERWISE INDICATED, ALL RCP PIPE SHALL BE MINIMUM
CLASS III WITH WATERTIGHT JOINTS PER ASTM C443. IN ADDITION,
ALL JOINTS SHALL BE WRAPPED WITH GEOTEXTILE FABRIC. REFER
TO DETAIL 2/SD3 AND SPECIFICATIONS.
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ G
R A
-S
TR
M .d w gZ
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ G
R A
-S
TR
M .d w g, J U
A N
Q , 1
0/
/2
8:
:0
A
M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
STA 36+30
STA 37+15
-25 -12 0 13 25
-25 -13 0 12 25
PROP. GRADE
EX. GROUND
EX. GROUND
EX. GROUND
PROP. GRADE
1:
M
AX
1:
M
AX
1:
M
AX
1:
M
AX
OHWMOHWM
STA 1+10
-13 0 13
OHWM
PROP. GRADE
1:
M
AX
1:
M
AX
H: 1"=10' V: 1"=2'
PROFILE 3
-0+25 0+00 0+50
H: 1"=10' V: 1"=2'
PROFILE 4
-0+25 0+00 0+50
H: 1"=10' V: 1"=2'
PROFILE 5
-0+25 0+00 0+50
PROP. 23 LF 15" RCP
@ 12.97%
PROP. 25 LF 18" RCP
@ 8.00%
PROP. 16 LF 15" RCP
@ 13.75%
INV: 74.00'
INV: 77.00'
INV: 74.75'
INV: 78.00'
INV: 75.00'
INV: 76.00'
CLASS B RIP RAP
SEE SCDOT DETAIL
804-310-00/SD2
HW-11
SEE DETAIL SHEET SD5
HW-11
SEE DETAIL SHEET SD5
EX. GROUND
EX. GROUND
EX. GROUND
SEE SCDOT DETAIL
714-005-00/SD2 & DETAIL 1/SD3
FOR TRENCHING
SEE SCDOT DETAIL
714-005-00/SD2 & DETAIL 1/SD3
FOR TRENCHING SEE SCDOT DETAIL
714-005-00/SD2 & DETAIL 1/SD3
FOR TRENCHING
S2
1S T
B E
N D
R O
A D
G R
A D
IN
G
X S
E C
NOTE:
ALL SECTION VIEWS LOOKING UPSLOPE
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ G
R A
-S
TR
M .d w gZ
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ G
R A
-S
TR
M .d w g, J U
A N
Q , 1
0/
/2
8:
:2
A
M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
SD1
S
TO
R M
S
TR
U C
TU
R
A L
D E
TA
IL
S
SPLICES
OPTIONAL WALL OR SLAB CONSTRUCTION JOINT
NOT TO SCALE
ISOLATION JOINT BETWEEN APRON AND CULVERT SLAB
NOT TO SCALE
WEEP HOLE SECTION
NOT TO SCALE
1.2
SD1
1.3
SD1
1.1
SD1
DEVELOPMENTAL LENGTH FOR STANDARD REINFORCING BARS
BAR SIZE (INCHES)
11 78 10 65 9 53 8 43 7 37 6 26 5 21 4 17 3 13
HOOK LEG
Ld
GENERAL STRUCTURAL NOTES:
I. FOUNDATIONS:
1. CONTRACTOR TO PROVIDE FOUNDATION DESIGN FOR ALLOWABLE SOIL BEARING PRESSURES AS STATED IN GEOTECHNICAL REPORT PREPARED BY ECS SOUTHEAST, LLC DATED 23 MAY 2025
II. STRUCTURAL CONCRETE:
1. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI, UNLESS NOTED OTHERWISE.
2. NORMAL-WEIGHT CONCRETE SHALL HAVE A MAXIMUM UNIT WEIGHT OF 145 PCF, UNLESS NOTED OTHERWISE.
3. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GR60, INCLUDING TIES AND STIRRUPS.
4. MINIMUM CONCRETE COVER SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE:
A) UNFORMED SURFACES IN CONTACT WITH THE GROUND.................................................................................................. 3" B) FORMED SURFACES EXPOSED TO EARTH OR WEATHER................................................................................................... 2" C) FORMED SURFACES NOT EXPOSED TO EARTH OR WEATHER........................................................................................... 1 1/2"
5. FINISHES SHALL CONFORM TO REQUIREMENTS OF ACI 301.
III. MISCELLANEOUS:
1. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH CIVIL DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH REQUIREMENTS INTO THEIR
SHOP DRAWINGS AND WORK.
2. NO OPENING SHALL BE MADE IN ANY STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL-ENGINEER-OF-RECORD.
3. NO CHANGE IN SIZE OR DIMENSION OF STRUCTURAL MEMBERS SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL-ENGINEER-OF-RECORD.
4. OPENINGS 1'-4" AND LESS ON A SIDE ARE GENERALLY NOT SHOWN ON THE STRUCTURAL DRAWINGS. REFER TO CIVIL DRAWINGS FOR SUCH OPENINGS.
5. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOADS APPLIED TO THE STRUCTURAL FRAMING. CONSTRUCTION LOADS SHALL NOT
EXCEED THE DESIGN CAPACITY OF THE FRAMING AT THE TIME THE LOADS ARE APPLIED.
6. DO NOT SCALE THESE DRAWINGS; USE DIMENSIONS.
7. ELEVATIONS OF TOP SLABS SHALL BE INTERPRETED AS PLUS OR MINUS WITH THE INTENT THAT THE CONTRACTOR WILL HAVE SOME FLEXIBILITY IN THE FIELD.
8. CONTRACTOR SHALL CONTACT TESTING AGENCY OR WK DICKSON (919-782-0495) TO CHECK REBAR PRIOR TO CONCRETE POUR.
GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS.
WEEPHOLES ARE TO BE CONSTRUCTED IN ALL HEADWALLS/WINGWALLS. WEEPHOLES SHOULD BE A MINIMUM OF 8' ON CENTER WITH A MINIMUM OF 1 WEEPHOLE PER WALL.
WEEPHOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR
THIS WORK.
REBAR DOWELS TO BE
IMBEDDED INTO RCP, SIZED AND
SPACED PER MANUFACTURES
RECOMMENDATION
6"
BAFFLE DETAIL
CONCRETE BAFFLE AT
CENTER OF CULVERT
RCP AND BAFFLE DETAIL
NOT TO SCALE
NOTE: CONCRETE BAFFLE TO
BE INSTALLED ON 54" & 60"
RCP BARREL
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ D
E
TA
IL
S
.d w gZ :\P ro je ct s\
D or ch es te r
C ou nt y\
C
H
R ic e M ill D riv e
D ra in ag e\ C
A D
D \P la n
S et
\S he et s\
.0 0.
C H
-R ic eM ill
_C _S
H T_
D E
TA
IL
S .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:3
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
SD2
D R
A
IN
A G
E D
E
TA
IL
S
-S C
D O
T 1S
T B
E N
D R
D
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ D
E
TA
IL
S
.d w gZ :\P ro je ct s\
D or ch es te r
C ou nt y\
C
H
R ic e M ill D riv e
D ra in ag e\ C
A D
D \P la n
S et
\S he et s\
.0 0.
C H
-R ic eM ill
_C _S
H T_
D E
TA
IL
S .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:4
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
NON-PLASTIC PIPE PLASTIC PIPE
FOR PLASTIC PIPE #57 STONE
TOTAL BEDDING THICKNESS
BACKFILL
INITIAL
BACKFILL
FINAL
PIPE #57 STONE
FOR NON-PLASTIC
PLASTIC PIPE
TRACER WIRE FOR
12" MIN. BEDDING THICKNESS
12"
OD
12"
D
MAX MAX
IDENTIFICATION TAPE
COMMON FILL
TYPICAL PAVEMENT
SECTION FOR PAVEMENT AREAS
BACKFILL AND FILL
12"
6"
6"
SD3
1 TRENCH FOR STORM DRAIN PIPE
NOT TO SCALE
FINISH GRADE/GRASS FOR
NON-PAVEMENT AREAS
12" MIN. BEDDING THICKNESS
BELOW PIPE FOR PLASTIC PIPE
#57 STONE WRAPPED IN
GEOTEXTILE FABRIC
(MIRAFI 140N OR APPROVED
EQUAL)
SD3
D R
A
IN
A G
E D
E
TA
IL
S
S
T B
E N
D R
D
SD3
2 CONCRETE PIPE JOINT DETAIL
NOT TO SCALE
3.0' MIN./18" MIN. EACH SIDE
A A
CONCRETE
PIPE SECTION
CONCRETE
PIPE SECTION
CONCRETE
PIPE SECTION
CONCRETE
PIPE SECTION
SECTION A-A
PLAN
CONCRETE PIPE JOINT (SEE
SPECIFICATIONS FOR REQUIRED
JOINT MATERIAL)
PROVIDE GEOTEXTILE FABRIC (MIRAFI
160N OR APPROVED EQUAL) AT EACH PIPE
JOINT. WRAP ENTIRE PIPE JOINT, OVERLAP
PIPE JOINT 18" MIN EACH SIDE OF JOINT,
AND OVERLAP GEOTEXTILE FABRIC MIN.
12" ALONG CIRCUMFERENCE. GEOTEXILE
FABRIC SHALL BE SECURED TO PIPE BY
STRAPS OR OTHER METHOD APPROVED
BY THE MANUFACTURER.
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ D
E
TA
IL
S
.d w gZ :\P ro je ct s\
D or ch es te r
C ou nt y\
C
H
R ic e M ill D riv e
D ra in ag e\ C
A D
D \P la n
S et
\S he et s\
.0 0.
C H
-R ic eM ill
_C _S
H T_
D E
TA
IL
S .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:4
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
WWW.WKDICKSON.COM
WRAPPED IN GEOTEXTILE
FABRIC (MIRAFI 140N OR
APPROVED EQUAL)
BOTTOM OF BANK
TOP OF BANK
GRAVEL SUBSTRATE
50 / 50 MIX OF IN SITU SOIL AND # 57 STONE
PLACED ONTOP AND COMPACTED INTO RIPRAP MIX GRADE CONTROL ROCK
50 / 50 MIX CLASS B / C RIP RAP
BO
TT
O M
W
ID
TH
W b
RIFFLE GRADE CONTROL - SECTION A-A
BANKFULL
ELEVATION
INVERT SET AT PROFILE
GRADE
GRAVEL SUBSTRATE
50 / 50 MIX OF IN SITU SOIL
AND # 57 STONE
10 OUNCE NON-WOVEN
GEOTEXTILE
FABRIC GRADE CONTROL
ROCK 50 / 50 MIX
CLASS B/C RIP RAP
2.5'
MIN.
0.25'
RIFFLE GRADE CONTROL - PROFILE B-B
1.0' MAX
TOP OF RIFFLE
(SEE PROFILE
FOR DESIGN ELEV.)
SLOPE VARIES
DESIGN BED
SURFACE
BOTTOM OF RIFFLE
(SEE PROFILE FOR
DESIGN ELEV.)
GRAVEL SUBSTRATE
50 / 50 MIX OF IN SITU SOIL
AND # 57 STONE
GRADE CONTROL ROCK
50 / 50 MIX CLASS B/ C RIP RAP
10 OUNCE NON-WOVEN
GEOTEXTILE
FABRIC
BANKFULL ELEVATION
2.5' MIN3.5' MIN
MATCH EXISTING
GROUND AT END OF
RIFFLE
NOT TO SCALE
BURIED RIFFLE GRADE CONTROL DETAIL
UNLESS SHOWN OTHERWISE WITH
RIPRAP FOR BANK STABILIZATION,
PROVIDE EROSION CONTROL
MATTING BOTH SIDES (SEE DETAIL
2/SECD3)
SD4
D R
A
IN
A G
E D
E
TA
IL
S
S
T B
E N
D R
D
TOP OF BANK
BOTTOM OF BANK
A
RIFFLE GRADE CONTROL - PLAN VIEW
LENGTH
B
A
B
20231200.00.CH
FI
LE
P A
TH
:Z
:\P ro je ct s\ D or ch es te r C ou nt y\
C H
R ic e
M ill
D riv e D ra in ag e\
C A
D D
\P la n S et \S he et s\
.0
0.
C
H -R ic eM ill _C
_S H
T_ D
E
TA
IL
S
.d w gZ :\P ro je ct s\
D or ch es te r
C ou nt y\
C
H
R ic e M ill D riv e
D ra in ag e\ C
A D
D \P la n
S et
\S he et s\
.0 0.
C H
-R ic eM ill
_C _S
H T_
D E
TA
IL
S .d w g, J S
E S
LE
R
, 1 0/
/2
8:
:5
A M
C O
P Y
R
IG
H T
, W
.K . D
IC
K
S O
N
C O
IN
C
A
LL
R
IG
H
TS
R E
S E
R V
E D
. T H
IS
D
R A
W
IN
G
IS
A N
IN
S
TR
U
M E
N T
O F
S E
R V
IC
E
A N
D S
H A
LL
R
E M
A
IN
T H
E P
R O
P E
R
TY
O F
TH
E
E N
G
IN
E E
R A
N D
S H
A
LL
N O
T B
E C
O P
IE
D
, R E
P R
O D
U C
E D
, P U
B
LI
S H
E D
, O R
U S
E D
IN
A
N Y
W A
Y W
IT
H
O U
T
TH
E E
X P
R E
S S
W R
IT
TE
N A
U
TH
O R
IZ
A
TI
O
N O
F
TH
E E
N G
IN
E
E R
. O N
LY
C
O P
IE
S
M A
R K
E D
W
IT
H A
N O
R
IG
IN
A
L S
IG
N
A
TU
R E
A N
D S
E A
L O
F
TH
E E
N G
IN
E
E R
S H
A
LL
B E
C O
N S
ID
E
R E
D V
A
LI
D , T
R U
E C
O P
IE
S
WKD PROJ. NO.:
P R
O
JE
C T
N A
M E
DRAWING NUMBER:
D R
A W
IN
G
T
IT
LE
C.O.A.
R E
V
IS
IO
N
R E
C O
R D
D E
S C
R
IP
TI
O
N B
Y D
A
TE
PROJ. DATE:
PROJ. MGR.:
DESIGN BY:
DRAWN BY:
N O community infrastructure consultants
PROFESSIONAL SEAL
1S T
B E
N D
R O
A D
D R
A
IN
A G
E
B
ID
D O
C U
M E
N
TS
N
O T
R E
LE
A
S E
D F
O R
C O
N S
TR
U
C
TI
O N
YY
JS
JMQ
OCT 2025
4105 FABER PLACE DRIVE
SUITE 410
NORTH CHARLESTON, SC 29405
(t) 843-416-5560
WWW.WKDICKSON.COM
CHANNEL DIMENSION AT RIFFLES
STRUCTURE
LENGTH
(LF)
BOTTOM WIDTH,
Wb (LF)
HW-11 45 20
HW-12 30 15
HW-13 40 8
ELEVATION
79.00' ±
ELEVATION
= 80.00' ±
DOWNSTREAM ELEVATION
NTS
2.00'
PROPOSED TWINS 60"
RCP CULVERT (1' BURIED)
INVERT ELEV. = 72.50'
PROPOSED 54" RCP
CULVERT (1' BURIED)
INVERT ELEV. = 72.50'
ELEVATION
=79.0' ±
PROPOSED 15" RCP PIPE
INV: 75.00'
PROPOSED 15" RCP PIPE
INV:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .