This is a bid drawing document for the 1st Bend Road Drainage Improvements project in Dorchester County, South Carolina, funded through the South Carolina Rural Infrastructure Authority (SC RIA #S-25-1409). The project encompasses comprehensive drainage improvements including the installation of three reinforced concrete pipe (RCP) culverts (50-foot 60" RCP twin culverts, 59-foot 54" RCP culvert, and various smaller diameter pipes ranging from 15" to 18"), three custom headwall structures with concrete baffles, riffle grade control structures, Class B/C riprap placement, and approximately 0.53 acres of disturbed area requiring erosion control. The scope of work includes removal of existing infrastructure (36" RCP pipes, 30" corrugated plastic pipe, 15" poly pipes, and 18" CPP), relocation of water and sanitary sewer utilities (6" and 4" diameter lines with steel casing), pavement removal and replacement (approximately 305-420 square yards), clearing and grubbing of wooded areas, and complete restoration with erosion control matting and riparian plantings in two designated plant zones. Traffic control measures requiring temporary lane closures on 1st Bend Road and coordination with South Carolina Department of Transportation (SCDOT) standards are mandated throughout construction.

The project requires adherence to all Dorchester County and SCDES regulations, with particular emphasis on sediment and erosion control compliance per NPDES permit requirements, weekly inspection protocols, and maintenance of stormwater detention facilities by property owners through recorded operating and maintenance agreements. Contractors must obtain all necessary permits, conduct utility locates through SC811 with minimum 72-hour advance notice, and submit shop drawings for precast structures sealed by a South Carolina professional engineer for approval prior to installation. All work must conform to SCDOT standard specifications and details, including 4000 PSI concrete compressive strength, Class III RCP pipe with watertight geotextile-wrapped joints, and restrained joint water main pipe. The contractor bears full responsibility for utility damage repairs, erosion control maintenance through project completion, as-built certifications, and submission of a Notice of Termination to SCDES upon achieving 70 percent site stabilization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

V E

R

1ST BEND ROAD DRAINAGE

FOR THE

DORCHESTER COUNTY, SC

OCTOBER 2025

Know what'sbelow.

before you digCallcommunity infrastructure consultants

NOTICE TO CONTRACTOR

1) CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TWO (2) WEEKS PRIOR TO

CONSTRUCTION TO OWNER AND NEIGHBORHOOD RESIDENTS.

2) PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS

RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT

MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER

INDICATED ON THE PLANS OR NOT. CALL "811" A MINIMUM OF 72 HOURS PRIOR TO

DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM

CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3) UNLESS OTHERWISE NOTED, EXISTING CONDITION INFORMATION PROVIDED BY AARON

KNIGHT OF CORNERSTONE SURVEYING, & ENGINEERING INC., SC PLS #30771.

NOT TO SCALE

VICINITY MAP

Survey Prepared By:

CORNERSTONE

WK DICKSON PROJECT NO.: 20231200.00.CH

PROJECT AREA

HOR. DATUM: SC GRID

NAD 83 (US FOOT)

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ C

O V

E R

N

O

TE

S .d w gZ

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ C

O V

E R

N

O

TE

S .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:5

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

WWW.WKDICKSON.COM

OWNER/DEVELOPER:

DORCHESTER COUNTY

CONTACT: MICHAEL GOLDSTON, P.E.

ENGINEERING MANAGER

2120 EAST MAIN STREET

DORCHESTER, SC 29437

843-832-0070 (PHONE)

MGOLDSTON@DORCHESTERCOUNTYSC.GOV (EMAIL)

WWW.DORCHESTERCOUNTYSC.GOV

PROJECT MANAGER:

ARDURRA

CONTACT: YESIM YAZGAN, P.E.,

PROJECT MANAGER

4105 FABER PLACE DRIVE, SUITE 410

NORTH CHARLESTON, SC 29405

843-867-2027 (PHONE)

YYAZGAN@ARDURRA.COM (EMAIL)

WWW.ARDURRA.COM

ENGINEER OF RECORD:

ARDURRA

CONTACT: JASON SESLER, P.E.,

DESIGN ENGINEER

4105 FABER PLACE DRIVE, SUITE 410

NORTH CHARLESTON, SC 29405

843-867-2027 (PHONE)

JSESLER@ARDURRA.COM (EMAIL)

WWW.ARDURRA.COM

WATER/SEWER:

TOWN OF HARLEYVILLE

CONTACT: AMANDA CHILDERS

CLERK/TREASURER

TOWN OF HARLEYVILLE

843-462-7676 (PHONE)

AMANDA.HARLEYVILLE@YAHOO.COM (EMAIL)

SCDES:

CONTACT: DAGNY JACOBS

COASTAL STORMWATER PERMIT COORDINATOR

BUREAU OF WATER

843-953-0694 (PHONE)

DAGNY.JACOBS@DES.SC.GOV (EMAIL)

WWW.DES.SC..GOV

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION:

CONTACT: WADE GROOMS

ASSISTANT DISTRICT PERMIT ENGINEER (ADPE)

6355 FAIN ST, N CHARLESTON, SC 29406

843-277-4108 (PHONE)

GROOMSRW@SCDOT.ORG (EMAIL)

WWW.SCDOT.ORG

INDEX OF SHEETS

Sheet

Number Sheet Title

1 COVER

2 NOTES AND LEGEND

X1 1ST BEND ROAD SURVEY (BY OTHERS)

D1 1ST BEND ROAD DEMOLITION PLAN

RW1 1ST BEND ROAD ROADWAY PLAN AND PROFILE

S1 1ST BEND ROAD GRADING AND DRAINAGE PLAN

S2 1ST BEND ROAD GRADING XSEC

SD1 STORM STRUCTURAL DETAILS.

SD2 DRAINAGE DETAILS-SCDOT 1ST BEND RD

SD3 DRAINAGE DETAILS 1ST BEND RD

SD4 DRAINAGE DETAILS 1ST BEND RD

SD5 HEADWALL (HW-11) DETAILS

SD6 HEADWALL (HW-12-13) DETAILS

AD1 SITE DETAILS

U1 1ST BEND ROAD UTILITY PLAN & PROFILE

UD1 UTILITY DETAILS

UD2 UTILITY DETAILS

SEC1 1ST BEND ROAD SEDIMENT & EROSION CONTROL NOTES

SEC2 1ST BEND ROAD SEDIMENT AND EROSION CONTROL PLAN

SECD1 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD

SECD2 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD

SECD3 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD

SECD4 SEDIMENT AND EROSION CONTROL DETAILS 1ST BEND ROAD

P1 1ST BEND ROAD PLANTING PLAN

PD1 PLANTING DETAILS

TC1 1ST BEND ROAD TRAFFIC CONTROL NOTES

TC2 1ST BEND ROAD TRAFFIC CONTROL PLAN

TCD1 TRAFFIC CONTROL DETAILS 1ST BEND ROAD

TCD2 TRAFFIC CONTROL DETAILS 1ST BEND ROAD

DESIGNER CERTIFICATION

" I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN

DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT

RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I

CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE

DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48,

CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED,

PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN

ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000."

CEPSCI / SWPPP INSPECTIONS

THE CONTRACTOR IS RESPONSIBLE FOR ALL CEPSCI

(SWPPP) INSPECTIONS AND MAINTENANCE OF ALL

EROSION CONTROL MEASURES, PER THE PERMIT

REQUIREMENTS, FOR THE FULL DURATION OF THE

PROJECT THROUGH APPROVAL OF THE NOTICE OF

TERMINATION AND PROJECT CLOSEOUT.

10/10/2025

1. DORCHESTER COUNTY SHALL NOT MAINTAIN STORMWATER DETENTION OR RETENTION PONDS, OR DRAINAGE DITCHES AND SWALES. THE PROPERTY OWNER SHALL MAINTAIN ALL STORMWATER DETENTION FACILITIES SHOWN HEREON. THE OPERATING AND MAINTENANCE AGREEMENT WILL BE RECORDED WITH THE DORCHESTER COUNTY REGISTER OF DEEDS.

2. AN “AS-BUILT” PLAN CERTIFIED THAT THE FACILITIES HAVE BEEN CONSTRUCTED AS SHOWN AND THAT THE FACILITY MEETS THE APPROVED STORM WATER PLAN AND SPECIFICATION OR ACHIEVES THE FUNCTION FOR WHICH THEY WERE DESIGNED, SHALL BE SUBMITTED PRIOR TO: THE USE OR OCCUPANCY OF ANY COMMERCIAL OR INDUSTRIAL SITE, FINAL ACCEPTANCE OF ANY ROAD INTO THE OFFICIAL COUNTY ROAD INVENTORY, RELEASE OF ANY FINANCIAL GUARANTEES HELD BY THE COUNTY, AND/OR APPROVAL AND/OR ACCEPTANCE FOR RECORDING OF MAPS, PLATS, OR DRAWINGS, THE INTENT OF WHICH

IS TO CAUSE A DIVISION OF A SINGLE PARCEL OF LAND INTO TWO OR MORE PARCELS

3. A CERTIFIED STORMWATER AS-BUILT MUST BE SUBMITTED TO DCPW PRIOR TO LETTER OF OCCUPANCY, CLOSEOUT

PACKAGE, AND TO SCDES PRIOR TO RECEIVING A NOTICE OF TERMINATION.

4. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING

CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE.

5. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK

HAS CEASED, EXCEPT AS STATED BELOW:

A. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS

STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE.

B. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE

INITIATED ON THAT PORTION OF THE SITE.

6. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP

WITHIN 48 HOURS OF IDENTIFICATION.

7. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED.

IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE

BEING PUMPED BACK INTO ANY WATERS OF THE STATE.

8. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION.

ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.

9. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM

PAVEMENT, AS MAY BE REQUIRED.

10. SWPPP SHOULD INCLUDE A CONCRETE WASHOUT STAGING AREA FOR SITE AND BUILDING CONSTRUCTION AND ALL OTHER

PURPOSES OF THE DEVELOPMENT TO INCLUDE BUT NOT BE LIMITED TO PAINTERS.

11. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C. REG. 72-300 ET SEQ. AND SCR100000.

12. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE

OUTLETS.

13. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF

SILT FENCE AND ALL WOS.

14. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES.

15. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF

CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED.

16. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.

17. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.

18. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES

EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE;

19. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES

ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).

20. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:

A. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;

B. WASTEWATER FROM WASHOUT AND CLEANOUTS OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND

OTHER CONSTRUCTION MATERIALS;

C. FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND

D. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.

21. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION

SITE.

22. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC'S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS

REASONABLY POSSIBLE.

23. THE PROJECT/SITE MUST BE BUILT ACCORDING TO APPROVED COUNTY AND SCDES PLANS UNLESS SWPPP DOCUMENTS ARE UPDATED BY THE ORIGINAL SWPPP PREPARER, OTHERWISE PERMITS AND APPROVALS WILL BE INVALIDATED.

24. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.

GENERAL NOTES

1. REFERENCE IS MADE TO THE FOLLOWING:

A. TOPOGRAPHIC SURVEY FOR FIRST BEND ROAD PERFORMED BY CORNERSTONE SURVEYING & ENGINEERING INC, DATED 07/2024; REVISED 07/29/2024.

B. GEOTECHINAL EVALUATION PREPARED FOR WK DICKSON BY ECS SOUTHEAST, LLC. DATED 05/23/2025.

2. ALL ELEVATIONS SHOWN REFER TO NAVD 88 DATUM.

3. HORIZONTAL COORDINATES REFER TO NAD 83 SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM.

4. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. VERIFY ALL FIELD CONDITIONS AND THE EXACT LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING DEMOLITION AND CONSTRUCTION. IF CONDITIONS ARE DIFFERENT FROM THAT SHOWN ON THE PLANS, STOP IMPACTED WORK, NOTIFY THE

ENGINEER, AND UPDATE WORKPLAN ACCORDINGLY WITH THE ENGINEER.

5. ALL WORK FOR THE PROJECT SHALL CONFORM TO THE PROJECT SPECIFICATIONS FOUND IN THE PROJECT MANUAL

(CONTRACT DOCUMENTS AND SPECIFICATIONS).

6. CONTRACTOR IS RESPONSIBLE FOR THE LAYOUT AND STAKING OF THE PROPOSED SITE AND LIMITS OF WORK.

7. ALL WATER MAIN AND SANITARY SEWER RELOCATION WORK SHALL BE PERFORMED PER DORCHESTER COUNTY STANDARDS

AND REQUIREMENTS.

8. ANY UTILITIES OR FACILITIES DAMAGED DURING THE PROJECT BY THE CONTRACTOR'S PERSONNEL OR EQUIPMENT SHALL BE PROMPTLY REPAIRED AT THE CONTRACTOR'S EXPENSE. HAND DIGGING TO PROTECT UTILITIES FROM DAMAGE SHOULD

BE ANTICIPATED.

9. THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING WORK IN ACCORDANCE WITH THE LATEST REQUIREMENTS AND

REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).

10. ALL DEMOLITION DEBRIS, INCLUDING CLEARING AND GRUBBING SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH ALL

LOCAL, STATE AND FEDERAL REGULATIONS AND SPECIFICATIONS, LATEST REVISION.

11. PROMPTLY INFORM THE ENGINEER OF ANY ERROR OR DISCREPANCIES DISCOVERED IN THE DRAWINGS OR SPECIFICATIONS OR CONFLICTS BETWEEN THE DRAWING AND SPECIFICATIONS IN ORDER FOR CORRECTIONS TO BE MADE.

12. ALL WORK AND MATERIALS MUST CONFORM WITH DORCHESTER COUNTY AND SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES (SCDES) REGULATIONS AND SPECIFICATIONS, LATEST REVISIONS AT THE BEGINNING OF

CONSTRUCTION.

13. KEEP ALL ADJACENT AREAS TO THE LIMITS OF WORK CLEAN AND FREE OF DEBRIS/MATERIALS/EQUIPMENT AT ALL TIMES.

14. CONTRACTOR RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL OF ALL TRAFFIC CONTROL PLANS AND LAYOUT AS

REQUIRED FOR THE DURATION OF THE PROJECT.

15. ANY POSSIBLE STOCKPILES, OFFSITE MATERIAL, WASTE, BORROW, OR CONSTRUCTION EQUIPMENT STORAGE / LAYDOWN

AREAS SHALL BE LOCATED WITHIN THE LIMITS OF DISTURBANCE.

16. THE CONCRETE WASHOUT SHALL BE LOCATED WITHIN THE LIMITS OF DISTURBANCE.

17. ALL ASPECTS OF CONSTRUCTION WILL MEET OR EXCEED THE REQUIREMENTS OF THE DORCHESTER COUNTY STORMWATER

MANAGMENT DESIGN MANUAL LATEST EDITION, UNLESS OTHERWISE NOTED.

18. THE CONTRACTOR SHALL NOTIFY "SC811" AT 1-888-721-7877 AT LEAST FIVE (5) WORKING DAYS PRIOR TO ANY EXCAVATION

WORK BEING DONE.

19. PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES, PHOTOGRAPHS OF THE PROPOSED WORK AREA AND ACCESS SHALL

BE TAKEN.

20. EXISTING AND PROPOSED WATER AND SEWER ARE PUBLIC UTILITIES.

21. THE CONTRACTOR SHALL EXERCISE CARE IN ALL ACTIVITIES INVOLVING EITHER CUT AND FILL OR GRADING IN THE VICINITY OF TREES AND WETLANDS THAT ARE TO REMAIN. ALL EARTH CUTS AND ACTIVITIES IN THE VICINITY OF TREES TO REMAIN SHALL BE MADE IN A MANNER THAT MINIMIZES DISTURBANCES IN OR AROUND THE CRITICAL ROOT ZONE OR WITHIN THE DRIPLINE OF THE TREE. TREE PROTECTION BARRICADE SHALL BE INSTALLED AROUND THE PERIMETER OF THE CRITICAL ROOT ZONE PRIOR TO CONSTRUCTION. THE LOCATION OF THE TREE PROTECTION BARRICADE SHALL BE APPROVED BY THE

ENGINEER OR THEIR REPRESENTATIVE PRIOR TO CONSTRUCTION.

22. ALL NORTH ARROWS REFERENCE GRID NORTH.

GRADING AND EROSION CONTROL NOTES:

1. EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED PRIOR TO INSTALLATION OF ANY NEW PIPE LINES OR GRADING

OPERATIONS.

2. WHEN GRADING BETWEEN CONTOURS AND BETWEEN POINTS OF SPOT ELEVATIONS, GRADE ON A UNIFORM SLOPE.

PROPOSED GRADES SHOWN ARE FINAL SURFACE ELEVATIONS.

3. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE ON ALL FINISHED GRADE SURFACES.

4. EACH SECTION OF STORM DRAINAGE PIPE SHALL BE LAID TO SPECIFIED GRADE AND LAID UPGRADE.

5. ALL VEGETATION TOPSOIL SHALL BE STRIPPED AND STOCKPILED PRIOR TO PLACING FILL, PROTECT STOCKPILE FROM

EROSION.

6. CONTRACTOR SHALL, FOR ALL GRASSED AREAS, BE RESPONSIBLE FOR REPLACING ERODED SOIL AND GRASS SEED UNTIL

AN APPROVED STAND OF GRASS IS ESTABLISHED.

7. PROPOSED FILL SOILS SHALL BE SUITABLE MATERIAL AND FREE OF ORGANIC MATERIAL, RUBBLE, DEBRIS, AND HIGHLY

PLASTIC CLAYS OR SILTS.

8. REMOVE ALL ORGANIC AND UNSUITABLE MATERIAL (MUCK AND/OR NON-COMPACTABLE MATERIAL) FROM AREAS TO BE

FILLED.

9. CONTRACTOR SHALL, BEFORE BEGINNING GRADING WORK ON SITE, STAKE SILT FENCE AND INSTALL ALL PERIMETER

EROSION CONTROLS AS SHOWN IN THESE PLANS.

10. CONTRACTOR SHALL BE AWARE OF EXISTING UTILITY LINES DURING PIPE LINE INSTALLATION. CONTRACTOR SHALL NOTIFY UTILITY COMPANIES SUCH AS THE LOCAL ELECTRIC COMPANY, AT&T, COMCAST, ETC. FOR LOCATION OF OTHER UTILITIES NOT SHOWN ON PLAN. CALL PALMETTO UTILITIES PROTECTION SERVICES (SC811) FOR UNDERGROUND UTILITY LINES LOCATION. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.

11. ALL NEWLY CONSTRUCTED SLOPES WHICH ARE STEEPER THAN OR EQUAL TO 2.5 TO 1 MUST BE STABILIZED BY INSTALLATION OF EROSION CONTROL MATTING. OTHER AREAS SUCH AS CHANNEL BOTTOMS, CHANNEL SIDE SLOPES, AND SLOPES NEAR SENSITIVE WETLAND AREAS MAY ALSO REQUIRE EROSION CONTROL MATTING WHERE SHOWN ON PLANS.

EQUAL PRODUCTS MUST BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.

12. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES AS MAY BE REQUIRED TO CONTROL SOIL EROSION DURING CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER

THE SITE IMPROVEMENTS ARE COMPLETED.

13. DO NOT DISTURB LAND OUTSIDE OF THE LIMITS OF WORK AS SHOWN IN THE CONTRACT DOCUMENTS. ANY AREAS OUTSIDE OF THE LIMITS OF WORK THAT ARE DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE SEEDED AT NO ADDITIONAL

EXPENSE TO THE OWNER.

14. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG-TERM EROSION PROTECTION MEASURES OR STRUCTURES AS

SOON AS PRACTICAL IN THE DEVELOPMENT PROCESS.

15. ALL DISTURBED AREAS NOT PAVED SHALL BE GRASSED OR LANDSCAPED. USE TEMPORARY PLANT COVER, MULCHING, AND/OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREA SUBJECT TO EROSION DURING CONSTRUCTION.

16. ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24-HOUR PERIOD. MAINTENANCE OF SEDIMENT TRAPPING DEVICES SHALL BE PERFORMED AS NECESSARY PER THESE INSPECTIONS. DAMAGED OR INEFFECTIVE

DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY.

17. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION TO CONTROL EROSION AND/OR OFF SITE SEDIMENTATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE STABILITY OF ALL GRADED AND/OR CLEARED AREAS UNTIL PERMANENT GROUND COVER IS ESTABLISHED. ANY AREAS DAMAGED BY EROSION SHALL BE REPAIRED TO ITS ORIGINAL CONDITION AND PROTECTED FROM FURTHER EROSION AT NO ADDITIONAL COST TO THE OWNER.

18. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ALL TEMPORARY

CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETED AND THE SITE STABILIZED.

19. ALL EROSION CONTROL METHODS SHALL BE IN ACCORDANCE WITH "SCDES STORM WATER MANAGEMENT & SEDIMENT

CONTROL BMP HANDBOOK FOR LAND DISTURBANCE ACTIVITY".

20. ALL DISTURBED AREAS, INCLUDING THE CONTRACTORS STAGING AREA, HAUL ROUTES, GRADING LIMITS, ETC., SHALL BE RESTORED TO A SMOOTH LINE AND GRADE WITH POSITIVE DRAINAGE. THE CONTRACTOR SHALL PERMANENTLY SEED ALL

DISTURBED AREAS.

21. CONTRACTORS ARE REQUIRED TO HAVE RAIN GAUGES AT THE CONSTRUCTION SITE AND THE RAIN TOTALS DOCUMENTED

FOR REVIEW BY SCDES.

22. THE INSTALLATIONS OF UTILITIES (CABLE, ELECTRICAL, NATURAL GAS, WATER, SEWER, ETC.) ARE TO BE WITHIN THE PERMITTED LIMITS OF DISTURBANCE AND THAT INSTALLATION OUTSIDE OF THESE AREAS WILL REQUIRE A MODIFICATION TO

THE PERMIT.

23. THE STABILIZATION OF CONVEYANCE CHANNELS ARE TO BE COMPLETED WITHIN 7 DAYS OF CHANNEL CONSTRUCTION (IF

THERE ARE CHANNELS).

SCDOT NOTES & STATEMENTS:

SCDOT NOTES:

1. SCDOT STANDARD DRAWINGS HAVE BEEN INCLUDED IN THE PLAN SET;

HOWEVER, CONTRACTOR SHALL REFER TO THE MOST CURRENT EDITION OF THE

SCDOT STANDARD DRAWINGS.

SCDOT STATEMENTS:

1. THE PROJECT MEETS THE AUTOMATIC PERMIT COVERAGE PROVISIONS FOR

LAND DISTURBANCE FOUND IN SECTION 1.3.1.B OF THE SOUTH CAROLINA

DEPARTMENT OF ENVIRONMENTAL SERVICES (SCDES) NPDES CONSTRUCTION

GENERAL PERMIT; THEREFORE, SELF-INVOKING COVERAGE IS BEING PURSUED.

2. WATER QUALITY AND DRAINAGE CERTIFICATION STATEMENT:

ALL ITEMS IN SECTION 10D OF THE CURRENT ARMS MANUAL FOR BOTH

CONSTRUCTION AND POST CONSTRUCTION DESIGN HAVE BEEN STUDIED AND

ADDRESSED. ALL NECESSARY BMPs HAVE BEEN IMPLEMENTED FOR BOTH

PHASES (CONSTRUCTION AND POST-CONSTRUCTION) TO AVOID NEGATIVELY

IMPACTING IMPAIRED WATERS OF THE SCDOT SYSTEM AND/OR ITS DISCHARGES.

ALL REQUIREMENTS IN SECTION 10B OF THE CURRENT ARMS MANUAL FOR POST

DEVELEPMENT RELEASE RATES HAVE BEEN MET.

3. THERE WILL BE ZERO RELEASE TO THE SCDOT RIGHT-OF-WAY.

4. PROPOSED PIPE BEDDING DESIGN WILL ACCOMMODATE THE PROPOSED PIPE

AND HEADWALLS.

5. THE HEADWALLS MEET THE CLEAR ZONE REQUIREMENT.

6. THE 25-YR POST DEVELOPMENT HGL IS BEING IMPROVED OVER THE

PRE-DEVELOPMENT 25-YR HGL.

5-FOOT CONTOUR

1-FOOT CONTOUR

STORM DRAINAGE PIPE

RIP RAP

STORM DRAINAGE STRUCTURE

TREE LINE

ROADWAY SIGN

SANITARY SEWER GRAVITY LINESS

SANITARY SEWER MANHOLE

POWER/UTILITY POLE

OVERHEAD UTILITY LINE

WATER LINE

MAIL BOX

WATER VALVE

FIRE HYDRANT

LEGEND

PROPOSEDEXISTING

LIMITS OF DISTURBANCE LOD

PROPERTY LINE

ORDINARY HIGH WATER MARK

FENCE LINE

RIGHT-OF-WAY

CONCRETE PAVEMENT

ROADWAY CENTERLINE

ASPHALT PAVEMENT

CONCRETE CURB AND GUTTER REMOVAL

STORM DRAINAGE REMOVAL

18" RCP

FULL DEPTH MILLING

SS

W

OHW

R/W

X

N O

TE

S

A N

D L

E G

E N

D

CUSTOM HEADWALL

TEMPORARY CONSTRUCTION EASEMENT TCE

CLEARING AND GRUBBING

SEDIMENT DEPOSIT REMOVAL LIMITS

UNDERGROUND UTILITY LINEUT

STORM DRAINAGE EASEMENTSDE

OHW OHW

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ C

O V

E R

N

O

TE

S .d w gZ

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ C

O V

E R

N

O

TE

S .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:5

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

WWW.WKDICKSON.COM

PROFESSIONAL SEAL FOR

SCDOT STATEMENTS

DORCHESTER COUNTY EROSION AND SEDIMENT CONTROL NOTES:

DEED BK./PG.: 14357/053

PLAT BK./PG.: 21/161

T.M.S. #036-12-04-004

STEVEN GRIFFITH

PROPERTY OF

& JILL M. GRIFFITH

DEED BK./PG.: 4135/147

PLAT BK./PG.: K/100

T.M.S. #036-00-00-071

C. S. CARTER

PROPERTY OF

DEED BK./PG.: 7430/001

PLAT BK./PG.: 4/117

T.M.S. #036-00-00-063

MILLIFORD BAKER

PROPERTY OF

& PEARLE-LIFE & ROY WOOD

SD

xSD x

S D x

EX SSMH-1

RIM: 81.94

INV IN: 73.16 (6" SW)

INV OUT: 73.33 (6" NW)

EX SSMH-2

RIM: 82.80

INV OUT: 73.00 (6" NE)

W

W

78 80

80 7878 79

7778747475

787979

77 78

797777

78 7978

80 80

80 80

80 7982

81 80

W

W

W

W

W

O

HW

O

HW

O

HW

OHW

OHWOHW

OHW

OHW

OH

W

O

HW

O

HW

OHW

OHW

OH

W

O

HW

O

HW

OHW

OHW

O H

W

OHW

OHW

OHW

OHW

OHW

OHW

O

HW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OH

WOHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D LO

D

LO

D LO

D

LO

D

LOD

LOD

EXISTING TOP OF CHANNEL BANK

EXISTING TOP OF CHANNEL BANK

LITTLE WALNUT BRANCH

LITTLE WALNUT BRANCH

SD

xSD x

S D x

EX. 36" RCP TO NOT BE DISTURBED

50 LF EX. 36" RCP

TO BE REMOVED

25 LF EX 18" CPP

TO BE REMOVED

56 LF EX. 30" CPP

TO BE REMOVED

46 LF EX. 36" RCP

TO BE REMOVED

EX. UTILITY TO BE

RELOCATED. CONTRACTOR TO

COORDINATE RELOCATION WITH

UTILITY PROVIDER.

EX. ROAD SIGN TO BE REPLACED

305 SY OF FULL DEPTH ASPHALT

PAVEMENT REPAIR WITHIN

TRENCHING LIMITS

PER DETAIL 1/AD1

MILL & RESURFACE 52 SY

PAVEMENT PER DETAIL 2/AD1

EXISTING WOODED AREA AND

VEGETATION SHALL BE CLEARED

AND GRUBBED (SHADED AREA)

MILL & RESURFACE 42 SY

PAVEMENT PER DETAIL 2/AD1

MILL & RESURFACE 20 SY

PAVEMENT PER DETAIL 2/AD1

EX. 2" WATER LINE W/ 4"

CASING TO BE

REMOVED AND

RELOCATED

EX. SANITARY MH TO BE

PROTECTED DURING

CONSTRUCTION

19 LF EX. 15" POLY TO

BE REMOVED.

25 LF EX. 15" POLY

TO BE REMOVED

20 LF EX. 6" CLAY SANITARY LINE

TO BE REMOVED

EX. (2)WATER VALVES TO BE

REMOVED

EX. OVERHEAD ELECTRIC LINE TO BE

PROTECTED DURING CONSTRUCTION

EX. WATER VALVE MONUMENTS

TO BE REMOVED AND RETURNED

TO DORCHESTER COUNTY

EX. GATE

REGRADE CHANNEL PER

GRADING PLAN S1 (TYP)

REMOVE APPROX. 2 CY (AREA:

67 SQ FT; 4 LF STREAM IMPACTS)

DEBRIS, STONE MATERIAL AND

VEGETATION WITHIN MAIN

CHANNEL

PROTECT EXISTING

UTILITY POLE

REMOVE APPROX. 4 CY (AREA:

220 SQ FT; 36 LF STREAM

IMPACTS) SEDIMENT DEPOSITS

WITHIN MAIN CHANNEL

35+00

36+00

37+00

38+00

REMOVE DEBRIS, STONE

MATERIAL AND VEGETATION

WITHIN MAIN CHANNEL

EX. OVERHEAD ELECTRIC LINE TO BE

PROTECTED DURING CONSTRUCTION

REMOVE APPROX. 4 CY (AREA:

164 SQ FT; 30 LF STREAM

IMPACTS) DEBRIS, STONE

MATERIAL AND VEGETATION

WITHIN MAIN CHANNEL

REMOVE APPROX. 21 CY

(AREA:555 SQ FT; 45 LF STREAM

IMPACTS) SEDIMENT DEPOSITS

WITHIN MAIN CHANNEL

IMPACT B:

391 SF, 0.0090 AC, 31 LF

IMPACT B:

164 SF, 0.0038 AC, 14 LF

*PER THE 03-14-2025 PRE-APPLICATION

MEETING, IMPACTS WITHIN 30'

UPSTREAM AND DOWNSTREAM OF

CULVERT REPLACEMENT DO NOT NEED

TO BE REPORTED

IMPACT A:

164 SF, 0.0038 AC, 30 LF

*PER THE 03-14-2025 PRE-APPLICATION

MEETING, IMPACTS WITHIN 30'

UPSTREAM AND DOWNSTREAM OF

CULVERT REPLACEMENT DO NOT NEED

TO BE REPORTED

IMPACT A:

67 SF, 0.0015AC, 4 LF

EX. WATER VALVE TO BE

REMOVED AND REPLACED

EX. 77 LF OF 6" WATER

LINE TO BE REMOVED

AND RELOCATED

25 LF EX. 15" POLY

TO BE REMOVED

D1

1S T

B E

N D

R O

A D

D E

M O

LI

TI

O N

P

LA

N

GENERAL NOTES:

1. SEE DRAINAGE PLAN AND PROFILE SHEETS FOR PROPOSED STORMWATER

DRAINAGE PLAN.

2. ALL DEBRIS SHALL BE DISPOSED OF OFF-SITE AT AN APPROPRIATE FACILITY.

3. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE TO APPROPRIATE EROSION

CONTROL MEASURES THROUGHOUT ALL PHASES OF DEMOLITION.

4. ALL PAVEMENT/CONCRETE CUTS SHALL BE DONE BY SAW CUTTING

5. FINAL MILL AND OVERLAY SHALL BE 5' ON EACH SIDE OF ROAD CUT AND EXTEND

THE FULL LANE WIDTH. IF CUT ENCROACHES ON MORE THAN ONE LANE, THEN FINAL

MILL AND OVERLAY WILL EXTEND THE FULL WIDTH OF SECOND LANE. IF ROAD CUT

IS IN THE INTERSECTION, THE ENTIRE INTERSECTION SHALL BE MILLED AND

OVERLAID RADIUS TO RADIUS.

CLEARING AND

GRUBBING

SHEET LEGEND

LIMITIS OF SEDIMENTS

DEPOSIT REMOVAL

AREA

STORM PIPE REMOVAL

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ D

E M

O .d w gZ

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ D

E M

O .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:1

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

FO

R

P E

R M

IT

TI

N G

-N O

T

FO

R C

O N

S

TR

U C

TI

O

N

YY

JS

JMQ

JUL 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

WWW.WKDICKSON.COM

DEED BK./PG.: 14357/053

PLAT BK./PG.: 21/161

T.M.S. #036-12-04-004

STEVEN GRIFFITH

PROPERTY OF

& JILL M. GRIFFITH

DEED BK./PG.: 7430/001

PLAT BK./PG.: 4/117

T.M.S. #036-00-00-063

MILLIFORD BAKER

PROPERTY OF

& PEARLE-LIFE & ROY W

OOD

S D x

S D x

SDx

S S x

S S x

S S x

S S x

SSx SSx

SSx

W W

777880

787879

807979 80

79 78

8078 79 77 7875

8077 78

787980

80 81

80 7879

W W

W W

W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

LOD

LO

D

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LODLODLODLODLOD

LO

D

LO

D

LOD

LO

D

LOD

LOD

LOD LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD LOD

LODLOD

LO

D

LO

D

LITTLE W

ALNUT BRANCH

LITTLE W

ALNUT BRANCH

TC

E

TCE

TC

E

TCE

TCE

TC

E

TC

E

TCE

TCE

2+74.36

-0+00

1+00 2+00

SSx SSx

SSx

SDx

EX. 2" WATERLINE W/ 4"

CASING PIPE TO BE

REMOVED AND RELOCATED

EX SSMH-2

1+00

1+49.09

EX. FH

PROP. 6" DIP SEWER LINE

S D x

S D x

SDx

+0

+0

+0

D

YH

0+

1+00

2+00 2+02.41

2+

.0

1+00

2+00

W

0+

1+

W

W

INSTALL GUARDRAIL ON TOP OF CULVERT.

SEE NOTE 5

EX SSMH-1

PROP. 6" DIP

WATERLINE

SEE SHEET U1

PROP. 4" DIP

WATERLINE

SEE SHEET U1

PROP. 50 LF 60" RCP

CULVERT (1' BURIED) PROP. 50 LF 60" RCP

CULVERT (1' BURIED)

PROP. 59 LF 54" RCP

CULVERT (1' BURIED)

PROP. 16 LF 15" RCP

PROP. 23 LF 15" RCP

PROP. 25 LF 18" RCP

EX. 36" RCP

TO BE REMOVED

EX. 15" POLY PIPE

TO BE REMOVED

EX. 15" POLY PIPE

TO BE REMOVED

EX. 18" CPP

TO REMOVED

EX. 36" RCP

EX. 36" RCP

TO BE REMOVED

EX. 30" CPP

TO BE REMOVED

HW-12

HW-13

HW-11

SECTION A-A'

SECTION B-B'

EX. 6" CLAY

SANITARY PIPE

TO NOT BE DISTURBED

EX. 6" CLAY SANITARY

SECTION A-A' OF 1st BEND ROAD

-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00

EX. 6" CLAY SANITARY SEWER PIPE

STA: 0+92

TO REMAIN AND BE PROTECTED

.2

.2

.1

.1

1.

.9

1.

.8

1.

.8

1.

.7

EX. 36" RCP PIPE

STA: 1+62

TO BE REMOVED

EX. 36" RCP PIPE

STA: 1+55

TO BE REMOVED 3.62'

PROP 60" CULVERT

(1' BURIED)

STA: 1+56.35

PROP 60" CULVERT

(1' BURIED)

STA: 1+64.47

3.29'

ST

A

0+

.0

EL

EV

2.

ST

A

0+

.2

EL

EV

2.

ST

A

1+

.2

EL

EV

1.

ST

A

2+

.3

EL

EV

1.

PROP 54" CULVERT

(1' BURIED)

STA: 1+23.85

SECTION B-B' OF HILTON STREET

-0+25 0+00 0+50 1+00 1+50 1+75

1.

.7

1.

.5

EX. 30" CPP PIPE

STA: 1+20

TO BE REMOVED

ST

A

0+

.4

EL

EV

1.

ST

A

1+

.5

EL

EV

1.

ST

A

1+

.9

EL

EV

1.

PROP 54" CULVERT

(1' BURIED)

STA: 1+48.58

PROP. 4" DIP WATERLINE

RW1

1S T

B E

N D

R O

A D

R O

A D

W A

Y P

LA

N

A N

D P

R O

FI

LE

NOTES:

1. REFER TO SHEET S1 FOR PROFILES OF PROPOSED CULVERTS.

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ R

W A

Y -S

IT

E

.d w gZ :\P ro je ct s\

D or ch es te r

C ou nt y\

C

H

R ic e M ill D riv e

D ra in ag e\ C

A D

D \P la n

S et

\S he et s\

.0 0.

C H

-R ic eM ill

_C _S

H T_

R W

A Y

-S

IT

E .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:1

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

SD

x SD x

S D x

EX SSMH-1

RIM: 81.94

INV IN: 73.16 (6" SW)

INV OUT: 73.33 (6" NW)

W

W

W

W

W

W

W

O

HW

O

HW

O

HW

OHW

OHW OHW

OHW

OHW

OHW

O

HW

O

HW

OHW

OHW

OHW

O

HW

O

HW

OHW

OHW

O H

W

OHW

OHW

OHW

OHW

OHW

OHW

O

HW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SD

x SD x

S D x

DY

H

0+00

1+

2+

2+

.41

2+95.01

2+

W

0+00

1+00

2+00

W

WSD

x SD x

S D x

35+00

36+00

37+00

38+00

LO

D

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

DLO

D

LO

DLO

D

LO

D

LOD

LOD

LIT

TLE WALN

UT BRANCH

LIT

TLE WALN

UT BRANCH

TCE TCE

TCE

TC

E

TC

E

TC

E

TCE

TCE

TCE

TCE

TCE

TCE

PROPERTY OF

MILLIFORD BAKER

& PEARLE-LIFE & ROY WOOD

DEED BK./PG.: 7430/001

PLAT BK./PG.: 4/117

T.M.S. #036-00-00-063

T.M.S. #036-00-00-071

DEED BK./PG.: 4135/147

PLAT BK./PG.: K/100

C. S. CARTER

PROPERTY OF T.M.S. #036-12-04-004

PLAT BK./PG.: 21/161

DEED BK./PG.: 14357/053

& JILL M. GRIFFITH

STEVEN GRIFFITH

PROPERTY OF

PROP. 20 LF 6" DIP

SANITARY SEWER LINE

HW-12

HW-11

HW-13

PROP. 30 LF (AREA: 288 SQ FT

STREAM IMPACTS) RIFFLE

GRADE CONTROL STRUCTURE

SEE DETAIL 1/SD4

+3

+3

+1

+1

PROP. 40 LF (AREA: 285 SQ FT

STREAM IMPACTS) RIFFLE

GRADE CONTROL STRUCTURE

SEE DETAIL 1/SD4

SEE SHEET S2 FOR

CROSS SECTIONS

PROP. 45 LF (AREA: 650 SQ FT

STREAM IMPACTS) RIFFLE

GRADE CONTROL STRUCTURE

SEE DETAIL 1/SD4 79

79 77

APPROX. OHWM

80 79

2+

.41

0+00 1+

2+

1+10

1+10

PROP. 13 SY (AREA: 72 SQ FT; VOLUME:

108 CF; 26 LF STREAM IMPACTS) CLASS

B RIP RAP FROM RIFFLE TO HEADWALL

AND ALONG SLOPES UP TO ELEV. 76'

SEE SCDOT DETAIL 804-310-00/SD2

PROP. 4 SY CLASS B RIP

RAP FROM RIFFLE TO

HEADWALL ALONG SLOPES

PROP. 3 SY (AREA: 8 SQ FT; VOLUME:

12 CF; 10 LF STREAM IMPACTS)

CLASS B RIP RAP FROM RIFFLE

ALONG SLOPES UP TO ELEV. 76'

SEE SCDOT DETAIL 804-310-00/SD2

PROP. REALIGNMENT OF

1ST BEND ROAD DITCH

EX. FH.

REMOVE APPROX. 21 CY (AREA:

555 SQ FT; 45 LF STREAM

IMPACTS) SEDIMENT DEPOSITS

WITHIN MAIN CHANNEL

REMOVE APPROX. 4 CY (AREA:

220 SQ FT; 36 LF STREAM

IMPACTS) SEDIMENT DEPOSITS

WITHIN MAIN CHANNEL

PROP. 3 SY CLASS B RIP

RAP FROM RIFFLE ALONG

SLOPES UP TO ELEV. 76'

SEE SCDOT DETAIL

804-310-00/SD2

TEMPORARY

CONSTRUCTION

EASEMENT

TEMPORARY

CONSTRUCTION

EASEMENT

IMPACT C:

650 SF, 0.0149 AC, 45 LF

IMPACT A:

220 SF, 0.0050 AC, 36 LF

IMPACT B:

285 SF, 0.0065 AC, 40 LF

IMPACT D:

288 SF, 0.0066 AC, 30 LF

IMPACT E:

16 SF, 0.0004 AC, 10 LF

W

PROP. 7 SY CLASS

B RIP RAP

SEE SCDOT DETAIL

804-310-00/SD2

PROP. 6" DIP WATERLINE

SEE SHEET U1

EX. 2" WATERLINE

W/ 4" CASING PIPE

TO BE REMOVED AND RELOCATED

EX. 30" CPP TO

BE REMOVED

EX. 15" POLY PIPE

TO BE REMOVED

EX. 18" CPP

TO BE REMOVED

EX. 36" RCP

TO BE REMOVED

EX. 36" RCP

TO BE REMOVED

EX. 36" RCP

EX. 15" POLY PIPE

TO BE REMOVED

PROP. 16 LF 15" RCP

SEE PROFILE 4 SHEET S5

PROP. 50 LF 60" RCP

CULVERT (1' BURIED) @0.60%

PROP. 50 LF 60" RCP

CULVERT (1' BURIED) @0.60%

PROP. 25 LF 18" RCP

SEE PROFILE 5 SHEET S5

PROP. 23 LF 15" RCP

SEE PROFILE 3 SHEET S5

PROP. 59 LF 54" RCP

CULVERT (1' BURIED)

@3.55%

W

W PROP. 4" DIP WATERLINE

SEE SHEET U1

H: 1"=20' V: 1"=4'

LITTLE WALNUT BRANCH

35+50 35+75 36+00 36+25 36+50 36+75 37+00 37+25 37+50 37+75 38+00

PR

O

P.

H

W -1

W

/ W

IN

G W

AL

LS

ST

A:

7+

.1

IN

V

O U

T:

T

W

IN

2.

(6

0" S

E)

TO

P:

0.

EX. GRADE

EX. 50 LF 36" RCP

TO BE REMOVED

3.63' 2.94'

TWIN 50 LF 60" RCP

(1' BURIED) @ 0.60%

EX. 46 LF 36" RCP

TO BE REMOVED

PR

O

P.

H

W -1

W

/ W

IN

G W

AL

LS

ST

A:

6+

.9

IN

V

IN

: T

W

IN

2.

(6

0" N

W

TO

P:

0.

PROP. CHANNEL

ELEV 73.50

PROP. CHANNEL

ELEV 73.80

PROP GRADE

PROP. GRADE

PROP. CONCRETE BAFFLE

SEE DETAIL 1/SD1

RIFFLE GRADE

CONTROL SEE

DETAIL 1/ SD4

RIFFLE GRADE CONTROL

SEE DETAIL 1/ SD4

-2.16%

4:1 -11:1

21.00'

EX. TRAVEL LANE

5:1

R /W

R /W

R /W

R /W

R /W

R /W

66' RIGHT-OF-WAY

SEE SCDOT DETAIL

714-005-00/SD2 & DETAIL 1/SD3

FOR TRENCHING

17.90' 10.91'

PROP. 4" DIP W/ 10" STEEL CASING

25 YR HGL

H: 1"=20' V: 1"=4'

PROP. REALIGMENT HILTON STREET

-0+20 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00

59 LF 54" RCP

(1' BURIED) @ 3.55%

PR

O

P.

H

W -1

W

/ W

IN

G W

AL

LS

ST

A:

+3

3.

IN

V

IN

: 7

2.

(5 4"

W

TO

P:

0.

PR

O

P.

H

W -1

W

/ W

IN

G W

AL

LS

ST

A:

+9

2.

IN

V

O U

T:

4.

(5 4"

E

TO

P:

1.

EX. 36" RCP

1.98'

EX. 6" CLAY SANITARY SEWER PIPE

STA: 1+04 TO BE REMOVED

AND REPLACED WITH DIP

1.86'

EX. GRADE

PROP. CHANNEL

ELEV 73.50

PROP. CHANNEL

ELEV 75.60

3.46%

PROTECT PROP. 6" DIP

SEWER LINE

PROP. CONCRETE BAFFLE

SEE DETAIL 1/SD1

PROP. GRADE

RIFFLE GRADE CONTROL

SEE DETAIL 1/ SD4

RIFFLE GRADE CONTROL

SEE DETAIL 1/ SD4

4.18'

R /W

R /W

R /W

66' RIGHT-OF-WAY

R /W

R /W

R /W

34.00'

EX. TRAVEL LANE

4:1

PROP. GRADE

PROP. GRADE

SEE SCDOT DETAIL

714-005-00/SD2 & DETAIL 1/SD3

FOR TRENCHING

20.51' 4.63'

PROP. 6" DIP WATERLINE

W/ 12" STEEL CASING

25 YR HGL

S1

1S T

B E

N D

R O

A D

G R

A D

IN

G

A N

D D

R A

IN

A

G E

P

LA

N

NOTES:

1. CONTRACTOR SHALL VERIFY UTILITY SIZES, MATERIALS AND

LOCATION PRIOR TO ANY UTILITY WORK.

2. CONTRACTOR TO PROTECT EXISTING WATER LINE, SEWER LINE AND

OTHER UTILITIES DURING CULVERT CONSTRUCTION.

3. NOT ALL TREES SURVEYED/SHOWN. PLEASE REFER TO EROSION

CONTROL SHEETS FOR TREE REMOVAL.

4. CONTRACTOR TO SUBMIT SHOP DRAWINGS OF PRE-CAST DRAINAGE

STRUCTURES, SEALED BY AN ENGINEER LICENSED IN THE STATE OF

SOUTH CAROLINA.

5. UNLESS OTHERWISE INDICATED, ALL RCP PIPE SHALL BE MINIMUM

CLASS III WITH WATERTIGHT JOINTS PER ASTM C443. IN ADDITION,

ALL JOINTS SHALL BE WRAPPED WITH GEOTEXTILE FABRIC. REFER

TO DETAIL 2/SD3 AND SPECIFICATIONS.

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ G

R A

-S

TR

M .d w gZ

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ G

R A

-S

TR

M .d w g, J U

A N

Q , 1

0/

/2

8:

:0

A

M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

STA 36+30

STA 37+15

-25 -12 0 13 25

-25 -13 0 12 25

PROP. GRADE

EX. GROUND

EX. GROUND

EX. GROUND

PROP. GRADE

1:

M

AX

1:

M

AX

1:

M

AX

1:

M

AX

OHWMOHWM

STA 1+10

-13 0 13

OHWM

PROP. GRADE

1:

M

AX

1:

M

AX

H: 1"=10' V: 1"=2'

PROFILE 3

-0+25 0+00 0+50

H: 1"=10' V: 1"=2'

PROFILE 4

-0+25 0+00 0+50

H: 1"=10' V: 1"=2'

PROFILE 5

-0+25 0+00 0+50

PROP. 23 LF 15" RCP

@ 12.97%

PROP. 25 LF 18" RCP

@ 8.00%

PROP. 16 LF 15" RCP

@ 13.75%

INV: 74.00'

INV: 77.00'

INV: 74.75'

INV: 78.00'

INV: 75.00'

INV: 76.00'

CLASS B RIP RAP

SEE SCDOT DETAIL

804-310-00/SD2

HW-11

SEE DETAIL SHEET SD5

HW-11

SEE DETAIL SHEET SD5

EX. GROUND

EX. GROUND

EX. GROUND

SEE SCDOT DETAIL

714-005-00/SD2 & DETAIL 1/SD3

FOR TRENCHING

SEE SCDOT DETAIL

714-005-00/SD2 & DETAIL 1/SD3

FOR TRENCHING SEE SCDOT DETAIL

714-005-00/SD2 & DETAIL 1/SD3

FOR TRENCHING

S2

1S T

B E

N D

R O

A D

G R

A D

IN

G

X S

E C

NOTE:

ALL SECTION VIEWS LOOKING UPSLOPE

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ G

R A

-S

TR

M .d w gZ

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ G

R A

-S

TR

M .d w g, J U

A N

Q , 1

0/

/2

8:

:2

A

M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

SD1

S

TO

R M

S

TR

U C

TU

R

A L

D E

TA

IL

S

SPLICES

OPTIONAL WALL OR SLAB CONSTRUCTION JOINT

NOT TO SCALE

ISOLATION JOINT BETWEEN APRON AND CULVERT SLAB

NOT TO SCALE

WEEP HOLE SECTION

NOT TO SCALE

1.2

SD1

1.3

SD1

1.1

SD1

DEVELOPMENTAL LENGTH FOR STANDARD REINFORCING BARS

BAR SIZE (INCHES)

11 78 10 65 9 53 8 43 7 37 6 26 5 21 4 17 3 13

HOOK LEG

Ld

GENERAL STRUCTURAL NOTES:

I. FOUNDATIONS:

1. CONTRACTOR TO PROVIDE FOUNDATION DESIGN FOR ALLOWABLE SOIL BEARING PRESSURES AS STATED IN GEOTECHNICAL REPORT PREPARED BY ECS SOUTHEAST, LLC DATED 23 MAY 2025

II. STRUCTURAL CONCRETE:

1. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI, UNLESS NOTED OTHERWISE.

2. NORMAL-WEIGHT CONCRETE SHALL HAVE A MAXIMUM UNIT WEIGHT OF 145 PCF, UNLESS NOTED OTHERWISE.

3. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GR60, INCLUDING TIES AND STIRRUPS.

4. MINIMUM CONCRETE COVER SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE:

A) UNFORMED SURFACES IN CONTACT WITH THE GROUND.................................................................................................. 3" B) FORMED SURFACES EXPOSED TO EARTH OR WEATHER................................................................................................... 2" C) FORMED SURFACES NOT EXPOSED TO EARTH OR WEATHER........................................................................................... 1 1/2"

5. FINISHES SHALL CONFORM TO REQUIREMENTS OF ACI 301.

III. MISCELLANEOUS:

1. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH CIVIL DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH REQUIREMENTS INTO THEIR

SHOP DRAWINGS AND WORK.

2. NO OPENING SHALL BE MADE IN ANY STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL-ENGINEER-OF-RECORD.

3. NO CHANGE IN SIZE OR DIMENSION OF STRUCTURAL MEMBERS SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL-ENGINEER-OF-RECORD.

4. OPENINGS 1'-4" AND LESS ON A SIDE ARE GENERALLY NOT SHOWN ON THE STRUCTURAL DRAWINGS. REFER TO CIVIL DRAWINGS FOR SUCH OPENINGS.

5. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOADS APPLIED TO THE STRUCTURAL FRAMING. CONSTRUCTION LOADS SHALL NOT

EXCEED THE DESIGN CAPACITY OF THE FRAMING AT THE TIME THE LOADS ARE APPLIED.

6. DO NOT SCALE THESE DRAWINGS; USE DIMENSIONS.

7. ELEVATIONS OF TOP SLABS SHALL BE INTERPRETED AS PLUS OR MINUS WITH THE INTENT THAT THE CONTRACTOR WILL HAVE SOME FLEXIBILITY IN THE FIELD.

8. CONTRACTOR SHALL CONTACT TESTING AGENCY OR WK DICKSON (919-782-0495) TO CHECK REBAR PRIOR TO CONCRETE POUR.

GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS.

WEEPHOLES ARE TO BE CONSTRUCTED IN ALL HEADWALLS/WINGWALLS. WEEPHOLES SHOULD BE A MINIMUM OF 8' ON CENTER WITH A MINIMUM OF 1 WEEPHOLE PER WALL.

WEEPHOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR

THIS WORK.

REBAR DOWELS TO BE

IMBEDDED INTO RCP, SIZED AND

SPACED PER MANUFACTURES

RECOMMENDATION

6"

BAFFLE DETAIL

CONCRETE BAFFLE AT

CENTER OF CULVERT

RCP AND BAFFLE DETAIL

NOT TO SCALE

NOTE: CONCRETE BAFFLE TO

BE INSTALLED ON 54" & 60"

RCP BARREL

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ D

E

TA

IL

S

.d w gZ :\P ro je ct s\

D or ch es te r

C ou nt y\

C

H

R ic e M ill D riv e

D ra in ag e\ C

A D

D \P la n

S et

\S he et s\

.0 0.

C H

-R ic eM ill

_C _S

H T_

D E

TA

IL

S .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:3

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

SD2

D R

A

IN

A G

E D

E

TA

IL

S

-S C

D O

T 1S

T B

E N

D R

D

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ D

E

TA

IL

S

.d w gZ :\P ro je ct s\

D or ch es te r

C ou nt y\

C

H

R ic e M ill D riv e

D ra in ag e\ C

A D

D \P la n

S et

\S he et s\

.0 0.

C H

-R ic eM ill

_C _S

H T_

D E

TA

IL

S .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:4

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

NON-PLASTIC PIPE PLASTIC PIPE

FOR PLASTIC PIPE #57 STONE

TOTAL BEDDING THICKNESS

BACKFILL

INITIAL

BACKFILL

FINAL

PIPE #57 STONE

FOR NON-PLASTIC

PLASTIC PIPE

TRACER WIRE FOR

12" MIN. BEDDING THICKNESS

12"

OD

12"

D

MAX MAX

IDENTIFICATION TAPE

COMMON FILL

TYPICAL PAVEMENT

SECTION FOR PAVEMENT AREAS

BACKFILL AND FILL

12"

6"

6"

SD3

1 TRENCH FOR STORM DRAIN PIPE

NOT TO SCALE

FINISH GRADE/GRASS FOR

NON-PAVEMENT AREAS

12" MIN. BEDDING THICKNESS

BELOW PIPE FOR PLASTIC PIPE

#57 STONE WRAPPED IN

GEOTEXTILE FABRIC

(MIRAFI 140N OR APPROVED

EQUAL)

SD3

D R

A

IN

A G

E D

E

TA

IL

S

S

T B

E N

D R

D

SD3

2 CONCRETE PIPE JOINT DETAIL

NOT TO SCALE

3.0' MIN./18" MIN. EACH SIDE

A A

CONCRETE

PIPE SECTION

CONCRETE

PIPE SECTION

CONCRETE

PIPE SECTION

CONCRETE

PIPE SECTION

SECTION A-A

PLAN

CONCRETE PIPE JOINT (SEE

SPECIFICATIONS FOR REQUIRED

JOINT MATERIAL)

PROVIDE GEOTEXTILE FABRIC (MIRAFI

160N OR APPROVED EQUAL) AT EACH PIPE

JOINT. WRAP ENTIRE PIPE JOINT, OVERLAP

PIPE JOINT 18" MIN EACH SIDE OF JOINT,

AND OVERLAP GEOTEXTILE FABRIC MIN.

12" ALONG CIRCUMFERENCE. GEOTEXILE

FABRIC SHALL BE SECURED TO PIPE BY

STRAPS OR OTHER METHOD APPROVED

BY THE MANUFACTURER.

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ D

E

TA

IL

S

.d w gZ :\P ro je ct s\

D or ch es te r

C ou nt y\

C

H

R ic e M ill D riv e

D ra in ag e\ C

A D

D \P la n

S et

\S he et s\

.0 0.

C H

-R ic eM ill

_C _S

H T_

D E

TA

IL

S .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:4

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

WWW.WKDICKSON.COM

WRAPPED IN GEOTEXTILE

FABRIC (MIRAFI 140N OR

APPROVED EQUAL)

BOTTOM OF BANK

TOP OF BANK

GRAVEL SUBSTRATE

50 / 50 MIX OF IN SITU SOIL AND # 57 STONE

PLACED ONTOP AND COMPACTED INTO RIPRAP MIX GRADE CONTROL ROCK

50 / 50 MIX CLASS B / C RIP RAP

BO

TT

O M

W

ID

TH

W b

RIFFLE GRADE CONTROL - SECTION A-A

BANKFULL

ELEVATION

INVERT SET AT PROFILE

GRADE

GRAVEL SUBSTRATE

50 / 50 MIX OF IN SITU SOIL

AND # 57 STONE

10 OUNCE NON-WOVEN

GEOTEXTILE

FABRIC GRADE CONTROL

ROCK 50 / 50 MIX

CLASS B/C RIP RAP

2.5'

MIN.

0.25'

RIFFLE GRADE CONTROL - PROFILE B-B

1.0' MAX

TOP OF RIFFLE

(SEE PROFILE

FOR DESIGN ELEV.)

SLOPE VARIES

DESIGN BED

SURFACE

BOTTOM OF RIFFLE

(SEE PROFILE FOR

DESIGN ELEV.)

GRAVEL SUBSTRATE

50 / 50 MIX OF IN SITU SOIL

AND # 57 STONE

GRADE CONTROL ROCK

50 / 50 MIX CLASS B/ C RIP RAP

10 OUNCE NON-WOVEN

GEOTEXTILE

FABRIC

BANKFULL ELEVATION

2.5' MIN3.5' MIN

MATCH EXISTING

GROUND AT END OF

RIFFLE

NOT TO SCALE

BURIED RIFFLE GRADE CONTROL DETAIL

UNLESS SHOWN OTHERWISE WITH

RIPRAP FOR BANK STABILIZATION,

PROVIDE EROSION CONTROL

MATTING BOTH SIDES (SEE DETAIL

2/SECD3)

SD4

D R

A

IN

A G

E D

E

TA

IL

S

S

T B

E N

D R

D

TOP OF BANK

BOTTOM OF BANK

A

RIFFLE GRADE CONTROL - PLAN VIEW

LENGTH

B

A

B

20231200.00.CH

FI

LE

P A

TH

:Z

:\P ro je ct s\ D or ch es te r C ou nt y\

C H

R ic e

M ill

D riv e D ra in ag e\

C A

D D

\P la n S et \S he et s\

.0

0.

C

H -R ic eM ill _C

_S H

T_ D

E

TA

IL

S

.d w gZ :\P ro je ct s\

D or ch es te r

C ou nt y\

C

H

R ic e M ill D riv e

D ra in ag e\ C

A D

D \P la n

S et

\S he et s\

.0 0.

C H

-R ic eM ill

_C _S

H T_

D E

TA

IL

S .d w g, J S

E S

LE

R

, 1 0/

/2

8:

:5

A M

C O

P Y

R

IG

H T

, W

.K . D

IC

K

S O

N

C O

IN

C

A

LL

R

IG

H

TS

R E

S E

R V

E D

. T H

IS

D

R A

W

IN

G

IS

A N

IN

S

TR

U

M E

N T

O F

S E

R V

IC

E

A N

D S

H A

LL

R

E M

A

IN

T H

E P

R O

P E

R

TY

O F

TH

E

E N

G

IN

E E

R A

N D

S H

A

LL

N O

T B

E C

O P

IE

D

, R E

P R

O D

U C

E D

, P U

B

LI

S H

E D

, O R

U S

E D

IN

A

N Y

W A

Y W

IT

H

O U

T

TH

E E

X P

R E

S S

W R

IT

TE

N A

U

TH

O R

IZ

A

TI

O

N O

F

TH

E E

N G

IN

E

E R

. O N

LY

C

O P

IE

S

M A

R K

E D

W

IT

H A

N O

R

IG

IN

A

L S

IG

N

A

TU

R E

A N

D S

E A

L O

F

TH

E E

N G

IN

E

E R

S H

A

LL

B E

C O

N S

ID

E

R E

D V

A

LI

D , T

R U

E C

O P

IE

S

WKD PROJ. NO.:

P R

O

JE

C T

N A

M E

DRAWING NUMBER:

D R

A W

IN

G

T

IT

LE

C.O.A.

R E

V

IS

IO

N

R E

C O

R D

D E

S C

R

IP

TI

O

N B

Y D

A

TE

PROJ. DATE:

PROJ. MGR.:

DESIGN BY:

DRAWN BY:

N O community infrastructure consultants

PROFESSIONAL SEAL

1S T

B E

N D

R O

A D

D R

A

IN

A G

E

B

ID

D O

C U

M E

N

TS

N

O T

R E

LE

A

S E

D F

O R

C O

N S

TR

U

C

TI

O N

YY

JS

JMQ

OCT 2025

4105 FABER PLACE DRIVE

SUITE 410

NORTH CHARLESTON, SC 29405

(t) 843-416-5560

WWW.WKDICKSON.COM

CHANNEL DIMENSION AT RIFFLES

STRUCTURE

LENGTH

(LF)

BOTTOM WIDTH,

Wb (LF)

HW-11 45 20

HW-12 30 15

HW-13 40 8

ELEVATION

79.00' ±

ELEVATION

= 80.00' ±

DOWNSTREAM ELEVATION

NTS

2.00'

PROPOSED TWINS 60"

RCP CULVERT (1' BURIED)

INVERT ELEV. = 72.50'

PROPOSED 54" RCP

CULVERT (1' BURIED)

INVERT ELEV. = 72.50'

ELEVATION

=79.0' ±

PROPOSED 15" RCP PIPE

INV: 75.00'

PROPOSED 15" RCP PIPE

INV:…