Attachment_B-_Solution_Cost_Estimate.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- 0000034655
- Issued by
- California
About this file
The document is an Excel-based Cost Estimate Attachment (Attachment B) for a CDP Platform implementation, associated with CPUC RFI# 24ITC0680. The spreadsheet provides a comprehensive level of effort (LOE) and rough order of magnitude (ROM) cost estimation template for implementing and configuring a technology solution, with predefined size categories ranging from 0-500 person-hours (Small) to 3001-5000 person-hours (Jumbo). The template is structured to capture implementation costs, software/license expenses, training costs, and ongoing maintenance and operations (M&O) fees.
The cost estimate document includes sections for itemizing implementation labor, software licensing, training, and annual maintenance costs, with placeholders for specific cost entries. The template allows respondents to detail their proposed solution's financial breakdown across different implementation phases and ongoing support. While no specific dollar amounts are filled in, the document provides a standardized framework for vendors to comprehensively outline their pricing structure for the CDP Platform solution, enabling a structured and comparable cost evaluation process for the California Public Utilities Commission (CPUC) procurement effort.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_C_-_Respondent_Questionaire.docx | DOCX document | |
| RFI_24ITC0680_-_Communications_Data_Portal.pdf | ||
| Attachment_D_-_Process_Flows-As_Is.pptx | PPTX presentation | |
| Attachment_F_-_Requirements.xlsx | XLSX spreadsheet | |
| Attachment_A-_Letter_of_Interest.docx | DOCX document | |
| Attachment_E_-_Process_Flows-To_Be.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment F
| CDP Platform | |||||
| Level of Effort/Rough Order of Magnitude (LOE/ROM) | Implementation and Initial Configuration | ||||
| Check the appropriate LOE/ROM designation (all are expressed in terms of person-hours): | |||||
| Small | Medium | Large | Jumbo | Respondent Defined | |
| 0 - 500 | 501 - 1000 | 1001 - 3000 | 3001 - 5000 | Please enter LOE/ROM |
| Copy and insert additional lines as needed below. |
| Implementation and Initial Configuration Labor/Services/Fees |
| Major tasks to implement the CDP Solution. |
| Task | CDP Solution | Cost Estimate |
| Task | Data Migration | Cost Estimate |
TOTAL $ - 0
| Implementation and Initial Configuration Software/License | |||
| List the Software, and Licenses required, if any | |||
| Item | description | Cost Estimate | |
| Item | Cost Estimate | ||
| TOTAL | $ - 0 |
| Implementation and Initial Configuration Other | |||
| List training and other costs not captured above, if any | |||
| Item | Training | Cost Estimate | |
| Item | Other | Cost Estimate | |
| TOTAL | $ - 0 |
| Maintenance & Operations (M&O) | M&O | |||
| List the annual maintenance and support fees for software, and licenses | ||||
| Item | description | Cost Estimate | ||
| Item | Cost Estimate | |||
| TOTAL | $ - 0 |
Total Cost Option 2a - CDP Platform GRAND TOTAL $ - 0
Assumptions Used in Cost Estimate
CPUC RFI# 24ITC0680
Page &P of &N
Sheet1