Attachment B - Site Plan, Project #25-05-26-01.pdf
PDF 10 MB Posted
- Solicitation number
- 25-05-26-01
- Issued by
- Decatur County, Iowa
About this file
Attachment B is a site plan document for the Iowa Department of Natural Resources' Bell Branch WMA Spillway Repair project (Project #25-05-26-01) located in the Sugema Wildlife Unit of Davis County. The project scope involves armoring a pond emergency spillway by filling a washout with 600 tons of class D riprap, with all work to be completed as directed by the project engineer. The site plan provides an aerial map view with marked access routes via Lily Avenue and Lilac Avenue, enabling bidders to assess project logistics and material staging areas. The bid opening is scheduled for December 30, 2024 at 3:00 PM CST, with proposals due by January 9, 2025 at 3:00 PM CST. Bidders must submit physical proposals directly to the DNR and are explicitly prohibited from electronic submissions through the Iowa IMPACS system. Project Engineer Jason Kruse (515-250-3707, jason.kruse@dnr.iowa.gov) and Stephanie Graham (515-344-0055) are available to address bidder inquiries.
The procurement documents do not specify a budget range, award value, or set-aside designations for this infrastructure improvement project. No incumbent vendors or current contractors are identified in the available documentation. Interested contractors should possess civil construction experience in environmental infrastructure repair and erosion control, including capabilities in heavy materials transportation, earthwork, and specialized riprap installation. The project represents standard public works infrastructure work focused on maintaining the structural integrity of wildlife management area water control infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sugema Wildlife Unit Bell Branch WMA Spillway Repair
1000 ft
N
N Image © 2024 Airbus
Image © 2024 Airbus
Image © 2024 Airbus
Jason Kruse PolyLine
Jason Kruse Text Box Access Route
Jason Kruse Text Box Lily Ave.
Jason Kruse Text Box Lilac Ave.
Jason Kruse Callout Fill washout in emergency spillway with 600 tons class D riprap as directed by the engineer.