1284344-event.pdf
PDF 223 KB Posted
- Solicitation number
- 25-05-26-01
- Issued by
- Decatur County, Iowa
About this file
This is an Iowa Department of Natural Resources (DNR) Construction Request for Bid document for the Bell Branch WMA Spillway Repair project located in the Sugema Wildlife Unit, Davis County. The project involves armoring a pond emergency spillway with 600 tons of class "D" riprap. The bid opens on December 30, 2024 at 3:00 PM CST and closes on January 9, 2025 at 3:00 PM CST. The project engineer is Jason Kruse, who can be contacted at 515-250-3707 or jason.kruse@dnr.iowa.gov for bid package documentation, including bid proposals and plans.
Bidders must submit their proposals directly to the Department of Natural Resources following the submission instructions in the attached documents, and electronic submissions through the Iowa IMPACS system are not permitted. The bid package includes three key attachments: the main contract document, a site plan, and a location map. The project number is 25-05-26-01, and Stephanie Graham (515-344-0055) serves as an additional contact for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
30 December 2024
Bell Branch WMA Spillway Repair, Sugema Wildlife Unit, Davis County Bell Branch WMA Spillway Repair
30 December 2024
Open 12/30/2024 3:00 PM CST Type DNR Construction - Request for Bid Close 1/9/2025 3:00 PM CST Number 25-05-26-01 Currency US Dollar
Sealed Until 1/9/2025 3:00 PM CST
Contacts Stephanie Graham stephanie.graham@dnr.iowa.gov
Phone +1 515-344-0055
Commodity Codes None Added
30 December 202430 December 202430 December 202430 December 2024 mailto:stephanie.graham@dnr.iowa.gov
Do not upload bids or questions to this system. Follow the submission instructions in the attached document to ask questions and/or to submit a bid directly to the Department of Natural Resources. Do NOT submit proposals electronically to this system.
This project consists of armoring a pond emergency spillway with 600 tons of class "D" riprap.
For bid package documentation, including bid proposal and plans, please contact Jason Kruse at 515-250-3707 or jason.kruse@dnr.iowa.gov
PROJECT ENGINEER: Jason Kruse CONTACT: 515-250-3707 or jason.kruse@dnr.iowa.gov
BID CLOSING DATE AND TIME: 1/9/2025 AT 3:00 PM CST
*Bids must be submitted as per the General Information and Instructions to Bidder
Description
Buyer Attachments
1. Contract, Project #25-05-26-01, Bell Branch WMA Spillway Repair, Sugema Wildlife Unit, Davis Co.pdf
2. Attachment B - Site Plan, Project #25-05-26-01.pdf
3. Attachment C - Location Map, Project #25-05-26-01.pdf
30 December 202430 December 202430 December 2024 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjg0MzQ0LTE3NDM0NTkwMzRDb250cmFjdCBQcm9qZWN0ICMyNS0wNS0yNi0wMSBCZWxsIEJyYW5jaCBXTUEgU3BpbGx3YXkgUmVwYWlyIFN1Z2VtYSBXaWxkbGlmZSBVbml0IERhdmlzIENvLnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjg0MzQ0LTE3NDM0NjA0MTRBdHRhY2htZW50IEIgLSBTaXRlIFBsYW4gUHJvamVjdCAjMjUtMDUtMjYtMDEucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjg0MzQ0LTE3NDM0NjA2NTJBdHRhY2htZW50IEMgLSBMb2NhdGlvbiBNYXAgUHJvamVjdCAjMjUtMDUtMjYtMDEucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9
File details come from the government source that posted it. Updated .