Attachment B -Rate Matrix.pdf

PDF 76 KB Posted

Attached to
Global Modeling & Assimilation Support (GLOMAS) Final Request For Proposal Federal contract opportunity
Solicitation number
80GSFC24R0036
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document is an Attachment B - Rate Matrix for an Indefinite Delivery Indefinite Quantity (IDIQ) contract solicitation under RFP 80GSFC24R0036. It provides the not-to-exceed direct labor rates, indirect rates, fixed fee rates, and cost estimating relationships (CERs) for both the prime contractor and subcontractors that must be used for pricing all task orders issued under the resulting contract. The contract will be a Cost-Plus-Fixed-Fee IDIQ with a 5-year ordering period, and is set aside for small businesses. The contract is for Global Modeling & Assimilation Support (GLOMAS) at the NASA Goddard Space Flight Center, with a focus on supporting the development and maintenance of the Goddard Earth Observing System (GEOS) model. The anticipated contract award date is April 30, 2025, with a June 1, 2025 contract effective date. The work will be performed primarily onsite at NASA GSFC.

View the file

Other files for this federal contract opportunity

Other files attached to Global Modeling & Assimilation Support (GLOMAS) Final Request For Proposal, newest first.
File Type Posted
Submitted QA 2.pdf PDF
GLOMAS Amendment 0003.pdf PDF
EXHIBITS 2-11 ALL IDIQ rev.1.pdf PDF
Submitted QA.pdf PDF
GLOMAS Amendment 0002.pdf PDF
Enclosure CC - GPM rev.1.pdf PDF
GLOMAS Amendment 0001.pdf PDF
Attachment A -SOW rev.1.pdf PDF
GLOMAS RFP Cover Letter.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
Attachment K CONTRACT DATA REQUIREMENTS LIST.pdf PDF
Attachment A -SOW.pdf PDF
Attachment D - Contract Historical Data.pdf PDF
Attachment I.1 - DEIAPlan.pdf PDF
Attachment J.1 OCI DRD.pdf PDF
EXHIBITS 1A-1B ALL IDIQ.pdf PDF
Exhibits 12 - PastPerfQues.pdf PDF
GLOMAS RFP 10.24.pdf PDF
Attachment F - IT DRD.pdf PDF
Attachment G -Req Statements List.pdf PDF
Attachment I.2 DEIA Plan DRD.pdf PDF
Enclosure CC - GPM.pdf PDF
GLOMAS SF33.pdf PDF
Attachment C - Financial Rep. Req..pdf PDF
Attachment H-IAGP.pdf PDF
Attachment J.2 OCI Plan.pdf PDF
Enclosure AA - Sample SH Plan.pdf PDF
Enclosure BB - Contract Historical Data.pdf PDF
Enclosure DD QASP.pdf PDF
EXHIBITS 2-11 ALL IDIQ.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

INDEFINITE DELIVERY INDEFINITE QUANTITY

(IDIQ)

DIRECT LABOR RATES, INDIRECT RATES AND

FEE MATRICES

RFP 80GSFC24R0036

Contract 80GSFC24R0036

Attachment B

(03/2015)

IDIQ DIRECT LABOR RATES, INDIRECT RATES

AND FEE MATRICES

Task Plan proposals must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued in accordance with the “Task Ordering

Procedure” and “Supplemental Task Ordering Procedures” clauses of the contract. All

Task Orders issued will be applied to the guaranteed minimum quantity and maximum quantity as provided in “Minimum/Maximum Amount of Supplies or Services” clause.

1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the direct labor rates as specified below for pricing all task orders:

**Labor

Categories

*CY 1

^HR Rate

CY 2

HR Rate

CY 3

HR Rate

CY 4

HR Rate

CY 5

HR Rate

CY 6

HR Rate

**Labor Categories - The Offeror shall provide Prime direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.

*CY = Contract Year

^HR = Hourly Rate: These are not-to-exceed rates to be used for task order pricing purposes only for the Prime Contractor direct labor hours. The Contractor may propose lower rates when pricing task orders.

(03/2015)

2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders):

The Prime Contractor shall not exceed the cost estimating relationships (CERs) rates or factors as specified below for deriving/pricing Other Direct Costs (ODCs), if applicable, on all task orders:

****CERs Base of

Application

CY 1 CY 2 CY 3 CY 4 CY 5 CY 6

****CERs – If applicable, the Offeror shall complete all Prime ODC categories and rates/factors that are proposed using a CER, such as management percentages or computer/IT fees. Clearly delineate the base of application. If not applicable, insert

“NONE”.

3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the indirect rates as specified below for pricing all task orders:

***Indirect

Rate

Categories

Base of

CY 1 CY 2 CY 3 CY 4 CY 5 CY 6

***Indirect Rate Categories - The Offeror shall complete all Prime indirect rate categories and rates that may be applied against direct and indirect costs under a task order in accordance with the contractor’s accounting and estimating procedures. Clearly delineate the base of application and onsite versus offsite rates.

(03/2015)

4. PRIME FIXED FEE RATE MATRIX (For All Task Orders):

The Prime Contractor shall not exceed the fixed fee rate specified below for pricing all

Cost-Plus-Fixed-Fee (CPFF) task orders:

*****Fixed

Fee

Rate

Base of

CY 1 CY 2 CY 3 CY4 CY 5 CY 6

*****The Offeror shall complete the Prime’s fixed fee rate that shall be used to calculate the fixed fee dollars for all task orders issued under the resultant contract. Clearly delineate the base of application.

5. SUBCONTRACTOR (Name-TBP) FULLY-LOADED LABOR RATE MATRIX (For

All Task Orders):

The Prime Contractor shall not exceed the fully-loaded direct labor rates as specified below for pricing the subcontractor direct labor hours on all task orders:

++Labor

Categories

*CY 1

^HR Rate

CY 2

HR Rate

CY 3

HR Rate

CY 4

HR Rate

CY 5

HR Rate

CY 6

HR Rate

++Labor Categories - The Offeror shall provide fully-loaded subcontractor direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.

Clearly delineate onsite versus offsite rates.

*CY = Contract Year

^HR = Hourly Rate: These are not-to-exceed fully-load rates to be used for pricing purposes only for the Subcontractor direct labor hours. The Contractor may propose lower rates when pricing task orders.

(03/2015)

6. POSITION QUALIFICATIONS (For All Prime and Subcontractor Direct Labor

Categories):

NOTE: TO BE PROPOSED (TBP) – A Position Qualification shall be proposed for each individual Prime Direct Labor Category included in Section 1 and each individual

Subcontractor Direct Labor Category included in Section 5.

File details come from the government source that posted it. Updated .