Attachment B Quality Assurance Surveillance Plan (QASP) Multifamily Loan Underwriting and Closing Support Services.pdf
PDF 379 KB Posted
- Attached to
- Multifamily Loan Underwriting and Closing Support Services Federal contract opportunity
- Solicitation number
- 86615723R00001
About this file
This Quality Assurance Surveillance Plan outlines the required performance standards and monitoring methodology for loan underwriting and closing support services for the Department of Housing and Urban Development. The contractor must provide personnel, equipment, and facilities to perform project management, loan underwriting, and closing administration for Section 223(a)(7), 223(f), and 221(d)(4) multifamily loan programs. Key deliverables include underwriting summaries, firm commitments, closing documents, and weekly status reports due by specified deadlines. Performance will be evaluated monthly based on metrics for timeliness, accuracy, and customer satisfaction. HUD may apply a 1% price reduction for work failing to meet standards but exceeding quality levels. The contractor must submit transition plans 30 days prior to contract expiration or award to ensure continuity of operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 86615723R00001 (A0004).pdf | ||
| Attachment 3 - Questions and Answers 11.02.2022.pdf | ||
| Sol_86615723R00001_Amd_0003.pdf | ||
| Attachment 2- Questions and Answers 10.31.2022.pdf | ||
| Attachment 1 of Amendment 2 Revised PWS MFH Loan Underwriting and Closing Support Services 10.31.2022.pdf | ||
| Sol_86615723R00001_Amd_0002.pdf | ||
| Sol_86615723R00001_Amd_0001.pdf | ||
| Attachment E- Past Performance Information.docx | DOCX document | |
| Attachment F Past Performance Survey.docx | DOCX document | |
| Attachment D - Nondisclosure-Agreement-between-HUD-and-Contractor-Employee.docx | DOCX document | |
| Attachment A Performance Work Statement - MF Loan Underwriting and Closing Support Services.pdf | ||
| Attachment C Schedule of Services - Multifamily Loan Underwriting and Closing Support Services.xlsx | XLSX spreadsheet | |
| Sol_86615723R00001 (1).pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
Quality Assurance Surveillance Plan (QASP) Multifamily Loan Underwriting and Closing
Support Services 09/23/2022 Version 1.0
1 Vision
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer's Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
6.4 Surveillance Matrix
Appendix 1 - Surveillance Matrix
Appendix 2 - Corrective Action Report (CAR)
Appendix 3 - Customer Complaint Record
Appendix 4 - Performance Assessment Report (PAR)
Quality Assurance Surveillance Plan (QASP)
Multifamily Loan Underwriting and Closing Support Services Contract
1 Vision
FHA Multifamily’s mission is to provide a reliable, counter-cyclical source of capital, but recent mortgage insurance application volume has significantly outpaced FHA Multifamily’s ability to process loan applications internally. The loan underwriting and closing support services to be provided via this contract are critical to FHA Multifamily’s ability to deliver on its mission and are intended to support the program office on an as-needed basis, to reduce or avoid backlogs and delays, and to help the office meet established timeframes and market demands.
1 INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Multifamily Loan Underwriting and Closing Support Services. This plan sets forth the procedures and guidelines HUD will use in ensuring the required performance standards or service levels are achieved by the Contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor's Quality Control Plan (QCP), and to ensure that the Government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor's performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around "what service or quality level is required", as opposed to "how the Contractor should perform the work" (i.e., results, not compliance). This QASP will define the performance management approach taken by HUD to monitor and manage the Contractor's performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
1.2.2 Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A "results focus" provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor's own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor's QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. This QASP enables the Government to take advantage of the Contractor's QC program.
1.3.2 The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
2.1 The Contracting Officer
The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officers Representative (COR) and the Contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor's performance, and must be identified and designated by the CO.
2.2 The Contracting Officer's Representative
The COR is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the Contractor's performance.
The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government's behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions, shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor's work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
The required performance standards and/or quality levels are included in the PWS and in Appendix 1, "Surveillance Matrix". If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The primary methods of surveillance are:
Random Sampling - The COR and SCOR typically performs the periodic inspection on a monthly basis
Customer Feedback
4.2 Customer Feedback
The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems. The customer always has the option to communicate complaints to the CO and/or COR as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The Acceptable Quality Levels (AQLs) included in Appendix 1, "Surveillance Matrix", for Contractor performance are structured to allow the Contractor to manage how the work is performed. For certain critical activities such as those involving loan underwriting and closing, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Appendix 1.
5.2 Monitoring Forms
The Government's QA surveillance, accomplished by the COR, may be reported using the following monitoring forms: Appendix 2 - "Corrective Action Report (CAR)", Appendix 3 - "Customer Complaint Record", and Appendix 4 "Performance Assessment Report" (PAR). The forms, when completed, will document the Government's assessment of the Contractor's performance under the contract to ensure that the required results are being achieved. The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT
6.1 Determining Performance
The Government will use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
At the end of each month, the COR will prepare a written report for the SCOR summarizing the overall results of the quality assurance surveillance of the Contractor's performance. This written report, which includes the Contractor's submitted monthly report and the completed quality assurance monitoring forms, will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the Contractor's project manager, or a designated alternate, to meet with the CO, PM and/or other Government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor;
however, if the need arises, the Contractor will meet with the COR as often as required or per the Contractor's request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis, Issues and concerns of both parties, Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis, Recommendations for improved efficiency and/or effectiveness
6.3.2 The CO and COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the discretion of the CO.
6.4 Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the Contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating Criteria
Excellent / Outstanding
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements.
The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Appendix 1 - Surveillance Matrix
Statements Standards/AQLs Inspections Ratings 5.1 Loan Underwriting for Section 223(f)
Deliverables:
A001 Underwriting summary narrative A002 Draft firm commitment and required exhibits A003 Lender Metrics survey form A004 CNA e-Tool submission for HUD Decision
a) Upon conclusion of full underwriting review of the application and review of the CNA e- Tool, submit all required deliverables to HUD POC (cc:
LoanSupportServices23- 26@hud.gov) for review within thirty-five (35) calendar days after application assignment AQL: No deviation; exceptions are only permitted for legitimate reasons (e.g., significant application deficiencies, lender delays), and any issues causing material delays must be discussed immediately with and agreed upon by the HUD office
b) Present loan underwriting summary and recommendation to the RLC, if required, on date to be scheduled by the HUD office and respond to any written requests from the RLC within two (2) business days after request AQL: No deviation
c) Make any corrections or additions to final deliverables requested by HUD office and resubmit to HUD office within three (3) business days
What: Deliverables How: Review of deliverables rating form Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for a particular loan for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
Standard(s): Inspection applies to all standards after request AQL: No deviation
5.2 Loan Underwriting for Section 223(a)(7)
Deliverables:
A001 Underwriting summary narrative A002 Draft firm commitment and required exhibits A003 Lender Metrics survey form A004 CNA e-Tool submission for HUD Decision
a) Upon conclusion of full underwriting review of the application and review of the CNA e- Tool, submit all required deliverables to HUD POC (cc:
LoanSupportServices23- 26@hud.gov) for review within twenty (20) calendar days after application assignment AQL: No deviation; exceptions are only permitted for legitimate reasons (e.g., significant CNA e-Tool deficiencies, lender delays), and any issues causing material delays must be discussed immediately with and agreed upon by the HUD office
b) Present loan underwriting summary and recommendation to the RLC, if required, on date to be scheduled by the HUD office and respond to any written requests from the RLC within two (2) business days after request AQL: No deviation
c) Make any corrections or additions to final deliverables requested by HUD office and resubmit to HUD office within three (3) business days
What: Deliverables How: Review of deliverables rating form Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for a particular loan for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
5.3 Loan Underwriting for Section 221(d)(4)
Deliverables:
A001 Underwriting summary narrative A002 Draft firm commitment and required exhibits A003 Lender Metrics survey form
a) Upon conclusion of full underwriting review of the application, submit all required deliverables stated above and below to HUD POC (cc:
LoanSupportServices23- 26@hud.gov) for review within forty-five (45) calendar days after application assignment AQL: No deviation; exceptions are only permitted for legitimate reasons (e.g., significant application deficiencies, lender delays), and any issues causing material delays must be discussed immediately with and agreed upon by the HUD office
b) Present loan underwriting summary and recommendation to the RLC, if required, on date to be scheduled by the HUD office and respond to any written requests from the RLC within two (2) business days after request AQL: No deviation
c) Make any corrections or additions to final deliverables requested by HUD office and resubmit to HUD office within three (3) business days
What: Deliverables How: Review of the deliverables rating form Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for a particular loan for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
5.4 Loan Closing for Section 223(f)
Deliverables:
A005 Draft firm commitment amendment letter, if applicable A006 Closing documents review comments A007 Draft clearance to close administrative memorandum A008 Evidence/notification of successful loan closing
a) Review any amendment requests and prepare/submit amendments to HUD POC for review/signature within five (5) business days after receipt AQL: Up to ten (10) total business days after receipt for amendment requests requiring substantial reprocessing (will be determined via conversation with HUD office)
b) Review all draft closing documents for completeness and accuracy, and provide comments to Lender, Lenders Counsel, and HUD Closing Attorney within ten (10) business days after receipt of draft closing documents AQL: No deviation
c) Draft and submit clearance to close administrative memorandum to HUD office within two (2) business days after all major issues have been addressed AQL: No deviation
d) Email the HUD POC/Closing Coordinator (cc:
LoanSupportServices23- 26@hud.gov) providing
What: Deliverables How: Review of deliverables rating form Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for a particular loan for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
evidence/notification that the loan has successfully closed no more than twenty-four (24) hours after the loan has closed
5.5 Loan Closing for Section 223(a)(7)
Deliverables:
A005 Draft firm commitment amendment letter, if applicable A006 Closing documents review comments A007 Draft clearance to close administrative memorandum A008 Evidence/notification of successful loan closing
a) Review any amendment requests and prepare/submit amendments to HUD POC for review/signature within five (5) business days after receipt AQL: Up to ten (10) total business days after receipt for amendment requests requiring substantial reprocessing (will be determined via conversation with HUD office)
b) Review all draft closing documents for completeness and accuracy, and provide comments to Lender, Lenders Counsel, and HUD Closing Attorney within ten (10) business days after receipt of draft closing documents AQL: No deviation
c) Draft and submit clearance to close administrative memorandum to the HUD office within two (2) business days after all major issues have been addressed AQL: No deviation
What: Deliverables How: Review of deliverables rating form Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for a particular loan for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
d) Email the HUD POC/Closing Coordinator (cc:
LoanSupportServices23- 26@hud.gov) providing evidence/notification that the loan has successfully closed no more than twenty-four (24) hours after the
5.6 Loan Closing for Section 221(d)(4)
Deliverables:
A005 Draft firm commitment amendment letter, if applicable A006 Closing documents review comments A007 Draft clearance to close administrative memorandum A008 Evidence/notification of successful loan closing
a) Review any amendment requests and prepare/submit amendments to HUD POC for review/signature within five (5) business days after receipt AQL: Up to ten (10) total business days after receipt for amendment requests requiring substantial reprocessing (will be determined via conversation with HUD office)
b) Review all draft closing documents (including initial draw) for completeness and accuracy, and provide comments to Lender, Lenders Counsel, and HUD Closing Attorney within ten (10) business days after receipt of draft closing documents AQL: No deviation
c) Draft and submit clearance to close administrative memorandum to
What: Deliverables How: Review of the deliverables rating form Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for a particular loan for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
HUD office within two (2) business days after all major issues have been addressed AQL: No deviation
d) Email the HUD POC/Closing Coordinator (cc:
LoanSupportServices23- 26@hud.gov) providing evidence/notification that the loan has successfully closed no more than twenty-four (24) hours after the
5.7 Regular Reports
a) Provide a weekly report to the COR, SCOR and Regional Coordinators on the status of assigned loans for underwriting and closing review every Wednesday by 5pm Eastern Standard Time.
What: Weekly report How: Review of weekly report Frequency: Once Who: SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
5.8 Transition In
a) Provide a written Quality Control Plan (QCP) to the COR thirty (30)
What: Written plan How: Review of written plan
Deliverables:
A011 Transition In Plan business days after contract award.
Frequency: Once Who: COR Incentive: HUD will apply a 1% reduction from the associated CLIN price for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
5.9 Transition Out
Deliverables:
A012 Transition Out Plan
a) a) Provide a written plan for the assumption of all on going work to the successor within thirty (30) days prior to the expiration date of the contract.
What: Plan How: Review of plan Frequency: Once Who: COR and SCOR Incentive: HUD will apply a 1% reduction from the associated CLIN price for performance that falls below the Standard but meets or exceeds the Acceptable Quality Level (AQL).
Appendix 2 - Corrective Action Report (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
Appendix 3 - Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 - Performance Assessment Report (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS
CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR NON-
CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-
CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
| 1 Vision |
| 1 INTRODUCTION |
| 1.1 Purpose |
| 1.2 Performance Management Approach |
| 1.3 Performance Management Strategy |
| 2 ROLES AND RESPONSIBILITIES |
| 2.1 The Contracting Officer |
| 2.2 The Contracting Officer's Representative |
| 3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| 4 METHODOLOGIES TO MONITOR PERFORMANCE |
| 4.1 Surveillance Techniques |
| 4.2 Customer Feedback |
| 4.3 Acceptable Quality Levels |
| 5 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 6 ANALYSIS OF QUALITY ASSURANCE ASSESSEMENT |
| 6.1 Determining Performance |
| 6.2 Reporting |
| 6.3 Reviews and Resolution |
| 6.4 Surveillance Matrix |
| Appendix 1 - Surveillance Matrix |
| Appendix 2 - Corrective Action Report (CAR) |
| Appendix 2 - Corrective Action Report (CAR) |
| Appendix 2 - Corrective Action Report (CAR) |
| Appendix 2 - Corrective Action Report (CAR) |
File details come from the government source that posted it. Updated .