Attachment B - Pricing Schedule USCGC BERTHOLF (WMSL-750).xls
XLS spreadsheet 49 KB Posted
- Attached to
- BERTHOLF DS FY25 FQ4
- Solicitation number
- 70Z08525RLREP0008
About this file
The file is a Pricing Schedule for the United States Coast Guard Cutter (USCGC) BERTHOLF (WMSL-750) dockside availability in Fiscal Year 2025. The solicitation (Number 70Z08525RLREP0008) covers ship maintenance and repair services to be performed in Alameda, California from 26 August 2025 through 18 November 2025. The pricing schedule includes multiple line items for specific maintenance tasks such as fire prevention, circuit breaker inspections, tank cleaning and inspections, and cargo handling elevator repair, with all items currently priced at $0.00.
The contract is issued by the Department of Homeland Security US Coast Guard, with an ordering period from the date of award through 18 November 2025. The contract includes a composite labor rate of 55, with assumed General & Administrative (G&A) factor of 15% and profit factor of 10%. Task order funds will be awarded subject to availability, and the scope encompasses comprehensive ship maintenance, repair, and associated support work to be specified in individual task orders. The pricing schedule includes detailed labor rate information for multiple geographical areas, suggesting potential flexibility in labor cost calculations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BERTHOLF (WMSL-418) DOCKSIDE AVAILABILITY FY2025 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention, Provide | JOB | |||
| D-002 | Circuit Breakers (400 Hz), Inspect and Test | JOB | |||
| D-003 | Circuit Breakers (Draw Out), Inspect and Test | JOB | $0.00 | ||
| D-004 | Stern Boat Launch and Recovery, Level II | JOB | $0.00 | ||
| D-005 | Cargo Handling Elevator, Inspect and Repair | JOB | $0.00 | ||
| D-006 | Tank (High Purity Water), Clean and Inspect | JOB | $0.00 | ||
| D-007 | Tanks (Oily Waste), Clean and Inspect | JOB | $0.00 | ||
| D-008 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | JOB | $0.00 | ||
| D-009 | Tanks (Aviation Fuel Service), Clean and Inspect | JOB | $0.00 | ||
| D-010 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | $0.00 | ||
| O-011 | Tanks (JP-5), Preserve (Partial)- OPTIONAL | JOB | $0.00 | ||
| O-0A | Composite Labor Rate | Hour | 0 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price | $0.00 |
&C(11/18/2024) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .