Attachment B - Pricing Schedule USCGC BERTHOLF (WMSL-750).xls

XLS spreadsheet 49 KB Posted

Attached to
BERTHOLF DS FY25 FQ4
Solicitation number
70Z08525RLREP0008
Issued by

About this file

The file is a Pricing Schedule for the United States Coast Guard Cutter (USCGC) BERTHOLF (WMSL-750) dockside availability in Fiscal Year 2025. The solicitation (Number 70Z08525RLREP0008) covers ship maintenance and repair services to be performed in Alameda, California from 26 August 2025 through 18 November 2025. The pricing schedule includes multiple line items for specific maintenance tasks such as fire prevention, circuit breaker inspections, tank cleaning and inspections, and cargo handling elevator repair, with all items currently priced at $0.00.

The contract is issued by the Department of Homeland Security US Coast Guard, with an ordering period from the date of award through 18 November 2025. The contract includes a composite labor rate of 55, with assumed General & Administrative (G&A) factor of 15% and profit factor of 10%. Task order funds will be awarded subject to availability, and the scope encompasses comprehensive ship maintenance, repair, and associated support work to be specified in individual task orders. The pricing schedule includes detailed labor rate information for multiple geographical areas, suggesting potential flexibility in labor cost calculations.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC BERTHOLF (WMSL-418) DOCKSIDE AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Fire Prevention, ProvideJOB
D-002Circuit Breakers (400 Hz), Inspect and TestJOB
D-003Circuit Breakers (Draw Out), Inspect and TestJOB$0.00
D-004Stern Boat Launch and Recovery, Level IIJOB$0.00
D-005Cargo Handling Elevator, Inspect and RepairJOB$0.00
D-006Tank (High Purity Water), Clean and InspectJOB$0.00
D-007Tanks (Oily Waste), Clean and InspectJOB$0.00
D-008Tanks (MP Fuel Stowage and Overflow), Clean and InspectJOB$0.00
D-009Tanks (Aviation Fuel Service), Clean and InspectJOB$0.00
D-010Tanks (Aviation Fuel Stowage and Overflow), Clean and InspectJOB$0.00
O-011Tanks (JP-5), Preserve (Partial)- OPTIONALJOB$0.00
O-0AComposite Labor RateHour0
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price$0.00

&C(11/18/2024) Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .