Attachment B - Pricing Form.xlsx

XLSX spreadsheet 157 KB Posted

Attached to
47PJ0023R0069 - DBB – NSF Ice Core Facility - Solicitation
Solicitation number
47PJ0023R0069
Issued by

About this file

This pricing form and related federal contract opportunity provide details for the construction of a new National Science Foundation Ice Core Facility. The pricing form is a spreadsheet template for contractors to provide pricing for the base scope of construction and two optional additional scopes of work including additional shelving and an ice cave. The base scope involves construction of a new freezer space within an existing federal building and includes five primary program elements: a refrigerated warehouse, refrigeration equipment space, shop/storage spaces, office and support spaces, and loading/shipping spaces for a total projected space of 19,058 square feet. The related federal contract opportunity provides additional context, with the solicitation seeking design-bid-build construction services to replace an aging ice core facility built in 1993 in order to preserve irreplaceable ice core samples for ongoing research. The General Services Administration is the contracting agency and construction must follow the 2021 GSA P-100 baseline. The response due date is not provided.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Questions and Answers_Amendment 0002.pdf PDF
Solicitation Amendment 47PJ0023R0069_0002.pdf PDF
47PJ0023R0069_Ice Core_GC_Agreement_March_2023_Amendment 0002.pdf PDF
47PJ0023R0069 SF1442 06132023.pdf PDF
20230606 - Site Visit - Sign in Sheet.pdf PDF
Solicitation Amendment 47PJ0023R0069_0001.pdf PDF
47PJ0023R0069_Ice Core_GC_Solicitation_March_2023_Amendment 0001.pdf PDF
47PJ0023R0069_Ice Core_GC_Solicitation_March_2023.pdf PDF
47PJ0023R0069_Ice Core_GC_Solicitation_March_2023.pdf PDF
47PJ0023R0069_Ice Core_GC_Agreement_March_2023.pdf PDF
CO20230023 05122023.pdf PDF
GSA527-21 Qualifications and Financial Information.pdf PDF
Attachment E - Request for Controlled Unclassified _CUI Building Information Form.docx DOCX document
Attachment D - Authorized Negotiators.docx DOCX document
Attachment C - Model Subcontracting Plan.docx DOCX document
Attachment A - Past Performance Questionnaire.docx DOCX document
47PJ0023R0069_Ice Core_GC Reps and Certs March 2023.docx DOCX document
47PJ0023R0069 SF1442 Ice Core 2023 05 23.pdf PDF
47PJ0023R0069_Ice Core_GC_Solicitation_March_2023.pdf PDF
47PJ0023R0069_Ice Core_GC_Agreement_March_2023.pdf PDF
Attachment G - GSA_Affiliated_Custom_Accounts_GACA.pptx PPTX presentation
Attachment F - GACA memo .pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE SCOPE - NSF ICF

NSF Ice Core Facility
*Note, not all descriptions need to have a cost allocated. Refer to P-120, Public Buildings Service Cost and Schedule Management Policy Requirements for more guidance on categorizing costs. If revisions to the pricing sheet are needed to appropriately price this project, offerors shall notify the CO in writing by June 9, 2023 to allow for revisions or amendment to the solicitation. Firms are resposible for formula accuracy, edit as required.
BASE SCOPE - ICE CORE FACILITY
NSF TENANT PRICINGTOTALS
DescriptionCORE AND SHELL COSTSTENANT IMPROVEMENT COSTSNSF TOTALTOTAL CORE AND SHELL COSTSTOTAL TENANT IMPROVEMENT COSTSGRAND TOTAL
DIVISION 01- GENERAL REQUIREMENTS OF WORK$ - 0
DIVISION 03 – CONCRETE$ - 0
Maintenance of Cast-In Place Concrete$ - 0
Concrete Forming and Accessories$ - 0
Concrete Reinforcing$ - 0
Cast-in-Place Concrete$ - 0
Polished Concrete Finishing$ - 0
DIVISION 04 – MASONRY$ - 0
Masonry Cleaning$ - 0
Brick Masonry Repair$ - 0
DIVISION 05 - METALS$ - 0
Structural Steel Framing$ - 0
Metal Fabrications$ - 0
DIVISION 06 - WOOD AND PLASTICS$ - 0
Rough Carpentry$ - 0
Plastic Laminate Faced Architectural Millwork$ - 0
DIVISION 07 - THERMAL AND MOISTURE PROTECTION$ - 0
Bituminous Dampprooing$ - 0
Vapor Retarder$ - 0
Joint Firestopping$ - 0
Joint Sealants$ - 0
DIVISION 08 - DOORS AND WINDOWS$ - 0
Hollow Metal Doors and Frames$ - 0
Flush Wood Doors$ - 0
Access Doors and Frames$ - 0
Overhead Coiling Doors$ - 0
Door Hardware$ - 0
DIVISION 09 – FINISHES$ - 0
Non-Structural Metal Framing$ - 0
Gypsum Board$ - 0
Acoustical Tile Ceilings$ - 0
Resilient Base and Accessories$ - 0
Resilient Tile Flooring$ - 0
Tile Carpeting$ - 0
Exterior Painting$ - 0
Interior Painting$ - 0
DIVISION 10 - SPECIALTIES$ - 0
Visual Display Units$ - 0
Panel Signage$ - 0
Wall and Door Protection$ - 0
Fire Protection Cabinets$ - 0
Fire Extinguishers$ - 0
Metal Lockers$ - 0
Mobile Storage Shelving$ - 0
DIVISION 12 - FURNISHINGS$ - 0
Curtains and Drapes$ - 0
DIVISION 13 - SPECIAL CONSTRUCTION$ - 0
Cold Storage Rooms$ - 0
DIVISION 21 – FIRE PROTECTION$ - 0
Basic Fire Suppression Requirements$ - 0
Through Penetration Firestopping$ - 0
Fire Suppression Demolition For Remodeling$ - 0
Fire Suppression Supports And Anchors$ - 0
Fire Suppression Identification$ - 0
Commissioning Of Fire Suppression$ - 0
Fire Protection Systems$ - 0
Clean Agent Fire Suppression System$ - 0
DIVISION 22 - PLUMBING$ - 0
Basic Plumbing Requirements$ - 0
Through Penetration Firestopping$ - 0
Plumbing Demolition For Remodeling$ - 0
Plumbing Supports And Anchors$ - 0
Plumbing Identification$ - 0
Plumbing Piping Insulation$ - 0
Plumbing Systems Commissioning$ - 0
Plumbing Piping Insulation$ - 0
Domestic Water Pumps$ - 0
Tanks – Plumbing$ - 0
Sump Pumps$ - 0
DIVISION 23 - MECHANICAL$ - 0
Basic HVAC Requirements$ - 0
Through Penetration Firestopping$ - 0
HVAC Demolition For Remodeling$ - 0
Motors$ - 0
Electric Heat Trace$ - 0
HVAC Supports And Anchors$ - 0
HVAC Vibration Isolation$ - 0
HVAC Identification$ - 0
Testing, Adjusting, And Balancing$ - 0
Ductwork Insulation$ - 0
HVAC Piping Insulation$ - 0
HVAC Systems Commissioning$ - 0
Controls$ - 0
Instrumentation$ - 0
Hydronic Piping$ - 0
Hydronic Specialties$ - 0
HVAC Pumps$ - 0
Ductwork Insulation$ - 0
Ductwork Accessories$ - 0
Power Ventilators$ - 0
Air Inlets And Outlets$ - 0
Air Cleaning$ - 0
Energy Recovery Devices$ - 0
Split System Air Conditioning Units$ - 0
Terminal Heat Transfer Units$ - 0
Air Coils$ - 0
Floor Heating Systems$ - 0
Dehumidification Unit$ - 0
DIVISION 26 - ELECTRICAL$ - 0
Basic Electrical Requirements$ - 0
Through Penetration Firestopping$ - 0
Electrical Demolition For Remodeling$ - 0
Wire And Cable$ - 0
Grounding And Bonding$ - 0
Supporting Devices$ - 0
Conduit And Boxes$ - 0
Electrical Identification$ - 0
Power System Study$ - 0
Electrical Systems Commissioning$ - 0
Dry Type Transformers$ - 0
Panelboards$ - 0
Wiring Devices$ - 0
Fuses$ - 0
Disconnect Switches$ - 0
Packaged Engine Generator Systems$ - 0
Static Uninterruptible Power Supply$ - 0
Transfer Switch$ - 0
Surge Protection Devices$ - 0
LED Lighting$ - 0
Emergency Lighting Inverter$ - 0
DIVISION 27 - COMMUNICATIONS$ - 0
Basic Communications Systems Requirements$ - 0
Communications Bonding$ - 0
Interior Communication Pathways$ - 0
Identification$ - 0
Commissioning Of Communications$ - 0
Communication Equipment Rooms (CER)$ - 0
Backbone Cabling Requirements$ - 0
Horizontal Cabling Requirements$ - 0
Testing$ - 0
Structured Cabling System Warranty$ - 0
DIVISION 28 – FIRE DETECTION$ - 0
Safety And Security System Commissioning$ - 0
Duress System$ - 0
Fire Alarm And Detection Systems Performance Based$ - 0
DIVISION 31 – EARTHWORK$ - 0
Site Clearing$ - 0
Earth Moving$ - 0
Trenching and Backfilling$ - 0
Temporary Erosion and Sediment Control$ - 0
DIVISION 32 – EXTERIOR IMPROVEMENTS$ - 0
Asphalt Paving$ - 0
Concrete Paving$ - 0
Chain Link Fences and Gates$ - 0
Seeding$ - 0
DIVISION 33 – UTILITIES$ - 0
Storm Utility Drainage Piping$ - 0
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT$ - 0
Common Works for Refrigeration$ - 0
Pipe Welding$ - 0
Hangers and Supports$ - 0
Refrigeration vibration isolation$ - 0
Refrigeration Insulation$ - 0
Refrigeration Systems Commissioning$ - 0
Refrigerant Piping$ - 0
Refrigeration Accessories$ - 0
CO2 Evaporators$ - 0
CO2 Packaged Equipment – Reciprocating Compressor$ - 0
Refrigeration Gas Cooler$ - 0
Leak Detection$ - 0
Leak Detection Controls Narrative$ - 0
Controls, DDC/HMI$ - 0
DDC/HMI Controls Narrative$ - 0
Identification for Piping and Equipment$ - 0
$ - 0
$ - 0
SUBTOTAL - Construction Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
General Conditions$ - 0
Overhead$ - 0
Profit$ - 0
Bond$ - 0
Insurance$ - 0
SUBTOTAL - General Conditions and Mark-Ups$ - 0$ - 0$ - 0
TOTAL#REF!#REF!#REF!#REF!#REF!#REF!

Prepared by: Date

Option 1 - Shelving

NSF Ice Core Facility
*Note, not all descriptions need to have a cost allocated. Refer to P-120, Public Buildings Service Cost and Schedule Management Policy Requirements for more guidance on categorizing costs. If revisions to the pricing sheet are needed to appropriately price this project, offerors shall notify the CO in writing by June 9, 2023 to allow for revisions or amendment to the solicitation.
OPTION 1 - ADDITIONAL SHELVING
DescriptionCORE AND SHELL COSTSNSF TOTAL
DIVISION 01- GENERAL REQUIREMENTS OF WORK$ - 0
DIVISION 03 – CONCRETE$ - 0
Maintenance of Cast-In Place Concrete$ - 0
Concrete Forming and Accessories$ - 0
Concrete Reinforcing$ - 0
Cast-in-Place Concrete$ - 0
Polished Concrete Finishing$ - 0
DIVISION 04 – MASONRY$ - 0
Masonry Cleaning$ - 0
Brick Masonry Repair$ - 0
DIVISION 05 - METALS$ - 0
Structural Steel Framing$ - 0
Metal Fabrications$ - 0
DIVISION 06 - WOOD AND PLASTICS$ - 0
Rough Carpentry$ - 0
Plastic Laminate Faced Architectural Millwork$ - 0
DIVISION 07 - THERMAL AND MOISTURE PROTECTION$ - 0
Bituminous Dampprooing$ - 0
Vapor Retarder$ - 0
Joint Firestopping$ - 0
Joint Sealants$ - 0
DIVISION 08 - DOORS AND WINDOWS$ - 0
Hollow Metal Doors and Frames$ - 0
Flush Wood Doors$ - 0
Access Doors and Frames$ - 0
Overhead Coiling Doors$ - 0
Door Hardware$ - 0
DIVISION 09 – FINISHES$ - 0
Non-Structural Metal Framing$ - 0
Gypsum Board$ - 0
Acoustical Tile Ceilings$ - 0
Resilient Base and Accessories$ - 0
Resilient Tile Flooring$ - 0
Tile Carpeting$ - 0
Exterior Painting$ - 0
Interior Painting$ - 0
DIVISION 10 - SPECIALTIES$ - 0
Visual Display Units$ - 0
Panel Signage$ - 0
Wall and Door Protection$ - 0
Fire Protection Cabinets$ - 0
Fire Extinguishers$ - 0
Metal Lockers$ - 0
Mobile Storage Shelving$ - 0
DIVISION 12 - FURNISHINGS$ - 0
Curtains and Drapes$ - 0
DIVISION 13 - SPECIAL CONSTRUCTION$ - 0
Cold Storage Rooms$ - 0
DIVISION 21 – FIRE PROTECTION$ - 0
Basic Fire Suppression Requirements$ - 0
Through Penetration Firestopping$ - 0
Fire Suppression Demolition For Remodeling$ - 0
Fire Suppression Supports And Anchors$ - 0
Fire Suppression Identification$ - 0
Commissioning Of Fire Suppression$ - 0
Fire Protection Systems$ - 0
Clean Agent Fire Suppression System$ - 0
DIVISION 22 - PLUMBING$ - 0
Basic Plumbing Requirements$ - 0
Through Penetration Firestopping$ - 0
Plumbing Demolition For Remodeling$ - 0
Plumbing Supports And Anchors$ - 0
Plumbing Identification$ - 0
Plumbing Piping Insulation$ - 0
Plumbing Systems Commissioning$ - 0
Plumbing Piping Insulation$ - 0
Domestic Water Pumps$ - 0
Tanks – Plumbing$ - 0
Sump Pumps$ - 0
DIVISION 23 - MECHANICAL$ - 0
Basic HVAC Requirements$ - 0
Through Penetration Firestopping$ - 0
HVAC Demolition For Remodeling$ - 0
Motors$ - 0
Electric Heat Trace$ - 0
HVAC Supports And Anchors$ - 0
HVAC Vibration Isolation$ - 0
HVAC Identification$ - 0
Testing, Adjusting, And Balancing$ - 0
Ductwork Insulation$ - 0
HVAC Piping Insulation$ - 0
HVAC Systems Commissioning$ - 0
Controls$ - 0
Instrumentation$ - 0
Hydronic Piping$ - 0
Hydronic Specialties$ - 0
HVAC Pumps$ - 0
Ductwork Insulation$ - 0
Ductwork Accessories$ - 0
Power Ventilators$ - 0
Air Inlets And Outlets$ - 0
Air Cleaning$ - 0
Energy Recovery Devices$ - 0
Split System Air Conditioning Units$ - 0
Terminal Heat Transfer Units$ - 0
Air Coils$ - 0
Floor Heating Systems$ - 0
Dehumidification Unit$ - 0
DIVISION 26 - ELECTRICAL$ - 0
Basic Electrical Requirements$ - 0
Through Penetration Firestopping$ - 0
Electrical Demolition For Remodeling$ - 0
Wire And Cable$ - 0
Grounding And Bonding$ - 0
Supporting Devices$ - 0
Conduit And Boxes$ - 0
Electrical Identification$ - 0
Power System Study$ - 0
Electrical Systems Commissioning$ - 0
Dry Type Transformers$ - 0
Panelboards$ - 0
Wiring Devices$ - 0
Fuses$ - 0
Disconnect Switches$ - 0
Packaged Engine Generator Systems$ - 0
Static Uninterruptible Power Supply$ - 0
Transfer Switch$ - 0
Surge Protection Devices$ - 0
LED Lighting$ - 0
Emergency Lighting Inverter$ - 0
DIVISION 27 - COMMUNICATIONS$ - 0
Basic Communications Systems Requirements$ - 0
Communications Bonding$ - 0
Interior Communication Pathways$ - 0
Identification$ - 0
Commissioning Of Communications$ - 0
Communication Equipment Rooms (CER)$ - 0
Backbone Cabling Requirements$ - 0
Horizontal Cabling Requirements$ - 0
Testing$ - 0
Structured Cabling System Warranty$ - 0
DIVISION 28 – FIRE DETECTION$ - 0
Safety And Security System Commissioning$ - 0
Duress System$ - 0
Fire Alarm And Detection Systems Performance Based$ - 0
DIVISION 31 – EARTHWORK$ - 0
Site Clearing$ - 0
Earth Moving$ - 0
Trenching and Backfilling$ - 0
Temporary Erosion and Sediment Control$ - 0
DIVISION 32 – EXTERIOR IMPROVEMENTS$ - 0
Asphalt Paving$ - 0
Concrete Paving$ - 0
Chain Link Fences and Gates$ - 0
Seeding$ - 0
DIVISION 33 – UTILITIES$ - 0
Storm Utility Drainage Piping$ - 0
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT$ - 0
Common Works for Refrigeration$ - 0
Pipe Welding$ - 0
Hangers and Supports$ - 0
Refrigeration vibration isolation$ - 0
Refrigeration Insulation$ - 0
Refrigeration Systems Commissioning$ - 0
Refrigerant Piping$ - 0
Refrigeration Accessories$ - 0
CO2 Evaporators$ - 0
CO2 Packaged Equipment – Reciprocating Compressor$ - 0
Refrigeration Gas Cooler$ - 0
Leak Detection$ - 0
Leak Detection Controls Narrative$ - 0
Controls, DDC/HMI$ - 0
DDC/HMI Controls Narrative$ - 0
Identification for Piping and Equipment$ - 0
$ - 0
$ - 0
SUBTOTAL - Construction Costs$ - 0$ - 0
General Conditions$ - 0
Overhead$ - 0
Profit$ - 0
Bond$ - 0
Insurance$ - 0
SUBTOTAL - General Conditions and Mark-Ups$ - 0$ - 0
TOTAL

Prepared by:

Option 2 - Ice Cave

NSF Ice Core Facility
*Note, not all descriptions need to have a cost allocated. Refer to P-120, Public Buildings Service Cost and Schedule Management Policy Requirements for more guidance on categorizing costs. If revisions to the pricing sheet are needed to appropriately price this project, offerors shall notify the CO in writing by June 9, 2023 to allow for revisions or amendment to the solicitation.
OPTION 2 - ICE CAVE
DescriptionCORE AND SHELL COSTSNSF TOTAL
DIVISION 01- GENERAL REQUIREMENTS OF WORK$ - 0
DIVISION 03 – CONCRETE$ - 0
Maintenance of Cast-In Place Concrete$ - 0
Concrete Forming and Accessories$ - 0
Concrete Reinforcing$ - 0
Cast-in-Place Concrete$ - 0
Polished Concrete Finishing$ - 0
DIVISION 04 – MASONRY$ - 0
Masonry Cleaning$ - 0
Brick Masonry Repair$ - 0
DIVISION 05 - METALS$ - 0
Structural Steel Framing$ - 0
Metal Fabrications$ - 0
DIVISION 06 - WOOD AND PLASTICS$ - 0
Rough Carpentry$ - 0
Plastic Laminate Faced Architectural Millwork$ - 0
DIVISION 07 - THERMAL AND MOISTURE PROTECTION$ - 0
Bituminous Dampprooing$ - 0
Vapor Retarder$ - 0
Joint Firestopping$ - 0
Joint Sealants$ - 0
DIVISION 08 - DOORS AND WINDOWS$ - 0
Hollow Metal Doors and Frames$ - 0
Flush Wood Doors$ - 0
Access Doors and Frames$ - 0
Overhead Coiling Doors$ - 0
Door Hardware$ - 0
DIVISION 09 – FINISHES$ - 0
Non-Structural Metal Framing$ - 0
Gypsum Board$ - 0
Acoustical Tile Ceilings$ - 0
Resilient Base and Accessories$ - 0
Resilient Tile Flooring$ - 0
Tile Carpeting$ - 0
Exterior Painting$ - 0
Interior Painting$ - 0
DIVISION 10 - SPECIALTIES$ - 0
Visual Display Units$ - 0
Panel Signage$ - 0
Wall and Door Protection$ - 0
Fire Protection Cabinets$ - 0
Fire Extinguishers$ - 0
Metal Lockers$ - 0
Mobile Storage Shelving$ - 0
DIVISION 12 - FURNISHINGS$ - 0
Curtains and Drapes$ - 0
DIVISION 13 - SPECIAL CONSTRUCTION$ - 0
Cold Storage Rooms$ - 0
DIVISION 21 – FIRE PROTECTION$ - 0
Basic Fire Suppression Requirements$ - 0
Through Penetration Firestopping$ - 0
Fire Suppression Demolition For Remodeling$ - 0
Fire Suppression Supports And Anchors$ - 0
Fire Suppression Identification$ - 0
Commissioning Of Fire Suppression$ - 0
Fire Protection Systems$ - 0
Clean Agent Fire Suppression System$ - 0
DIVISION 22 - PLUMBING$ - 0
Basic Plumbing Requirements$ - 0
Through Penetration Firestopping$ - 0
Plumbing Demolition For Remodeling$ - 0
Plumbing Supports And Anchors$ - 0
Plumbing Identification$ - 0
Plumbing Piping Insulation$ - 0
Plumbing Systems Commissioning$ - 0
Plumbing Piping Insulation$ - 0
Domestic Water Pumps$ - 0
Tanks – Plumbing$ - 0
Sump Pumps$ - 0
DIVISION 23 - MECHANICAL$ - 0
Basic HVAC Requirements$ - 0
Through Penetration Firestopping$ - 0
HVAC Demolition For Remodeling$ - 0
Motors$ - 0
Electric Heat Trace$ - 0
HVAC Supports And Anchors$ - 0
HVAC Vibration Isolation$ - 0
HVAC Identification$ - 0
Testing, Adjusting, And Balancing$ - 0
Ductwork Insulation$ - 0
HVAC Piping Insulation$ - 0
HVAC Systems Commissioning$ - 0
Controls$ - 0
Instrumentation$ - 0
Hydronic Piping$ - 0
Hydronic Specialties$ - 0
HVAC Pumps$ - 0
Ductwork Insulation$ - 0
Ductwork Accessories$ - 0
Power Ventilators$ - 0
Air Inlets And Outlets$ - 0
Air Cleaning$ - 0
Energy Recovery Devices$ - 0
Split System Air Conditioning Units$ - 0
Terminal Heat Transfer Units$ - 0
Air Coils$ - 0
Floor Heating Systems$ - 0
Dehumidification Unit$ - 0
DIVISION 26 - ELECTRICAL$ - 0
Basic Electrical Requirements$ - 0
Through Penetration Firestopping$ - 0
Electrical Demolition For Remodeling$ - 0
Wire And Cable$ - 0
Grounding And Bonding$ - 0
Supporting Devices$ - 0
Conduit And Boxes$ - 0
Electrical Identification$ - 0
Power System Study$ - 0
Electrical Systems Commissioning$ - 0
Dry Type Transformers$ - 0
Panelboards$ - 0
Wiring Devices$ - 0
Fuses$ - 0
Disconnect Switches$ - 0
Packaged Engine Generator Systems$ - 0
Static Uninterruptible Power Supply$ - 0
Transfer Switch$ - 0
Surge Protection Devices$ - 0
LED Lighting$ - 0
Emergency Lighting Inverter$ - 0
DIVISION 27 - COMMUNICATIONS$ - 0
Basic Communications Systems Requirements$ - 0
Communications Bonding$ - 0
Interior Communication Pathways$ - 0
Identification$ - 0
Commissioning Of Communications$ - 0
Communication Equipment Rooms (CER)$ - 0
Backbone Cabling Requirements$ - 0
Horizontal Cabling Requirements$ - 0
Testing$ - 0
Structured Cabling System Warranty$ - 0
DIVISION 28 – FIRE DETECTION$ - 0
Safety And Security System Commissioning$ - 0
Duress System$ - 0
Fire Alarm And Detection Systems Performance Based$ - 0
DIVISION 31 – EARTHWORK$ - 0
Site Clearing$ - 0
Earth Moving$ - 0
Trenching and Backfilling$ - 0
Temporary Erosion and Sediment Control$ - 0
DIVISION 32 – EXTERIOR IMPROVEMENTS$ - 0
Asphalt Paving$ - 0
Concrete Paving$ - 0
Chain Link Fences and Gates$ - 0
Seeding$ - 0
DIVISION 33 – UTILITIES$ - 0
Storm Utility Drainage Piping$ - 0
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT$ - 0
Common Works for Refrigeration$ - 0
Pipe Welding$ - 0
Hangers and Supports$ - 0
Refrigeration vibration isolation$ - 0
Refrigeration Insulation$ - 0
Refrigeration Systems Commissioning$ - 0
Refrigerant Piping$ - 0
Refrigeration Accessories$ - 0
CO2 Evaporators$ - 0
CO2 Packaged Equipment – Reciprocating Compressor$ - 0
Refrigeration Gas Cooler$ - 0
Leak Detection$ - 0
Leak Detection Controls Narrative$ - 0
Controls, DDC/HMI$ - 0
DDC/HMI Controls Narrative$ - 0
Identification for Piping and Equipment$ - 0
$ - 0
$ - 0
SUBTOTAL - Construction Costs$ - 0$ - 0
General Conditions$ - 0
Overhead$ - 0
Profit$ - 0
Bond$ - 0
Insurance$ - 0
SUBTOTAL - General Conditions and Mark-Ups$ - 0$ - 0
TOTAL

Prepared by: