ATTACHMENT B - PRICE SCHEDULE.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- 36C78626Q50082
About this file
This is a Price Schedule (Attachment B) for ground maintenance services at Mountain Home National Cemetery with a base period from June 2026 through May 2027, followed by four optional one-year renewal periods extending through May 2031. The schedule contains 36 line items (CLINs) for the base year and corresponding CLINs for each option year, organized by service category and referenced to specific Statement of Work (SOW) sections. Services include edging and trimming of walkways and headstones, leaf and debris collection, grounds repair and sod installation, plant bed and shrub maintenance, tree maintenance and mulching, fertilization and weed control applications, pest control services, storm damage cleanup, headstone receiving and installation services, headstone cleaning and pressure washing of various cemetery structures, irrigation system repairs on an as-needed basis with government-supplied parts, and material procurement for turf sod, topsoil, and chat (crushed rock).
The pricing schedule uses multiple units of measure including each (EA), monthly (MO), job (JB), hourly rates (HR), 15-minute increments for irrigation labor, and square feet or yards for materials. Estimated quantities are provided for each service line, with monthly services occurring 4 or 12 times annually, job-based services ranging from 1 to 10 occurrences per year, and material quantities specified (10,000 square feet of sod, 50 yards of topsoil, 40 yards of chat, 120 quarterly-hour irrigation labor increments). All cost fields currently display $0, indicating this is a template awaiting price submissions from contractors. The document includes a threaded comment questioning how the Independent Government Cost Estimate (IGCE) was derived, requiring documentation of the pricing basis such as previous contracts or market research.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Mountain Home National Cemetery Ground Maintenance Services tc={24BE3D1C-2BDE-4483-B04F-E165E17A7B5F}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
How was the IGCE derived? (i.e. previous contracts, internet prices, etc.)
| Base Period Jun 2026 - May 2027 + 4 option years | |||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | |
| 0001 | 4.1.1 | Edging of Walkways, Curbs and other Horizontal Surfaces | EA | 42 | $ - 0 | Service | |
| 0002 | 4.1.2 | Trimming of Headstones, Monuments, Markers, and other Vertical Surfaces | EA | 42 | $ - 0 | Service | |
| 0003 | 4.1.3 | Leaf and Debris Collection and Removal | MO | 4 | $ - 0 | Service | |
| 0004 | 4.3.1; |
4.3.2;
4.3.3;
| 4.4.4; | Sunken Grave and Grounds Repair of Casket Sites, Sunken Cremation Sites, Small Areas grounds repairs, Subsequent Burial Sites and other Sod repairs and Installation. | EA-SQFT | 15000 | $ - 0 | Service | |||
| 0005 | 4.4.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | 12 | $ - 0 | Service | ||
| 0006 | 4.4.2 | Tree Maintenance | JB | 1 | $ - 0 | Service | ||
| 0007 | 4.4.3 | Mulching - Install and Replenish mulch to include all planting beds, all tree rings, shrubs. | JB | 2 | $ - 0 | Service | ||
| 0008 | 4.5.2 | Fertilization of Turf Type Tall Fescue ,Turf Type Perennial Ryegrass and Zeon Zoysia | JB | 5 | $ - 0 | Service | ||
| 0009 | 4.5.2 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | $ - 0 | Service | ||
| 0010 | 4.5.2 | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | $ - 0 | Service | ||
| 0011 | 4.5.2 | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 10 | $ - 0 | Service | ||
| 0012 | 45.2 | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | $ - 0 | Service | ||
| 0013 | 4.5.2 | Post Emergent Bermuda Eradication - Spot Application | JB | 10 | $ - 0 | Service | ||
| 0014 | 4.5.3 | Gypsum or Dolomitic Lime Application | JB | 1 | $ - 0 | Service | ||
| 0015 | 4.5.4 | Overseeding of Turf Type Tall Fescue (Spring) and Turf Type Perennial Ryegrass (Fall) | JB | 2 | $ - 0 | Service | ||
| 0016 | 4.5.5 | Core Aerification (65 acres) | JB | 1 | $ - 0 | Service | ||
| 0017 | 4.5.6 | Turf Dethatching (30 acre) | JB | 1 | $ - 0 | Service | ||
| 0018 | 4.6.1 | Insect/Pest/Disease control-Blanket Application | JB | 1 | $ - 0 | Service | ||
| 0019 | 4.6.1 | Insect/Pest/Disease control-Spot Application | JB | 5 | $ - 0 | Service | ||
| 0020 | 4.6.2 | Moles, Voles, Ground Hogs, Skunks and any other pest control | MO | 12 | $ - 0 | Service | ||
| 0021 | 4.7.1 | Extreme Weather Storm Damage and Debris Clean-up | HR | 80 | $ - 0 | Service | ||
| 0022 | 4.8.1 | Headstone Receiving (All First, Subsequent and Replacement Headstones) | EA | 750 | $ - 0 | Service | ||
| 0023 | 4.8.2 | Headstone Transport, Installation and Setting, All First Interment, Subsequent and replacement Headstones. | EA | 750 | $ - 0 | Service | ||
| 0024 | 4.8.3 | Headstone Raise and Realign | EA | 1800 | $ - 0 | Service | ||
| 0025 | 4.8.4 | Headstone Fine Tune Alignment (Bump & Run) | EA | 5000 | $ - 0 | Service | ||
| 0026 | 4.9.1 | Cleaning of Headstones and Markers | JB | 2 | $ - 0 | Service | ||
| 0027 | 4.9.2 | Pressure washing -Entrance Gates, Fencing, Signs and Concrete Pads under Signs and Lights | JB | 2 | $ - 0 | Service | ||
| 0028 | 4.9.3 | Pressure washing Entrance Ways, Walkways and Curbs | JB | 2 | $ - 0 | Service | ||
| 0029 | 4.9.4 | Pressure washing both Committal Shelters | JB | 2 | $ - 0 | Service | ||
| 0030 | 4.9.5 | Pressure washing Buildings and Surrounding Concrete Walkways, Sidewalks, and Hardscape | JB | 2 | $ - 0 | Service | ||
| 0031 | 4.9.6 | Pressure washing Floral Vase and Trash Receptacle Cleaning | JB | 2 | $ - 0 | Service | ||
| 0032 | 4.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken |
down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed
| / As-Requested" basis - All Parts and Supplies Provided By Government. | 15min | 120 | $ - 0 | Construction | |||||
| 0033 | 4.2.1 | Irrigation System Pump Station Services | JB | 3 | $ - 0 | Construction | |||
| 0034 | 5.1 | Turf Type Tall Fescue Sod | SQ FT | 10000 | $ - 0 | Service | |||
| 0035 | 5.2 | Screened Topsoil | YDS | 50 | $ - 0 | Service | |||
| 0036 | 5.3 | Chat (Fine Crushed Rock) | YDS | 40 | $ - 0 | Service | |||
| Base Year Total Estimate COST | $ - 0 | ||||||||
| Option Year One (1) Jun 2027 - May 2028 | |||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | |||
| 1001 | 4.1.1 | Edging of Walkways, Curbs and other Horizontal Surfaces | EA | 42 | $ - 0 | Service | |||
| 1002 | 4.1.2 | Trimming of Headstones, Monuments, Markers, and other Vertical Surfaces | EA | 42 | $ - 0 | Service | |||
| 1003 | 4.1.3 | Leaf and Debris Collection and Removal | MO | 4 | $ - 0 | Service | |||
| 1004 | 4.3.1; |
4.3.2;
4.3.3;
| 4.4.4; | Sunken Grave and Grounds Repair of Casket Sites, Sunken Cremation Sites, Small Areas grounds repairs, Subsequent Burial Sites | ||||||||
| and other Sod repairs and Installation. | EA-SQFT | 15000 | $ - 0 | Service | |||||
| 1005 | 4.4.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | 12 | $ - 0 | Service | |||
| 1006 | 4.4.2 | Tree Maintenance | JB | 1 | $ - 0 | Service | |||
| 1007 | 4.4.3 | Mulching - Install and Replenish mulch to include all planting beds, all tree rings, shrubs. | JB | 2 | $ - 0 | Service | |||
| 1008 | 4.5.2 | Fertilization of Turf Type Tall Fescue ,Turf Type Perennial Ryegrass and Zeon Zoysia | JB | 5 | $ - 0 | Service | |||
| 1009 | 4.5.2 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 1010 | 4.5.2 | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | $ - 0 | Service | |||
| 1011 | 4.5.2 | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 10 | $ - 0 | Service | |||
| 1012 | 45.2 | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 1013 | 4.5.2 | Post Emergent Bermuda Eradication - Spot Application | JB | 10 | $ - 0 | Service | |||
| 1014 | 4.5.3 | Gypsum or Dolomitic Lime Application | JB | 1 | $ - 0 | Service | |||
| 1015 | 4.5.4 | Overseeding of Turf Type Tall Fescue (Spring) and Turf Type Perennial Ryegrass (Fall) | JB | 2 | $ - 0 | Service | |||
| 1016 | 4.5.5 | Core Aerification (65 acres) | JB | 1 | $ - 0 | Service | |||
| 1017 | 4.5.6 | Turf Dethatching (30 acre) | JB | 1 | $ - 0 | Service | |||
| 1018 | 4.6.1 | Insect/Pest/Disease control-Blanket Application | JB | 1 | $ - 0 | Service | |||
| 1019 | 4.6.1 | Insect/Pest/Disease control-Spot Application | JB | 5 | $ - 0 | Service | |||
| 1020 | 4.6.2 | Moles, Voles, Ground Hogs, Skunks and any other pest control | MO | 12 | $ - 0 | Service | |||
| 1021 | 4.7.1 | Extreme Weather Storm Damage and Debris Clean-up | HR | 80 | $ - 0 | Service | |||
| 1022 | 4.8.1 | Headstone Receiving (All First, Subsequent and Replacement Headstones) | EA | 750 | $ - 0 | Service | |||
| 1023 | 4.8.2 | Headstone Transport, Installation and Setting, All First Interment, Subsequent and replacement | |||||||
| Headstones. | EA | 750 | $ - 0 | Service | |||||
| 1024 | 4.8.3 | Headstone Raise and Realign | EA | 1800 | $ - 0 | Service | |||
| 1025 | 4.8.4 | Headstone Fine Tune Alignment (Bump & Run) | EA | 5000 | $ - 0 | Service | |||
| 1026 | 4.9.1 | Cleaning of Headstones and Markers | JB | 2 | $ - 0 | Service | |||
| 1027 | 4.9.2 | Pressure washing -Entrance Gates, Fencing, Signs and Concrete Pads under Signs and Lights | JB | 2 | $ - 0 | Service | |||
| 1028 | 4.9.3 | Pressure washing Entrance Ways, Walkways and Curbs | JB | 2 | $ - 0 | Service | |||
| 1029 | 4.9.4 | Pressure washing both Committal Shelters | JB | 2 | $ - 0 | Service | |||
| 1030 | 4.9.5 | Pressure washing Buildings and Surrounding Concrete Walkways, Sidewalks, and Hardscape | JB | 2 | $ - 0 | Service | |||
| 1031 | 4.9.6 | Pressure washing Floral Vase and Trash Receptacle Cleaning | JB | 2 | $ - 0 | Service | |||
| 1032 | 4.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed |
/ As-Requested" basis - All Parts and Supplies Provided
| By Government. | 15min | 120 | $ - 0 | Construction | |||||
| 1033 | 4.2.1 | Irrigation System Pump Station Services | JB | 3 | $ - 0 | Construction | |||
| 1034 | 5.1 | Turf Type Tall Fescue Sod | SQ FT | 10000 | $ - 0 | Service | |||
| 1035 | 5.2 | Screened Topsoil | YDS | 50 | $ - 0 | Service | |||
| 1036 | 5.3 | Chat (Fine Crushed Rock) | YDS | 40 | $ - 0 | Service | |||
| Option Year One Total Estimate COST | $ 0.00 | ||||||||
| Option Year Two (2) Jun 2028 - May 2029 | |||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | |||
| 2001 | 4.1.1 | Edging of Walkways, Curbs and other Horizontal Surfaces | EA | 42 | $ - 0 | Service | |||
| 2002 | 4.1.2 | Trimming of Headstones, Monuments, Markers, and other Vertical Surfaces | EA | 42 | $ - 0 | Service | |||
| 2003 | 4.1.3 | Leaf and Debris Collection and Removal | MO | 4 | $ - 0 | Service | |||
| 2004 | 4.3.1; |
4.3.2;
4.3.3;
| 4.4.4; | Sunken Grave and Grounds Repair of Casket Sites, Sunken Cremation Sites, Small Areas grounds repairs, Subsequent Burial Sites | ||||||||
| and other Sod repairs and Installation. Sod shall be provided by Government. | EA-SQFT | 15000 | $ - 0 | Service | |||||
| 2005 | 4.4.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | 12 | $ - 0 | Service | |||
| 2006 | 4.4.2 | Tree Maintenance | JB | 1 | $ - 0 | Service | |||
| 2007 | 4.4.3 | Mulching - Install and Replenish mulch to include all planting beds, all tree rings, shrubs. | JB | 2 | $ - 0 | Service | |||
| 2008 | 4.5.2 | Fertilization of Turf Type Tall Fescue ,Turf Type Perennial Ryegrass and Zeon Zoysia | JB | 5 | $ - 0 | Service | |||
| 2009 | 4.5.2 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 2010 | 4.5.2 | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | $ - 0 | Service | |||
| 2011 | 4.5.2 | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 10 | $ - 0 | Service | |||
| 2012 | 45.2 | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 2013 | 4.5.2 | Post Emergent Bermuda Eradication - Spot Application | JB | 10 | $ - 0 | Service | |||
| 2014 | 4.5.3 | Gypsum or Dolomitic Lime Application | JB | 1 | $ - 0 | Service | |||
| 2015 | 4.5.4 | Overseeding of Turf Type Tall Fescue (Spring) and Turf Type Perennial Ryegrass (Fall) | JB | 2 | $ - 0 | Service | |||
| 2016 | 4.5.5 | Core Aerification (65 acres) | JB | 1 | $ - 0 | Service | |||
| 2017 | 4.5.6 | Turf Dethatching (30 acre) | JB | 1 | $ - 0 | Service | |||
| 2018 | 4.6.1 | Insect/Pest/Disease control-Blanket Application | JB | 1 | $ - 0 | Service | |||
| 2019 | 4.6.1 | Insect/Pest/Disease control-Spot Application | JB | 5 | $ - 0 | Service | |||
| 2020 | 4.6.2 | Moles, Voles, Ground Hogs, Skunks and any other pest control | MO | 12 | $ - 0 | Service | |||
| 2021 | 4.7.1 | Extreme Weather Storm Damage and Debris Clean-up | HR | 80 | $ - 0 | Service | |||
| 2022 | 4.8.1 | Headstone Receiving (All First, Subsequent and Replacement Headstones) | EA | 750 | $ - 0 | Service | |||
| 2023 | 4.8.2 | Headstone Transport, Installation and Setting, All First Interment, Subsequent and replacement | |||||||
| Headstones. | EA | 750 | $ - 0 | Service | |||||
| 2024 | 4.8.3 | Headstone Raise and Realign | EA | 1800 | $ - 0 | Service | |||
| 2025 | 4.8.4 | Headstone Fine Tune Alignment (Bump & Run) | EA | 5000 | $ - 0 | Service | |||
| 2026 | 4.9.1 | Cleaning of Headstones and Markers | JB | 2 | $ - 0 | Service | |||
| 2027 | 4.9.2 | Pressure washing -Entrance Gates, Fencing, Signs and Concrete Pads under Signs and Lights | JB | 2 | $ - 0 | Service | |||
| 2028 | 4.9.3 | Pressure washing Entrance Ways, Walkways and Curbs | JB | 2 | $ - 0 | Service | |||
| 2029 | 4.9.4 | Pressure washing both Committal Shelters | JB | 2 | $ - 0 | Service | |||
| 2030 | 4.9.5 | Pressure washing Buildings and Surrounding Concrete Walkways, Sidewalks, and Hardscape | JB | 2 | $ - 0 | Service | |||
| 2031 | 4.9.6 | Pressure washing Floral Vase and Trash Receptacle Cleaning | JB | 2 | $ - 0 | Service | |||
| 2032 | 4.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed |
/ As-Requested" basis - All Parts and Supplies Provided
| By Government. | 15min | 120 | $ - 0 | Construction | |||||
| 2033 | 4.2.1 | Irrigation System Pump Station Services | JB | 3 | $ - 0 | Construction | |||
| 2034 | 5.1 | Turf Type Tall Fescue Sod | SQ FT | 10000 | $ - 0 | Service | |||
| 2035 | 5.2 | Screened Topsoil | YDS | 50 | $ - 0 | Service | |||
| 2036 | 5.3 | Chat (Fine Crushed Rock) | YDS | 40 | $ - 0 | Service | |||
| Option Year Two Total Estimate COST | $ 0.00 | ||||||||
| Option Year Three (3) Jun 2029 - May 2030 | |||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | |||
| 3001 | 4.1.1 | Edging of Walkways, Curbs and other Horizontal Surfaces | EA | 42 | $ - 0 | Service | |||
| 3002 | 4.1.2 | Trimming of Headstones, Monuments, Markers, and other Vertical Surfaces | EA | 42 | $ - 0 | Service | |||
| 3003 | 4.1.3 | Leaf and Debris Collection and Removal | MO | 4 | $ - 0 | Service | |||
| 3004 | 4.3.1; |
4.3.2;
4.3.3;
| 4.4.4; | Sunken Grave and Grounds Repair of Casket Sites, Sunken Cremation Sites, Small Areas grounds repairs, Subsequent Burial Sites | ||||||||
| and other Sod repairs and Installation. | EA-SQFT | 15000 | $ - 0 | Service | |||||
| 3005 | 4.4.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | 12 | $ - 0 | Service | |||
| 3006 | 4.4.2 | Tree Maintenance | JB | 1 | $ - 0 | Service | |||
| 3007 | 4.4.3 | Mulching - Install and Replenish mulch to include all planting beds, all tree rings, shrubs. | JB | 2 | $ - 0 | Service | |||
| 3008 | 4.5.2 | Fertilization of Turf Type Tall Fescue ,Turf Type Perennial Ryegrass and Zeon Zoysia | JB | 5 | $ - 0 | Service | |||
| 3009 | 4.5.2 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 3010 | 4.5.2 | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | $ - 0 | Service | |||
| 3011 | 4.5.2 | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 10 | $ - 0 | Service | |||
| 3012 | 45.2 | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 3013 | 4.5.2 | Post Emergent Bermuda Eradication - Spot Application | JB | 10 | $ - 0 | Service | |||
| 3014 | 4.5.3 | Gypsum or Dolomitic Lime Application | JB | 1 | $ - 0 | Service | |||
| 3015 | 4.5.4 | Overseeding of Turf Type Tall Fescue (Spring) and Turf Type Perennial Ryegrass (Fall) | JB | 2 | $ - 0 | Service | |||
| 3016 | 4.5.5 | Core Aerification (65 acres) | JB | 1 | $ - 0 | Service | |||
| 3017 | 4.5.6 | Turf Dethatching (30 acre) | JB | 1 | $ - 0 | Service | |||
| 3018 | 4.6.1 | Insect/Pest/Disease control-Blanket Application | JB | 1 | $ - 0 | Service | |||
| 3019 | 4.6.1 | Insect/Pest/Disease control-Spot Application | JB | 5 | $ - 0 | Service | |||
| 3020 | 4.6.2 | Moles, Voles, Ground Hogs, Skunks and any other pest control | MO | 12 | $ - 0 | Service | |||
| 3021 | 4.7.1 | Extreme Weather Storm Damage and Debris Clean-up | HR | 80 | $ - 0 | Service | |||
| 3022 | 4.8.1 | Headstone Receiving (All First, Subsequent and Replacement Headstones) | EA | 750 | $ - 0 | Service | |||
| 3023 | 4.8.2 | Headstone Transport, Installation and Setting, All First Interment, Subsequent and replacement | |||||||
| Headstones. | EA | 750 | $ - 0 | Service | |||||
| 3024 | 4.8.3 | Headstone Raise and Realign | EA | 1800 | $ - 0 | Service | |||
| 3025 | 4.8.4 | Headstone Fine Tune Alignment (Bump & Run) | EA | 5000 | $ - 0 | Service | |||
| 3026 | 4.9.1 | Cleaning of Headstones and Markers | JB | 2 | $ - 0 | Service | |||
| 3027 | 4.9.2 | Pressure washing -Entrance Gates, Fencing, Signs and Concrete Pads under Signs and Lights | JB | 2 | $ - 0 | Service | |||
| 3028 | 4.9.3 | Pressure washing Entrance Ways, Walkways and Curbs | JB | 2 | $ - 0 | Service | |||
| 3029 | 4.9.4 | Pressure washing both Committal Shelters | JB | 2 | $ - 0 | Service | |||
| 3030 | 4.9.5 | Pressure washing Buildings and Surrounding Concrete Walkways, Sidewalks, and Hardscape | JB | 2 | $ - 0 | Service | |||
| 3031 | 4.9.6 | Pressure washing Floral Vase and Trash Receptacle Cleaning | JB | 2 | $ - 0 | Service | |||
| 3032 | 4.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed |
/ As-Requested" basis - All Parts and Supplies Provided
| By Government. | 15min | 120 | $ - 0 | Construction | |||||
| 3033 | 4.2.1 | Irrigation System Pump Station Services | JB | 3 | $ - 0 | Construction | |||
| 3034 | 5.1 | Turf Type Tall Fescue Sod | SQ FT | 10000 | $ - 0 | Service | |||
| 3035 | 5.2 | Screened Topsoil | YDS | 50 | $ - 0 | Service | |||
| 3036 | 5.3 | Chat (Fine Crushed Rock) | YDS | 40 | $ - 0 | Service | |||
| Option Year Three Total Estimate COST | $ 0.00 | ||||||||
| OPTION YEAR Four (4) Jun 2030 - May 2031 | |||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | |||
| 4001 | 4.1.1 | Edging of Walkways, Curbs and other Horizontal Surfaces | EA | 42 | $ - 0 | Service | |||
| 4002 | 4.1.2 | Trimming of Headstones, Monuments, Markers, and other Vertical Surfaces | EA | 42 | $ - 0 | Service | |||
| 4003 | 4.1.3 | Leaf and Debris Collection and Removal | MO | 4 | $ - 0 | Service | |||
| 4004 | 4.3.1; |
4.3.2;
4.3.3;
| 4.4.4; | Sunken Grave and Grounds Repair of Casket Sites, Sunken Cremation Sites, Small Areas grounds repairs, Subsequent Burial Sites | ||||||||
| and other Sod repairs and Installation. | EA-SQFT | 15000 | $ - 0 | Service | |||||
| 4005 | 4.4.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | 12 | $ - 0 | Service | |||
| 4006 | 4.4.2 | Tree Maintenance | JB | 1 | $ - 0 | Service | |||
| 4007 | 4.4.3 | Mulching - Install and Replenish mulch to include all planting beds, all tree rings, shrubs. | JB | 2 | $ - 0 | Service | |||
| 4008 | 4.5.2 | Fertilization of Turf Type Tall Fescue ,Turf Type Perennial Ryegrass and Zeon Zoysia | JB | 5 | $ - 0 | Service | |||
| 4009 | 4.5.2 | Weed Control: Pre-Emerge Herbicide - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 4010 | 4.5.2 | Weed Control: Post Emerge Herbicide - Blanket Application | JB | 3 | $ - 0 | Service | |||
| 4011 | 4.5.2 | Weed Control: Post Emerge Herbicide Treatment - Spot Application | JB | 10 | $ - 0 | Service | |||
| 4012 | 45.2 | Post Emergent Bermuda Eradication - Blanket Application | JB | 2 | $ - 0 | Service | |||
| 4013 | 4.5.2 | Post Emergent Bermuda Eradication - Spot Application | JB | 10 | $ - 0 | Service | |||
| 4014 | 4.5.3 | Gypsum or Dolomitic Lime Application | JB | 1 | $ - 0 | Service | |||
| 4015 | 4.5.4 | Overseeding of Turf Type Tall Fescue (Spring) and Turf Type Perennial Ryegrass (Fall) | JB | 2 | $ - 0 | Service | |||
| 4016 | 4.5.5 | Core Aerification (65 acres) | JB | 1 | $ - 0 | Service | |||
| 4017 | 4.5.6 | Turf Dethatching (30 acre) | JB | 1 | $ - 0 | Service | |||
| 4018 | 4.6.1 | Insect/Pest/Disease control-Blanket Application | JB | 1 | $ - 0 | Service | |||
| 4019 | 4.6.1 | Insect/Pest/Disease control-Spot Application | JB | 5 | $ - 0 | Service | |||
| 4020 | 4.6.2 | Moles, Voles, Ground Hogs, Skunks and any other pest control | MO | 12 | $ - 0 | Service | |||
| 4021 | 4.7.1 | Extreme Weather Storm Damage and Debris Clean-up | HR | 80 | $ - 0 | Service | |||
| 4022 | 4.8.1 | Headstone Receiving (All First, Subsequent and Replacement Headstones) | EA | 750 | $ - 0 | Service | |||
| 4023 | 4.8.2 | Headstone Transport, Installation and Setting, All First Interment, Subsequent and replacement | |||||||
| Headstones. | EA | 750 | $ - 0 | Service | |||||
| 4024 | 4.8.3 | Headstone Raise and Realign | EA | 1800 | $ - 0 | Service | |||
| 4025 | 4.8.4 | Headstone Fine Tune Alignment (Bump & Run) | EA | 5000 | $ - 0 | Service | |||
| 4026 | 4.9.1 | Cleaning of Headstones and Markers | JB | 2 | $ - 0 | Service | |||
| 4027 | 4.9.2 | Pressure washing -Entrance Gates, Fencing, Signs and Concrete Pads under Signs and Lights | JB | 2 | $ - 0 | Service | |||
| 4028 | 4.9.3 | Pressure washing Entrance Ways, Walkways and Curbs | JB | 2 | $ - 0 | Service | |||
| 4029 | 4.9.4 | Pressure washing both Committal Shelters | JB | 2 | $ - 0 | Service | |||
| 4030 | 4.9.5 | Pressure washing Buildings and Surrounding Concrete Walkways, Sidewalks, and Hardscape | JB | 2 | $ - 0 | Service | |||
| 4031 | 4.9.6 | Pressure washing Floral Vase and Trash Receptacle Cleaning | JB | 2 | $ - 0 | Service | |||
| 4032 | 4.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed |
/ As-Requested" basis - All Parts and Supplies Provided
| By Government. | 15min | 120 | $ - 0 | Construction | |||||
| 4033 | 4.2.1 | Irrigation System Pump Station Services | JB | 3 | $ - 0 | ||||
| 4034 | 5.1 | Turf Type Tall Fescue Sod | SQ FT | 10000 | $ - 0 | Service | |||
| 4035 | 5.2 | Screened Topsoil | YDS | 50 | $ - 0 | Service | |||
| 4036 | 5.3 | Chat (Fine Crushed Rock) | YDS | 40 | $ - 0 | Service | |||
| Option Year Four Total Estimate COST | $ 0.00 | ||||||||
| Total Amounts | |||||||||
| BASE YEAR: JUN 2026 - MAY 2027 | $ 0.00 | ||||||||
| OPTION YEAR 1: JUN 2027 - MAY 2028 | $ 0.00 | ||||||||
| OPTION YEAR 2: JUN 2028 - MAY 2029 | $ 0.00 | ||||||||
| OPTION YEAR 3: JUN 2029 - MAY 2030 | $ 0.00 | ||||||||
| OPTION YEAR 4: JUN 2030 - MAY 2031 | $ 0.00 | ||||||||
| TOTAL BASE +4 | $ 0.00 |
How was the IGCE derived? (i.e. previous contracts, internet prices, etc.)
File details come from the government source that posted it. Updated .