Attachment B Price Per Flag.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- 8345--VA Burial Flags Federal contract opportunity
- Solicitation number
- 36C10G23R0001
About this file
This document is a combined synopsis and solicitation for VA burial flags from the Department of Veterans Affairs. The VA seeks to establish multiple contracts to supply burial flags as an entitlement for deceased veterans' families, with a one-year base period and four one-year option periods. Interested offerors must propose pricing for at least one contract line item per contract year in the base year and option years using the price per flag templates. Questions are due by October 7, 2022 and proposals by October 31, 2022. Awards will be made to a minimum of two and maximum of five contractors based on a best value determination. The associated NAICS code is 314999 and size standard is 500 employees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 36C10G23R0001 VA Burial Flags Amendment 0001.pdf | ||
| 36C10G23R0001 Amendment 0001.pdf | ||
| Attachment D Questions with Answers.pdf | ||
| 36C10G23R0001 0001_1.docx | DOCX document | |
| Attachment A Proposed Delivery Schedule.xlsx | XLSX spreadsheet | |
| Attachment D Questions.xlsx | XLSX spreadsheet | |
| 36C10G23R0001_1.docx | DOCX document | |
| Attachment F Past Performance Questionnaire.docx | DOCX document | |
| Attachment E FAT Statement of Attestation.pdf | ||
| Attachment C BAA Attestation.docx | DOCX document | |
| Solicitation 36C10G23R0001 VA Burial Flags.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Per Flag CLIN X001AA
| PRICE SCHEDULE ADJUSTMENT TEMPLATE (PRICE PER FLAG) | |||||||||
| Element - Material | Item# | Material - Direct | Unit of Measure (UOM) | Cost Per UOM | Material Required Per Flag | Material Cost Per Flag | Part# or SKU | Source | TAB Identifier |
| 1 | Blue Cotton | $0.00 | 0.0000 | $0.00 | |||||
| 2 | 30/2 Ply Embroidery Yarn | ||||||||
| 3 | 40/2 Ply Embroidery Yarn | ||||||||
| 4 | Red Cotton | ||||||||
| 5 | White Cotton | ||||||||
| 6 | Cotton Duck | ||||||||
| 7 | #2 RRG Brass Grommets | ||||||||
| 8 | #2 SW Brass Grommets | ||||||||
| 9 | VA - FLAG 6 PACK MASTER | ||||||||
| 10 | VA - SINGLE FLAG BOX | ||||||||
| 11 | 2" X 3" INNER CARTON LABEL VA | ||||||||
| Subtotal Material | |||||||||
| Element - Labor | Labor | ||||||||
| 1 | Labor - Direct | hourly rate | |||||||
| 2 | Labor - Indirect (Fringe)* | hourly rate | |||||||
| Subtotal Labor | |||||||||
| Element - Other Indirect Costs (Not Eligible for Adjustment Under EPA) | Indirect Expenses** | ||||||||
| Material Overhead | |||||||||
| Manufacturing Overhead | |||||||||
| G & A | |||||||||
| Profit | |||||||||
| Freight | |||||||||
| other | |||||||||
| other | |||||||||
| Subtotal Indirect Expenses | |||||||||
| Total Price Per Flag | $0.00 | ||||||||
| NOTE: | Tab Identifier (Column J): The vendor shall place all supporting documentation in a pdf file (in sequence and index (label) each item for ease of review and analysis. | ||||||||
| The supporting documentation shall be included in the Pricing Volume or as an Attachment to Pricing Volume; there is no page limitation for supporting documentation. |
| UOM | (text) | Type of or unit of measument by which the element is purchase (yards, inches, etc.) |
| Cost per UOM | (currency) | Cost of the UOM indicated (if UOM is yard: $xx per yard) |
| Material Required Per Flag | (number) | How much of the material is required to make one flag (if UOM is yard: specify fraction of yard) |
| Material Cost Per Flag | (number) | Cost of that material to make one flag (E * F) |
| Part # | (text) | If available |
| Source | (text) | Source is where the element is obtained from |
NOTE: Prices proposed shall be FOB Origin to VA Service and Distribution Center (SDC), Hines, IL, as specified in the Delivery Section of this RFQ.
*Indirect Labor - Fringe - is as defined by FAR 16.203
**Indirect Costs - cannot be considered for adjustment per FAR
Price Per Flag CLIN X001AB
| PRICE SCHEDULE ADJUSTMENT TEMPLATE (PRICE PER FLAG) | |||||||||
| Element - Material | Item# | Material - Direct | Unit of Measure (UOM) | Cost Per UOM | Material Required Per Flag | Material Cost Per Flag | Part# or SKU | Source | TAB Identifier |
| 1 | Blue Cotton | $0.00 | 0.0000 | $0.00 | |||||
| 2 | 30/2 Ply Embroidery Yarn | ||||||||
| 3 | 40/2 Ply Embroidery Yarn | ||||||||
| 4 | Red Cotton | ||||||||
| 5 | White Cotton | ||||||||
| 6 | Cotton Duck | ||||||||
| 7 | #2 RRG Brass Grommets | ||||||||
| 8 | #2 SW Brass Grommets | ||||||||
| 9 | VA - FLAG 6 PACK MASTER | ||||||||
| 10 | VA - SINGLE FLAG BOX | ||||||||
| 11 | 2" X 3" INNER CARTON LABEL VA | ||||||||
| Subtotal Material | |||||||||
| Element - Labor | Labor | ||||||||
| 1 | Labor - Direct | hourly rate | |||||||
| 2 | Labor - Indirect (Fringe)* | hourly rate | |||||||
| Subtotal Labor | |||||||||
| Element - Other Indirect Costs (Not Eligible for Adjustment Under EPA) | Indirect Expenses** | ||||||||
| Material Overhead | |||||||||
| Manufacturing Overhead | |||||||||
| G & A | |||||||||
| Profit | |||||||||
| Freight | |||||||||
| other | |||||||||
| other | |||||||||
| Subtotal Indirect Expenses | |||||||||
| Total Price Per Flag | $0.00 | ||||||||
| NOTE: | Tab Identifier (Column J): The vendor shall place all supporting documentation in a pdf file (in sequence and index (label) each item for ease of review and analysis. | ||||||||
| The supporting documentation shall be included in the Pricing Volume or as an Attachment to Pricing Volume; there is no page limitation for supporting documentation. |
| UOM | (text) | Type of or unit of measument by which the element is purchase (yards, inches, etc.) |
| Cost per UOM | (currency) | Cost of the UOM indicated (if UOM is yard: $xx per yard) |
| Material Required Per Flag | (number) | How much of the material is required to make one flag (if UOM is yard: specify fraction of yard) |
| Material Cost Per Flag | (number) | Cost of that material to make one flag (E * F) |
| Part # | (text) | If available |
| Source | (text) | Source is where the element is obtained from |
NOTE: Prices proposed shall be FOB Origin to VA Service and Distribution Center (SDC), Hines, IL, as specified in the Delivery Section of this RFQ.
*Indirect Labor - Fringe - is as defined by FAR 16.203
**Indirect Costs - cannot be considered for adjustment per FAR
Price Per Flag CLIN X001AC
| PRICE SCHEDULE ADJUSTMENT TEMPLATE (PRICE PER FLAG) | |||||||||
| Element - Material | Item# | Material - Direct | Unit of Measure (UOM) | Cost Per UOM | Material Required Per Flag | Material Cost Per Flag | Part# or SKU | Source | TAB Identifier |
| 1 | Blue Cotton | $0.00 | 0.0000 | $0.00 | |||||
| 2 | 30/2 Ply Embroidery Yarn | ||||||||
| 3 | 40/2 Ply Embroidery Yarn | ||||||||
| 4 | Red Cotton | ||||||||
| 5 | White Cotton | ||||||||
| 6 | Cotton Duck | ||||||||
| 7 | #2 RRG Brass Grommets | ||||||||
| 8 | #2 SW Brass Grommets | ||||||||
| 9 | VA - FLAG 6 PACK MASTER | ||||||||
| 10 | VA - SINGLE FLAG BOX | ||||||||
| 11 | 2" X 3" INNER CARTON LABEL VA | ||||||||
| Subtotal Material | |||||||||
| Element - Labor | Labor | ||||||||
| 1 | Labor - Direct | hourly rate | |||||||
| 2 | Labor - Indirect (Fringe)* | hourly rate | |||||||
| Subtotal Labor | |||||||||
| Element - Other Indirect Costs (Not Eligible for Adjustment Under EPA) | Indirect Expenses** | ||||||||
| Material Overhead | |||||||||
| Manufacturing Overhead | |||||||||
| G & A | |||||||||
| Profit | |||||||||
| Freight | |||||||||
| other | |||||||||
| other | |||||||||
| Subtotal Indirect Expenses | |||||||||
| Total Price Per Flag | $0.00 | ||||||||
| NOTE: | Tab Identifier (Column J): The vendor shall place all supporting documentation in a pdf file (in sequence and index (label) each item for ease of review and analysis. | ||||||||
| The supporting documentation shall be included in the Pricing Volume or as an Attachment to Pricing Volume; there is no page limitation for supporting documentation. |
| UOM | (text) | Type of or unit of measument by which the element is purchase (yards, inches, etc.) |
| Cost per UOM | (currency) | Cost of the UOM indicated (if UOM is yard: $xx per yard) |
| Material Required Per Flag | (number) | How much of the material is required to make one flag (if UOM is yard: specify fraction of yard) |
| Material Cost Per Flag | (number) | Cost of that material to make one flag (E * F) |
| Part # | (text) | If available |
| Source | (text) | Source is where the element is obtained from |
NOTE: Prices proposed shall be FOB Origin to VA Service and Distribution Center (SDC), Hines, IL, as specified in the Delivery Section of this RFQ.
*Indirect Labor - Fringe - is as defined by FAR 16.203
**Indirect Costs - cannot be considered for adjustment per FAR
File details come from the government source that posted it. Updated .