This document is the Attachment B plans for the Oregon Department of Aviation's Toledo State Airport Apron Reconstruction Project. The project will reconstruct the airport's apron, north taxiway, taxilanes, and access road, as the existing pavements have deteriorated. The work includes asphalt and aggregate pavement construction, new culverts, aircraft tie-downs, and pavement markings. The contract has a 30 calendar day period from the notice to proceed, with an additional 1 day permitted for the second application of pavement markings. The project site is located in Toledo, within Lincoln County.
The project will utilize a mix of asphalt and aggregate base materials, with ODOT specification requirements for subgrade, aggregate base, and asphalt compaction. Temporary erosion and sediment control measures are specified, including sediment barriers, construction entrances, and hydroseeding. The project is funded by the state, and there are no set-asides or incumbent contractors mentioned. The solicitation package does not include pricing terms or funding amounts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35330_00003385_ITB.docx | DOCX document | |
| 00003385_Add 1.docx | DOCX document | |
| Attachment A_Special Provisions.pdf | ||
| Attachment D_Geotechnical Report.pdf | ||
| Bid tab.xlsx | XLSX spreadsheet | |
| Attachment C_Bid Pricing Form.xlsx | XLSX spreadsheet | |
| Notice of Intent to Award-ORPIN.doc~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _C ov er
S he et .d w g
COVER SHEET
G-01
JAK
MAH
MAH
TAXILANE OBJECT FREE AREA
OBSTACLE FREE ZONE
RUNWAY SAFETY AREA
EDGE OF PAVEMENT
ACCESS ROAD
ASPHALT PAVEMENT
HANGAR TAXILANE
AGGREGATE SHOULDER
SIGN (SINGLE POST)
FLOW ARROW
INLET
CUT/FILL SLOPE
INDEX CONTOUR
INTERMEDIATE CONTOUR
ELECTRICAL LINE
ELECTRICAL BOX
GUY WIRE
POWER POLE
OFZ
RSA
OFZ
RSA
E E
C/F
E
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION PROJECT
PA #B38112
MAY 2022
VICINITY MAP
NO SCALE
JOSEPH
ASTORIA
PORTLAND THE DALLES
UMATILLA
BOARDMAN
LA GRANDE
TILLAMOOK
SALEM
NEWPORT ALBANY
CORVALLIS
FLORENCE
REEDSPORT
EUGENE
COOS BAY
ROSEBURG
GRANTS PASS
ASHLAND KLAMATH FALLS LAKEVIEW
BEND
REDMOND
PRINEVILLE
MADRAS
CONDON
BAKER
JOHN DAY
BURNS
ONTARIO
VALE
JORDAN
VALLEY
WASHINGTON
CALIFORNIA NEVADA
ID
AH
O
I-5 26 197
PROJECT
SITE
SITE MAP
NO SCALE
APPROXIMATE
WORK AREA
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
DRAWING INDEX
SHEET
NUMBER
DRAWING
NUMBER DRAWING TITLE
1 G-01 COVER SHEET
2 G-02 SITE AND SURVEY CONTROL
3 G-03 CONSTRUCTION SAFETY AND PHASING PLAN
4 EC-01 EROSION CONTROL PLAN
5 EC-02 EROSION CONTROL STANDARD NOTES
6 EC-03 EROSION CONTROL ADDITIONAL NOTES
7 EC-04 EROSION CONTROL DETAILS
8 C-01 DEMOLITION PLAN
9 C-02 LAYOUT PLAN
10 C-03 GRADING PLAN APRON, TAXIWAY, AND TAXILANES
11 C-04 GRADING PLAN ACCESS ROAD
12 C-05 PAVEMENT SECTIONS APRON
13 C-06 PAVEMENT SECTIONS TAXIWAY AND TAXILANES
14 C-07 PAVEMENT MARKING PLAN
15 C-08 DETAILS
EXISTING PROPOSED
STANDARD DRAWING LEGEND
TOFA
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
CONTROL
#105
CONTROL
#104
CONTROL
#102
CONTROL
#101
CONTROL TABLE
Point #
Northing
359617.04
359754.42
359530.47
359479.96
Easting
7306590.64
7306690.02
7307001.94
7307115.84
Elevation
10.52
9.76
14.49
25.07
Description
CNT I.R W\RPC
CNT H&T
CNT I.R W\RPC
CNT MAG
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _S ite
S ur ve y
C on tro l P la n.
dw g
SITE AND SURVEY CONTROL
G-02
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
G-02
SITE AND SURVEY CONTROL PLAN
SCALE: 1" = 40'
40 0 40 80
SCALE OF FEET
SCALE: 1"=40'
APRON
ACCESS ROAD
SURVEY NOTES:
1. THE COORDINATES SHOWN ARE BASED ON THE OREGON STATE PLANE NORTH ZONE (3601).
HORIZONTAL DATUM: NAD 83(2011)(EPOCH: 2010.0000)
VERTICAL DATUM: NAVD88 (GEOID18)
2. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN THROUGHOUT THIS SET OF DRAWINGS ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY
AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTORS FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
5'
71'
.7
63' (TYP)
RUNWAY 13-31
NORTH TAXIWAYSOUTH TAXIWAY
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
TAXILANE OBSTACLE
FREE ZONE
SURVEY CONTROL
POINT
PROPOSED APRON
(SCHEDULE A)
HANGAR TAXILANE
(SCHEDULE B)
PROPOSED ACCESS
ROAD (SCHEDULE C)
PROPOSED SHOULDER
RSA
OFZ
TOFA
HANGAR
TAXILANES
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
TO
FA
TO
FA
TOFA
TO
FA
TO
FA
OFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZOFZ
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _S ite
S ur ve y
C on tro l P la n.
dw g
CONSTRUCTION SAFETY AND PHASING PLAN
G-03
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
G-03
CONSTRUCTION SAFETY AND PHASING PLAN
SCALE: 1" = 40'
80 0 80 160
SCALE OF FEET
SCALE: 1"=80'
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
TAXILANE OBSTACLE
FREE ZONE
CONTRACTORS HAUL
ROUTE
PROPOSED APRON
(SCHEDULE A)
HANGAR TAXILANE
(SCHEDULE B)
PROPOSED ACCESS
ROAD (SCHEDULE C)
PROPOSED SHOULDER
BARRICADES
RSA
OFZ
NOTES:
1. ALL WORK SHALL BE COMPLETE WITHIN 30
CALENDAR DAYS OF CONTRACT NOTICE TO
PROCEED. THE RUNWAY SHALL BE CLOSED
WHEN WORK IS PERFORMED.
2. WORK EXEMPT FROM CALENDAR DAY
CONTRACT PERIOD INCLUDES THE SECOND
APPLICATION OF PAVEMENT MARKINGS. A
CONTINUOUS 1 CALENDAR DAY (24 HOUR)
CLOSURE FOR THE SECOND APPLICATION OF
PAVEMENT MARKINGS WILL BE PERMITTED, A
MINIMUM OF 30 DAYS AFTER PAVING
OPERATIONS HAVE BEEN COMPLETED.
3. PLACE OREGON DEPARTMENT OF AVIATION
(ODA) PROVIDED RUNWAY CLOSURE CROSSES
WHERE SHOWN ON CONSTRUCTION SAFETY
AND PHASING PLAN, AS DESCRIBED IN THE
SPECIFICATIONS, OR AS DIRECTED BY THE
ENGINEER.
4. REQUEST RUNWAY CLOSURE A MINIMUM OF 7
DAYS BEFORE WORK BEGINS; NO WORK MAY
OCCUR WITHIN OBSTACLE FREE ZONE (OFZ)
WHILE RUNWAY IS OPEN.
5. PROVIDE FOR AND MAINTAIN PUBLIC PARKING
AND ACCESS TO EXISTING AIRPORT HANGARS
WHERE APPLICABLE.
6. CONTRACTOR SHALL MAINTAIN THE EXISTING
ACCESS ROAD AND REPAIR ANY DAMAGE AT
THE CONCLUSION OF CONSTRUCTION.
PAYMENT FOR THIS WORK SHALL BE MADE
UNDER ACCESS ROAD RESTORATION (IF
SCHEDULE C/D NOT CONSTRUCTED).
7. STAGING AREA AND STAGING AREA ACCESS
WIDTH, LENGTH, DEPTH, MATERIAL, AND
UTILITY PROTECTION IMPROVEMENTS TO BE
DETERMINED BY THE CONTRACTOR AND
SUBMITTED TO THE OWNER FOR APPROVAL. AT
THE CONCLUSION OF THE PROJECT, THE
CONTRACTOR SHALL REMOVE AND RESTORE
THE STAGING AREA AND STAGING AREA
ACCESS TO ITS ORIGINAL CONDITION.
8. CONTRACTOR SHALL CONTROL DUST AND
SMOKE RELATED TO CONSTRUCTION
ACTIVITIES AT ALL TIMES.
9. FOR GEOTECHNICAL INFORMATION, REFER TO
GEOTECHNICAL ENGINEERING REPORT FROM
FOUNDATION ENGINEERING, INC., TITLED
"TOLEDO STATE AIRPORT TAXIWAY AND APRON
REHABILITATION" DATED JANUARY 27, 2022.
G-03
RUNWAY CLOSURE CROSSES
SCALE: 1" = 80'
40 0 40 80
SCALE OF FEET
SCALE: 1"=40'
PLACE ODA PROVIDED RUNWAY
CLOSURE CROSSES OVER
RUNWAY NUMERALS (TYP)
LOCAL ACCESS ROAD,
CONSTRUCTION
VEHICLES PROHIBITED
CONTRACTORS
STAGING AREA
ACCESS ROAD
APRON
5'
0'
0'
TOFA
HANGAR
TAXILANES
RUNWAY 13-31
NORTH TAXIWAYSOUTH TAXIWAY
PLACE BARRICADES
(TYP)
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
C/F
C/F
C/F
C/F
C/F
C /F
C/F
C/F
C /F
C/F C
/F
C/FC/FC/FC/F
C/F
C /F
C/F C/F C/F
C /F
C/F
C/F
C/ F
C/F
C/F C/F C/F C/F
C/F
C/F
C/F
C/F
XXXXXXXX
X X X
X X
X X
X X
X X E E E E E E E E E E
EE
E
E E
9.
11.2
11.6
11.0
10.8
10.6
10.4
10.2
10.0
9.
8 9.
9.8
10.0
.410
.210 .0
11.2
.411
.6
11.2
11.0
X X
X X
X X
X
X
X
X
X
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _E ro si on C on tro l P la n.
dw g
EROSION CONTROL PLAN
EC-01
JAK
BBK
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
EC-01
EROSION CONTROL PLAN
SCALE: 1" = 40'
40 0 40 80
SCALE OF FEET
SCALE: 1"=40'
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
PROPOSED APRON
(SCHEDULE A)
HANGAR TAXILANE
(SCHEDULE B)
PROPOSED ACCESS ROAD
(SCHEDULE C)
PROPOSED SHOULDER
PROPOSED SEEDING
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
CUT/FILL LIMITS
EXISTING MAJOR
CONTOUR
EXISTING MINOR
CONTOUR
SEDIMENT BARRIER
CONSTRUCTION
ENTRANCE
EXISTING FLOW LINE
PROPOSED FLOW LINE
RSA
OFZ
ACCESS ROAD NOTES:
1. WORK SHALL BE IN ACCORDANCE WITH OREGON DEQ1200-C PERMIT FOR THE PROJECT.
2. PLACE SEDIMENT BARRIER AROUND SOIL STOCK PILES AS NEEDED.
3. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER DISTURBED SURFACES, UNLESS
OTHERWISE SHOWN, OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE OWNER. HYDROSEEDING
SHALL NOT OCCUR ON GRAVEL SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR
ADDITIONAL SEEDING REQUIREMENTS.
4. REFER TO DRAWING EC-02 FOR EROSION AND SEDIMENT CONTROL STANDARD NOTES AND DRAWING
EC-03 FOR EROSION AND SEDIMENT CONTROL ADDITIONAL NOTES.
CONTRACTOR STAGING AREA, PORTABLE TOILET, CONCRETE
WASHOUT, AND SOIL STOCKPILE TO OCCUR WITHIN THIS AREA,
REFER TO G-03 FOR ADDITIONAL INFORMATION
CONSTRUCTION ENTRANCE PER
SB SB
APRON
RUNWAY 13-31
10.0
10.2
PROPOSED 6" CULVERT
HANGAR
TAXILANES
NORTH TAXIWAYSOUTH TAXIWAY
C/F
PERMANENT OUTLET
PROTECTION PER
PERMANENT INLET
PROTECTION PER
EC-04
EC-04
EC-04
WORK AREA BOUNDARY MARKERS PER
50' FROM NEAREST LAND DISTURBING
ACTIVITY
EC-03
SEDIMENT BARRIER PER
EC-04
PROPOSED 4" CULVERT WITH
INLET/OUTLET PROTECTION
ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _E ro si on C on tro l P la n.
dw g
EROSION CONTROL STANDARD NOTES
EC-02
JAK
BBK
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
1. INCLUDE A LIST OF ALL PERSONNEL (BY NAME AND POSITION) THAT ARE RESPONSIBLE FOR THE DESIGN, INSTALLATION AND MAINTENANCE OF STORMWATER CONTROL MEASURES (E.G. ESCP DEVELOPER, BMP INSTALLER (SEE SECTION 4.10), AS WELL AS THEIR INDIVIDUAL RESPONSIBILITIES. (SECTION 4.4.C.II)
2. VISUAL MONITORING INSPECTION REPORTS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT
REQUIREMENTS. (SECTION 6.5)
3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS. (SECTION 6.5.Q)
4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO DEQ, AGENT, OR THE LOCAL MUNICIPALITY. (SECTION 4.7)
5. THE PERMIT REGISTRANT MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SECTION 4 AND 4.11)
6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SECTION 4.8)
7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT WITHIN 10 DAYS.
(SECTION 4.9)
8. SEQUENCE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE
AREAS FROM BECOMING A SOURCE OF EROSION. (SECTION 2.2.2)
9. CREATE SMOOTH SURFACES BETWEEN SOIL SURFACE AND EROSION AND SEDIMENT CONTROLS TO
PREVENT STORMWATER FROM BYPASSING CONTROLS AND PONDING. (SECTION 2.2.3)
10. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G. WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SECTION 2.2.1)
11. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF
VEGETATIVE SEED MIX USED. (SECTION 2.2.5)
12. MAINTAIN AND DELINEATE ANY EXISTING NATURAL BUFFER WITHIN THE 50-FEET OF WATERS OF THE STATE.
(SECTION 2.2.4)
13. INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET PROTECTION AS WELL AS ALL
SEDIMENT BASINS, TRAPS, AND BARRIERS PRIOR TO LAND DISTURBANCE. (SECTIONS 2.1.3)
14. CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE EROSION AT OUTLETS
AND DOWNSTREAM CHANNELS AND STREAMBANKS. (SECTIONS 2.1.1 AND 2.2.16)
15. CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL INTERNAL STORM DRAIN INLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY AND AT THE SITE BOUNDARY.
(SECTIONS 2.2.6 AND 2.2.13)
16. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING
CONCRETE WORK. (SECTION 2.2.14)
17. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS AS GRADING PROGRESSES. TEMPORARY OR PERMANENT STABILIZATION MEASURES ARE NOT REQUIRED FOR AREAS THAT ARE INTENDED TO BE LEFT UNVEGETATED, SUCH AS DIRT ACCESS ROADS OR
UTILITY POLE PADS. (SECTIONS 2.2.20 AND 2.2.21)
18. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. (SECTION 2.3.7)
19. KEEP WASTE CONTAINER LIDS CLOSED WHEN NOT IN USE AND CLOSE LIDS AT THE END OF THE BUSINESS DAY FOR THOSE CONTAINERS THAT ARE ACTIVELY USED THROUGHOUT THE DAY. FOR WASTE CONTAINERS THAT DO NOT HAVE LIDS, PROVIDE EITHER (1) COVER (E.G., A TARP, PLASTIC SHEETING, TEMPORARY ROOF) TO PREVENT EXPOSURE OF WASTES TO PRECIPITATION, OR (2) A SIMILARLY EFFECTIVE MEANS DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS (E.G., SECONDARY CONTAINMENT). (SECTION 2.3.7)
20. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OF PRIVATE ROADS USING BMPS SUCH AS: CONSTRUCTION ENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE PRIOR TO LAND-DISTURBING
ACTIVITIES. (SECTION 2.2.7)
21. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS
ON SITE. (SECTION 2.2.7.F)
22. CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E., CONCRETE WASH-OUT, WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING COMPOUNDS. (SECTIONS 1.5 AND 2.3.9)
23. ENSURE THAT STEEP SLOPE AREAS WHERE CONSTRUCTION ACTIVITIES ARE NOT OCCURRING ARE NOT
DISTURBED. (SECTION 2.2.10)
24. PREVENT SOIL COMPACTION IN AREAS WHERE POST-CONSTRUCTION INFILTRATION FACILITIES ARE TO BE
INSTALLED. (SECTION 2.2.12)
25. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, FERTILIZER, PESTICIDES AND HERBICIDES, PAINTS, SOLVENTS, CURING COMPOUNDS AND ADHESIVES FROM CONSTRUCTION OPERATIONS. (SECTIONS 2.2.15
AND 2.3)
26. PROVIDE PLANS FOR SEDIMENTATION BASINS THAT HAVE BEEN DESIGNED PER SECTION 2.2.17 AND
STAMPED BY AN OREGON PROFESSIONAL ENGINEER. (SECTION 2.2.17.A)
27. IF ENGINEERED SOILS ARE USED ON SITE, A SEDIMENTATION BASIN/IMPOUNDMENT MUST BE INSTALLED.
(SECTIONS 2.2.17 AND 2.2.18)
28. PROVIDE A DEWATERING PLAN FOR ACCUMULATED WATER FROM PRECIPITATION AND UNCONTAMINATED
GROUNDWATER SEEPAGE DUE TO SHALLOW EXCAVATION ACTIVITIES. (SEE SECTION 2.4)
29. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE
AND SUPPLIES. (SECTION 2.3)
30. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID
WIND-BLOWN SOIL. (SECTION 2.2.9)
31. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. (SECTION 2.3.5)
32. IF AN ACTIVE TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN ENVIRONMENTAL MANAGEMENT PLAN APPROVAL FROM DEQ BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE
TREATMENT SYSTEM ACCORDING TO MANUFACTURER'S SPECIFICATIONS. (SECTION 1.2.9)
33. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED.
THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL
TIMES OF THE YEAR. (SECTION 2.2)
34. AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE
WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS. (SECTION 2.2.8)
35. SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND
HEIGHT AND BEFORE FENCE REMOVAL. (SECTION 2.1.5.B)
36. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES
DEPTH ABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SECTION 2.1.5.C)
37. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN
REDUCED BY FIFTY PERCENT AND AT COMPLETION OF PROJECT. (SECTION 2.1.5.D)
38. WITH 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED.
INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE
PERFORMED ACCORDING TO THE OREGON DEPARTMENT OF STATE LANDS REQUIRED TIMEFRAME.
(SECTION 2.2.19.A)
39. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR.
VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEAN UP RELEASED SEDIMENTS.
(SECTION 2.2.19)
40. DOCUMENT ANY PORTION(S) OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED OR WILL BE TEMPORARILY INACTIVE FOR 14 OR MORE CALENDAR DAYS. (SECTION 6.5.F)
41. PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT PORTION OF THE SITE.
(SECTION 2.2.20)
42. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY EROSION CONTROLS AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY, UNLESS NEEDED FOR LONG TERM USE FOLLOWING TERMINATION OF PERMIT COVERAGE.
(SECTION 2.2.21)
EROSION/SEDIMENT CONTROL PLAN (ESCP) NOTES:
REFER TO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGE PERMIT, ISSUED BY OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY PURSUANT TO ORS 468B.050 AND SECTION 402 OF THE FEDERAL CLEAN WATER ACT.
EROSION/SEDIMENT INSPECTION FREQUENCY
SITE CONDITION MINIMUM FREQUENCY
1. ACTIVE PERIOD. ON INITIAL DATE THAT LAND DISTURBANCE ACTIVITIES COMMENCE.
WITHIN 24 HOURS OF ANY STORM EVENT, INCLUDING RUNOFF FROM
SNOW MELT, THAT RESULTS IN DISCHARGE FROM THE SITE. AT LEAST
ONCE EVERY 14 DAYS, REGARDLESS OF WHETHER STORMWATER RUNOFF
IS OCCURRING.
2. INACTIVE PERIODS GREATER
THAN FOURTEEN (14)
CONSECUTIVE CALENDAR
DAYS.
THE INSPECTOR MAY REDUCE THE FREQUENCY OF INSPECTIONS IN ANY
AREA OF THE SITE WHERE THE STABILIZATION STEPS IN SECTION 2.2.20
HAVE BEEN COMPLETED TO TWICE PER MONTH FOR THE FIRST MONTH,
NO LESS THAN 14 CALENDAR DAYS APART, THEN ONCE PER MONTH.
3. PERIODS DURING WHICH THE
SITE IS INACCESSIBLE DUE TO
INCLEMENT WEATHER.
IF SAFE, ACCESSIBLE AND PRACTICAL, INSPECTIONS MUST OCCUR DAILY
AT A RELEVANT DISCHARGE POINT OR DOWNSTREAM LOCATION OF THE
RECEIVING WATERBODY.
4. PERIODS DURING WHICH
CONSTRUCTION ACTIVITIES
ARE SUSPENDED AND RUNOFF
IS UNLIKELY DUE TO FROZEN
CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE TEMPORARILY SUSPENDED.
IMMEDIATELY RESUME MONITORING UPON THAWING, OR WHEN WEATHER
CONDITIONS MAKE DISCHARGES LIKELY.
5. PERIODS DURING WHICH
CONSTRUCTION ACTIVITIES
ARE CONDUCTED AND RUNOFF
IS UNLIKELY DUE TO FROZEN
CONDITIONS.
VISUAL MONITORING INSPECTIONS MAY BE REDUCED TO ONCE A MONTH.
IMMEDIATELY RESUME MONITORING UPON THAWING, OR WHEN WEATHER
CONDITIONS MAKE DISCHARGES LIKELY.
AUTHORIZED NON-STORMWATER DISCHARGES:
1. WATER AND ASSOCIATED DISCHARGES FROM EMERGENCY FIREFIGHTING ACTIVITIES;
2. FIRE HYDRANT FLUSHING;
3. PROPERLY MANAGED LANDSCAPE IRRIGATION;
4. WATER USED TO WASH EQUIPMENT AND VEHICLES (EXCLUDING THE ENGINE, UNDERCARRIAGE, AND WHEELS/TIRES) PROVIDED THERE IS
NO DISCHARGE OF SOAPS, SOLVENTS, OR DETERGENTS USED;
5. WATER TO CONTROL DUST;
6. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS;
7. EXTERNAL BUILDING WASHDOWN, PROVIDED SOAPS, SOLVENTS, AND DETERGENTS ARE NOT USED, AND EXTERNAL SURFACES DO NOT
CONTAIN HAZARDOUS SUBSTANCES;
8. PAVEMENT WASH WATERS, PROVIDED SPILLS OR LEAKS OF TOXIC OR HAZARDOUS SUBSTANCES HAVE NOT OCCURRED (UNLESS ALL SPILL MATERIAL HAS BEEN REMOVED) AND WHERE SOAPS, SOLVENTS, AND DETERGENTS ARE NOT USED. DIRECTING PAVEMENT WASH WATERS INTO ANY SURFACE WATER, STORM DRAIN INLET, OR STORMWATER CONVEYANCE IS PROHIBITED, UNLESS THE CONVEYANCE IS CONNECTED TO A SEDIMENT BASIN, SEDIMENT TRAP, OR SIMILARLY EFFECTIVE CONTROL FOR THE POLLUTANTS PRESENT. PER 2.2.19.b, HOSING OF ACCUMULATED SEDIMENTS ON PAVEMENT INTO ANY STORMWATER CONVEYANCE IS PROHIBITED;
9. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE;
10. UNCONTAMINATED, NON-TURBID DISCHARGES OF GROUNDWATER OR SPRING WATER;
11. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS OR
CONTAMINATED GROUNDWATER; AND
12. CONSTRUCTION DEWATERING ACTIVITIES (INCLUDING GROUNDWATER DEWATERING AND WELL DRILLING DISCHARGE ASSOCIATED WITH
THE REGISTERED CONSTRUCTION ACTIVITY), PROVIDED THAT:
12.1. THE WATER IS LAND APPLIED IN A WAY THAT RESULTS IN COMPLETE INFILTRATION WITH NO POTENTIAL TO DISCHARGE TO A SURFACE WATER OF THE STATE, OR THE USE OF A SANITARY OR COMBINED SEWER DISCHARGE IS AUTHORIZED WITH LOCAL
SEWER DISTRICT APPROVAL; OR
12.2. BEST MANAGEMENT PRACTICES AND A TREATMENT SYSTEM APPROVED BY DEQ OR AGENT (SEE SECTION 1.2.9) ARE USED TO
ENSURE COMPLIANCE WITH DISCHARGE AND WATER QUALITY REQUIREMENTS IN SECTION 2.4.
POLLUTANT-GENERATING ACTIVITIES:
1. STORMWATER DISCHARGE FOR THE SITE DOES NOT REACH "WATERS OF THE STATE". POLLUTANT-GENERATING ACTIVITIES FOR THE
SITE INCLUDE CLEARING, GRUBBING, STRIPPING, EXCAVATION, BACKFILL, COMPACTION, ASPHALT PAVEMENT AND ASPHALT PAINTING.
STORAGE OF POLLUTANTS AND FUELING AND MAINTENANCE OF EQUIPMENT SHALL OCCUR IN CONTRACTORS STAGING AREA.
ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _E ro si on C on tro l P la n.
dw g
EROSION CONTROL ADDITIONAL NOTES
EC-03
JAK
BBK
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
NARRATIVE:
PART I
1. PERMIT REGISTRATION INFORMATION
1.1. DATE: MAY 2022
1.2. PROJECT NAME: TOLEDO STATE AIRPORT APRON RECONSTRUCTION
1.3. COMPANY NAME: OREGON DEPARTMENT OF AVIATION
1.4. EMAIL: ANTHONY.BEACH@ODAV.OREGON.GOV
1.5. PREPARED BY: SEE TITLE BLOCK INFORMATION
2. OREGON PROFESSIONAL CERTIFICATION INFORMATION
2.1. THIS PROJECT DOES NOT COVER MORE THAN 20 ACRES.
2.2. THIS PROJECT DOES NOT REQUIRE ENGINEERED FACILITIES.
3. INSPECTOR QUALIFICATION INFORMATION
3.1. MARK HAGEDORN, PE (CESCL #CWTA-71811285, EXP. 4/6/25)
1020 SW EMKAY DR., STE 100, BEND, OR 97702
541-322-8962, MHAGEDORN@CENTURYWEST.COM
4. ENVIRONMENTAL MANAGEMENT PLAN
4.1. NO CONTAMINATED MATERIAL(S) ARE ANTICIPATED.
4.2. NO ACTIVE TREATMENT SYSTEM(S) ARE ANTICIPATED.
5. NARRATIVE SITE DESCRIPTION
5.1. THE TOLEDO STATE AIRPORT APRON RECONSTRUCTION PROJECT
WILL RECONSTRUCT THE AIRPORT'S APRON, NORTH TAXIWAY,
TAXILANES, AND ACCESS ROAD. IN GENERAL, EXISTING PAVEMENTS
HAVE COMPLETELY DETERIORATED AND THIS PROJECT WILL FULLY
RECONSTRUCT THE PAVEMENT SECTION OVER THE EXISTING
FOOTPRINT.
5.2. NEW PAVEMENT SECTIONS WILL CONSIST OF ASPHALT AND
AGGREGATE IMPORTED FROM LOCAL QUARRIES. ONSITE SOILS WILL
BE UTILIZED FOR EARTH FILL. GEOTECHNICAL REPORT DESCRIBES
SOILS AS VARIABLE COMBINATIONS OF SAND AND SILT ACROSS SITE.
NRCS ASSIGNS THESE SOILS A MODERATE ERODIBILITY FACTOR (K)
OF 0.37.
6. TMDL AND 303(D) LISTING
6.1. NEAREST WATERBODY DOES NOT HAVE TMDL OR 303(d)
REQUIREMENTS.
7. NATURAL BUFFER ZONE
7.1. NO WATERS OF THE STATE EXIST WITHIN THE PROJECT SITE OR
WITHIN 50 FEET OF THE SITE.
8. ENGINEERED SOILS
8.1. ENGINEERED SOILS ARE NOT USED ON SITE.
SPILL PROCEDURES:
1. IF MEDICAL EMERGENCY AND/OR ADDITIONAL ASSISTANCE IS REQUIRED,
CALL 911.
2. AVOID CONTACT AND MOVE AWAY OR UPWIND FORM THE SPILL IF UNSURE
IF SAFE.
3. KEEP NON-EMERGENCY INDIVIDUALS OUT OF AREA.
4. CONTROL AND CONTAIN THE SPILL.
5. CLEAN UP WHAT YOU CAN.
6. REPORT THE SPILL TO OREGON EMERGENCY RESPONSE SYSTEM
(1-800-452-0311) IF:
6.1. OIL REACHES A WATER OF THE STATE
6.2. LAND OIL SPILLS GREATER THAN 42 GALLONS
6.3. REPORTABLE QUANTITIES AND HAZARDOUS MATERIALS PER 40 CFR
PART 302.
7. APPROPRIATELY DISPOSE OF CLEANUP MATERIALS.
8. REFER TO EPA'S EMERGENCY RESPONSE WEBSITE TO DETERMINE IF
REPORTABLE AND CALL 1-800-424-8802 IF REQUIRED.
9. CONTINUE LONG TERM CLEANUP.
10. COMPLETE AND SUBMIT SPILL RELEASE REPORT FORM WITH OREGON DEQ.
FERTILIZER APPLICATION AND STORAGE :
1. FERTILIZER IS INCLUDED IN HYDROSEED MIXTURE. FERTILIZER
SHALL NOT BE STORED ONSITE.
2. FERTILIZER SHALL BE APPLIED PER MANUFACTURERS
RECOMMENDED APPLICATION RATE.
3. APPLY FERTILIZER DURING TIME OF YEAR TO MAXIMIZE
VEGETATIVE UPTAKE AND GROWTH.
4. AVOID APPLICATION BEFORE HEAVY RAINS.
5. DO NOT APPLY TO FROZEN GROUND AND/OR STORMWATER
CHANNELS.
6. COMPLY WITH LOCAL, STATE, AND FEDERAL FERTILIZER LAWS .
SITE INFORMATION
AREA TYPE SIZE (AC)
TOTAL PROPERTY 14
TOTAL DISTURBED
SCHEDULE A
SCHEDULE B
SCHEDULE C
1.1 1.0 0.05 0.05
TOTAL IMPERVIOUS 0.9
TOTAL PERVIOUS 0.2
SEEDING INFORMATION
SEED PLS
(LBS/AC)
FINE FESCUE 26.7
PERENNIAL
RYEGRASS 4.8
KENTUCKY
BLUEGRASS 1.7
COLONIAL
BENTGRASS 3.15
CHECKLIST OF REQUIRED ELEMENTS:
PART III
THE FOLLOWING LIST ADDRESSES CHECKLIST ITEMS THAT ARE NOT
OTHERWISE DESCRIBED IN THESE PLANS AND NOTES.
1. GIVEN THE DEPTH OF GROUNDWATER FROM THE PROJECT
GEOTECHNICAL REPORT, DEWATERING SHOULD NOT BE NECESSARY.
2. THE FOLLOWING ITEMS DO NOT EXIST AND ARE NOT PROPOSED FOR
THE SITE:
2.1. SEPTIC DRAIN FIELDS
2.2. DRY WELLS
2.3. DRINKING WATER WELLS
2.4. PLANTERS
ANTICIPATED SCHEDULE AND BMPS:
PART II
1. ANTICIPATED SCHEDULE
1.1. ANTICIPATED START DATE FOR WORK IS JULY 2022.
1.2. ANTICIPATED END DATE FOR WORK IS AUGUST 2022; NO TEMPORARY
STOP DATES ARE ANTICIPATED.
1.3. FINAL STABILIZATION AND REMOVAL OF TEMPORARY STORMWATER
CONTROLS IS ANTICIPATED TO OCCUR IN AUGUST 2022.
2. ANCIPATED BMP SCEDULE
2.1. CONSTRUCTION ENTRANCE: JULY - AUGUST 2022
2.2. CONCRETE WASHOUT: JULY - AUGUST 2022
2.3. SEDMENT BARRIERS: JULY - AUGUST 2022
2.4. HYROSEEDING: AUGUST 2022
2.5. INLET/OUTFALL: PERMANENT
RAIN GAUGE:
1. THE REFERENCE RAIN GAUGE FOR THE PROJECT SHALL
BE KORTOLED15 LOCATED IN DOWNTOWN TOLEDO.
EC-03
WORK AREA BOUNDARY MARKERS
NO SCALE
WOOD POST,
MIN. 3' TALL
EXISTING GRADE
PAINT MIN. TOP 2'
ORANGE, ALL SIDES
NOTES:
1. INSTALL WORK AREA BOUNDARY MARKERS ON 25' INTERVALS
WHERE SHOWN ON PLANS. NO EQUIPMENT/WORK PERMITTED
OUTSIDE OF MARKERS.
2. FLAGGING TAPE NOT PERMITTED ON STAKES.
3. INSTALLATION, MAINTENANCE, AND REMOVAL OF WORK AREA
BOUNDARY MARKERS SHALL BE INCIDENTAL TO "EROSION
CONTROL." NO SEPARATE MEASUREMENT OR PAYMENT SHALL
BE MADE.
ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _E ro si on C on tro l P la n.
dw g
EROSION CONTROL DETAILS
EC-04
JAK
BBK
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
NOTES:
1. CONSTRUCT STRAW WATTLE SEDIMENT BARRIER PER
ODOT STANDARD DRAWING RD1030 TYPE 3 OR OTHER
APPROVED EQUAL FROM ODOT STANDARD DRAWINGS OR
OREGON DEQ BEST MANAGEMENT PRACTICES MANUAL.
2. COUNTERSINK WATTLE MINIMUM 3".
3. INSTALLATION, MAINTENANCE, AND REMOVAL OF STRAW
WATTLE SHALL BE INCIDENTAL TO "EROSION CONTROL." NO
SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE.
EC-04
SEDIMENT BARRIER
NO SCALE
MATCH EXISTING GRADE
100'
B
B
AC
C
ES
S
R O
AD
' R
M
IN
20' MIN.
8" MIN, UNLESS OTHERWISE
SPECIFIED BY SOILS ENGINEER.
ORIGINAL GRADE
4" - 1" OPEN GRADED
AGGREGATE
FILTER FABRIC
PLAN
N.T.S.
SECTION B-B
N.T.S.
EC-04
CONSTRUCTION
ENTRANCE DETAIL
NO SCALE
VARIES
10' MIN.
A A
STAKE (TYP)
STANDARD RECTANGULAR
STRAW BALE (TYP)
STANDARD RECTANGULAR
STRAW BALE (TYP)
2 - 2"X2" WOOD STAKES
PER BALE, DRIVEN 12" MIN.
INTO GROUND (TYP)
10 MIL POLYETHYLENE
PLASTIC LINING
SECTION A-A
N.T.S.
EC-04
CONCRETE WASHOUT
DETAIL
NO SCALE
STAPLE PLASTIC LINING TO
BALES, 2 PER BALE
PLAN
N.T.S.
6"
2"
STAPLE DETAIL
N.T.S.
1/8" DIAMETER
STEEL WIRE
NOTES:
1. INSTALL CONSTRUCTION ENTRANCE PER ODOT
STANDARD DRAWING RD1000 OR OTHER
APPROVED EQUAL FROM ODOT STANDARD
DRAWINGS OR OREGON DEQ BEST
MANAGEMENT PRACTICES MANUAL.
2. INSTALLATION, MAINTENANCE, AND REMOVAL
OF CONSTRUCTION ENTRANCE SHALL BE
INCIDENTAL TO "EROSION CONTROL." NO
SEPARATE MEASUREMENT OR PAYMENT SHALL
BE MADE.
NOTES:
1. INSTALL CONSTRUCTION TRUCK
WASHOUT PER ODOT STANDARD
DRAWING RD1070 OR OTHER
APPROVED EQUAL.
2. INSTALLATION, MAINTENANCE, AND
REMOVAL OF CONCRETE WASHOUT
SHALL BE INCIDENTAL TO "EROSION
CONTROL." NO SEPARATE
MEASUREMENT OR PAYMENT SHALL
BE MADE.
12" OVERLAP (TYP)
2"X2'X36" WOOD
STAKES (TYP)
4' MAXIMUM STAKE
SPACING (TYP)
A
PLAN
SECTON A-A
C900 PIPE
3'
5'
PLACE ODOT CLASS 100 RIPRAP (1'
THICK MIN.) OVER GEOTEXTILE FABRIC
EC-04
CULVERT INLET/OUTLET
ENERGY DISSIPATOR
NO SCALE
PLACE GEOTEXTILE
FABRIC UNDER RIP
RAP
BACKFILL
CULVERT PER 3
C-06
A
OUTLET
INSTALL RAT GUARD
SECTON A-A
C900 PIPE
PLACE GEOTEXTILE
FABRIC UNDER RIP RAP
BACKFILL
CULVERT PER
C-06
INLET
INSTALL RAT GUARD
PLACE ODOT CLASS 100
RIPRAP (1' THICK MIN.) PLACE ODOT CLASS 100
RIPRAP (1' THICK MIN.)
NOTES:
1. CONSTRUCT ENERGY DISSIPATOR PER ODOT STANDARD
DRAWING RD1050 .
2. RIPRAP SHALL BE AGGREGATE; CONCRETE OR OTHER
MAN-MADE MATERIALS NOT PERMITTED.
3. INSTALLATION, MAINTENANCE, AND REMOVAL OF ENERGY
DISSIPATOR SHALL BE INCIDENTAL TO "EROSION
CONTROL." NO SEPARATE MEASUREMENT OR PAYMENT
SHALL BE MADE.
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C /F
C/F C
/F
C/FC/FC/FC/F
C/F
C /F
C/F C/F C/F
C /F
C/F
C/F
C/ F
C/F
C/F C/F C/F C/F
C/F
C/F
C/F
C/F
XXXXXXXX
X X X
X X
X X
X X
X X E E E E E E E E E E
EE
E
E E
START SAWCUT
N: 359547.75
E: 7306676.48
START SAWCUT
N: 359767.01
E: 7306491.04
END SAWCUT
N: 359513.66 E: 7306995.59
ANGLE POINT
N: 359571.23
E: 7306687.39
ANGLE POINT
N: 359581.22 E: 7306661.96
ANGLE POINT
N: 359766.61
E: 7306490.08
ANGLE POINT
N: 359824.06 E: 7306465.89
ANGLE POINT
N: 359512.86
E: 7306996.20
ANGLE POINT
N: 359507.90
E: 7306987.41
END SAWCUT
N: 359557.06 E: 7306651.65
END SAWCUT
N: 359824.59 E: 7306467.14
START SAWCUT
N: 359508.70
E: 7306986.80
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _D em ol iti on
P la n.
dw g
DEMOLITION PLAN
C-01
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
C-01
DEMOLITION PLAN
SCALE: 1" = 40'
40 0 40 80
SCALE OF FEET
SCALE: 1"=40'
APRON
NOTES:
1. ALL EXISTING FEATURES SHALL BE PROTECTED IN PLACE UNLESS
OTHERWISE NOTED.
2. REMOVE EXISTING TIE-DOWN ANCHORS AND DISPOSE OF OFF SITE.
BACKFILL TIE-DOWN ANCHOR VOID IN LIFTS TO MATCH SURROUNDING
GRADE.
E E
ACCESS ROAD
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
EXISTING MAJOR
CONTOUR
EXISTING MINOR
CONTOUR
EXISTING ELECTRICAL
SAWCUT
SCARIFY EXISTING
SURFACE
REMOVE AC PAVEMENT /
PCC CONCRETE
STRIP SURFACE
VEGETATION
RSA
OFZ
PROPOSED APRON
EDGE OF PAVEMENT
PROTECT EXISTING
SIGN, GATE, AND FENCE
REMOVE, STORE, AND
REINSTALL EXISTING SIGN,
SIGN SHOWN IN
PROTECT EXISTING
POWER POLE
SEE NOTE 2
PROTECT EXISTING SIGN
RUNWAY 13-31
HANGAR
TAXILANES
NORTH TAXIWAY
SOUTH TAXIWAY
C-01
EXISTING SIGN
SCALE: NO SCALE
C-01
CURVE TABLE
CURVE #
C1
C2
C3
C4
C5
C6
LENGTH
6.11
65.72
15.71
15.71
15.71
15.71
RADIUS
4.48
157.46
10.00
10.00
10.00
10.00
DELTA
78.22
23.91
90.00
90.00
90.00
90.00
CHORD DIRECTION
S61° 19' 41"W
S54° 57' 42"E
N67° 50' 20"W
S22° 09' 40"W
S67° 50' 20"E
S22° 09' 40"W
CHORD LENGTH
5.65
65.24
14.14
14.14
14.14
14.14
XXX
XXXXXXXXXXXXXXXXX
E E E E
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
C
C2
C3
C4 C5 C6
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _L ay ou t P la n.
dw g
LAYOUT PLAN
C-02
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
C-02
LAYOUT PLAN
SCALE: 1" = 20'
C-05
C-05
C-06
APRON
TIE DOWN ANCHOR
(TYP), PER
C-03
C-06
6" CULVERT PER
C-03
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
PROPOSED APRON
(SCHEDULE A)
HANGAR TAXILANE
(SCHEDULE B)
PROPOSED ACCESS ROAD
(SCHEDULE C)
PROPOSED SHOULDER
PROPOSED SEEDING
AIRCRAFT TIE DOWN
RSA
OFZ
20 0 20 40
SCALE OF FEET
SCALE: 1"=20'
.3'
28'
25'
62'
RUNWAY 13-31
HANGAR
TAXILANES
NORTH TAXIWAYSOUTH TAXIWAY
197'
1' ROCK SHOULDER (TYP)
2'
16' (TYP)
C-08
FOR ACCESS ROAD
IMPROVEMENTS SEE
C-04
NOTES:
1. FOR APRON, TAXIWAY, AND TAXILANE ANGLE POINTS AND
ELEVATIONS REFER TO DRAWING C-03.
2. FOR ACCESS ROAD ANGLE POINTS, ELEVATIONS, AND CURVE
TABLE REFER TO DRAWING AND C-04.
PERMANENT OUTLET
PROTECTION PER
PERMANENT INLET
PROTECTION PER
EC-04
EC-04
4" CULVERT PER
PERMANENT OUTLET
PROTECTION PER
EC-04
PERMANENT INLET
PROTECTION PER
EC-04
C-03
XXX
XXXXXXXXXXXXXXXXX
E E E E
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
C7
C8
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F C
/F
C/F C/F
C/F
C/F
C /F
C /F
C/F
C /F
C /F
C/F
C
/FC/FC/FC/FC/FC
/F
C
/FC/FC/FC/FC/F
C /F
C/FC/F
C
/FC
/F
C/F
C/F C/F C/F C/F C/F C/F
C/F
C /F
C /F
C/F
C/F C/F
C/F
C/ F
C/ F
C/F C/F
C/F
C/F C/F C/F C/F C/F C/F C/F C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
C/F
6" C900 CULVERT
N: 359732.67
E: 7306559.69
IE: 8.28
6" C900 CULVERT
N: 359818.86 E: 7306592.45
IE: 7.91
.05
11.39
.97
.36
.24
.88
.17
.74
.54
.88
.31
.11
.01
9.7
10.76
.77
9.7
9.749.8
9.9
.04
.14
.23
.33
.34
9.67
9.76
9.72
9.81
9.72
9.77
9.87
9.78
9.83
9.92
9.83
9.87
9.97
9.89
9.9
.05
9.95
.08
10.0310.03
10.99 10 .92
10.84 10 .71
.56
.37
.17
9.9
9.6
.86
.78
10.68 10 .54
.38
.20
.04
9.9
9.5
.73 10.65 10 .52
.39
10.27 10 .13
9.9 7 9.85
9.5
.60
.50
.40
10.29
.16
10.06 9.9
9.7
9.5
.47
.41
.30
10.18
.09
9.9
9.8
9.7
9.6
202328
18 17
19 16 15
4 125
32 33
35 36
.12
TD-1
TD-3
TD-2 TD-8
TD-7
TD-6
TD-11
TD-4
TD-5
TD-9
TD-10
TD-12
TD-13
TD-14
TD-15
TD-16
TD-17
TD-18
TD-19
TD-20
TD-21
TD-22
TD-23
TD-24
TD-25
TD-26
TD-27
11.4
11.2
11.0
10.8
10.6
10.4
10.2
10.0 9.
9.
.0
.2
.4
9.8
10.0
9.6
9.6
9.
9.
.6
.4
11.2
11.0
11.2
.0
4" C900 CULVERT
N: 359538.47
E: 7306826.07
IE: 10.44
4" C900 CULVERT
N: 359571.08 E: 7306811.65
IE: 10.39
4" C900 CULVERT
N: 359550.08
E: 7306853.73
IE: 10.59
4" C900 CULVERT
N: 359582.69
E: 7306839.31
IE: 10.55
TIE DOWN TABLE
POINT NO.
TD-1
TD-2
TD-3
TD-4
TD-5
TD-6
TD-7
TD-8
TD-9
TD-10
TD-11
TD-12
TD-13
TD-14
TD-15
TD-16
TD-17
TD-18
TD-19
TD-20
TD-21
TD-22
TD-23
TD-24
TD-25
TD-26
TD-27
ELEVATION
10.16
10.13
10.26
10.34
10.31
10.47
9.97
10.08
10.04
10.11
10.20
10.17
10.14
9.94
10.26
10.38
10.46
10.93
9.61
9.49
9.21
9.31
10.04
9.66
9.74
9.37
9.75
NORTHING
359645.74
359666.07
359655.06
359663.62
359683.95
359672.93
359688.41
359677.41
359697.73
359706.29
359695.28
359715.61
359568.49
359557.49
359577.81
359586.37
359575.36
359595.68
359772.80
359793.13
359782.12
359790.68
359811.01
359799.99
359808.55
359828.88
359817.87
EASTING
7306669.65
7306674.12
7306691.77
7306712.09
7306716.56
7306734.21
7306651.68
7306669.34
7306673.80
7306694.12
7306711.79
7306716.24
7306713.25
7306730.92
7306735.37
7306755.69
7306773.36
7306777.81
7306627.20
7306631.67
7306649.32
7306669.64
7306674.11
7306691.76
7306712.09
7306716.56
7306734.21
ANGLE POINT TABLE
POINT NO.
ELEVATION
11.00
10.38
10.35
10.26
9.80
9.86
9.85
9.89
10.09
10.06
9.88
9.67
9.88
NORTHING
359617.30
359571.23
359581.22
359607.29
359720.94
359769.73
359767.01
359766.61
359824.06
359824.59
359787.13
359752.78
359819.39
EASTING
7306796.78
7306687.39
7306661.96
7306672.20
7306624.34
7306495.99
7306491.04
7306490.08
7306465.89
7306467.14
7306520.56
7306610.93
7306769.09
ANGLE POINT TABLE
POINT NO.
ELEVATION
9.88
9.88
10.80
11.03
11.03
10.80
11.21
11.43
11.43
11.20
11.39
11.61
11.60
NORTHING
359804.66
359800.78
359768.09
359772.54
359757.82
359753.34
359719.55
359723.75
359709.01
359704.69
359672.18
359676.46
359661.75
EASTING
7306775.33
7306766.12
7306779.88
7306790.46
7306796.73
7306786.10
7306800.33
7306810.31
7306816.52
7306806.59
7306820.28
7306830.43
7306836.73
ANGLE POINT TABLE
POINT NO.
ELEVATION
11.38
11.50
11.28
11.11
11.65
11.65
11.57
11.28
10.88
10.88
11.18
11.39
11.16
NORTHING
359657.44
359633.97
359629.72
359611.96
359530.84
359535.52
359548.85
359561.94
359570.52
359581.55
359573.00
359578.34
359616.62
EASTING
7306826.49
7306836.37
7306826.27
7306809.88
7306844.04
7306855.09
7306849.48
7306854.81
7306875.19
7306870.45
7306850.16
7306837.06
7306820.94
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _G ra di ng P la n.
dw g
APRON, TAXIWAY, AND TAXILANES
GRADING PLAN
C-03
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
C-03
GRADING PLAN
APRON, TAXIWAY, AND TAXILANES
SCALE: 1" = 20'
APRON
20 0 20 40
SCALE OF FEET
SCALE: 1"=20'
25' (TYP)
TY
P)
21.94'
12.5'(TYP) 12.5'(TYP)
' (T
YP)
TIE DOWN
ANCHOR (TYP),
PER 4
C-08
INSTALL 92 LF 6"
CULVERT PER 3
C-06
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
PROPOSED APRON
(SCHEDULE A)
HANGAR TAXILANE
(SCHEDULE B)
PROPOSED ACCESS ROAD
(SCHEDULE C)
PROPOSED SHOULDER
PROPOSED CUT/FILL
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
EXISTING MAJOR
CONTOUR
EXISTING MINOR
CONTOUR
AIRCRAFT TIE DOWN
RSA
OFZ
10.0
10.2
FOR ACCESS ROAD
IMPROVEMENTS SEE
C-04
RUNWAY 13-31
HANGAR
TAXILANES
NORTH TAXIWAY
SOUTH TAXIWAY
NOTES:
1. FOR APRON, TAXIWAY, AND TAXILANE CURVE TABLE REFER TO
DRAWING C-02.
2. FOR ACCESS ROAD ANGLE POINTS, ELEVATIONS, AND CURVE
TABLE REFER TO DRAWING AND C-04.
REINSTALL SIGN AFTER
CULVERT INSTALLATION
C/F
INSTALL 30 LF 4"
CULVERT PER 3
C-06
INSTALL 30 LF 4"
CULVERT PER 3
C-06
ANGLE POINT TABLE
POINT NO.
ELEVATION
11.22
11.15
11.15
11.09
10.90
11.02
11.16
11.00
11.40
11.55
12.64
12.69
NORTHING
359606.99
359620.52
359603.75
359613.04
359604.66
359613.88
359615.57
359624.78
359607.62
359613.66
359512.86
359507.90
EASTING
7306824.99
7306820.15
7306831.58
7306835.35
7306856.33
7306852.45
7306882.21
7306878.33
7306911.84
7306919.81
7306996.20
7306987.41
XXXXXXXXXXXXXXXXX
X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
E E E E E E E E E E E E E E E E E
E
E
E
E E E E
C7
C8
C9
C1
C/FC/FC/FC/F
C /F
C/FC/F
C
/FC
/F
C/F
C/F C/F C/F C/F C/F C/F
C/F
11 10
11.4
11.2
11.0
.6
.4
11.2
11.0
11.2
44 45
46 47
.6
.4
12.2
12.0
11.8
11.6
11.4
11.2
.0
CURVE TABLE
CURVE #
C7
C8
C9
C10
LENGTH
25.31
17.47
33.02
46.23
RADIUS
35.00
25.00
25.00
35.00
DELTA
41.44
40.04
75.68
75.68
CHORD DIRECTION
S87° 52' 51"W
N87° 10' 59"E
N74° 59' 48"W
S74° 59' 48"E
CHORD LENGTH
24.77
17.12
30.67
42.94
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _G ra di ng P la n.
dw g
ACCESS ROAD
GRADING PLAN
C-04
JAK
BBK
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
C-04
GRADING PLAN
ACCESS ROAD
SCALE: 1" = 20'
20 0 20 40
SCALE OF FEET
SCALE: 1"=20'
ACCESS ROAD,
SEE NOTE 1
LEGEND
RUNWAY SAFETY AREA
OBSTACLE FREE ZONE
PROPOSED APRON
(SCHEDULE A)
HANGAR TAXILANE
(SCHEDULE B)
PROPOSED ACCESS ROAD
(SCHEDULE C)
PROPOSED SHOULDER
NEW MAJOR CONTOUR
NEW MINOR CONTOUR
EXISTING MAJOR
CONTOUR
EXISTING MINOR
CONTOUR
RSA
OFZ
10.0
10.2
10'
VARIES
SEEDING LIMITS / GRADE TO EXISTING
IF SCHEDULE C AWARDED: 2" OF LEVEL 3,
1/2" ASPHALT CONCRETE PAVEMENT
IF SCHEDULE D AWARDED: 2" OF 3/4-INCH
AGGREGATE BASE (GRAVEL SURFACING)
3" OF 3/4-INCH
AGGREGATE BASE
10' SEEDING LIMITS / GRADE TO EXISTING
C-04
ACCESS ROAD SECTION
SCALE: NO SCALE
1' SHOULDER1' SHOULDER
25%
25%
25%
25%
MATCH EXISTING
GROUND, TYP
C-04
NOTES:
1. IF SCHEDULE C OR D IS AWARDED, CONSTRUCT ACCESS ROAD AS
SHOWN. IF SCHEDULE C OR D IS NOT AWARDED, PLACE MINIMUM
3 INCHES GRAVEL OVER ACCESS ROAD FOOTPRINT. PAYMENT
FOR GRAVEL SHALL BE MADE UNDER ACCESS ROAD
RESTORATION (IF SCHEDULE C/D NOT CONSTRUCTED).
2. SLOPES AND DISTANCES VARY WHERE SHOWN.
3. ALL SUBGRADE AND AGGREGATE BASE COMPACTION
REQUIREMENTS PER OREGON STANDARD SPECIFICATION
00330.43(c) UNLESS NOTED OTHERWISE. DEFLECTION TESTING
SHALL BE PERFORMED WITH THE ENGINEER PRESENT.
4. AC COMPACTION REQUIREMENTS PER OREGON STANDARD
SPECIFICATION 00744.49.
ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _T yp ic al S ec tio ns
P av in g
D et ai ls
.d w g
APRON
PAVEMENT SECTIONS
C-05
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
VARIES
1' SHOULDER
2%
197' SEEDING LIMITS / GRADE TO EXISTINGSEEDING LIMITS / GRADE TO EXISTING
C-05
APRON SECTION
SCALE: NO SCALE
C-05
APRON SECTION
SCALE: NO SCALE
2" OF LEVEL 3, 1/2"
ASPHALT CONCRETE
PAVEMENT
3" OF 3/4-INCH
AGGREGATE BASE
MATCH EXISTING
GROUND, TYP
0.5%
0.5%
1.5" DROP AT
EDGE, TYP
2%
2%
2%
1' SHOULDER
VARIES
1' SHOULDER
VARIES SEEDING LIMITS / GRADE TO EXISTING
0.5%
0.5%
1' SHOULDER
25%
25%
25%
25%
SEEDING LIMITS / GRADE TO EXISTING
2" OF LEVEL 3, 1/2" ASPHALT
CONCRETE PAVEMENT
3" OF 3/4-INCH
AGGREGATE BASE
1.5" DROP AT
EDGE, TYP
MATCH EXISTING
GROUND, TYP
VARIES
VARIES
GENERAL NOTES:
1. THESE GENERAL NOTES APPLY TO ALL DETAILS ON THIS SHEET.
2. SLOPES AND DISTANCES VARY WHERE SHOWN.
3. ALL SUBGRADE AND AGGREGATE BASE COMPACTION
REQUIREMENTS PER OREGON STANDARD SPECIFICATION
00330.43(c) UNLESS NOTED OTHERWISE. DEFLECTION TESTING
SHALL BE PERFORMED WITH THE ENGINEER PRESENT.
4. AC COMPACTION REQUIREMENTS PER OREGON STANDARD
SPECIFICATION 00744.49.
FINISHED GRADE,
PER PLAN
FINISHED GRADE,
PER PLAN
ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _T yp ic al S ec tio ns
P av in g
D et ai ls
.d w g
TAXIWAY AND TAXILANES
PAVEMENT SECTIONS
C-06
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
VARIES
12'12' VARIESVARIES VARIES
SEEDING LIMITS / GRADE TO EXISTING
1.5%1.5%
VARIES
MATCH EXISTING
GROUND, TYP
VARIES SEEDING LIMITS / GRADE TO EXISTING
25%
C-06
TAXIWAY SECTION
SCALE: NO SCALE
VARIES
25%
1' SHOULDER1' SHOULDER
VARIES
SEEDING LIMITS / GRADE TO EXISTING VARIES SEEDING LIMITS / GRADE TO EXISTING
C-06
TAXILANE SECTION
SCALE: NO SCALE
1' SHOULDER1' SHOULDER
0.5%
25%
25%
25%
25%
1.5" DROP AT
EDGE, TYP
1.5" DROP AT
EDGE, TYP
0.5%
MATCH EXISTING
GROUND, TYP
PROPOSED PAVEMENT SECTION
FINISHED GRADE
BEDDING PER
SPECIFICATIONS
NOTE:
1. EXCAVATE, BACKFILL, AND COMPACT PER OREGON STANDARD SPECIFICATION 00405.
2. IN PAVED AREAS, TRENCH BACKFILL SHALL BE CLASS B. IN NON-PAVED AREAS, TRENCH
BACKFILL SHALL BE CLASS A..
4" MIN 4" MIN
PIPE
OUTSIDE
DIA.
4" M
IN
TR
EN
C H
B
AC
KF
IL
L, D
EP
TH
V
AR
IE
S, SE
E
N O
TE
1/
D
IA
C-06
CULVERT BACKFILL DETAIL
NO SCALE
BEDDING PER
SPECIFICATIONS
4" MIN 4" MIN
PIPE
OUTSIDE
DIA.
4" M
IN
TR
EN
C H
B
AC
KF
IL
L, D
EP
TH
V
AR
IE
S, SE
E
N O
TE
1/
D
IA
SURFACE RESTORATION OUTSIDE
OF PAVED AREAS PER PLAN (4"
AGGREGATE BASE COURSE OR
SEED)
NON-PAVEDPAVED
FINISHED GRADE,
PER PLAN
CL
GENERAL NOTES:
1. THESE GENERAL NOTES APPLY TO ALL DETAILS ON THIS SHEET.
2. SLOPES AND DISTANCES VARY WHERE SHOWN.
3. ALL SUBGRADE AND AGGREGATE BASE COMPACTION
REQUIREMENTS PER OREGON STANDARD SPECIFICATION
00330.43(c) UNLESS NOTED OTHERWISE. DEFLECTION TESTING
SHALL BE PERFORMED WITH THE ENGINEER PRESENT.
4. AC COMPACTION REQUIREMENTS PER OREGON STANDARD
SPECIFICATION 00744.49.
FINISHED GRADE,
PER PLAN
2" OF LEVEL 3, 1/2"
ASPHALT CONCRETE
PAVEMENT
3" OF 3/4-INCH
AGGREGATE BASE
2" OF LEVEL 3, 1/2"
ASPHALT CONCRETE
PAVEMENT
3" OF 3/4-INCH
AGGREGATE BASE
XXXXXXXX
X X X
X X
X X
X X
X X E E E E E E E E E E
EE
E
E E
M1
M
M3
M4
M
M6 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
BEGIN TAXIWAY LEAD IN STRIPE
N: 359236.49
E: 7306697.62
PC
N: 359420.81
E: 7306619.99
PT
N: 359439.66
E: 7306619.76
PC
N: 359594.34
E: 7306680.54
PT
N: 359608.24
E: 7306694.11
PC
N: 359641.07 E: 7306772.07
PT
N: 359673.82
E: 7306785.41
PT
N: 359751.23 E: 7306752.81
PC
N: 359764.56
E: 7306720.06
PT
N: 359733.42 E: 7306646.12
PC
N: 359733.10 E: 7306627.53
PT
N: 359792.24
E: 7306471.96
PC
N: 359805.90
E: 7306457.80 BEGIN TAXIWAY LEAD IN STRIPE
N: 359990.22 E: 7306380.17
END TAXIWAY LEAD IN STRIPE
N: 359577.46 E: 7306673.91
BEGIN APRON STRIPE
N: 359592.13
E: 7306679.67
END APRON STRIPE
N: 359736.37 E: 7306618.92
END TAXIWAY LEAD IN STRIPE
N: 359741.77
E: 7306604.71
CURVE TABLE
CURVE #
M1
M2
M3
M4
M5
M6
LENGTH
19.33
19.94
39.27
39.27
19.05
20.22
RADIUS
25.00
25.00
25.00
25.00
25.00
25.00
DELTA
44.29
45.71
90.00
90.00
43.66
46.35
CHORD DIRECTION
S0° 41' 36"E
N44° 18' 24"E
N22° 09' 40"E
N67° 50' 20"W
S88° 59' 26"W
N46° 00' 44"W
CHORD LENGTH
18.85
19.42
35.36
35.36
18.59
19.68
X:
\P ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _P av em en t M ar ki ng P la n.
dw g
PAVEMENT MARKING PLAN
C-07
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS NOTED40097.103.01
THIS PLAN SHEET IS INTENDED TO BE VIEWED
IN COLOR. THE FOLLOWING COLORS SHOULD
BE DISTINGUISHABLE WHEN PRINTED
CORRECTLY:
RED BLUE
LEGEND
PROPOSED AC PAVEMENT
AND MARKING
40 0 40 80
SCALE OF FEET
SCALE: 1"=40'
C-07
PAVEMENT MARKING PLAN
SCALE: 1" = 40'
6" YELLOW TAXIWAY LEAD
IN STRIPE (TYP), PER
4" YELLOW TIE DOWN
STRIPE (TYP), PER
RUNWAY HOLDING POSITION
MARKER (TYP), PER
6" YELLOW TAXIWAY
STRIPE (TYP)
200' 200'
C-08
C-08
C-08
NOTES
1. SEE "TIE DOWN TABLE" ON DRAWING C-03
FOR LAYOUT OF TIE DOWN MARKINGS.
ro je ct s\
O D
A\
- T ol ed o
St at e Ap ro n
R eh ab \C
AD
\5
S4 _D et ai ls .d w g
DETAILS
C-08
JAK
MAH
MAH
SCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
MAY 2022
OREGON DEPARTMENT OF AVIATION
TOLEDO STATE AIRPORT
APRON RECONSTRUCTION
CENTURY
WEST
E N G I N E E R I N G
BEND OFFICE
1020 SW EMKAY DRIVE, #100
BEND, OR 97702
541.322.8962
541.382.2423 FAX
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
AS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .