Attachment B - Performance Work Statement.docx
DOCX document 19 KB Posted
- Attached to
- Well Repair - Clay Center, NE
- Solicitation number
- 12805B21Q0213
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawings.pdf | ||
| RFQ Questions for Well Repair.docx | DOCX document | |
| RFQ - 12805B21Q0213.pdf | ||
| Attachment C - NDAA 889 Certification.pdf | ||
| Attachment A - Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
GENERAL INFORMATION
1.0 Background and Purpose:
This well was drilled originally in approximately 1991. Drawings of the well are attached. This well is intended to pump 500 GPM at about 350' TDH. It is required for the well to continue to operate at this output. The discharge and column is 8", the column shaft is 1-1/4", the pump is 7 stage 10 SC Sargent and the maximum speed is 1770 rpm. Well depth is 217' and the water level is approximately 100'.
CONTRACTOR REQUIREMENTS
2.0 Technical Requirements/Tasks:
The Contractor shall provide all tools, equipment, parts, and labor to remove pump, motor, column, shaft, and associated parts for inspection so as to determine what needs to be replaced and what type of well treatment, if any, is required. Contractor shall replace defective parts and perform work as agreed to by owner.
It is required to provide pricing for each of the items listed below as it is not exactly known what is required to renovate the pumping components and well to original performance after the work is completed. Items to be priced separately are as follows:
1. Labor to remove and reinstall pump, motor, shaft, column, etc.
2. Labor to Surge, Bail, and Test Pump well.
3. Replacement of pump motor power cables.
4. Replace Check Valve.
5. Video Survey
6. Sodium Hypochlorite treatment
7. Acid Treatment
8. Replace pump
9. Replace motor and motor shroud.
10. Install Elec. Splice kit
11. Install Pipe Wrap
12. Disinfection of Well
13. Sonar jet well treatment of well screen.
14. 8" Column pipe (Threaded and coupled) per ft
15. Bronze bearing retainers
16. Stainless Steel line shaft per ft
17. Operate well at operating speed to prove operation when complete. Electric motor, and controls for pressure, including automatic "on" shall be proven to operate well as before work was performed on well herein. Contractor shall perform a base line operation test before dismantling to check current operation of system to verify functioning correctly.
18. Replace existing 8” propellor flow meter with 6” mag flow meter, including proper fittings and pipe.
It will be determined after pump, column, motor, and shaft are removed which of the above items are to be done. Other parts or operations not listed above may be needed, depending on what is found. If components, including electrical and controls are found to be defective, they shall be brought to the attention of the owner.
Contractor is to provide literature (shop drawings) and operation and maintenance manuals on those items replaced.
Any items replaced shall be removed from property by contractor.
Contractor may use owner's bathroom facilities as approved by owner.
Working hours shall be from 7:00 A.M. to 5:00 P.M. on dates mutually agreed to by contractor and owner.
3.0 Deliverable / Schedule:
Repair to be completed within 90 days of award.
Facility Location:
U.S. Meat Animal Research Center P.O. Box 166 833 Road 313 Clay Center NE 68933
Key Deliverables
Item No.
Deliverable
Objective
Due
| 1 |
| Fully operational Well #8 |
| Repair Well #8 so that it operates as described in Paragraph 1. |
| No later than 90 days after the date of award. |
| 4.0 | Government Furnished: |
| 1) Access to the facility during normal business operations (Monday through Friday, | |
| 7:30 am to 5 pm) | |
| 2) Location of Well #8. |
5.0 Travel:
N/A
| 6.0 | Contractor’s Key Personnel: |
| N/A |
| 7.0 | Security Requirements: |
| N/A |
| 8.0 | Data Rights: |
| N/A |
| 9.0 | Section 508 – Electronic and Information Technology Standards: |
| N/A |
| 10.0 | Performance Requirement Measures: |
| A one-time repair of Well #8 per the requirements in paragraphs 1 & 2 and within the expected time. |