Attachment (B)_MTRA Disposal Box Supplemental Requirements.pdf

PDF 213 KB Posted

Attached to
MTRA Disposal Box
Solicitation number
N4215826QE028
Issued by

About this file

MTRA Disposal Box Supplemental Requirements Summary

This document is an attachment containing supplemental requirements for MTRA disposal boxes. The vendor must provide one additional set of forty-eight (48) studs, forty-eight (48) lock washers, and forty-eight (48) nylon insert lock nuts to be supplied as spare parts. These spares shall be packaged in one or more good quality sealed bags or containers to prevent spillage during shipping and handling. The spare components correspond to items 12, 13, and 14 of drawing 2370.2-7407V (revision D).

Additional requirements include submission of a certificate of compliance, ensuring that studs installed on boxes remain unpainted, and fabricating boxes in accordance with Norfolk Naval Shipyard (NNSY) provided drawings. Notably, NNSY will not review vendor-provided drawings, indicating that all fabrication must strictly follow the government-furnished design specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .