The file's text, extracted by GovTribe without its formatting.
ATTACHMENT (B)
KEY PERSONNEL RESUME SUPPLEMENTAL INFORMATION
| NAME: |
| ROLE IN THIS CONTRACT (NOT TITLE IN COMPANY): |
| CRITERION 2 – PROFESSIONAL QUALIFICATIONS |
| RELEVANT PROJECT: |
| 1 |
| PROJECT TITLE AND LOCATION (CITY & STATE): |
| CLIENT AND PROJECT OWNER: |
| POINT OF CONTACT / CONTACT INFORMATION: |
| SPECIFIC ROLE IN PROJECT: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
SPECIFIED DESIGN/ENGINEERING SERVICE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT SERVICES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
RELEVANT PROJECT TYPE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT TYPES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 2 – PROFESSIONAL QUALIFICATIONS |
| RELEVANT PROJECT: |
| 2 |
| PROJECT TITLE AND LOCATION (CITY & STATE): |
| CLIENT AND PROJECT OWNER: |
| POINT OF CONTACT / CONTACT INFORMATION: |
| SPECIFIC ROLE IN PROJECT: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
SPECIFIED DESIGN/ENGINEERING SERVICE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT SERVICES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
RELEVANT PROJECT TYPE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT TYPES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 2 – PROFESSIONAL QUALIFICATIONS |
| RELEVANT PROJECT: |
| 3 |
| PROJECT TITLE AND LOCATION (CITY & STATE): |
| CLIENT AND PROJECT OWNER: |
| POINT OF CONTACT / CONTACT INFORMATION: |
| SPECIFIC ROLE IN PROJECT: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
SPECIFIED DESIGN/ENGINEERING SERVICE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT SERVICES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
RELEVANT PROJECT TYPE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT TYPES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 2 – PROFESSIONAL QUALIFICATIONS |
| RELEVANT PROJECT: |
| 4 |
| PROJECT TITLE AND LOCATION (CITY & STATE): |
| CLIENT AND PROJECT OWNER: |
| POINT OF CONTACT / CONTACT INFORMATION: |
| SPECIFIC ROLE IN PROJECT: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
SPECIFIED DESIGN/ENGINEERING SERVICE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT SERVICES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
RELEVANT PROJECT TYPE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT TYPES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 2 – PROFESSIONAL QUALIFICATIONS |
| RELEVANT PROJECT: |
| 5 |
| PROJECT TITLE AND LOCATION (CITY & STATE): |
| CLIENT AND PROJECT OWNER: |
| POINT OF CONTACT / CONTACT INFORMATION: |
| SPECIFIC ROLE IN PROJECT: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
SPECIFIED DESIGN/ENGINEERING SERVICE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT SERVICES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
RELEVANT PROJECT TYPE(S) THAT KEY PERSONNEL PARTICIPATED IN FOR THIS PROJECT (NOT TYPES IN OVERALL PROJECT SCOPE) (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |