The file's text, extracted by GovTribe without its formatting.
ATTACHMENT (A)
SPECIALIZED EXPERIENCE SUPPLEMENTAL INFORMATION
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 1 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 2 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 3 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 4 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 5 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 6 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |
| CRITERION 1 - SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 7 |
| TITLE AND LOCATION (CITY & STATE): |
| YEAR DESIGN COMPLETED (NOT INCLUDING PCAS): |
| EST. CONSTRUCTION COMPLETED (YR): |
| PROJECT ROLE (PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT): |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
| AE FIRM NAME OR JV: |
| NEW CONSTRUCTION (NC) OR REPAIR (R): |
SPECIFIED DESIGN/ENGINEERING SERVICES (CHECK ALL THAT APPLY):
| ☐ | DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS |
| ☐ | DESIGN-BUILD RFP SOLICITATION DOCUMENTS |
| ☐ | ENGINEERING STUDIES AND REPORTS |
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLY):
| ☐ | STRUCTURAL |
| ☐ | CIVIL |
| ☐ | ARCHITECTURAL |
| ☐ | MECHANICAL |
| ☐ | ELECTRICAL |
| ☐ | TELECOMMUNICATIONS |
| ☐ | GEOTECHNICAL |
| ☐ | FIRE PROTECTION |
| ☐ | CATHODIC PROTECTION |
RELEVANT PROJECTS (CHECK ALL THAT APPLY):
| ☐ | NEW CONSTRUCTION OF PIER OR WHARF |
| ☐ | OVERHAUL REPAIR OF DRYDOCK CAISSON |
| ☐ | CONCRETE CORROSION REPAIR OF SHORE FACILITY OR WATERFRONT STRUCTURE |
| ☐ | SEISMIC ANALYSIS STUDY OF EXISTING BUILDING OR PIER/WHARF |
| ☐ | LOAD CAPACITY STUDY OF EXISTING PIER OR WHARF FOR MOBILE CRANE TRAVEL AND OPERATIONS |