Attachment B - IDIQ Labor Rate Matrix.pdf
PDF 92 KB Posted
- Attached to
- FLIGHT DYNAMICS SUPPORT SERVICES (FDSS) IV - Draft Request For Proposal (DRFP) 80GSFC24R0027
- Solicitation number
- FDSSIV23JG
About this file
This is an IDIQ labor rate matrix template (Attachment B) for DRFP 80GSFC24R0027 that provides tables and instructions for offerors to submit their direct labor rates, indirect rates, and fee structures for both prime contractors and subcontractors.
The template includes sections for: 1) Prime direct labor rates across 6 contract years, 2) Prime cost estimating relationships for Other Direct Costs, 3) Prime indirect cost rates, 4) Prime fixed fee rates for CPFF task orders, and 5) Subcontractor fully-loaded labor rates. All rates provided must be not-to-exceed rates, though contractors may propose lower rates when pricing individual task orders. The template requires offerors to propose labor categories aligned with Position Qualifications in Section 6 and clearly delineate onsite versus offsite rates where applicable. The document serves as a pricing framework for all task orders to be issued under the contract's minimum/maximum quantity requirements.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
INDEFINITE DELIVERY INDEFINITE QUANTITY
(IDIQ)
DIRECT LABOR RATES, INDIRECT RATES AND
FEE MATRICES
DRFP 80GSFC24R0027
Contract TBD Attachment B
(03/2015)
IDIQ DIRECT LABOR RATES, INDIRECT RATES
AND FEE MATRICES
Task Plan proposals must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued in accordance with the “Task Ordering Procedure” and “Supplemental Task Ordering Procedures” clauses of the contract. All Task Orders issued will be applied to the guaranteed minimum quantity and maximum quantity as provided in “Minimum/Maximum Amount of Supplies or Services” clause.
1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the direct labor rates as specified below for pricing all task orders:
**Labor Categories
*CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
**Labor Categories - The Offeror shall provide Prime direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.
*CY = Contract Year
^HR = Hourly Rate: These are not-to-exceed rates to be used for task order pricing purposes only for the Prime Contractor direct labor hours. The Contractor may propose lower rates when pricing task orders.
(03/2015)
2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders):
The Prime Contractor shall not exceed the cost estimating relationships (CERs) rates or factors as specified below for deriving/pricing Other Direct Costs (ODCs), if applicable, on all task orders:
****CERs Base of Application CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
****CERs – If applicable, the Offeror shall complete all Prime ODC categories and rates/factors that are proposed using a CER, such as management percentages or computer/IT fees. Clearly delineate the base of application. If not applicable, insert
“NONE”.
3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the indirect rates as specified below for pricing all task orders:
***Indirect Rate
Categories
Base of Application CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
***Indirect Rate Categories - The Offeror shall complete all Prime indirect rate categories and rates that may be applied against direct and indirect costs under a task order in accordance with the contractor’s accounting and estimating procedures. Clearly delineate the base of application and onsite versus offsite rates.
(03/2015)
4. PRIME FIXED FEE RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the fixed fee rate specified below for pricing all Cost-Plus-Fixed-Fee (CPFF) task orders:
*****Fixed Fee Rate
Base of Application CY 1 CY 2 CY 3 CY4 CY 5 CY 6
*****The Offeror shall complete the Prime’s fixed fee rate that shall be used to calculate the fixed fee dollars for all task orders issued under the resultant contract. Clearly delineate the base of application.
5. SUBCONTRACTOR (Name-TBP) FULLY-LOADED LABOR RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the fully-loaded direct labor rates as specified below for pricing the subcontractor direct labor hours on all task orders:
++Labor Categories
*CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
++Labor Categories - The Offeror shall provide fully-loaded subcontractor direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.
Clearly delineate onsite versus offsite rates.
*CY = Contract Year
^HR = Hourly Rate: These are not-to-exceed fully-load rates to be used for pricing purposes only for the Subcontractor direct labor hours. The Contractor may propose lower rates when pricing task orders.
(03/2015)
6. POSITION QUALIFICATIONS (For All Prime and Subcontractor Direct Labor Categories):
NOTE: TO BE PROPOSED (TBP) – A Position Qualification shall be proposed for each individual Prime Direct Labor Category included in Section 1 and each individual Subcontractor Direct Labor Category included in Section 5.
File details come from the government source that posted it. Updated .