This document is a government furnished information attachment related to a solicitation for submarine propeller and propulsor on-site repair services. The Naval Surface Warfare Center, Philadelphia Division is seeking to procure on-site repair services to be performed at various naval shipyards and storage facilities within and outside the continental United States to repair cracks and other defects identified during periodic inspections of submarine propellers and propulsors. Offerors should review solicitation N64498-20-R-4021 for additional details on the required scope of work, response date, terms and conditions, and evaluation factors. The attachment provides instructions for a standard government form used to identify technical data and documentation to be furnished to the contractor to facilitate contract performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2

GOVERNMENT FURNISHED INFORMATION

ATTACHMENT # PR#

PROGRAM TITLE: CONTRACT NUMBER: DATE:

CODE:

(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE

NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of

GOVERNMENT FURNISHED INFORMATION

(1) NUMBER

(5) GFI DUE DATE

(4) DOCUMENT DATE

(3) DOCUMENT NUMBER

(2) DOCUMENT TITLE

NAVSEA Form 4340/2 - Government Furnished Information Instructions

ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.

PR #: Enter Purchase Request (PR) number.

PROGRAM TITLE: Enter the title of the program.

CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.

DATE: Enter the calendar date that this form was prepared.

CODE: Enter the Program Office / Requiring Activity's office code.

NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.

DOCUMENT TITLE, Column (2): Enter Document Title for each item.

DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.

DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).

GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:

DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test

PAGE __ OF __: Assign page numbers sequentially.

11.0.1.20130826.2.901444.899636

CurrentPage:
PageCount:
TextField1: B
TextField2:
TextField7: Submarine Propeller & Propulsor On-Site Services
TextField8:
DateField1: 27 April, 2020
TextField3: 446
DateField3:
DateField2:
TextField6:
TextField5: Submarine Propeller and Propulsor On-Site Repair Technical Data Package
TextField5: NSWC letter Set 932/088 dtd 22 Jul 08, Void Repair Requirements
TextField5: NSWC letter Ser 932/104 dtd 9 Sep 08, Submarine Propeller Piece X Repair Patch and Mechanical Fastener Installation Requirements
TextField5: NAVSEA S9245-AZ-TSM-010 Propulsor Repair Manual
TextField5: NAVSEA S9245-AQ-TSM-010/PROP Submarine Propeller and Propulsor Repair Manual
TextField4: 1
TextField4: 5
TextField4: 4
TextField4: 3
TextField4: 2

File details come from the government source that posted it. Updated .