Attachment B - Fuel Storage Tank List.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
POL Tank Inspection EIE - Eielson AFB, Alaska
Solicitation number
PANNWD-24-P-0000-002757
Issued by

About this file

This document is an attachment titled "Fuel Storage Tank List" that provides detailed information about fuel storage tanks located at Eielson Air Force Base in Alaska. The attachment lists the site code, installation, state/country, inspection type, facility number, local ID number, fuel type, tank capacity, tank dimensions, and other specifications for five (5) storage tanks at the facility.

The related federal contract opportunity is a solicitation (PANNWD-24-P-0000-002757) issued by the Department of the Army Corps of Engineers Engineering District Omaha for the completion of four (4) API Internal Inspections with Wiper Seal Replacement, and one (1) API External Inspection of the fuel storage tanks at Eielson AFB, as well as the provision of draft and final inspection reports. The solicitation does not include information about response dates, award dates, pricing terms, set asides, or incumbents.

View the file

Other files

File Type Posted
Revised EIE PWS.docx DOCX document
Revised CLIN Bid Schedule.docx DOCX document
Revised Attachment B - Fuel Storage Tank List.xlsx XLSX spreadsheet
Eielson AFB-6257 OOS Final Report.pdf PDF
Questions and Answers.docx DOCX document
Eielson AFB-6239 OOS Final Report.pdf PDF
Attachment 1 - Revised CLIN Bid Schedule.docx DOCX document
Eielson AFB-4482 OOS Final Report.pdf PDF
Eielson AFB-6259 OOS Final Report.pdf PDF
Attachment B - Revised Fuel Storage Tank List.xlsx XLSX spreadsheet
Attachment I - API External Inspection Template.docx DOCX document
Attachment D - Monthly Contractors Progress Management and Status Report.xlsx XLSX spreadsheet
Attachment F - API Internal Inspection Template.docx DOCX document
Attachment 2 - PWS - SP-POL-CMP-INSPECT-FY24-EIE.docx DOCX document
Attachment G - Return To Service Letter.docx DOCX document
WD2015-5683-Rev 19.pdf PDF
Attachment A - General Installation Security Requirements.docx DOCX document
Attachment E - API Internal Inspection Telecon Briefing Template.docx DOCX document
Attachment 3 - 52.212-1 Addendum - EIE Tank Inspection.rtf RTF text file
Combined Synopsis-Solicitation PANNWD-24-P-0000 002757.docx DOCX document
Attachment 1 - CLIN Bid Schedule - EIE Tank Inspection.docx DOCX document
Attachment C - Tank Data Sheet.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SITE CODEINSTALLATIONSTATE / COUNTRYINSPECTION TYPEFACILITY NUMBERLOCAL ID #FUEL TYPETANK CAPACITY (GA)TANK DIAMETER (FT)TANK LENGTH / HEIGHT (FT)UT (Yes/No)ROUNDNESS SURVEY Req. (Yes/No)CERTIFIED STRAPPING CHART Req. (Yes/No)REPLACE IFR SEAL (Yes/No)Gallons Remaining will need to be stored/transferred/disposed of# Manways & Sizes
EIEEielson AFBAlaska/USAPI EXTERNAL3244TK600JP-8423,08443' 6"42' 3"YESNONONON/AN/A
EIEEielson AFBAlaska/USAPI INTERNAL4482TK300JP-8427,69453'25' 11"YESYESYESYESN/A2, 26"
EIEEielson AFBAlaska/USAPI INTERNAL6239TK515JP-8617,70059' 11"31' 9"YESYESYESYESN/A2, 26"
EIEEielson AFBAlaska/USAPI INTERNAL6257TK538JP-81,236,67673' 4"39'YESYESYESYESN/A2, 26"
EIEEielson AFBAlaska/USAPI INTERNAL6259TK539JP-81,243,39073' 4"38' 11"YESYESYESYESN/A2, 26"

Total gallons per purchase order to be removed: 0

File details come from the government source that posted it. Updated .