Attachment B - FP PH1 Unwatering Pump Replacement Pricing Schedule.pdf

PDF 119 KB Posted

Attached to
Fort Peck Unwatering Pump Replacement Federal contract opportunity
Solicitation number
W9128F25QA057
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a Pricing Schedule for the Fort Peck Power Plant 1 Unwatering Pump Replacement project. The pricing schedule includes four Contract Line Item Numbers (CLINs) for a job located in Ft. Peck, Montana: (1) Parts & Materials for Unwatering Pumps and Motor Systems, (2) Installation & Commissioning of Complete Unwatering Pump System, (3) Mitigation & Removal of Lead Base Paint Piping, and (4) All Remaining Work Not Included in the Base Items. Each CLIN is for 1 Job with a quantity of 1, and requires unit pricing to be entered. The document emphasizes that total amounts submitted without individual item prices will be rejected, and in case of price variations, the lump sum prices will be considered the submitted price.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FP00109

CLIN Description Quantity Unit

Measure Unit Price Amount

0001 Parts & Materials for Unwatering Pumps and Motor Systems 1 Job XXX $______________

Installation & Commissioning of Complete Unwatering Pump

System 1 Job XXX $______________

0003 Mitigation & Removal of Lead Base Paint Piping. 1 Job XXX $______________

0004 All Remaining Work Not Included in the Base Items Above 1 Job XXX $______________

NOTES:

FP Power Plant 1 Unwatering Pump Replacement , Ft Peck, MT

SECTION 00 10 00

Pricing Schedule

BASE ITEMS

TOTAL BASE (Items 0001 thru 0004)

Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected.

Additions will be subject to verification by the Government. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted.

A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item Nos. 0001 thru 0004.

File details come from the government source that posted it. Updated .