ATTACHMENT B - Existing Anchor Details.pdf
PDF 14 MB Posted
- Attached to
- Roof Tie Back Testing & Inspection Federal contract opportunity
- Solicitation number
- 36C25220Q0551
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT A - Construction Drawings for New Anchors.pdf | ||
| S02 36C25220Q0551.pdf | ||
| ATTACHMENT C MAD DOL WD 15-4897 REV-11 12.23.19.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. Appendix
Appendix A: Roof Warranty Site Plan and Existing Reference Drawings to be used as reference for structural
Appendix
A - Building
Project 607-18-
106, Reference
Key Dwg.
Reference
(Existing dwg)
1 Site Plan
-- Roof Warranties -
Drawing 000
Connecting
Cooridor A-
West wall GI002
Project number 607-
10-121, dwg SF-
103MH
Connecting
Cooridor A-
East wall GI002
Project number 607-
10-121, dwg SF-
103MH
Connecting
Cooridor B-
North wall GI002
Project number 607-
10-121, dwg SF-
103D
Connecting
Cooridor B-
Southwall GI002
Project number 607-
10-121, dwg SF-
103D
Parking garage
Building 15 GI003
Project number 607-
391, dwg 15 - SS403
Parking garage
Building 15 GI003
Project number 607-
391, 15-SS405
EXISTING REFERENCE DRAWING KEY Table of Contents
Appendix
A - Building
Project 607-18-
106, Reference
Key Dwg.
Reference
(Existing dwg)
3 1 GI003/A101
Project number
2891, DWG 32-04-S6
& 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-S6
& 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-
S13 & 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-
S13 & 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-
S13 & 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-
S13 & 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-
S17 & 32-04-S20
3 1 GI003/A101
Project number
2891, DWG 32-04-
S17 & 32-04-S20
Old Laundry
Bldg 2 GI004
Project number
2891, DWG 26-06-S5
& S7
4 2 GI004
Project number 607-
12-115 dwg S-103 &
S-105
4 2 GI004
Project number 607-
12-115 dwg S-103 &
S-105
EXISTING REFERENCE DRAWING KEY Table of Contents
Appendix A-1: Roof Warranty Site Plan
PARK
IN
G
RAM
P
B
LD
G #15
'D' WING
C
H
I
L
L
E
R
P
L
A
N
T
B
L
D
G
C
W
I
A
N
G
SWITCHGEAR
LAUNDRY
EMER. GENERATOR
WELL
PUMPHOUSE
MENTAL
HEALTH
CLINIC
ANIMAL LAB.
ENTRANCE
MAIN
U N
I V
E R
S I T
Y
B
Y
R I V
E
H I G
H L
A N
D
A
V E
/LOBBY
Veterans Affairs
Department of
BLDG #7
BLDG #12
BLDG #1
BLDG #2
BLDG #13
BLDG #3
CENTER
BLDG #5
B
L
BLDG #4
ELEC.
VA KIDS
FENCE
ENTRANCE
OLD MAIN
BLDG #22
M
R
I
COMMUNITY LIVING CENTER
HOSPICE
MENTAL HEALTH
EMERGENCY
UNIVERSITY
OF
WISCONSIN
HOSPITAL
WM. S. MIDDLETON MEMORIAL VA HOSPITAL
SCALE:
08/2018
0 20 40 60
Ft.
80 100
C
O
N
N
E
C
T
I
O
R
R
I
D
CONNECTING CORRIDOR
BLDG #27
BLDG #17
B
L
BLDG #14
L
C
O
N
T
R
A
C
T
P
R
K
I N
G
CONNECTING CORRIDOR
B
L
SITE PLAN
28A
7A
4A
4B
4C
Hazard storage
Aug 2018
BLDG #9
C
A
N
C
E
T
R
Wm. S. Middleton Memorial VA Hospital Roof Warranties
Roof # Bldg # Description Year Done Term Contractor Material 1 1 CLC 2010 10/15 Tri-North - Gary Brown EPDM 2 1 Hospice 2010 10/15 Tri-North - Gary Brown EPDM 3 1 8B Stairwell 1 Roof 2004 10 JB Cullen - Maly Roofing Ballast 4 1 Roof Over 7B 2015 10 JB Cullen - Maly Roofing EPDM
4A 1 8B Mech Room Roof 2015 10 JB Cullen - Maly Roofing EPDM 4B 1 Roof Over 7B 2015 10 JB Cullen - Maly Roofing EPDM
4C 1 8B Mech Room Roof 2017 10/20 Nations Roofing / Carlisle EPDM 5 1 Roof Over 7B 20009 10 Magill - Mad City Roofing Ballast 6 1 B-wing Roof 2007 15 Universal Roofing Ballast 7 1 Penthouse B-wing Roof 2008 15 Universal Roofing Ballast
7A 1 9B PH Mech Rm Roof 2017 10/20 Nations Roofing / Carlisle Ballast 8 1 8B Mech Rm Roof 2008 10 Universal Roofing Ballast 9 1 4C Roof 2011 10 AH West - Maly Roofing EPDM 10 1 5C Penthouse Roof 2009 10 C3T Inc - Maly Roofing EPDM 11 1 Loading Dock Roof 2008 10 Universal Roofing EPDM 12 1 Recycle Room Roof 2008 10 Universal Roofing EPDM 13 1 Canteen Stairs Roof 2011 20 Cbay - Maly Roofing EPDM 14 1 B2055 Roof 2007 10 Universal Roofing EPDM 15 1 SPS Air Handler Roof 2017 20 Maly Roofing EPDM 16 1 SPS Air Handler Roof 2017 20 Maly Roofing EPDM 17 1 8A Roof 2017 10/20 Nations Roofing EPDM 18 1 8A Roof 2008 10 Nations Roofing / Carlisle EPDM 19 1 8A Roof 2008 10 JB Cullen - Maly Roofing EPDM 20 1 1D Roof 2008 10 Nations Roofing EPDM 21 1 1D Entrance Canopy 2008 10 Nations Roofing EPDM 22 1 1D Roof 2008 10 Nations Roofing EPDM 23 1 9D Clinic Elev PH Roof 2008 10 Nations Roofing EPDM 24 1 D-wing Mech PH Roof 2011 20 Cbay - Maly Roofing EPDM 25 1 2D Labs Roof 2010 10/15 Tri-North - Maly Roofing EPDM 26 1 7D Roof 2010 10/15 C3T Inc - Maly Roofing EPDM 27 1 MRI Expansion Roof 2008 10 Nations Roofing EPDM 28 1 4D Mech Roof 2010 10/20 C3T Inc - Maly Roofing EPDM
28A 1 5D GRECC SW Roof 2011 20 Cbay - Maly Roofing EPDM 29 1 MRI Docking Roof 2010 10/15 C3T Inc - Maly Roofing EPDM 30 1 ED Canopy Roof 2008 10 Nations Roofing EPDM 31 1 Admissions Roof 2008 10 Nations Roofing EPDM 32 1 Auditorium Roof 2008 10 Nations Roofing EPDM 33 1 Auditorium Roof 2008 10 Universal Roofing Ballast 34 1 Chiller Plant Roof 2008 10 Universal Roofing Ballast 35 1 Chiller Plant Roof 2008 10 Nations Roofing Ballast 36 1 UW Connecting Roof 2011 20 Cbay - Maly Roofing EPDM 37 1 UW Connecting Roof 2011 20 Cbay - Maly Roofing EPDM 38 1/15 Connecting Corridor 2013 15 US Vet - Gary Brown EPDM 39 1 Entrance Canopy 2008 15 US Vet - Lake City Glass Glass 40 2 Laundry Roof 2010 10/20 C3T Inc - Maly Roofing EPDM 41 2 Boiler Plant Roof 2010 10/20 C3T Inc - Maly Roofing EPDM 42 2 Admin Support Roof 2015 15 C3T Inc - Maly Roofing EPDM 43 3 Maintenance Shops Roof 2011 20 Cbay - Maly Roofing EPDM 44 4 Bldg 4 Roof 2017 20 Maly Roofing EPDM 45 5 Bldg 5 Roof 2011 20 Cbay - Maly Roofing EPDM 46 6 Bldg 6 Roof & OH 2010 10/20 C3T Inc - Maly Roofing EPDM 47 6 Bldg 6 Add. Roof 2010 10/15 4 Bears - Nations Roofing EPDM 48 7 Bldg 7 Roof 2009 10 4 Bears - Nations Roofing EPDM 49 12 Bldg 12 Roof 2010 10/20 C3T Inc - Maly Roofing EPDM 50 12 Bldg 12 Penthouse Roof 2013 15 C3T - Northern Mtl & Rfg EPDM 51 13 G-wing Roof 2011 20 Cbay - Maly Roofing EPDM 52 14 Generator Roof 2009 10/20 4 Bears EPDM 53 15 Parking Ramp Roofs 2011 10 C3T Inc - Maly Roofing EPDM
54 17 Pump House Roof 2011 20 Cbay - Maly Roofing EPDM/Co ncrete
55 18 Electric Switchgear 2011 20 Cbay - Maly Roofing EPDM 56 19 Pharmacy Cache Roof 2013 15 US Vet - Gary Brown EPDM 57 20 Electric Switchgear - - - Metal 58 22 Bldg 22 Roof 2010 15 C3T Inc - Maly Roofing EPDM 59 22 Connecting Corridor 2009 15 Tri-North - Maly Roofing EPDM 60 27 Hazardous Storage Roof 2011 20 Cbay - Maly Roofing EPDM 61 - Cancer Center Roof 2019 10/20 Nations Roofing EPDM
HIGHLIGTHED AREAS ARE ROOF WARRANTY WORK
EFFECTED BY THE NEW ANCHOR INSTALLATION
Department of Veterans Affairs 000
PROJECT NO: 607-18-106
DRAWING NO:
DRAWN BY: PACHECKED BY: PABUILDING NO: CAMPUS
LOCATION: WILLIAM S. MIDDLETON MEMORIAL HOSPITAL, 2500 OVERLOOK TERRACE, MADISON, WI 53705
PROJECT: Install Roof Tiebacks Roof Warranties - Reference Drawing
DATE: 11/15/20192019 Update DATE: Dec 3 2019, 1:23pmDec 3 2019, 1:23pm
Appendix A-2: Existing Reference Drawings Connecting Corridor A and B and Parking Garage Towers
Appendix A-3: Existing Reference Drawings Building 1- A, B and C Structural Framing Plans and Construction Details
Appendix A-4: Existing Reference Drawings Building 2 and Old Laundry Structural Roof Framing Plans
7 8 9 10 11 12 13
B/C
D
B
C
W
F
W
F
W
F
10WF21 10WF21
10WF21 10WF21 10WF21
W
F
W
F
W
F
12WF27 12WF27 12WF27 12WF27 12WF27
W
F
EOEB
16WF45 16WF45 16WF45 16WF45 16WF45
20' - 0" VIF 20' - 0" VIF 20' - 0" VIF 20' - 0" VIF 20' - 0" VIF 19' - 3" VIF
V
IF
V
IF
V
IF
W
F
1'
V
IF
V
IF
16WF40
12WF27
18WF50
V
IF
1'
1'
V
IF
EOEB
EOEB
TOEC = 136'-0"
EOB
1' - 1"
1'
1' - 1"
1'
V
IF
H S
S
X 4X
3/
W
X
(B E
LO
W
E X
IS
T
IN
G
T
O B
'-8
/2
W
X
W
X
W
X
W
X
L6 L6
AHU
10WF21 10WF21 10WF21
(EXISTING LOCATION)(EXISTING LOCATION)10WF21 (EXISTING LOCATION)
(RELOCATED)
.03
. 03
S-521
W
F
S-511
S-521
S-521
(RELOCATED)
(RELOCATED)
(RELOCATED)
(RELOCATED)
(RELOCATED)
10WF21 (EXISTING LOCATION)
0"
10WF21 (EXISTING LOCATION) 10WF21 (EXISTING LOCATION)
0"
0"
MW1
T O
B
8'
-1
/2
S-521
15 TYP
W24X55
W24X55
W/EQUIPMENT
4'-0" MAX
COORDINATE
W/EQUIPMENT
4'-0" MAX
COORDINATE
EQ EQ EQ
W
X
W
X
06 AT STRINGERS
TYP AT (4)
LOCATIONS
TIEBACK (2 TYP)
SEE 9/S521
TIEBACK (2 TYP)
SEE 9/S521
6'
1/ 4"
NEW COLUMN ABOVE
NEW COLUMN ABOVE
COLU
MN A
BOVE
COLU
MN A
BOVE
INFORMATION PERTAINING TO THE EXISTING CONDITIONS PROVIDED IN
THESE CONSTRUCTION DOCUMENTS REPRESENTS TO THE BEST OF OUR
KNOWLEDGE OF THE ACTUAL EXISTING FIELD CONDITIONS. DIMENSIONS OF
EXISTING CONSTRUCTION SHALL BE FIELD VERIFIED AND COORDINATION
PRIOR TO FABRICATION OF STRUCTURAL COMPONENTS. REPORT
DISCREPENCIES BETWEEN THESE DRAWINGS AND FIELD CONDITIONS TO
THE RESIDENT ENGINEER FOR REVIEW. ANY WORK PERFORMED PRIOR TO
RESOLUTION OF DISCREPENCIES BY THE RESIDENT ENGINEER IS SUBJECT
TO REMOVAL AND REPLACEMENT AT NO ADDITIONAL COST TO THE
CONTRACT. BUILDING 2 AS BUILT DRAWINGS DATED 11-28-51 WERE UTILIZED
IN PREPERATION OF THESE DOCUMENTS.
NOTE REGARDING
EXISTING CONDITIONS
- FOR GENERAL NOTES AND DESIGN SPECIFICATIONS REFER TO SHEET S-001
- MW1 = CONCRETE MASONRY BLOCK WALL, SEE S-541
- = LINTELMARK, SEE S-541
- SEE S-541 FOR TYPICAL CMU DETAILS.
LX
Drawing Number:
Drawing Title:
Project Number
DrawnChecked
CONSULTANTS
Project Title
Building Number
Location
ARCHITECT/ ENGINEERS:
Approved:
Date
Dwg. of
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
Department of Veterans Affairs
Revisions Date www.graef-usa.com JW/KNJUNE 28, 2013
Madison, WI
BS
5126 W. Terrace Drive Suite 111 Madison, WI 53718-8343 608 / 242 1550 608 / 242 0787 fax
213100 watertown plank road suite 200 elm grove, wi 53122 p 262.641.0746 f 262.641.0584
N8 W22195 JOHNSON DR
STE 180
WAUKESHA, WI 53186
262.549.1190
262.549.1620 fx
BRYANT E. STEMPSKI
WI PE No.37299
LOW ROOF LEVEL FRAMING PLAN
S-103
607-12-115William S. Middleton VA Hospital Renovate Building 2
Office of Construction and Facilities Management
3/16" = 1'-0"1
LOW ROOF FRAMING PLAN
PLAN KEYNOTES
03 RELOCATE EXISTING 10WF21 TO EACH SIDE OF CUT CONCRETE JOIST AND
FRAME INTO EXISTING STEEL GIRDER SIMILAR TO EXISTING.
04 PERIMETER OF OPENING ABOVE OR BELOW, NOT SLAB EDGE THIS PLAN
ONLY.
06 REMOVE AND REPLACE EXISTING MASONRY AS REQUIRED TO INSTALL
NEW TO EXISTING BEAM CONNECTIONS.
15 EXISTING ROOF OPENING TO BE INFILLED, SEE 11-13/S-501. NOTE ALL
ROOF OPENINGS TO BE INFILLED NOT SHOWN, SEE ARCHITECTURAL AND
MEP PLANS.
17 HANG STRINGERS AND LANDING AS REQUIRED FROM STRUCTURAL STEEL
BEAMS ABOVE. DESIGN SHALL BE PART OF STAIR DESIGN. HANGERS AND
ALL CONNECTION SHALL BE HIDDEN IN ARCHITECTURAL WALLS.
PLAN NOTES
7 8 9 10 11 12 13
B/C
D
B
C
12WF27 12WF27 12WF27 12WF27 12WF27 12WF27
12WF2712WF2712WF2712WF2712WF2712WF27
W
F
W
F
W
F
W
F
W
F
W
F
W
F
W16X26W16X26
W
X
W
X
W
X
W
X
W
X
W
X
W
X
W14X22
W 8X
W 8X
W12X14
W16X26
TOD = 156'-4"
V
IF
V
IF
V
IF
EOEB
1' - 1" VIF
1'
V
IF
1'
V
IF
1' - 1" VIF
20' - 0" VIF 20' - 0" VIF 20' - 0" VIF 20' - 0" VIF 20' - 0" VIF 19' - 3" VIF
V
IF
V
IF
4'
V
IF
V
IF
119' - 3" VIF
TOEC = 152'-9 1/2"
EOB
5"
5"
5"
5"
1'
7'
/8
EOS
S-521
S-511 k
W
X33
W
X33
5"
W
X33
W
X33
W
X33
5"
3 EQ SPACES @ 6'-8" = 20'-0" 3 EQ SPACES @ 6'-5" = 19'-3"
TYP
AT BEAMS,
TYP
AT DECK,
TYP
8"
W8X18 HOIST
BEAM, TOS 4"
BELOW BOTTOM
OF BEAM ABOVE
S-521
TYP
S-521
EQ EQ
9'-3 1/2"
S-521
3/ 4"
3' -1
1"
S-521
TY
P
SIM
S-521
TYP
W12X14 W12X14
TIEBACK (1 TYP)
SEE 10/S-521
TIEBACK (4 TYP)
SEE 9/S-521
TIEBACK (4 TYP)
SEE 9/S-521
TIEBACK (4 TYP)
SEE 9/S-521
TIEBACK (4 TYP)
SEE 9/S-521
3 LOCATIONS
H L
PROVIDE KICKERS AT
4'-0" OC, SEE 6/S-521
S-521
- FOR GENERAL NOTES AND DESIGN SPECIFICATIONS REFER TO SHEET S-001.
- TYPICAL METAL DECK = 1 1/2" x 20 GAGE WIDE RIB METAL ROOF DECK.
- = DIRECTION IN WHICH METAL DECK SPANS.
- TOP OF BEAM (TOB) ELEVATION NOTED ON PLAN THUS TOB = 156'-2 1/2".
- REFER TO PLUMBING DRAWINGS FOR ROOF DRAIN LOCATIONS. REFER TO
DETAIL 1/S-521 FOR ROOF DRAIN SUBFRAME.
- PROVIDE MECHANICAL SUBFRAME FOR ALL DUCT PENETRATIONS THROUGH
ROOF. COORDINATE SIZE AND LOCATION WITH MECHANICAL CONTRACTOR.
RFER TO SUBFRAME DETAIL 2/S-521.
- REFER TO DETAIL 3/S-521 FOR ROOF EDGE ANGLE / BENT PLATE SPLICES AT
DECK PERIMETER.
- FOR EDGE CONDITION AT ALL DECK OPENINGS AND DECK EDGES REFER TO
DETAIL 4/S-521 UNLESS NOTED OTHERWISE.
- MW1 = CONCRETE MASONRY BLOCK WALL, SEE S-541
INFORMATION PERTAINING TO THE EXISTING CONDITIONS PROVIDED IN
THESE CONSTRUCTION DOCUMENTS REPRESENTS TO THE BEST OF OUR
KNOWLEDGE OF THE ACTUAL EXISTING FIELD CONDITIONS. DIMENSIONS OF
EXISTING CONSTRUCTION SHALL BE FIELD VERIFIED AND COORDINATION
PRIOR TO FABRICATION OF STRUCTURAL COMPONENTS. REPORT
DISCREPENCIES BETWEEN THESE DRAWINGS AND FIELD CONDITIONS TO
THE RESIDENT ENGINEER FOR REVIEW. ANY WORK PERFORMED PRIOR TO
RESOLUTION OF DISCREPENCIES BY THE RESIDENT ENGINEER IS SUBJECT
TO REMOVAL AND REPLACEMENT AT NO ADDITIONAL COST TO THE
CONTRACT. BUILDING 2 AS BUILT DRAWINGS DATED 11-28-51 WERE UTILIZED
IN PREPERATION OF THESE DOCUMENTS.
NOTE REGARDING
EXISTING CONDITIONS
Drawing Number:
Drawing Title:
Project Number
DrawnChecked
CONSULTANTS
Project Title
Building Number
Location
ARCHITECT/ ENGINEERS:
Approved:
Date
Dwg. of
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
Department of Veterans Affairs
Revisions Date www.graef-usa.com JW/KNJUNE 28, 2013
Madison, WI
BS
5126 W. Terrace Drive Suite 111 Madison, WI 53718-8343 608 / 242 1550 608 / 242 0787 fax
213100 watertown plank road suite 200 elm grove, wi 53122 p 262.641.0746 f 262.641.0584
N8 W22195 JOHNSON DR
STE 180
WAUKESHA, WI 53186
262.549.1190
262.549.1620 fx
BRYANT E. STEMPSKI
WI PE No.37299
HIGH ROOF LEVEL FRAMING PLAN
S-105
607-12-115William S. Middleton VA Hospital Renovate Building 2
Office of Construction and Facilities Management
3/16" = 1'-0"1
HIGH ROOF FRAMING PLAN
PLAN NOTES
PLAN KEYNOTES
15 EXISTING ROOF OPENING TO BE INFILLED, SEE 11-13/S-501. NOTE ALL
ROOF OPENINGS TO BE INFILLED NOT SHOWN, SEE ARCHITECTURAL AND
MEP PLANS.
L3x3x5/16, COPE
VERTICAL LEG AT
BEAM END
BEAM TOP FLANGES
3/16
3/16
TYPICAL
4 1/2"
2'-11"
4 1/2"DIMENSION BETWEEN
L3x3x5/16, COPE VERTICAL
LEG EACH END
4"4"
NOTES:
1. = DIMENSION BY MECHANICAL CONTRACTOR.
2. FASTEN DECK TO ANGLES WITH PUDDLE WELD AT 6" OC ALONG EACH SIDE OF OPENING.
CL BEAMCL BEAM
ROOF DRAIN, SEE
PLUMBING DRAWINGS
FOR LOCATIONS
C L
B E
A M
BEAM, SEE PLAN
BEAM, SEE PLAN
3/16
EDGE OF BEAM,
TYPICAL
4"
ROOF DRAIN SUBFRAME
L3 x3 x5 /1
CL BEAM CL BEAM
NOTES:
1. = DIMENSION BY MECHANICAL CONTRACTOR.
2. DECK SUPPLIER TO PROVIDE 1 1/2" HIGH, 20 GAGE CHANNEL CLOSURE ALONG NON-BEARING SIDES OF DECK.
3. FASTEN DECK TO ANGLES WITH PUDDLE WELD AT 6" OC ALONG EACH SIDE OF OPENING.
L3 x3 x5 /1
BEAM TOP FLANGES
DIMENSION BETWEEN4" 4"
L3x3x5/16, COPE
VERTICAL LEG
EACH END
3/16
TYPICAL
3/16
TYPICAL
3/16
TYPICAL
BEAM, SEE PLANEDGE OF BEAM,
TYPICAL
BEAM, SEE PLAN
MECHANICAL SUBFRAME
BEAM, SEE PLAN
AT ROOF EDGE ANGLE / BENT PLATE DIRECTLY ON TOP OF BEAM TOP FLANGE
BEAM, SEE PLAN
COLUMN, SEE SCHEDULE
NOTES:
1. WELD ALL ROOF EDGE ANGLE / BENT PLATE SEGMENTS TOGETHER WITH BUTT
WELD, BOTH LEGS.
2. DO NOT SPLICE WITHIN 5'-0" OF COLUMN CENTERLINE.
3. SEE SECTIONS FOR WELD OF ROOF EDGE ANGLE / BENT PLATE TO BEAM.
TOS
SEE PLAN
SPLICE
LOCATION
ROOF EDGE ANGLE /
BENT PLATE
ROOF PERIMETER EDGE ANGLE / BENT PLATE SPLICE
BEAM, SEE PLAN
3"
ROOF DECK,
SEE PLAN
SEE PLAN FOR
DIRECTION
OF DECK SPAN
1/4" CONTINUOUS
BENT PLATE OR
EDGE ANGLE
TOS
SEE PLAN
1/4 2-12
(1'-0" MAXIMUM)
CL BEAM
EOD, SEE PLAN
EDGE CONDITION AT DECK OPENINGS / EDGES
3/8" PLATE, TYPICAL
BEAM, SEE PLAN
TOS
SEE PLAN
L3x3x5/16 AT 4'-0" OC
MAXIMUM
3/16
TYPICAL
3/16
TYPICAL
ROOF DECK, SEE PLAN
L3X3X5/16 x CONTINUOUS 1/4
SEE PLAN
EOD
BEAM,
SEE PLAN
BEAM, SEE
PLAN
ROOF DECK,
SEE PLAN
1/4
TYPICAL
TOS
SEE PLAN
3/8" PLATE,
TYPICAL
L3x3x5/16
3/16
TYPICAL
CL BEAM CL BEAM
SIDE INDICATED
AS "H" ON PLAN
SIDE INDICATED
AS "L" ON PLAN
1' - 8"
EXISTING BEAM,
IN NEW
LOCATION
SHIM TIGHT TO
UNDERSIDE OF
EXISTING SLAB, TYP
1' - 0" 1' - 0"
SEE 13/S-521
CUT BRIDGING TO INSTALL
STEEL BEAMS
4"4"
3/16 2
TYP
1/4" x 4" WIDE PLATE WITH
(2) 1/2" DIAMETER EXPANSION
AT 6" OC, SHIM TIGHT TO
BRIDGING
PROVIDE L3x3x1/4 ANGLE TO
SUPPORT INFILL
METAL ROOF DECK,
SEE PLAN
CMU WALL, SEE PLAN
8" BOND BEAM (2) #4
1/4" x 4" x CONTINOUS
PLATE WITH 1/2" DIAMETER
STUDS x 4" AT 1'-4" OC
12 5/8
TYP
4" 8"
4"
1/4" CONTINUOUS
BENT PLATE OR
ANGLE
3"
8" BOND BEAM
WITH (2) #4
5/8 12
3/16
L3x3x1/4 AT 2'-8" WITH
(2) 3/4" DIAMETER x 4"
EXPANSION ANCHORS
4 1/2" 4 1/2"
1/ 2"
1/ 2"
1"
BEAM, SEE PLAN
(4) 3/4" DIA THREADED
STUD @ 4" GAGE
3/8" STIFFENER PLATE
EACH SIDE
CONTINUOUS
PEDESTAL BY OTHERS
FASTEN VIBRATION
ISOLATION CURB TO
STEEL BEAM WITH 1"
WELDS @ 12" OC, TYP
1/4
TYP
1/4
1/4
HSS6x6x1/4 WITH 1/2"x7"x12" CAP PLATE
PACK POCKET
WITH GROUT
EXISTING CONCRETE
JOIST AND BRIDGING
SAFETY TIE BACK WITH
THRU BOLT CLAMPS IN
PLACE AT CONCRETE
JOIST AND BRIDGING
INTERSECTION. DESIGN
BY SUPPLIER, SEE
SPECIFICATIONS
SAFETY TIE BACK WITH
DIRECT WELD. DESIGN
BY SUPPLIER, SEE
SPECIFICATIONS
ROOF DECK,
SEE PLAN
PER
SUPP
SPEC
1/4
TYP
BEAM, SEE PLAN
3/8" FULL HEIGHT STIFFENER
EACH SIDE, TYPICAL
BEAM, SEE PLAN
L3 1/2x3 1/2x1/4 EACH AROUND
OPENING PERIMETER
WELDED AT CORNERS
3/16
TYPICAL
CONCRETE INFILL OVER 1" x
20 GAGE METAL DECK
L2x2x1/4 @ 18" OC MAX
TOES
SEE PLAN
EXISTING
CONCRETE JOIST
COLUMN,
SEE PLAN
1"x12"x9" BASE PLATE
EXISTING STEEL BEAM,
SEE PLAN
1/4
PARALLEL TO
WEB ONLY
CREATE POCKET IN EXISTING
SLAB AND INFILL WITH GROUT
AFTER WELDING BASE PLATE
5/16
A
EXISTING COLUMN
COLUMN, SEE PLAN
2"x15"x15" BASE PLATE
CREATE POCKET IN EXISTING CURB
AND ROOF SLAB, INFILL WITH GROUT
AFTER COLUMN INSTALLATION
5/16
5/16
5/16
TYP
FLOWABLE/SELF
CONSOLIDATING
CONCRETE INFILL
WITH 6x6xW2.1xW2.1
WELDED WIRE FABRIC
2"
2"
4"
MIN
1 1/2"
1/
2"
MAXIMUM 6'-0"
FIELD VERIFY
L4x3x1/4 EACH END
SITTING ON BENT PLATE
1 1/2" x 18 GA METAL
COMPOSITE DECK (WIDE RIB)
3/8" BENT PLATE, EPOXY BOLTED TO
EXISTING CONCRETE JOIST WITH 5/8"
DIAMETER THREADED RODS @ 10" OC
WITH 4" EMBED
FIELD VERIFY
OPENING EXTENDS
TO FACE OF JOISTS
EXISTING
CONCRETE JOIST
1/8
TYPICAL
Drawing Number:
Drawing Title:
Project Number
DrawnChecked
CONSULTANTS
Project Title
Building Number
Location
ARCHITECT/ ENGINEERS:
Approved:
Date
Dwg. of
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
Department of Veterans Affairs
Revisions Date www.graef-usa.com JW/KNJUNE 28, 2013
Madison, WI
BS
5126 W. Terrace Drive Suite 111 Madison, WI 53718-8343 608 / 242 1550 608 / 242 0787 fax
213100 watertown plank road suite 200 elm grove, wi 53122 p 262.641.0746 f 262.641.0584
N8 W22195 JOHNSON DR
STE 180
WAUKESHA, WI 53186
262.549.1190
262.549.1620 fx
BRYANT E. STEMPSKI
WI PE No.37299
STEEL DETAILS
S-521
607-12-115William S. Middleton VA Hospital Renovate Building 2
Office of Construction and Facilities Management
3/4" = 1'-0"1
DETAIL
3/4" = 1'-0"2
DETAIL
3/4" = 1'-0"3
DETAIL
3/4" = 1'-0"4
DETAIL
3/4" = 1'-0"5
SECTION
3/4" = 1'-0"6
SECTION
3/4" = 1'-0"12
SECTION
3/4" = 1'-0"7
SECTION
1" = 1'-0"8
SECTION AT ELEVATOR ROOF
3/4" = 1'-0"16
SECTION
1 1/2" = 1'-0"9
TIE BACK ANCHOR CONCEPT
1 1/2" = 1'-0"10
TIE BACK ANCHOR CONCEPT
1" = 1'-0"11
SECTION AT TYPICAL ROOF OPENING INFILL
1" = 1'-0"14
SECTION
1" = 1'-0"15
SECTION
1" = 1'-0"13
SECTION AT TYPICAL ROOF OPENING INFILL
Appendix B: Scope Areas building roof pictures with Figure Nos Reference Drawings)
1. N/A 2. Connecting Corridor A
3. Connecting Corridor B 4. N/A
5. 4C Roof Plan 6. B-Wing Mechanical and Core
7. A-Wing Looking West 8. B-Wing looking East
9. Building 15 parking garage towers 10. Building 2 – East End
11. Building 2(old)- Laundry 12. Building 1- 8th floor B8060-
| References |
| s_nsg01, s_nsgA-0901700_LINK-IAC.dgn, Default |
| s_dnfp03-0901700_LINK-IAC.dgn, Default |
| x_dcp03-0901700_LINK-IAC.dgn |
| 08-3483-Topo-Util update 11-18-09.dwg |
| s_ncp03-0901700_LINK-IAC.dgn, Default |
| gg_ab01-0901700_LINK-IAC.dgn |
| s_nfp03-0901700_LINK-IAC.dgn, Default |
| s_nfp03-0901700-IAC.dgn |
| SF-103D-0901700_LINK-IAC.dgn |
| References |
| s_nsg01, s_nsgb-0901700_LINK-IAC.dgn, Default |
| s_dnfp03-0901700_LINK-IAC.dgn, Default |
| x_dcp03-0901700_LINK-IAC.dgn |
| 08-3483-Topo-Util update 11-18-09.dwg |
| s_ncp03-0901700_LINK-IAC.dgn, Default |
| gg_ab01-0901700_LINK-IAC.dgn |
| s_nnp01-0901700_LINK-IAC.dgn |
| s_nfp03-0901700_LINK-IAC.dgn, Default |
| s_dnfp04-0901700_LINK-IAC.dgn |
| Project 607-18-106 -Specification 11 00 14 Appendix A-2-Existing Reference Drawings-Connecting Coordor and Parking Garage.pdf |
| References |
| s_nsg01, s_nsgA-0901700_LINK-IAC.dgn, Default |
| s_dnfp03-0901700_LINK-IAC.dgn, Default |
| x_dcp03-0901700_LINK-IAC.dgn |
| 08-3483-Topo-Util update 11-18-09.dwg |
| s_ncp03-0901700_LINK-IAC.dgn, Default |
| gg_ab01-0901700_LINK-IAC.dgn |
| s_nfp03-0901700_LINK-IAC.dgn, Default |
| s_nfp03-0901700-IAC.dgn |
| SF-103D-0901700_LINK-IAC.dgn |
| References |
| s_nsg01, s_nsgb-0901700_LINK-IAC.dgn, Default |
| s_dnfp03-0901700_LINK-IAC.dgn, Default |
| x_dcp03-0901700_LINK-IAC.dgn |
| 08-3483-Topo-Util update 11-18-09.dwg |
| s_ncp03-0901700_LINK-IAC.dgn, Default |
| gg_ab01-0901700_LINK-IAC.dgn |
| s_nnp01-0901700_LINK-IAC.dgn |
| s_nfp03-0901700_LINK-IAC.dgn, Default |
| s_dnfp04-0901700_LINK-IAC.dgn |
File details come from the government source that posted it. Updated .