Attachment_B_-_Drawings.pdf
PDF 37 MB Posted
- Attached to
- Eau Gallie Library Exterior Renovations
- Solicitation number
- B-4-25-59
- Issued by
- Brevard County, Florida
About this file
The document is a comprehensive set of architectural drawings and technical specifications for the Eau Gallie Library Exterior Renovation project by Brevard County, Florida. The project involves a complete exterior restoration of the library located at 1521 Pineapple Avenue in Melbourne, including pressure cleaning, stucco repairs, replacing control joints, window seal replacements, and repainting the entire exterior surfaces. The renovation will utilize Sto Corp. air/moisture barriers and Sherwin-Williams paint systems, following the 2023 Florida Building Code requirements. A non-mandatory pre-bid meeting is scheduled for Tuesday, June 17, 2025, at 9:30 am, with sealed bids due on Wednesday, July 2, 2025, at 10:00 AM. The project timeline requires 90 calendar days for Substantial Completion from the Notice to Proceed, with an additional 30 calendar days for Final Completion.
The estimated base bid cost is $120,000, with potential additional funding through an optional window glazing sealant work. Contractors must demonstrate successful completion of at least five commercial projects valued at $50,000 or more within the past three years involving painting, stucco, and window caulking. The county will award the contract to the lowest responsive bidder, requiring contractors to maintain $1,000,000 in general liability insurance and workers' compensation coverage. Bidders must submit comprehensive documentation, including a Reference Form, Foreign Influence Disclosure, and Scrutinized Company Affidavit. The project must also comply with various regulations, including the Build America, Buy America Act (BABAA) requirements, and focus on restoring and improving the library's exterior finishes and surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Eau Gallie Library Exterior Renovation
PROJECT SCOPE
LEVEL 1 EXTERIOR FINISH RESTORATION AND REPAINTING.
PROJECT ADDRESS
1521 PINEAPPLE AVENUE
MELBOURNE, FLORIDA 32935
OWNER
BREVARD COUNTY
2725 JUDGE FRAN JAMIESON WAY
VIERA, FLORIDA 32940
PROJECT MANAGER
MICHAEL DUNLAP
BREVARD COUNTY
2725 JUDGE FRAN JAMESON WAY
VIERA, FLORIDA 32940
321-633-2050 michael.dunlap@brevardfl.gov
ARCHITECT
SHAD TRAYLOR, AIA
TSARK ARCHITECTURE, LLC
1990 W. NEW HAVEN AVE., SUITE 306
MELBOURNE, FL 32904
321-684-9966 shad@tsarkarchitecture.com
APPLICABLE CODES
FBC (2023) FLORIDA BUILDING CODE 8TH EDITION: BUILDING
FBC-EB (2023) FLORIDA BUILDING CODE 8TH EDITION: EXISTING BUILDING
FBC-A (2023) FLORIDA BUILDING CODE 8TH EDITION: ACCESSIBILITY
FBC-ECC (2023) FLORIDA BUILDING CODE 8TH EDITION: ENERGY CONSERVATION
FBC-TP (2023) FLORIDA BUILDING CODE 8TH EDITION: TEST PROTOCOLS HVHZ
FFPC (2023) FLORIDA FIRE PREVENTION CODE 8TH EDITION
NFPA 10 (2022) STANDARD FOR PORTABLE FIRE EXTINGUISHERS
NFPA 70 (2023) NATIONAL ELECTRICAL CODE
COMPLIANCE STATEMENT
REVIEW AND APPROVAL BY THE AUTHORITY HAVING JURISDICTION SHALL NOT RELIEVE
THE APPLICANT OF THE RESPONSIBILITY OF COMPLIANCE WITH THE APPLICABLE MINIMUM
CODES AND STANDARDS.
TO THE BEST OF OUR KNOWLEDGE, THESE DOCUMENTS COMPLY WITH THE APPLICABLE
MINIMUM CODES AND STANDARDS AS SET FORTH BY THE FLORIDA BUILDING CODE AND
GOVERNING FLORIDA STATUTES.
KEY NOTE DESIGNATION
B1
101A
DOOR NUMBER
ROOM NUMBER
ROOM NAME
ON WHICH ELEVATION IS SHOWN
ELEVATION NUMBER/SHEET NUMBER
SHEET ON WHICH SECTION IS SHOWN
SECTION NUMBER
DRAWING NUMBER
A
P1
WINDOW DESIGNATION
ACCESSORY DESIGNATION
PARTITION TYPE DESIGNATION
WHICH DETAIL IS SHOWN
SURFACE SHOWN IN ELEVATION
DIRECTION OF CUTTING PLANE
EXTENT OF DETAIL
SHEET ON WHICH DRAWING IS SHOWN
ROOM
NAME
A101
DETAIL NUMBER/SHEET NUMBER ON
A/C AIR CONDITIONING
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE, ALTERNATIVE
ALUM ALUMINUM
APPROX APPROXIMATE(LY)
ARCH ARCHITECT(URAL)
AV AUDIOVISUAL
BLDG BUILDING
BO BOTTOM OF
CLG CEILING
CLG HT CEILING HEIGHT
CLO CLOSET
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUE, CONTINUOUS
CORR CORRIDOR
DEMO DEMOLISH
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIV DIVISION
E EAST
EA EACH
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FLR FINISHED FLOOR
FLR FLOOR
FT FOOT, FEET
FURN FURNITURE
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GYP BD GYPSUM BOARD
HC HANDICAP
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION & AIR
CONDITIONING
INCL INCLUDE(D), (ING)
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
KIT KITCHEN
LAB LABOATORY
LAV LAVATORY
LF LINEAR FEET
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEZZ MEZZANINE
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINUMUM
MISC MISCELLANEOUS
MR MOISTURE RESISTANT
MTG MOUNTING
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OPT OPTION(AL)
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FEET
PLYWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
PREFIN PREFINISH
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFRIGERATOR, REFERENCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
S SOUTH
SC SOLID CORE
SD STORM DRAIN
SECT SECTION
SF SQUARE FEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STOR STORAGE
SUSP SUSPENDED
SYS SYSTEM
TEL TELEPHONE
TEMP TEMPORARY
THRU THROUGH
TO TOP OF
TRTD TREATED
TV TELEVISION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W WEST, WIDE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WT WEIGHT
GRAPHIC SYMBOLS
ABBREVIATIONS
PROJECT INFORMATION
NO. SHEET DESCRIPTION LATEST REVISION
ARCHITECTURAL
G101 COVER SHEET
G102 GENERAL REQUIREMENTS
A001 SPECIFICATIONS
A201 BUILDING ELEVATIONS
A202 EXISTING CONDITIONS
A203 EXISTING CONDITIONS
A204 EXISTING CONDITIONS
A205 EXISTING CONDITIONS
A206 EXISTING CONDITIONS
A207 EXISTING CONDITIONS
A208 EXISTING CONDITIONS
A209 EXISTING CONDITIONS
A210 EXISTING CONDITIONS
A211 EXISTING CONDITIONS
INDEX OF DRAWINGSLOCATION MAP
N
PROJECT LOCATION
G101
COVER SHEET
P in ea p p le A v en u e
REVISION:
DRAWN BY:
DATE:
SHEET TITLE:
P ro je ct
N o
A ãCOPYRIGHT 2025 by Tsark Architecture, LLC All rights reserved. No part of this work covered by the copyright hereon may be reproduced or used in any form or by any means - graphic, electronic or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without written permission of the copyright holder.
4/30/2025
E au
G al lie L ib ra ry
M el b o u rn e, F lo ri d a
Tsark Architecture, LLC 1600 Sarno Road, Suite 212 Melbourne, Florida 32935 tel: (321) 241-6378 License Number: AA26003779
E xt er io r R en o v at io n
4.30.2025
01 10 00 GENERAL REQUIREMENTS ACCESSIBILITY NOTES 01 33 00 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. THIS SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS FOR
SUBMITTING SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER MISCELLANEOUS
SUBMITTALS.
1.2 DEFINITIONS
A. ACTION SUBMITTALS: WRITTEN AND GRAPHIC INFORMATION THAT REQUIRES
ARCHITECT'S/ENGINEER'S RESPONSIVE ACTION.
B. INFORMATIONAL SUBMITTALS: WRITTEN INFORMATION THAT DOES NOT REQUIRE
ARCHITECT'S/ENGINEER'S APPROVAL. SUBMITTALS MAY BE REJECTED FOR NOT COMPLYING
WITH REQUIREMENTS.
1.3 SUBMITTAL PROCEDURES
A. GENERAL: ELECTRONIC COPIES (.PDF ONLY) OF DRAWINGS OF THE CONTRACT DRAWINGS
WILL BE PROVIDED BY ARCHITECT/ENGINEER FOR CONTRACTOR'S USE IN PREPARING
SUBMITTALS.
B. CONTRACTOR SHALL SUBMIT SOFT COPIES OF PRODUCT DATA, SHOP DRAWINGS, AND
PHYSICAL COPIES OF SAMPLES.
C. ALL SUBMITTED SHOP DRAWINGS SHALL HAVE ENHANCEMENT OR ADDITIONAL DETAILS
THAN THAT OF THE ARCHITECT'S/ENGINEER'S, REFLECTING TYPES OF MATERIAL ALREADY
SUBMITTED FOR APPROVAL AND APPROVED BY THE ARCHITECT/ENGINEER AND REFLECTING
ALL NECESSARY EQUIPMENT, IF ANY, OR ELSE THE SUBMITTED SHOP DRAWING SHALL NOT BE
CONSIDERED AS COMPLETE.
D. COORDINATION: COORDINATE PREPARATION AND PROCESSING OF SUBMITTALS WITH
PERFORMANCE OF CONSTRUCTION ACTIVITIES.
E. PROCESSING TIME: ALLOW ENOUGH TIME FOR SUBMITTAL REVIEW, INCLUDING TIME FOR
RESUBMITTALS, AS FOLLOWS. TIME FOR REVIEW SHALL COMMENCE ON
ARCHITECT'S/ENGINEER'S RECEIPT OF SUBMITTAL.
1. INITIAL REVIEW: ALLOW UP TO 14 DAYS FOR INITIAL REVIEW OF EACH SUBMITTAL. ALLOW
ADDITIONAL TIME IF PROCESSING MUST BE DELAYED TO PERMIT COORDINATION WITH
SUBSEQUENT SUBMITTALS. ARCHITECT/ENGINEER WILL ADVISE CONTRACTOR WHEN A
SUBMITTAL BEING PROCESSED MUST BE DELAYED FOR COORDINATION.
2. CONCURRENT REVIEW: WHERE CONCURRENT REVIEW OF SUBMITTALS BY
ARCHITECT'S/ENGINEER'S CONSULTANTS, OWNER, OR OTHER PARTIES IS REQUIRED,
ALLOW UP TO 21 DAYS FOR INITIAL REVIEW OF EACH SUBMITTAL.
3. NO EXTENSION OF THE CONTRACT TIME WILL BE AUTHORIZED BECAUSE OF FAILURE TO
TRANSMIT SUBMITTALS ENOUGH IN ADVANCE OF THE WORK TO PERMIT PROCESSING.
F. IDENTIFICATION: PLACE A LABEL OR TITLE BLOCK ON EACH SUBMITTAL FOR IDENTIFICATION.
1. INDICATE NAME OF FIRM OR ENTITY THAT PREPARED EACH SUBMITTAL ON LABEL OR TITLE
BLOCK.
2. PROVIDE A SPACE APPROXIMATELY 4 BY 5 INCHES (100 BY 125 MM) ON LABEL OR BESIDE
TITLE BLOCK TO RECORD CONTRACTOR'S REVIEW AND APPROVAL MARKINGS AND ACTION
TAKEN BY ARCHITECT/ENGINEER.
3. INCLUDE THE FOLLOWING INFORMATION ON LABEL FOR PROCESSING AND RECORDING
ACTION TAKEN:
a. PROJECT NAME.
b. DATE.
c. NAME OF ARCHITECT/ENGINEER.
d. NAME OF CONTRACTOR.
e. NAME OF SUBCONTRACTOR.
f. NAME OF SUPPLIER.
g. NAME OF MANUFACTURER.
h. UNIQUE IDENTIFIER, INCLUDING REVISION NUMBER.
i. NUMBER AND TITLE OF APPROPRIATE SPECIFICATION SECTION.
j. DRAWING NUMBER AND DETAIL REFERENCES, AS APPROPRIATE.
G. DEVIATIONS: HIGHLIGHT, ENCIRCLE, OR OTHERWISE IDENTIFY DEVIATIONS FROM THE
CONTRACT DOCUMENTS ON SUBMITTALS.
H. TRANSMITTAL: ARCHITECT/ENGINEER WILL RETURN SUBMITTALS, WITHOUT REVIEW,
RECEIVED FROM SOURCES OTHER THAN CONTRACTOR.
1. ON AN ATTACHED SEPARATE SHEET, PREPARED ON CONTRACTOR'S LETTERHEAD, RECORD
RELEVANT INFORMATION, REQUESTS FOR DATA, REVISIONS OTHER THAN THOSE
REQUESTED BY ARCHITECT/ENGINEER ON PREVIOUS SUBMITTALS, AND DEVIATIONS FROM
REQUIREMENTS OF THE CONTRACT DOCUMENTS, INCLUDING MINOR VARIATIONS AND
LIMITATIONS. INCLUDE THE SAME LABEL INFORMATION AS THE RELATED SUBMITTAL.
2. INCLUDE CONTRACTOR'S CERTIFICATION STATING THAT INFORMATION SUBMITTED
COMPLIES WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS.
I. DISTRIBUTION: FURNISH COPIES OF FINAL SUBMITTALS TO MANUFACTURERS,
SUBCONTRACTORS, SUPPLIERS, FABRICATORS, INSTALLERS, AUTHORITIES HAVING
JURISDICTION, AND OTHERS AS NECESSARY FOR PERFORMANCE OF CONSTRUCTION
ACTIVITIES.
J. USE FOR CONSTRUCTION: USE ONLY FINAL SUBMITTALS WITH MARK INDICATING ACTION
TAKEN BY ARCHITECT/ENGINEER IN CONNECTION WITH CONSTRUCTION.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. GENERAL: PREPARE AND SUBMIT ACTION SUBMITTALS REQUIRED BY CONTRACT
DOCUMENTS.
1. NUMBER OF COPIES: SUBMIT COPIES OF EACH SUBMITTAL, AS FOLLOWS, UNLESS
OTHERWISE INDICATED:
a. INITIAL SUBMITTAL: SUBMIT A PRELIMINARY SINGLE COPY OF EACH SUBMITTAL WHERE
SELECTION OF OPTIONS, COLOR, PATTERN, TEXTURE, OR SIMILAR CHARACTERISTICS IS
REQUIRED. ARCHITECT/ENGINEER, WILL RETURN SUBMITTAL WITH OPTIONS SELECTED.
B. PRODUCT DATA: COLLECT INFORMATION INTO A SINGLE SUBMITTAL FOR EACH ELEMENT OF
CONSTRUCTION AND TYPE OF PRODUCT OR EQUIPMENT. l
1. IF INFORMATION MUST BE SPECIALLY PREPARED FOR SUBMITTAL BECAUSE STANDARD
PRINTED DATA ARE NOT SUITABLE FOR USE, SUBMIT AS SHOP DRAWINGS, NOT AS
PRODUCT DATA.
2. MARK EACH COPY OF EACH SUBMITTAL TO SHOW WHICH PRODUCTS AND OPTIONS ARE
APPLICABLE.
3. INCLUDE THE FOLLOWING INFORMATION, AS APPLICABLE:
a. MANUFACTURER'S WRITTEN RECOMMENDATIONS.
b. MANUFACTURER'S PRODUCT SPECIFICATIONS.
c. MANUFACTURER'S INSTALLATION INSTRUCTIONS.
d. STANDARD COLOR CHARTS.
e. MANUFACTURER'S CATALOG CUTS.
f. WIRING DIAGRAMS SHOWING FACTORY-INSTALLED WIRING.
g. PRINTED PERFORMANCE CURVES.
h. OPERATIONAL RANGE DIAGRAMS.
i. MILL REPORTS.
j. STANDARD PRODUCT OPERATING AND MAINTENANCE MANUALS.
k. COMPLIANCE WITH RECOGNIZED TRADE ASSOCIATION STANDARDS.
l. COMPLIANCE WITH RECOGNIZED TESTING AGENCY STANDARDS.
m. APPLICATION OF TESTING AGENCY LABELS AND SEALS.
n. NOTATION OF COORDINATION REQUIREMENTS.
C. SHOP DRAWINGS: PREPARE PROJECT-SPECIFIC INFORMATION, DRAWN ACCURATELY TO
SCALE. DO NOT BASE SHOP DRAWINGS ON REPRODUCTIONS OF THE CONTRACT DOCUMENTS
OR STANDARD PRINTED DATA.
D. SAMPLES: PREPARE PHYSICAL UNITS OF MATERIALS OR PRODUCTS, INCLUDING THE
FOLLOWING:
1. SAMPLES FOR INITIAL SELECTION: SUBMIT MANUFACTURER'S COLOR CHARTS CONSISTING
OF UNITS OR SECTIONS OF UNITS SHOWING THE FULL RANGE OF COLORS, TEXTURES, AND
PATTERNS AVAILABLE.
SAMPLES FOR VERIFICATION: SUBMIT FULL-SIZE UNITS OR SAMPLES OF SIZE INDICATED,
PREPARED FROM THE SAME MATERIAL TO BE USED FOR THE WORK, CURED AND FINISHED
IN MANNER SPECIFIED, AND PHYSICALLY IDENTICAL WITH THE PRODUCT PROPOSED FOR
USE, AND THAT SHOW FULL RANGE OF COLOR AND TEXTURE VARIATIONS EXPECTED.
SAMPLES INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: PARTIAL SECTIONS OF
MANUFACTURED OR FABRICATED COMPONENTS; SMALL CUTS OR CONTAINERS OF
MATERIALS; COMPLETE UNITS OF REPETITIVELY USED MATERIALS; SWATCHES SHOWING
COLOR, TEXTURE, AND PATTERN; COLOR RANGE SETS; AND COMPONENTS USED FOR
INDEPENDENT TESTING AND INSPECTION.
2. PREPARATION: MOUNT, DISPLAY, OR PACKAGE SAMPLES IN MANNER SPECIFIED TO
FACILITATE REVIEW OF QUALITIES INDICATED. PREPARE SAMPLES TO MATCH
ARCHITECT'S/ENGINEER'S SAMPLE WHERE SO INDICATED. ATTACH LABEL ON UNEXPOSED
SIDE THAT INCLUDES THE FOLLOWING:
a. GENERIC DESCRIPTION OF SAMPLE.
b. PRODUCT NAME OR NAME OF MANUFACTURER.
c. SAMPLE SOURCE.
3. ADDITIONAL INFORMATION: ON AN ATTACHED SEPARATE SHEET, PREPARED ON
CONTRACTOR'S LETTERHEAD, PROVIDE THE FOLLOWING, AS APPLICABLE:
a. SIZE LIMITATIONS.
b. COMPLIANCE WITH RECOGNIZED STANDARDS.
c. AVAILABILITY.
d. DELIVERY TIME.
4. SUBMIT SAMPLES FOR REVIEW OF KIND, COLOR, PATTERN, AND TEXTURE FOR A FINAL
CHECK OF THESE CHARACTERISTICS WITH OTHER ELEMENTS AND FOR A COMPARISON OF
THESE CHARACTERISTICS BETWEEN FINAL SUBMITTAL AND ACTUAL COMPONENT AS
DELIVERED AND INSTALLED.
5. NUMBER OF SAMPLES FOR INITIAL SELECTION: SUBMIT ONE FULL SET OF AVAILABLE
CHOICES WHERE COLOR, PATTERN, TEXTURE, OR SIMILAR CHARACTERISTICS ARE
REQUIRED TO BE SELECTED FROM MANUFACTURER'S PRODUCT LINE.
ARCHITECT/ENGINEER WILL RETURN SUBMITTAL WITH OPTIONS SELECTED.
6. DISPOSITION: MAINTAIN SETS OF APPROVED SAMPLES AT PROJECT SITE, AVAILABLE FOR
QUALITY- CONTROL COMPARISONS THROUGHOUT THE COURSE OF CONSTRUCTION
ACTIVITY. SAMPLE SETS MAY BE USED TO DETERMINE FINAL ACCEPTANCE OF
CONSTRUCTION ASSOCIATED WITH EACH SET.
2.2 INFORMATIONAL SUBMITTALS
A. GENERAL: PREPARE AND SUBMIT INFORMATIONAL SUBMITTALS REQUIRED BY OTHER
SPECIFICATION SECTIONS.
1. CERTIFICATES AND CERTIFICATIONS: PROVIDE A NOTARIZED STATEMENT THAT INCLUDES
SIGNATURE OF ENTITY RESPONSIBLE FOR PREPARING CERTIFICATION. CERTIFICATES AND
CERTIFICATIONS SHALL BE SIGNED BY AN OFFICER OR OTHER INDIVIDUAL AUTHORIZED TO
SIGN DOCUMENTS ON BEHALF OF THAT ENTITY.
2. TEST AND INSPECTION REPORTS: COMPLY WITH REQUIREMENTS IN CONTRACT
DOCUMENTS
B. CONTRACTOR'S CONSTRUCTION SCHEDULE:
C. MATERIAL TEST REPORTS: PREPARE REPORTS WRITTEN BY A QUALIFIED TESTING AGENCY, ON
TESTING AGENCY'S STANDARD FORM, INDICATING AND INTERPRETING TEST RESULTS OF
MATERIAL FOR COMPLIANCE WITH REQUIREMENTS.
D. MAINTENANCE DATA: PREPARE WRITTEN AND GRAPHIC INSTRUCTIONS AND PROCEDURES
FOR OPERATION AND NORMAL MAINTENANCE OF PRODUCTS AND EQUIPMENT. COMPLY
WITH GENERAL REQUIREMENTS.
E. MANUFACTURER'S INSTRUCTIONS: PREPARE WRITTEN OR PUBLISHED INFORMATION THAT
DOCUMENTS MANUFACTURER'S RECOMMENDATIONS, GUIDELINES, AND PROCEDURES FOR
INSTALLING OR OPERATING A PRODUCT OR EQUIPMENT. INCLUDE NAME OF PRODUCT AND
NAME, ADDRESS, AND TELEPHONE NUMBER OF MANUFACTURER. INCLUDE THE FOLLOWING,
AS APPLICABLE:
1. PREPARATION OF SUBSTRATES.
2. RECOMMENDATIONS FOR CLEANING AND PROTECTION.
F. MANUFACTURER'S FIELD REPORTS: PREPARE WRITTEN INFORMATION DOCUMENTING
FACTORY-AUTHORIZED SERVICE REPRESENTATIVE'S TESTS AND INSPECTIONS. INCLUDE THE
FOLLOWING, AS APPLICABLE:
1. NAME, ADDRESS, AND TELEPHONE NUMBER OF FACTORY-AUTHORIZED SERVICE
REPRESENTATIVE MAKING REPORT.
2. STATEMENT ON CONDITION OF SUBSTRATES AND THEIR ACCEPTABILITY FOR INSTALLATION
OF PRODUCT.
3. STATEMENT THAT PRODUCTS AT PROJECT SITE COMPLY WITH REQUIREMENTS.
4. SUMMARY OF INSTALLATION PROCEDURES BEING FOLLOWED, WHETHER THEY COMPLY
WITH REQUIREMENTS AND, IF NOT, WHAT CORRECTIVE ACTION WAS TAKEN.
5. RESULTS OF OPERATIONAL AND OTHER TESTS AND A STATEMENT OF WHETHER OBSERVED
PERFORMANCE COMPLIES WITH REQUIREMENTS.
6. STATEMENT WHETHER CONDITIONS, PRODUCTS, AND INSTALLATION WILL AFFECT
WARRANTY.
G. INSURANCE CERTIFICATES AND BONDS: PREPARE WRITTEN INFORMATION INDICATING
CURRENT STATUS OF INSURANCE OR BONDING COVERAGE. INCLUDE NAME OF ENTITY
COVERED BY INSURANCE OR BOND, LIMITS OF COVERAGE, AMOUNTS OF DEDUCTIBLES, IF
ANY, AND TERM OF THE COVERAGE.
H. MONTHLY PROGRESS REPORT: REPORT SHALL INCLUDE THE FOLLOWING:
1. SCHEDULE OF PLANNING WITH UPDATES AND CURRENT SITUATION AT THE DATE OF
REPORT PREPARATION.
2. UPDATED CASHFLOW.
3. SUBMITTALS LOG.
4. CONSTRUCTION PROGRESS PHOTOGRAPHS
5. DAILY REPORTS
6. VARIATION ORDERS.
7. PAYMENT CERTIFICATES.
8. LIST OF PROBLEMS FACED ON SITE.
PART 3 - EXECUTION
3.1 CONTRACTOR'S REVIEW
A. REVIEW EACH SUBMITTAL AND CHECK FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS.
NOTE CORRECTIONS AND FIELD DIMENSIONS. MARK WITH APPROVAL STAMP BEFORE
SUBMITTING TO ARCHITECT/ENGINEER.
B. APPROVAL STAMP: STAMP EACH SUBMITTAL WITH A UNIFORM, APPROVAL STAMP. INCLUDE
PROJECT NAME AND LOCATION, SUBMITTAL NUMBER, SPECIFICATION SECTION TITLE AND
NUMBER, NAME OF REVIEWER, DATE OF CONTRACTOR'S APPROVAL, AND STATEMENT
CERTIFYING THAT SUBMITTAL HAS BEEN REVIEWED, CHECKED, AND APPROVED FOR
COMPLIANCE WITH THE CONTRACT DOCUMENTS.
3.2 ARCHITECT'S/ENGINEER'S ACTION
A. GENERAL: ARCHITECT/ENGINEER WILL NOT REVIEW SUBMITTALS THAT DO NOT BEAR
CONTRACTOR'S APPROVAL STAMP AND WILL RETURN THEM WITHOUT ACTION.
B. ACTION SUBMITTALS: ARCHITECT/ENGINEER WILL REVIEW EACH SUBMITTAL, MAKE MARKS
TO INDICATE CORRECTIONS OR MODIFICATIONS REQUIRED, AND RETURN IT.
ARCHITECT/ENGINEER WILL ATTACH A COVER LETTER TO EACH SUBMITTAL INDICATING AN
ACTION TO BE TAKEN, AS FOLLOWS:
1. REVIEWED
2. REVIEWED WITH COMMENTS
3. REVISE AND RESUBMIT
4. REJECTED
5. FOR INFORMATION ONLY
C. INFORMATIONAL SUBMITTALS: ARCHITECT/ENGINEER WILL REVIEW EACH SUBMITTAL AND
WILL NOT RETURN IT, OR WILL REJECT AND RETURN IT IF IT DOES NOT COMPLY WITH
REQUIREMENTS. ARCHITECT/ENGINEER WILL FORWARD EACH SUBMITTAL TO APPROPRIATE
PARTY.
D. SUBMITTALS NOT REQUIRED BY THE CONTRACT DOCUMENTS WILL NOT BE REVIEWED AND
MAY BE DISCARDED.
ALL WORK SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (2010), THE CURRENT
VERSION OF FLORIDA BUILDING CODE -- ACCESSIBILITY, AND LOCAL ACCESSIBILITY
REGULATIONS TO INCLUDE BUT NOT LIMITED TO THE FOLLOWING:
1. DOOR CLOSERS SHALL BE ADJUSTED SO THAT FROM AN OPEN POSITION OF 90 DEGREES,
THE TIME REQUIRED TO MOVE THE DOOR TO A POSITION OF 12 DEGREES FROM THE
LATCH IS 5 SECONDS MINIMUM.
1. THE ARCHITECT HAS PREPARED THIS SET OF CONTRACT DOCUMENTS BASED ON VISUAL
INSPECTION OF THE EXISTING PREMISES AND ON INFORMATION PROVIDED BY THE OWNER.
2. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL NECESSARY TO MEET THE
STANDARD OF CARE FOR A COMPLETE JOB.
3. CONSTRUCTION SHALL COMPLY WITH THE FLORIDA BUILDING CODE.
4. ALL BUILDINGS SHALL BE REMODELED TO MEET ALL APPLICABLE CODES AS ISSUED IN SECTIONS 453 AND 468 OF THE CURRENT FLORIDA BUILDING CODE, FLORIDA FIRE PREVENTION CODE, AND ALL
REFERENCED CODES AS STATED THEREIN.
5. ALL WORK SHALL BE ACCOMPLISHED IN COMPLIANCE WITH THE ENVIRONMENTAL PROTECTION
AGENCY (EPA), STATE AND LOCAL ENVIRONMENTAL LAWS AND REGULATIONS. THE CONTRACTOR
SHALL OBTAIN ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION. THE REQUIRED BUILDING PERMITS
SHALL BE OBTAINED THROUGH THE CITY OF MELBOURNE FACILITIES MANAGEMENT BUILDING
DEPARTMENT PRIOR TO THE START OF CONSTRUCTION. THESE PERMITS, AS WELL AS ALL
ENVIRONMENTAL PERMITS SHALL BE POSTED AT THE JOBSITE.
6. ALL WORK SHALL BE TO THE BEST PRACTICE OF EACH TRADE.
7. TO ESTABLISH THE COMPREHENSIVE SCOPE OF THEIR WORK AND TO ASSURE CLOSE
COORDINATION WITH THE OTHER TRADES, EACH CONTRACTOR SHALL COMPLETELY REVIEW THE
PLANS AND SPECIFICATIONS, NOT ONLY FOR HIS RESPECTIVE TRADE BUT FOR THE WORK OF OTHER TRADES AS WELL. TITLES OF DIVISIONS AND SECTIONS IN SPECIFICATIONS IDENTIFYING WORK ARE
PROVIDED FOR ORGANIZATIONAL AND REFERENCE PURPOSES AND SHALL NOT BE TAKEN AS AN
ABSOLUTE SEPARATION OF THE TRADES OF THE UNITS OF MATERIAL AND LABOR. THE DOCUMENTS
ARE COMPLIMENTARY AND INTERDEPENDENT.
8. ALL SUBCONTRACTORS FOR DEMOLITION AND REMEDIATION SHALL BE LICENSED TO OPERATE IN
BREVARD COUNTY, FLORIDA.
9. ALL SUBCONTRACTORS SHALL BE LICENSED TO OPERATE IN BREVARD COUNTY, FLORIDA.
10. BUILDING PRODUCTS SHALL NOT CONTAIN ASBESTOS, LEAD, FORMALDEHYDE, MERCURY,
VOLATILE ORGANIC COMPOUNDS (VOCS) OR ANY OTHER HARMFUL PRODUCTS. ONLY NON TOXIC
ADHESIVES ARE TO BE USED.
11. NO ASBESTOS CONTAINING BUILDING MATERIALS MAY BE USED DURING THE CONSTRUCTION OF
NEW BUILDINGS/STRUCTURES AND/OR THE RENOVATION/ REMODELING OF ANY EXISTING
BUILDINGS OR STRUCTURES.
12. ASBESTOS REMOVAL SHALL BE PERFORMED BY THE ABATEMENT CONTRACTOR.
13. ALL DIMENSIONS GOVERNED BY EXISTING CONDITIONS ARE APPROXIMATE. ALL SUCH
DIMENSIONS AND CONDITIONS SHALL BE FIELD VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO
PROCEEDING WITH ANY WORK. SHOULD CONDITIONS OR DIMENSIONS VARY FROM THOSE SHOWN,
THE CONTRACTOR SHALL NOTIFY THE ARCHITECT BEFORE PROCEEDING. USE FIGURED DIMENSIONS.
WHERE DIMENSIONS ARE SHOWN WITH A "±", ADJUSTMENTS MAY BE MADE TO SUIT FIELD
CONDITIONS.
14. DETAILS NOT SHOWN ARE SIMILAR IN NATURE TO THOSE DETAILED. WHERE SPECIFIC
DIMENSIONS, DETAILS, OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT ARCHITECT BEFORE PROCEEDING WITH WORK. TYPICAL DETAILS APPLY AT ALL SIMILAR CONDITIONS WHETHER CROSS
REFERENCED OR NOT.
15. DO NOT SCALE DRAWINGS. WHERE DIMENSIONS OR EXACT LOCATIONS ARE REQUIRED AND NOT
INCLUDED ON THE DRAWINGS, REQUEST INFORMATION FROM ARCHITECT.
16. CONSTRUCTION OF WORK INDICATED ON THE DRAWINGS AS (N.I.C) IS NOT IN CONTRACT.
17. THE CONTRACTOR IS TO PRESERVE AND PROTECT ALL EXISTING VEGETATION SUCH AS TREES, SHRUBS AND GRASS ADJACENT TO THE SITEWORK WHICH IS NOT TO BE REMOVED AND WHICH DOES NOT INTERFERE WITH THE CONSTRUCTION WORK. THE CONTRACTOR, AT NO ADDITIONAL COST TO
OWNER, SHALL REPLACE DAMAGED VEGETATION RESULTING FROM CONTRACTOR OPERATIONS
WITH A COMPARABLE SPECIMEN.
18. THE CONTRACTOR SHALL PROTECT UNDERGROUND AND OVERHEAD UTILITIES AT ALL TIMES.
CARE SHOULD BE TAKEN WHEN THE CONTRACTOR IS REQUIRED TO TIE INTO EXISTING UTILITIES. THE CONTRACTOR SHALL NOTIFY BREVARD COUNTY 72 HOURS IN ADVANCE TO SCHEDULE ANY UTILITY CONNECTIONS. THE CONTRACTOR, AT NO ADDITIONAL COST TO OWNER, SHALL REPAIR ANY AND ALL
DAMAGE TO UTILITIES RESULTING FROM CARELESS OPERATIONS.
19. THROUGHOUT THE DURATION OF CONSTRUCTION, THE CONTRACTOR SHALL MAKE EVERY
EFFORT TO ENSURE THE BUILDING REMAIN IN DRIED-IN CONDITION AND PREVENT UNLAWFUL ENTRY
INTO THE CONSTRUCTION SITE.
20. LIMIT PERIMETER ACCESS OPENINGS TO THOSE REQUIRED FOR LIFE SAFETY CONFORMANCE AND
AS NECESSARY FOR INDEPENDENT PUBLIC USE (I.E. AUDITORIUMS, GYMNASIUMS).
21. THE CONTRACTOR SHALL PROVIDE A CONSTRUCTION ACCESS AND STAGING AREA PLAN FOR
OWNER APPROVAL.
22. ACCESS TO AND FROM THE SITE MUST BE COORDINATED WITH THE OWNER'S SCHEDULE OF
OPERATIONS AND GENERAL CONTRACTOR.
23. THE CONTRACTOR SHALL COORDINATE THE USE OF ANY EXISTING BUILDINGS, UTILITIES AND
AVAILABLE AREAS FOR THE CONTRACTOR'S USE INCLUDING STAGING AREAS WITH THE OWNER.
24. SAFETY BARRIER REQUIREMENTS TO KEEP INTERACTIONS BETWEEN ADJACENT TENTANTS AND CONSTRUCTION WORKERS TO A MINIMUM. ANY BARRIERS DIRECTLY ADJACENT TO OCCUPIED AREAS OR PATHS OF CIRCULATION MUST BE SOLID TO A MINIMUM HEIGHT OF 6'. NO BARRIER SHALL
IMPEDE THE MEANS OF EGRESS.
25. CONTROL MEASURES TO KEEP SNAKES, RODENTS, BIRDS, AND OTHER ANIMALS FROM ENTERING
IN THE BUILDING(S) DURING THE CONSTRUCTION PERIOD.
26. OWNER SHALL RETAIN ALL SAVAGE RIGHTS UNTIL THE RIGHTS ARE RELEASED BY THE OWNER.
27. ACCURATE RECORD DOCUMENTS ARE TO BE RECORDED FOR LOCATIONS OF UNDERGROUND
STRUCTURES AND UTILITIES.
28. EACH SUBCONTRACTOR SHALL CALL FOR UTILITY LOCATES OR COORDINATE DIRECTLY WITH THE
GENERAL CONTRACTOR PRIOR TO ALL DIGGING OPERATIONS.
29. CONTRACTOR TO PROVIDE A COMPLETE SUBMITTAL REQUIREMENT MATRIX FOR EACH PRODUCT
LISTING ALL ANTICIPATED SUBMITTALS CROSS REFERENCED WITH THE SECTION NUMBER.
30. THE QUANTITY OF SUBMITTALS THAT WILL BE REQUIRED FOR THE PROJECT INCLUDING THE
NUMBER OF SAMPLES, PRODUCT DATA AND SHOP DRAWINGS REQUIRED TO BE DETERMINED.
31. ALTERNATES MAY BE USED AS REQUIRED BY THE SCOPE OF WORK. THESE WILL BE DETERMINED
BY THE ARCHITECT AND USED UNDER THE DIRECTION OF THE OWNER.
32. PROGRESS PAYMENTS TO BE SUBMITTED MONTHLY.
33. A SCHEDULE OF VALUES SHALL BE SUBMITTED AND APPROVED PRIOR TO THE INITIAL PAY
REQUEST.
34. "AS-BUILT DOCUMENTS" WILL BE REVIEWED MONTHLY AS A CONDITION TO THE PAY
APPLICATION.
35. AN INITIAL COPY OF THE PAY APPLICATION SHALL BE SUBMITTED AS A "PENCIL COPY" FOR
REVIEW ON OR BEFORE THE DATE SCHEDULED FOR THE FIELD OBSERVATION.
36. THE PROJECT SHALL HAVE FULL TIME, CONSTRUCTION REPRESENTATION DURING ALL HOURS OF
OPERATION. THIS REPRESENTATION CAN BE IN THE FORM OF A PROJECT MANAGER OR
SUPERINTENDENT.
37. A DAILY REPORT IS TO BE KEPT BY THE CONTRACTOR AND A WEEKLY REPORT IS TO BE
SUBMITTED TO OWNER'S REPRESENTATIVE SHOWING CURRENT PROJECT STATUS, THREE WEEK LOOK
AHEAD, ISSUES AND PROBLEMS, PERMIT STATUS AND PERCENT COMPLETE.
38. CONTRACTOR SHALL ATTEND WEEKLY MEETINGS WITH OWNER AT TIME / DATE TBD.
39. THE CONSTRUCTION SCHEDULE WILL BE UPDATED MONTHLY AT EACH PAY REQUEST AND BE
REVIEWED AT THAT TIME AS A CONDITION OF THE PAY APPLICATION.
40. ALL SUBSTITUTION REQUESTS FROM THE CONTRACTOR SHALL BE REVIEWED BY THE ARCHITECT
AND ACCEPTED BY OWNER'S REPRESENTATIVE BASED ON THE ARCHITECT'S RECOMMENDATION
PRIOR TO INCORPORATION INTO THE WORK.
41. CONTRACTOR TO PROVIDE FINAL CLEANING. OWNER RESERVES THE RIGHT TO PROVIDE
CLEANING SERVICES WHEN CLEAN-UP HAS NOT BEEN PROVIDED TO THE SATISFACTION OF THE
OWNER. ASSOCIATED COSTS WILL BE CHARGED BACK TO THE CONTRACTOR.
42. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING LADDERS OR OTHER MEANS OF ACCESS TO
THE AUTHORITY HAVING JURISDICTION (AHJ), ARCHITECT, ENGINEER, AND OWNER REQUIRED
OBSERVATIONS AND INSPECTIONS.
43. ALL MATERIAL SAFETY DATA SHEETS ON ANY HAZARDOUS PRODUCT FOR FILING AT THE JOB SITE.
THESE SHEETS SHALL ALSO BE INCLUDED IN CLOSEOUT DOCUMENTATION.
44. CONTRACTOR TO INCLUDE DIGITAL COPY OF ALL CLOSE OUT DOCUMENTS.
45. CONTRACTOR SHALL WARRANT THE PROJECT FOR A TERM OF ONE YEAR FROM THE DATE OF
FINAL COMPLETION OF THE ENTIRE PROJECT REGARDLESS OF PARTIAL OCCUPANCY.
46. ELECTROLYTIC PROTECTION SHALL BE PROVIDED BETWEEN DISSIMILAR METALS WHENEVER THE
TWO ARE IN CONTACT.
47. OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALLS AND
FOUNDATIONS, BETWEEN WALL AND ROOF, BETWEEN WALL PANELS, AT PENETRATIONS OF UTILITIES THROUGH THE BUILDING ENVELOPE SHALL BE SEALED W/ BACKER ROD IF REQUIRED, FLASHED OR WEATHER-STRIPPED AS REQUIRED FOR COMPATIBILITY WITH ADJACENT MATERIALS TO ELIMINATE
AIR LEAKAGE AND WATER INFILTRATION, AND TO MEET THE REQUIREMENTS OF THE FLORIDA
MODEL ENERGY CODE AS APPLICABLE.
G102
GENERAL
P in ea p p le A v en u e
REVISION:
DRAWN BY:
DATE:
SHEET TITLE:
P ro je ct
N o
A ãCOPYRIGHT 2025 by Tsark Architecture, LLC All rights reserved. No part of this work covered by the copyright hereon may be reproduced or used in any form or by any means - graphic, electronic or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without written permission of the copyright holder.
4/30/2025
E au
G al lie L ib ra ry
M el b o u rn e, F lo ri d a
Tsark Architecture, LLC 1600 Sarno Road, Suite 212 Melbourne, Florida 32935 tel: (321) 241-6378 License Number: AA26003779
E xt er io r R en o v at io n
REQUIREMENTS
4.30.2025
Mike.Mcgrew Cross-Out
SUBMITTAL REQUIREMENTS
SECTION ITEM
DIVISION 1 GENERAL
01 10 00 GENERAL REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
DIVISION 7 THERMAL AND MOISTURE PROTECTION
07 92 00 SEALANTS AND CAULKING
DIVISION 8
08 85 00 GLAZING SEALANTS
DIVISION 9 FINISHES
09 24 23 CEMENT STUCCO
09 91 13 EXTERIOR PAINTING
07 92 00 SEALANTS AND CAULKING
1. EXTERIOR "GENERAL SEALANTS" SEALANTS SHALL BE A
URETHANE PRODUCT (EQUAL TO SONNERBORN NP-1) TEST
SAMPLE AREA TO ASSURE COMPATIBLE WITH ADJACENT
MATERIALS AND PAINTABLE.
2. REFER TO MANUFACTURED SYSTEMS FOR SEALANT TYPE
RECOMMENDED BY MANUFACTURER.
3. MISCELLANEOUS MATERIALS SHALL INCLUDE BACKER RODS
FOR A WEATHER TIGHT SYSTEM.
4. PROVIDE NEW LATEX BASED, LOW VOC. CAULKING AT JOINTS
BETWEEN CHANGES IN MATERIALS (I.E. WALLS AT DOORS,
WINDOWS AND FRAMES, BUILT-IN CABINETS, ETC.
08 85 00 - GLAZING SEALANTS
1.1 MANUFACTURERS
A. BASIS-OF-DESIGN PRODUCTS: PROVIDE JOINT SEALANT
PRODUCTS MANUFACTURED BY TREMCO, INC., COMMERCIAL
SEALANTS AND WATERPROOFING DIVISION, AN RPM
COMPANY, BEACHWOOD OH; (866) 321-6357;
WWW.TREMCOSEALANTS.COM, OR COMPARABLE PRODUCTS
OF OTHER MANUFACTURER APPROVED BY ARCHITECT IN
ACCORDANCE WITH INSTRUCTIONS TO BIDDERS AND
DIVISION 01 GENERAL REQUIREMENTS.
1.2 MATERIALS, GENERAL
A. COMPATIBILITY: PROVIDE JOINT SEALANTS AND ACCESSORY
MATERIALS THAT ARE COMPATIBLE WITH ONE ANOTHER, AND
WITH ADJACENT MATERIALS, AS DEMONSTRATED BY
SEALANT MANUFACTURER USING ASTM C 1087 TESTING AND
RELATED EXPERIENCE.
B. JOINT SEALANT STANDARD: COMPLY WITH ASTM C 920 AND
OTHER SPECIFIED REQUIREMENTS FOR EACH JOINT
SEALANT.
C. STAIN TEST CHARACTERISTICS: WHERE SEALANTS ARE
REQUIRED TO BE NONSTAINING, PROVIDE SEALANTS TESTED
PER ASTM C 1248 AS NON-STAINING ON POROUS JOINT
SUBSTRATES SPECIFIED.
1.3 SILICONE GLAZING SEALANTS
A. SINGLE-COMPONENT, NONSAG, NON-STAINING,
NEUTRAL-CURING SILICONE JOINT SEALANT: ASTM C 920,
TYPE S, GRADE NS, CLASS 50, USE NT; SWRI VALIDATED.
1. BASIS OF DESIGN PRODUCT: TREMCO, INC., SPECTREM 2.
2. TENSILE STRENGTH, ASTM D 412: 220 PSI, AT 100 PERCENT
ELONGATION.
3. TEAR STRENGTH, ASTM D 624: 35 PLI.
4. PEEL STRENGTH, ASTM C 794: 30 PLI.
5. HARDNESS, ASTM C 661: 37 DUROMETER SHORE A, MINIMUM.
6. VOLATILE ORGANIC COMPOUND (VOC) CONTENT: 44 G/L
MAXIMUM.
7. STAINING, ASTM C 1248: NONE ON CONCRETE, MARBLE,
GRANITE, LIMESTONE, AND BRICK.
8. COLOR: AS SELECTED BY ARCHITECT FROM MANUFACTURER'S
STANDARD LINE OF NOT LESS THAN 10 COLORS.
1.4 JOINT SEALANT ACCESSORIES
A. CYLINDRICAL SEALANT BACKING: ASTM C 1330, TYPE B
NON-ABSORBENT, BI-CELLULAR MATERIAL WITH SURFACE
SKIN, OR TYPE O OPEN-CELL POLYURETHANE, AS
RECOMMENDED BY SEALANT MANUFACTURER FOR
APPLICATION.
B. BOND BREAKER TAPE: POLYMER TAPE COMPATIBLE WITH
JOINT SEALANT AND ADJACENT MATERIALS AND
RECOMMENDED BY SEALANT MANUFACTURER.
C. JOINT SUBSTRATE PRIMERS: SUBSTRATE PRIMER
RECOMMENDED BY SEALANT MANUFACTURER FOR
APPLICATION.
D. CLEANERS: CHEMICAL CLEANERS ACCEPTABLE TO JOINT
SEALANT MANUFACTURER.
E. MASKING TAPE: NON-STAINING, NON-ABSORBENT TAPE
PRODUCT COMPATIBLE WITH JOINT SEALANTS AND
ADJACENT JOINT SURFACES.
09 24 23 CEMENT STUCCO
PART 1 GENERAL
1.1 SUMMARY
A. MATERIALS AND INSTALLATION OF EXTERIOR STUCCO WALL
COVERING BACKED WITH AIR/MOISTURE BARRIER AND WRB.
1.2 DESIGN REQUIREMENTS
A. MOISTURE CONTROL
1. PREVENT THE ACCUMULATION OF WATER INTO OR BEHIND THE
STUCCO, EITHER BY CONDENSATION OR LEAKAGE INTO THE
WALL CONSTRUCTION, IN THE DESIGN AND DETAILING OF THE
WALL ASSEMBLY:
a. PROVIDE CORROSION RESISTANT FLASHING TO PROTECT
EXPOSED ELEMENTS AND TO DIRECT WATER TO THE
EXTERIOR, INCLUDING, ABOVE WINDOW AND DOOR HEADS,
BENEATH WINDOW AND DOOR SILLS, AT FLOOR LINES, AT
ROOF/WALL INTERSECTIONS, DECKS, ABUTMENTS OF
LOWER WALLS WITH HIGHER WALLS, ABOVE PROJECTING
FEATURES, AND AT THE BASE OF THE WALL.
b. AIR LEAKAGE PREVENTION - PREVENT EXCESS AIR
LEAKAGE IN THE DESIGN AND DETAILING OF THE
WALL ASSEMBLY. PROVIDE CONTINUITY BETWEEN AIR
BARRIER COMPONENTS IN THE WALL ASSEMBLY.
c. VAPOR DIFFUSION AND CONDENSATION - PERFORM A DEW
POINT ANALYSIS AND/OR DYNAMIC HYDROTHERMAL
MODELING OF THE WALL ASSEMBLY TO DETERMINE THE
POTENTIAL FOR ACCUMULATION OF MOISTURE IN THE
WALL ASSEMBLY AS A RESULT OF WATER VAPOR
DIFFUSION AND CONDENSATION.
ADJUST WALL ASSEMBLY COMPONENTS ACCORDINGLY TO
MINIMIZE THE RISK OF CONDENSATION. AVOID THE USE OF
VAPOR RETARDERS ON THE INTERIOR SIDE OF THE WALL IN
WARM, HUMID CLIMATES.
d. PROVIDE STOGUARD AIR/MOISTURE BARRIER OVER
SHEATHING.
e. AT THROUGH WALL EXPANSION JOINTS AND AT JOINTS
FORMED WITH BACK-TO-BACK CASING BEADS, BACK JOINTS
WITH STOGUARD TRANSITION MEMBRANE. REFER TO STO
GUIDE DETAILS AT WWW.STOCORP.COM.
f. SEAL STUCCO TERMINATIONS AND ACCESSORY BUTT
JOINTS WITH APPROPRIATE SEALANT. SEAL ALL
PENETRATIONS THROUGH THE STUCCO WALL ASSEMBLY
WITH APPROPRIATE SEALANT, OR BACKER ROD AND
SEALANT, AS DICTATED BY JOINT TYPE.
B. JOINTS AND ACCESSORIES
1. PROVIDE TWO-PIECE EXPANSION JOINTS IN THE STUCCO
ASSEMBLY WHERE BUILDING MOVEMENT IS ANTICIPATED: AT
JOINTS IN THE SUBSTRATE OR SUPPORTING CONSTRUCTION,
WHERE THE SYSTEM IS TO BE INSTALLED OVER DISSIMILAR
CONSTRUCTION OR SUBSTRATES, AT CHANGES IN BUILDING
HEIGHT, AT FLOOR LINES, AT COLUMNS AND CANTILEVERED
AREAS.
2. PROVIDE ONE PIECE EXPANSION JOINTS EVERY 144 FT2. CUT
AND WIRE TIE LATH TO THE EXPANSION JOINT ACCESSORY SO
LATH IS DISCONTINUOUS AT OR BENEATH THE ACCESSORY. DO
NOT EXCEED LENGTH TO WIDTH RATIO OF 2-1/2:1 IN
EXPANSION JOINT LAYOUT AND DO NOT EXCEED MORE THAN
18 FEET IN ANY DIRECTION WITHOUT AN EXPANSION JOINT.
WHERE CASING BEAD IS USED BACK-TO-BACK AS THE
EXPANSION JOINT, BACK THE JOINT WITH STOGUARD
TRANSITION MEMBRANE.
3. PROVIDE ONE PIECE EXPANSION JOINTS AT THROUGH WALL
PENETRATIONS, FOR EXAMPLE, ABOVE AND BELOW DOORS OR
WINDOWS.
4. PROVIDE MINIMUM 3/8 INCH WIDE JOINTS WHERE THE SYSTEM
ABUTS WINDOWS, DOORS AND OTHER THROUGH WALL
PENETRATIONS.
5. PROVIDE APPROPRIATE ACCESSORIES AT STUCCO
TERMINATIONS AND JOINTS.
6. AVOID THE USE OF CHANNEL REVEAL ACCESSORIES WHICH
CAN INTERFERE WITH PROPER DRAINAGE AND PROPER
STRESS RELIEF.
7. PROVIDE APPROPRIATE SEALANT AT STUCCO TERMINATIONS
AND AT STUCCO ACCESSORY BUTT JOINTS.
8. INDICATE LOCATION OF JOINTS, ACCESSORIES AND
ACCESSORY TYPE ON ARCHITECTURAL DRAWINGS.
C. STUCCO THICKNESS (DOES NOT INCLUDE PRIMER OR
TEXTURED FINISH COAT)
1. APPLICATION TO METAL PLASTER BASES: STUCCO THICKNESS
SHALL BE UNIFORM ¾ INCH OR 7/8 INCH. STUCCO THICKNESS
SHALL NOT EXCEED 7/8 INCH.
2. STUCCO SHALL BE APPLIED IN 2 COATS, SCRATCH AND BROWN
COAT, TO ACHIEVE THE PRESCRIBED THICKNESS.
3. THICKNESS SHALL BE UNIFORM THROUGHOUT THE WALL
AREA.
1.3 WARRANTY
A. PROVIDE MANUFACTURER'S 10 YEAR WARRANTY.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. AIR/MOISTURE BARRIER, PORTLAND CEMENT STUCCO,
STUCCO PRIMERS, AND STUCCO FINISHES.
1. BASIS OF DESIGN: STO CORP., 3800 CAMP CREEK PARKWAY,
BUILDING 1400, SUITE 120. ATLANTA, GA 30331
2.2 AIR/MOISTURE BARRIER
A. STOGUARD FLUID APPLIED AIR/MOISTURE BARRIER FOR
SHEATHING, CONCRETE, AND CONCRETE MASONRY
SUBSTRATES CONSISTING OF MULTIPLE COMPATIBLE
COMPONENTS:
1. STO GOLD FILL -- READY MIXED ACRYLIC BASED FLEXIBLE
JOINT TREATMENT FOR ROUGH OPENING PROTECTION, JOINT
TREATMENT OF WALL SHEATHING, AND DETAIL COMPONENT
FOR SHIPLAP CONNECTIONS WITH FLASHING, WEEP SCREED,
AND SIMILAR SHIP LAP DETAILS.
2. STO GOLD COAT -- READY MIXED FLEXIBLE WATERPROOF
COATING FOR WALL SHEATHING, CONCRETE AND CMU WALL
SURFACES
3. STO AIR SEAL - READY MIXED MEDIUM-HIGH BUILD COATING
APPLIED BY BRUSH, ROLLER OR SPRAY FOR ROUGH OPENING
PROTECTION OF FRAME WALLS AND JOINT TREATMENT OF
SHEATHING WHEN USED WITH STOGUARD FABRIC. ALSO USED
AS A DETAIL COMPONENT WITH STOGUARD FABRIC TO SPLICE
OVER BACK FLANGE OF STARTER TRACK, FLASHING, AND
SIMILAR SHINGLE LAP DETAILS
4. STOGUARD MESH-- NOMINAL 4.2 OZ/YD2, SELF-ADHESIVE,
FLEXIBLE, SYMMETRICAL, INTERLACED GLASS FIBER MESH,
WITH ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH
STO MATERIALS, USED WITH STO GOLD FILL TO REINFORCE
ROUGH OPENINGS, INSIDE AND OUTSIDE CORNERS,
SHEATHING JOINTS, AND DETAIL COMPONENT FOR SHIPLAP
CONNECTIONS WITH FLASHING, WEEP SCREED, AND SIMILAR
SHIP LAP DETAILS.
5. STOGUARD FABRIC - NONWOVEN CLOTH REINFORCEMENT
USED WITH STO EMERALDCOAT FOR ROUGH OPENING
PROTECTION, JOINT TREATMENT OF WALL SHEATHING, AND
DETAIL COMPONENT FOR SHIPLAP CONNECTIONS WITH
FLASHING, WEEP SCREED, AND SIMILAR SHINGLE LAP DETAILS.
6. STOGUARD REDICORNER - A PREFORMED FABRIC PIECE USED
IN THE CORNERS OF ROUGH OPENINGS IN TANDEM WITH
STOGUARD FABRIC FOR QUICKER INSTALLATION.
7. STOGUARD TAPE - SELF ADHERING RUBBERIZED ASPHALT
TAPE FOR ROUGH OPENING PROTECTION IN WOOD OR METAL
FRAME CONSTRUCTION
8. STOGUARD PRIMER - PRIMER FOR USE WITH STOGUARD TAPE
9. STOGUARD TRANSITION MEMBRANE - FLEXIBLE AIR BARRIER
MEMBRANE FOR CONTINUITY AT STATIC TRANSITIONS:
SHEATHING TO FOUNDATION, DISSIMILAR MATERIALS (CMU TO
FRAME WALL), WALL TO BALCONY FLOOR SLAB OR CEILING,
FLASHING SHINGLE LAP TRANSITIONS. ALSO USED FOR
DYNAMIC JOINTS: FLOOR LINE DEFLECTION JOINTS, AND
THROUGH WALL JOINTS IN MASONRY OR FRAME
CONSTRUCTION.
10.STO RAPIDGUARD - ONE COMPONENT STPE RAPID DRYING
GUN-APPLIED TREATMENT FOR SHEATHING JOINTS, ROUGH
OPENINGS, SEAMS, CRACKS, PENETRATIONS AND OTHER
STATIC TRANSITIONS IN ABOVE GRADE WALL CONSTRUCTION
SUCH AS: SHINGLE LAP OVER FLASHING, WALL TO BALCONY
FLOOR SLAB OR CEILING, AND THROUGH WALL PENETRATIONS
- PIPES, ELECTRICAL BOXES, AND SCUPPER PENETRATIONS
2.3 LATH
A. MINIMUM 2.5 LB./YD2 SELF_FURRED GALVANIZED STEEL
DIAMOND MESH METAL LATH IN COMPLIANCE WITH ASTM C
847.
2.4 MECHANICAL FASTENERS
A. NON-CORRODING FASTENERS IN COMPLIANCE WITH AISI S200
- 2007 AND ASTM C 1513:
1. STEEL FRAMING - MINIMUM #8 TYPE S OR S-12 WAFER HEAD
FULLY THREADED CORROSION RESISTANT SCREWS WITH
MINIMUM 3/8 INCH AND THREE THREAD PENETRATION INTO
STUDS.
B. TIE WIRE - 18 GAUGE GALVANIZED AND ANNEALED
LOW-CARBON STEEL IN COMPLIANCE WITH ASTM A 641 WITH
CLASS I COATING.
2.5 ACCESSORIES
A. WEEP SCREED, CASING BEAD, CORNER BEAD, CORNER LATH,
EXPANSION AND CONTROL JOINT ACCESSORIES. ALL
ACCESSORIES SHALL MEET THE REQUIREMENTS OF ASTM C
1063 AND ITS REFERENCED DOCUMENTS
1. PVC PLASTIC IN COMPLIANCE WITH ASTM D 1784, CELL
CLASSIFICATION 13244C.
B. ALL ACCESSORIES SHALL HAVE PERFORATED OR EXPANDED
FLANGES AND SHALL BE DESIGNED WITH GROUNDS FOR THE
SPECIFIED THICKNESS OF STUCCO.
2.6 JOB MIXED INGREDIENTS
A. WATER: CLEAN AND POTABLE.
B. SAND: IN COMPLIANCE WITH ASTM C 897 OR ASTM C 144, FOR
USE WITH ONE COAT AND ASTM C 926 STUCCO
CONCENTRATES
2.7 STUCCO
A. 102 STOPOWERWALL STUCCO PRE-BLENDED: FIBER
REINFORCED ONE COAT PORTLAND CEMENT STUCCO
PRE-BLENDED WITH GRADED SAND, AND IN COMPLIANCE
WITH ICC AC 11. SEE ICC ESR 2323.
B. 103 STOPOWERWALL STUCCO: FIBER REINFORCED ONE COAT
PORTLAND CEMENT STUCCO CONCENTRATE IN COMPLIANCE
WITH ICC AC 11. SEE ICC ESR 2323.
C. 108 STOPOWERWALL SCRATCH & BROWN: PORTLAND
CEMENT-BASED STUCCO CONCENTRATE IN COMPLIANCE
WITH ASTM C 926.
2.8 CRACK DEFENSE
A. BASE COAT
1. STO BTS XTRA - LIGHT WEIGHT ONE COMPONENT POLYMER
MODIFIED CEMENT-BASED EXTRA HIGH BUILD BASE COAT
MATERIAL.
2. MESH: NOMINAL 4.5 OZ./YD2, SYMMETRICAL, INTERLACED
OPEN-WEAVE GLASS FIBER MESH MADE WITH ALKALINE
RESISTANT COATING FOR COMPATIBILITY WITH MATERIALS
2.9 PRIMER
A. STOPRIME HOT: ACRYLIC BASED PRIMER/SEALER FOR
FRESHLY PLACED (MINIMUM 4 DAY OLD) AND HIGH PH
STUCCO SURFACES.
B. STOPRIME SAND: ACRYLIC BASED TINTED, SANDED PRIMER
FOR FULLY CURED (MINIMUM 28 DAY OLD OR PH LESS THAN
10) STUCCO SURFACES.
C. STOPRIME: ACRYLIC BASED TINTED PRIMER FOR FULLY
CURED (MINIMUM 28 DAY OLD OR PH LESS THAN 10) STUCCO
SURFACES.
2.10 FINISH COAT
A. STOPOWERWALL FINISH - INTEGRALLY COLORED, FACTORY
BLENDED, FLEXIBLE ACRYLIC TEXTURED WALL FINISH WITH
GRADED MARBLE AGGREGATE.
2.11 MIXING
A. STOGUARD
1. STO GOLD FILL - MIX WITH A CLEAN, RUST-FREE ELECTRIC
DRILL AND PADDLE TO A UNIFORM CONSISTENCY. DO NOT THIN
OR DILUTE WITH WATER.
2. STO AIRSEAL - MIX WITH A CLEAN, RUST-FREE ELECTRIC DRILL
AND PADDLE TO A UNIFORM CONSISTENCY. DO NOT THIN OR
DILUTE WITH WATER.
3. STO GOLD COAT - MIX WITH A CLEAN, RUST-FREE ELECTRIC
DRILL AND PADDLE TO A UNIFORM CONSISTENCY. DO NOT THIN
OR DILUTE WITH WATER.
B. STOPOWERWALL STUCCO
1. REFER TO MIX INSTRUCTIONS ON PACKAGING. USE ONLY THE
AMOUNT OF WATER NECESSARY FOR A WORKABLE MIX. USE
OF EXCESS WATER IS DETRIMENTAL TO PERFORMANCE.
C. PRIMER--MIX WITH A CLEAN, RUST-FREE HIGH SPEED MIXER
TO A UNIFORM CONSISTENCY.
D. FINISH--MIX WITH A CLEAN, RUST-FREE HIGH SPEED MIXER TO
A UNIFORM CONSISTENCY. A SMALL AMOUNT OF WATER (UP
TO 12 OUNCES) MAY BE ADDED TO ADJUST WORKABILITY.
LIMIT ADDITION OF WATER TO AMOUNT NEEDED TO ACHIEVE
THE FINISH TEXTURE.
E. MIX ONLY AS MUCH MATERIAL AS CAN READILY BE USED.
F. DO NOT ADD LIME, ANTI-FREEZE COMPOUNDS, OR OTHER
ADDITIVES TO ANY OF THE MATERIALS.
PART 3 EXECUTION
3.1 EXAMINATION
A. INSPECT SURFACES FOR:
1. CONTAMINATION - ALGAE, CHALKINESS, DIRT, DUST,
EFFLORESCENCE, FORM OIL, FUNGUS, GREASE, LAITANCE,
MILDEW OR OTHER FOREIGN SUBSTANCES.
2. SURFACE ABSORPTION AND CHALKINESS.
3. CRACK - MEASURE CRACK WIDTH AND RECORD LOCATION OF
CRACKS.
4. DAMAGE AND DETERIORATION.
5. MOISTURE DAMAGE - RECORD ANY AREAS OF MOISTURE
DAMAGE.
B. INSPECT SHEATHING APPLICATION FOR COMPLIANCE WITH
APPLICABLE REQUIREMENT:
1. GLASS MAT FACED GYPSUM SHEATHING IN COMPLIANCE WITH
ASTM C 1177 - REFER TO MANUFACTURER'S INSTRUCTIONS
AND/OR ICC EVALUATION REPORT.
3.2 SURFACE PREPARATION
A. SHEATHING
1. REMOVE SURFACE CONTAMINANTS AND REPLACE DAMAGED
SHEATHING.
2. ALL SHEATHING MUST BE HANDLED AND INSTALLED IN
COMPLIANCE WITH APPLICABLE BUILDING CODE AND/OR
MANUFACTURER REQUIREMENTS. INSTALLED SHEATHING
MUST BE CLEAN, DRY AND FREE FROM DAMAGE, FROST, AND
ALL BOND-INHIBITING MATERIALS. ABUT GYPSUM SHEATHING
JOINTS.
3.2.2 HURRICANE IMPACT RESISTANCE LAYER OVER APPROVED ASTM
C1177 SHEATHING
A. STO ARMOR MAT XX MESH APPLICATION
APPLY APPROVED BASE COAT (STO PRIMER/ADHESIVE-B)
OVER THE SHEATHING WITH A STAINLESS STEEL TROWEL TO
A UNIFORM THICKNESS OF APPROXIMATELY 1/8". WORK
HORIZONTALLY OR VERTICALLY IN STRIPS OF 40" AND
IMMEDIATELY EMBED THE MESH INTO THE WET BASE COAT
BY TROWELLING FROM THE CENTER TO THE EDGE OF THE
MESH. EITHER OVERLAP THE MESH NOT LESS THAN 2-½" AT
MESH SEAMS OR BUTT MESH AT SEAMS. IF BUTTING AT
SEAMS, STO DETAIL MESH EMBEDDED IN STO BASE COAT
MUST BE USED TO TREAT BUTTED SEAMS PRIOR TO THE
APPLICATION OF THE STOGUARD AIR & MOISTURE BARRIER.
ALLOW BASE COAT TO DRY BEFORE APPLYING THE
STOGUARD PRODUCTS.
3.3 AIR/MOISTURE BARRIER INSTALLATION
THE FOLLOWING INSTRUCTIONS ARE APPLICABLE TO:
• GLASS MAT FACED GYPSUM SHEATHING IN COMPLIANCE WITH
ASTM C 1177 (NATIONAL GYPSUM EXP2 BOARD)
A. TRANSITION DETAILING
1. DETAIL TRANSITION AREAS WITH STO GOLD COAT (STATIC
JOINTS AND SEAMS) OR STOGUARD TRANSITION MEMBRANE
(DYNAMIC JOINTS AND SEAMS) TO ACHIEVE AIR BARRIER
CONTINUITY. FOR ILLUSTRATIONS OF INSTALLATION, REFER
TO STO GUIDE DETAILS AND STO RAPIDGUARD INSTALLATION
GUIDE OR STOGUARD TRANSITION MEMBRANE INSTALLATION
GUIDE WWW.STOCORP.COM)
B. ROUGH OPENING PROTECTION:
1. STO GOLD COAT OR STO AIR SEAL WITH STOGUARD FABRIC:
APPLY COATING LIBERALLY BY SPRAY OR ROLLER TO
CORNERS OF OPENINGS, IMMEDIATELY PLACE STOGUARD
REDICORNERS IN THE WET COATING, AND APPLY ADDITIONAL
COATING OVER THE REDICORNERS TO COMPLETELY EMBED
THEM. AFTER ALL CORNERS HAVE BEEN COMPLETED APPLY
COATING LIBERALLY TO THE ENTIRE ROUGH OPENING,
IMMEDIATELY PLACE STOGUARD FABRIC IN THE WET COATING,
SMOOTH ANY WRINKLES WITH A BRUSH OR ROLLER, AND
APPLY ADDITIONAL COATING OVER THE FABRIC TO
COMPLETELY EMBED IT. OVERLAP ALL SEAMS MINIMUM 2
INCHES. ONCE COMPLETED TOPCOAT WITH ADDITIONAL
COATING AS NEEDED TO COMPLETELY SEAL THE SURFACE.
ALLOW TO DRY AND INSPECT FOR PINHOLES OR VOIDS. IF
PINHOLES OR VOIDS ARE PRESENT, SEAL WITH ADDITIONAL
COATING OR STO GOLD COAT.
C. SHEATHING JOINT TREATMENT
1. STO AIRSEAL OR STO GOLD COAT WITH STOGUARD FABRIC:
APPLY COATING LIBERALLY BY SPRAY OR ROLLER ALONG
SHEATHING JOINTS AND IMMEDIATELY PLACE 4 INCH WIDE
FABRIC CENTERED OVER THE JOINTS INTO THE WET COATING,
AND 6 INCH WIDE FABRIC CENTERED AND FOLDED AT INSIDE
AND OUTSIDE CORNERS INTO THE WET COATING. SMOOTH
ANY WRINKLES WITH A BRUSH OR ROLLER AND APPLY
ADDITIONAL COATING TO COMPLETELY EMBED THE FABRIC.
OVERLAP SEAMS MINIMUM 2 INCHES.
D. AIR/MOISTURE BARRIER COATING INSTALLATION
1. GYPSUM SHEATHING: APPLY WATERPROOF COATING BY
SPRAY OR ROLLER OVER SHEATHING SURFACE, INCLUDING
THE DRY JOINT TREATMENT, ROUGH OPENING PROTECTION,
AND TRANSITION AREAS, TO A UNIFORM WET MIL THICKNESS
OF 10 WET MILS IN ONE COAT (GOLD COAT) OR 50 WET MILS IN
ONE COAT (STO AIRSEAL). USE ¾ INCH NAP ROLLER FOR
GLASS MAT FACED GYPSUM SHEATHING. PROTECT FROM
WEATHER UNTIL DRY.
E. AIR /MOISTURE BARRIER CONNECTIONS AND SHINGLE LAPS
1. COORDINATE INSTALLATION OF CONNECTING AIR BARRIER
COMPONENTS WITH OTHER TRADES TO PROVIDE A
CONTINUOUS AIRTIGHT MEMBRANE.
2. COORDINATE INSTALLATION OF FLASHING AND OTHER
MOISTURE PROTECTION COMPONENTS WITH OTHER TRADES
TO ACHIEVE COMPLETE MOISTURE PROTECTION SUCH THAT
WATER IS DIRECTED TO THE EXTERIOR, NOT INTO THE WALL
ASSEMBLY, AND DRAINED TO THE EXTERIOR AT SOURCES OF
LEAKS (WINDOWS, DOORS AND SIMILAR PENETRATIONS
THROUGH THE WALL ASSEMBLY).
3. SPLICE-IN HEAD FLASHINGS ABOVE WINDOWS, DOORS, FLOOR
LINES, ROOF/SIDEWALL STEP FLASHING, AND SIMILAR
LOCATIONS WITH STOGUARD DETAIL COMPONENT TO ACHIEVE
SHINGLE LAP OF THE AIR/MOISTURE BARRIER SUCH THAT
WATER IS DIRECTED TO THE EXTERIOR.
3.4 SHEET WATER-RESISTIVE BARRIER INSTALLATION
A. INSTALL IN COMPLIANCE WITH THE APPLICABLE BUILDING
CODE REQUIREMENTS FOR BUILDING PAPER. LAP PAPER
OVER FOUNDATION WEEP SCREED ATTACHMENT
FLANGE, FLOOR LINE FLASHING, AND WINDOW/DOOR HEAD
FLASHINGS. REFER TO STO GUIDE DETAILS AT
WWW.STOCORP.COM
3.5 STUCCO INSTALLATION
B. APPLY THE STUCCO IN DISCRETE PANELS WITHOUT
INTERRUPTION TO AVOID COLD JOINTS AND DIFFERENCES IN
APPEARANCE. ABUT WET STUCCO TO SET STUCCO AT
NATURAL OR ARCHITECTURAL BREAKS IN THE WALL SUCH AS
EXPANSION JOINTS, PILASTERS, TERMINATIONS, OR
CHANGES IN PLANE. HOT OR DRY CONDITIONS ACCELERATE
DRYING AND MOISTURE LOSS FROM STUCCO WHICH CAN
DIMINISH STRENGTH AND RESISTANCE TO CRACKING. UNDER
THESE CONDITIONS ADJUSTMENTS IN THE APPLICATION,
SCHEDULING AND CURING OF STUCCO TO PREVENT RAPID
LOSS OF MOISTURE ARE NECESSARY TO ACHIEVE A
SATISFACTORY STUCCO INSTALLATION. COLD
TEMPERATURES RETARD DRYING, AND STRENGTH GAIN
AND ADJUSTMENTS MAY HAVE TO BE MADE IN THE
APPLICATION, SCHEDULING AND CURING OF STUCCO TO
PREVENT DAMAGE FROM FROST AND OTHER TRADES. DO
NOT INSTALL STUCCO DURING EXTREMELY HOT, DRY AND/OR
WINDY CONDITIONS. DO NOT INSTALL STUCCO DURING
FREEZING CONDITIONS OR ON FROZEN SUBSTRATES. DO NOT
INSTALL STUCCO ONTO GROUNDS OF ACCESSORIES.
COMPLETELY EMBED LATH AND FLANGES OF ACCESSORIES
AND COMPLETELY COVER FASTENER ATTACHMENTS WITH
STUCCO. MOIST CURE STUCCO MINIMUM 48 HOURS FOR
OPTIMUM STRENGTH GAIN AND RESISTANCE TO CRACKING.
ALLOW FINAL STUCCO APPLICATION TO COMPLETELY DRY (28
DAYS) BEFORE APPLYING PRIMER OR FINISH (EXCEPT IN THE
CASE OF STOPRIME HOT WHICH CAN BE APPLIED 48 HOURS
AFTER COMPLETING MOIST CURE OF STUCCO). THE FINISHED
INSTALLATION MUST BE TRUE, PLUMB AND SQUARE. SHOULD
STUCCO GET INTO CONTROL OR EXPANSION JOINTS, REMOVE
THE STUCCO FROM WITHIN THE JOINT BEFORE THE STUCCO
SETS. AFTER SATISFACTORY INSPECTION OF SURFACES AND
CORRECTION OF ANY DEVIATIONS FROM SPECIFICATION
REQUIREMENTS COMMENCE THE STUCCO INSTALLATION AS
DESCRIBED BELOW:
A. INSTALLATION OVER STOGUARD WITH PAPER OR FELT WRB
1. WEEP SCREED INSTALLATION
a. INSTALL FOUNDATION WEEP SCREED AT THE BASE OF THE
WALL SECURELY TO SOLID SUBSTRATE OR FRAMING WITH
THE APPROPRIATE FASTENER. LOCATE FOUNDATION WEEP
SCREED SO THAT IT OVERLAPS THE JOINT BETWEEN THE
FOUNDATION AND FRAMING BY A MINIMUM OF 1 INCH.
LOCATE THE FOUNDATION WEEP SCREED NOSING MINIMUM
4 INCHES ABOVE EARTH GRADE, 2 INCHES ABOVE FINISHED
GRADE (PAVED SURFACES, FOR EXAMPLE). LAP
WATERPROOF AIR BARRIER, SHEET WATER-RESISTIVE
BARRIER, AND DRAINAGE MAT OVER THE WEEP SCREED
ATTACHMENT FLANGE.
2. CASING BEAD AND TWO PIECE EXPANSION JOINT
INSTALLATION
a. INSTALL CASING BEADS AT STUCCO TERMINATIONS -
DOORS, WINDOWS AND OTHER THROUGH WALL
PENETRATIONS. INSTALL TWO PIECE EXPANSION
JOINTS (OR BACK-TO-BACK CASING BEADS) AT BUILDING
EXPANSION JOINTS, WHERE THE STUCCO IS TO BE
INSTALLED OVER DISSIMILAR CONSTRUCTION OR
SUBSTRATES, AT CHANGES IN BUILDING HEIGHT, AT FLOOR
LINES, COLUMNS, AND CANTILEVERED AREAS. INSTALL
FULL ACCESSORY PIECES WHERE POSSIBLE AND AVOID
SMALL PIECES. SEAL ADJOINING PIECES BY EMBEDDING
ENDS IN SEALANT. ABUT HORIZONTAL INTO VERTICAL JOINT
ACCESSORIES (EXCEPT WHERE HORIZONTAL MOVEMENT
JOINTS EXIST THAT PREVENT CONTINUOUS VERTICAL RUNS
OF ACCESSORIES). ATTACH AT NO MORE THAN 7 INCHES
INTO SOLID SUBSTRATE/FRAMING WITH APPROPRIATE
FASTENERS.
3. LATH INSTALLATION
a. DIAMOND MESH METAL LATH - CONFORM TO ASTM C 1063
1. GENERAL - INSTALL METAL LATH WITH THE LONG DIMENSION
AT RIGHT ANGLES TO STRUCTURAL FRAMING (HORIZONTALLY
ON SOLID SUBSTRATES). TERMINATE LATH AT EXPANSION
JOINTS. DO NOT INSTALL CONTINUOUSLY AT JOINTS.
2. SEAMS/OVERLAPS--OVERLAP SIDE SEAMS MINIMUM 1/2 INCH
AND END SEAMS MINIMUM 1 INCH. STAGGER END SEAMS.
OVERLAP CASING BEADS AND EXPANSION JOINTS MINIMUM 1
INCH OVER NARROW WING ACCESSORIES, MINIMUM 2 INCHES
OVER EXPANDED FLANGE ACCESSORIES. DO NOT INSTALL
LATH CONTINUOUSLY BENEATH EXPANSION JOINTS.
3. ATTACHMENT--FASTEN SECURELY INTO SOLID SUBSTRATES
OR THROUGH SHEATHING INTO STRUCTURAL FRAMING AT 7
INCHES ON CENTER MAXIMUM VERTICALLY AND 16 INCHES ON
CENTER HORIZONTALLY*. WIRE TIE AT NO MORE THAN 9
INCHES ON CENTER AT: SIDE LAPS, ACCESSORY OVERLAPS,
AND WHERE END LAPS OCCUR BETWEEN SUPPORTS.
4. ONE PIECE EXPANSION JOINT INSTALLATION
a. INSTALL ONE PIECE EXPANSION JOINTS AT THROUGH WALL
PENETRATIONS, FOR EXAMPLE, ABOVE AND BELOW DOORS
AND WINDOWS. INSTALL ONE PIECE EXPANSION JOINTS AT
EVERY 144 FT2. WIRE TIE ONE PIECE EXPANSION JOINTS
TO LATH AT NO MORE THAN 7 INCHES ON CENTER. SEAL
ADJOINING PIECES BY EMBEDDING ENDS IN SEALANT. MAKE
CERTAIN LATH IS DISCONTINUOUS AT OR BENEATH JOINTS.
5. INSIDE AND OUTSIDE CORNERS
a. INSTALL CORNER LATH AT INSIDE CORNERS AND CORNER
BEAD AT OUTSIDE CORNERS OVER LATH. ATTACH
THROUGH LATH INTO SOLID SUBSTRATE OR FRAMING AT
NO MORE THAN 7 INCHES ON CENTER WITH APPROPRIATE
FASTENERS.
6. STUCCO INSTALLATION
a. SCRATCH COAT: APPLY STUCCO WITH SUFFICIENT
PRESSURE TO KEY INTO AND EMBED THE METAL LATH.
APPLY SUFFICIENT MATERIAL, 3/8 OR ½ INCH, TO COVER
THE METAL LATH AND TO PERMIT SCORING THE SURFACE.
SCORE THE STUCCO UPON COMPLETION OF EACH PANEL IN
PREPARATION FOR A SECOND COAT. SCORE
HORIZONTALLY.
b. BROWN COAT: AS SOON AS THE FIRST COAT IS FIRM
ENOUGH TO RECEIVE THE SECOND COAT WITHOUT
DAMAGE, APPLY THE SECOND COAT. ALTERNATIVELY,
MOIST CURE THE FIRST COAT UP TO 48 HOURS AND
DAMPEN THE SCRATCHED SURFACE WITH WATER
IMMEDIATELY BEFORE APPLYING THE SECOND COAT.
APPLY THE SECOND COAT WITH SUFFICIENT PRESSURE TO
ENSURE INTIMATE CONTACT WITH THE FIRST COAT AND AS
NEEDED TO BRING THE STUCCO TO A UNIFORM THICKNESS
THAT MATCHES THE GROUNDS OF THE ACCESSORIES.
USE A ROD OR STRAIGHT EDGE TO BRING THE SURFACE TO
A TRUE, EVEN PLANE. FILL DEPRESSIONS IN PLANE WITH
STUCCO. FINAL THICKNESS OF STUCCO SHALL BE UNIFORM
THROUGHOUT THE WALL AREA AND SHALL BE EITHER 3/4
INCH OR 7/8 INCH AND SHALL NOT EXCEED 7/8 INCH.
c. AFTER THE STUCCO HAS BECOME SLIGHTLY FIRM FLOAT
THE SURFACE LIGHTLY WITH A DARBY OR WOOD FLOAT TO
DENSIFY THE SURFACE AND TO PROVIDE A SMOOTH, EVEN
SURFACE. THE PROPER TIME TO FLOAT IS WHEN THE
WOOD FLOAT NO LONGER STICKS TO THE SURFACE OF THE
STUCCO.
d. MOIST CURE AFTER THE STUCCO HAS SET BY LIGHTLY
FOGGING FOR AT LEAST 48 HOURS. FOG AS FREQUENTLY
AS REQUIRED DURING THE 48 HOUR PERIOD TO PREVENT
LOSS OF MOISTURE FROM THE STUCCO. AVOID ERODING
THE STUCCO SURFACE WITH EXCESS MOISTURE. IF
RELATIVE HUMIDITY EXCEEDS 75% THE FREQUENCY OF
MOIST CURING CAN BE DIMINISHED.
B. PRIMER INSTALLATION
1. STOPRIME HOT - MOIST CURE STUCCO FOR A MINIMUM OF 48
HOURS. ALLOW STUCCO TO DRY AN ADDITIONAL 48 HOURS,
THEN APPLY PRIMER EVENLY WITH BRUSH, ROLLER OR
PROPER SPRAY EQUIPMENT OVER THE CLEAN, DRY STUCCO
AND FOAM BUILD-OUTS, AND ALLOW TO DRY. FINAL AGE OF
PRIMED STUCCO APPLICATION MUST BE MINIMUM 7 DAYS
BEFORE APPLICATION OF FINISH.
2. STOPRIME SAND - MOIST CURE STUCCO FOR A MINIMUM OF 48
HOURS. WAIT UNTIL STUCCO IS 28 DAYS OLD OR THE PH LEVEL
OF THE SURFACE IS BELOW 10 BEFORE APPLYING PRIMER.
FINAL AGE OF PRIMED STUCCO APPLICATION MUST BE
MINIMUM 28 DAYS BEFORE APPLICATION OF FINISH OR PH
MUST BE BELOW 10.
3. STOPRIME - MOIST CURE STUCCO FOR A MINIMUM OF 48
HOURS. WAIT UNTIL STUCCO IS 28 DAYS OLD OR THE PH LEVEL
OF THE SURFACE IS BELOW 10 BEFORE APPLYING PRIMER.
FINAL AGE OF PRIMED STUCCO APPLICATION MUST BE
MINIMUM 28 DAYS BEFORE APPLICATION OF FINISH OR PH
MUST BE BELOW 10.
C. FINISH INSTALLATION
1. APPLY FINISH TO MINIMUM 28 DAY OLD STUCCO OR PRIMED
STUCCO OR APPLY WHEN PH OF STUCCO…
This is the start of the file's text. The full file is on GovTribe.