Attachment B Composite CDRLs Draft List4.pdf
PDF 180 KB Posted
- Attached to
- Composite Armor Development and Testing Federal contract opportunity
- Solicitation number
- 19AQMM23Q0005
About this file
This document contains a Contract Data Requirements List (CDRL) and related solicitation for a composite armor development and testing opportunity. The CDRL outlines eight required deliverables for the project, including presentation materials, meeting minutes, a management plan, monthly status reports, a system design document, a test plan, a test report, and a contract summary report. The solicitation seeks an industry partner to research and analyze deployed armored vehicles to develop lighter composite armor materials with equal or greater ballistic and blast protection compared to existing steel armor. The selected contractor must identify suitable composite materials, design composite armor systems for integration into vehicles, and validate armor performance. Quotes for the opportunity are due based on submission instructions in attached documents. The period of performance and pricing terms are not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM23Q0005 AMD 0001 QandA Matrix.pdf | ||
| RFQ 19AQMM23Q0005 AMD 0001.pdf | ||
| RFQ 19AQMM23Q0005 SF1449 Composite Armor.pdf | ||
| Attachment 1 Composite Armor PWS.pdf | ||
| Attachment A AV Spec REV 5.pdf | ||
| Attachment 2 DD Form 254 Rev 1_BIDDERS 19AQMM-23-Q-0005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A001 Presentation Material
DI-ADMN-81373 DS/C/PSP/DEAV
NO
YES
30 Days after award
Contractor format is acceptable. Presentations to be provided electronically in .pdf or .pptx file formats.
1. Kickoff Meeting presentation must be delivered 3 business prior to the kick off meeting.
2. Weekly Design Review presentations must be provided by close of business on the business day prior to the meeting.
3. Preliminary Design Review presentation must be delivered 3 business prior to the meeting.
4. Critical Design Review presentation must be delivered 3 business prior to the meeting.
5. Test Readiness Review presentation must be delivered 3 business prior to the meeting.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
Program Analyst X ds_av_cap@state.gov X
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A002 Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
3 Days after Kickoff Meeting
Contractor format is acceptable. Meeting minutes to be provided electronically in .pdf or .docx file formats.
Meeting minutes must be submitted 3 business days after each of the following Meetings
• Kickoff Meeting
• Weekly Design Review Meetings
• Monthly Status Meetings
• Preliminary Design Review
• Critical Design Review
• Test Readiness Review
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
DI-ADMN-81505
Program Analyst X
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A003 Management Plan
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
3 Days prior to Kickoff Meeting
Contractor format is acceptable. Management Plan to be provided electronically in .pdf or .docx file formats.
Management plant must be submitted 3 business days Prior to the kick off meeting. The contractor must update the management plan throughout the program as directed by the Government.
Management plan must include include a project schedule with a gantt chart.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
4. AUTHORITY (Data Acquisition Document No.)
Program Analyst X
DI-MGMT-80004
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A004 Monthly Status Report
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Monthly reports to be provided electronically in .pdf or .docx file formats.
The first Monthly Report must be submitted on the last business day of the first complete calendar month after contract award.
Subsequent Monthly reports must be submitted 3 business days prior to the monthly status meetings. Dates for monthly status meetings will be proposed by the Contractor.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A005
2. TITLE OF DATA ITEM
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION
(SSDD)
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. SSDD must be provided electronically in .pdf or .doc file formats.
Draft due 5 business days prior to the Preliminary Design Review. The Government may have comments or revisions that must be addressed or resolved. Revision due 5 business days prior to the Critical Design Review.
Final Due 10 business days after Critical Design Review.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
D. SYSTEM/ITEM
Lightweight Composite Armor ds_av_cap@state.gov X X
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A006 Test Plan
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Test and Evaluation Master Plan must be provided electronically in .pdf or .xlsx file formats.
The Test and Evaluation Master Plan must be submitted 10 business days prior to the test readiness review.
The Government may have comments or revisions that must be addressed or resolved. The Government will have 10 business days to provide comments.
The final Test and Evaluation Master Plan must be delivered 10 business days after receipt of Government request for revision.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-81284
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A007 Test Report
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Test Report must be provided electronically in .pdf or .xlsx file formats.
The Test Report must be submitted 20 business days after the conclusion of test conduct.
The Government may have comments or revisions that must be addressed or resolved. The Government will have 10 business days to provide comments. The final Test and Report must be delivered 10 business days after receipt of Government request for revision.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
Lightweight Composite Armor
A008 Contract Summary Report
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Contract Summary Report to be provided electronically in .pdf or .docx file formats. Draft must be submitted 30 days prior to the end of the Period of Performance. The Government may have comments or revisions that must be addressed or resolved. The Government will have 10 business days to provide comments.
The final Test and Report must be delivered 10 business days after receipt of Government request for revision.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
5. DI-ADMN-80447A
| CDRLs All |
| DD-1423-A1 Presentation Material |
| DD-1423-A2 Meeting Minutes |
| DD-1423-A3 Project Management Plan |
| DD-1423-A4 Monthly Status Report |
| DD-1423-A5 System Design Document |
| DD-1423-A6 Requirements Verification and Traceability Matrix |
| DD-1423-A7 Configuration Management Plan |
| DD-1423-A8 Test and Evaluation Master Plan |
| DD-1423-A9 Test Report |
| DD-1423-A10 OEM Manuals |
| DD-1423-A11 Armored Vehicle Manual |
| DD-1423-A12 Contract Summary Report |
| DD-1423-A13 Technical Data Package |
DD-1423-A14 Failure Analysis