This is an Official Bid Document (Attachment B) for Request for Bid No. RFB-110-27 issued by the Department for Military Affairs for Electrical Support Services at Bluegrass Station in Lexington, Kentucky. The bid document establishes a comprehensive pricing schedule for labor, equipment, and services across 64 line items. Labor categories include various levels of electrical personnel (Electrical Engineers, Project Managers, Site Supervisors, Foremen, Master Electricians, Certified Electricians, Journeyman Electricians, and Apprentice Electricians), as well as specialized technicians (SCADA Technicians, Utility Locators, Linemen, Groundmen, CAD Designers, and General Laborers), with pricing required for both regular hours and after-hours/holiday work. Equipment pricing is requested on an hourly and daily basis for specialized vehicles and machinery including bucket trucks (various sizes), digger derricks, hydro excavation trucks, backhoe loaders, excavators, trenchers, cable tensioning equipment, directional boring equipment, and diagnostic tools such as ground penetrating radar, VLF cable testers, power quality analyzers, and infrared thermography cameras. Bidders must price all items in the schedule, with award based on aggregate total. The bid validity period is sixty calendar days from the opening date.

Unit prices must include all labor, materials, overhead, profit, insurance, and related costs necessary to complete work in accordance with contract specifications. Unbalanced bidding and front-loading are grounds for bid rejection. The Commonwealth will reimburse only the price invoiced to the vendor and requires copies of supplier invoices for any materials used. Bidders must certify non-collusion, non-conflict of interest, legal eligibility to contract with the Commonwealth of Kentucky, and compliance with the Kentucky Civil Rights Act and Equal Employment Act. Bidders must also affirm they are not debarred from federal contracting and commit to notifying the buyer within seventy-two hours if debarred during contract performance. Only one contract will be awarded based on the lowest aggregate bid total.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFB-110-27

Attachment B

Official Bid Document

Electrical Support Services Department for Military Affairs

Bluegrass Station Lexington, Kentucky

NOTES FOR BID SCHEDULE:

A. No bid will be considered unless all items in the Bid Schedule are priced, and only one contract will be awarded.

B. The bid will be awarded in the aggregate total of the Bid Schedule.

C. Unbalanced bidding and front loading of bid will be grounds for rejection of bids.

D. Unit Prices shall include the furnishing of labor, materials complete and in place, overhead profit, insurance, etc., to cover the furnished work of the several classifications listed and shall be based on the same type and/or similar work included in the contract specifications.

1 Electrical Engineer Regular Hours HR $

2 Electrical Engineer after Hours/Holidays HR $

3 Project Manager Regular Hours HR $

4 Project Manager after Hours/Holidays HR $

5 Site Supervisor Regular Hours HR $

6 Site Supervisor after Hours/Holidays HR $

7 Foreman Regular Hours HR $

8 Foreman after Hours/Holidays HR $

9 Master Electrician Regulars Hours HR $

10 Master Electrician after Hours/Holidays HR $

11 Certified Electrician Regular Hours HR $

12 Certified Electrician after Hours/Holidays HR $

13 Journeyman Electrician Regulars Hours HR $

14 Journeyman Electrician after Hours/Holidays HR $

15 Apprentice Electrician Regular Hours HR $

16 Apprentice Electrician after Hours/Holidays HR $

17 SCADA Technician Regular Hours HR $

18 SCADA Technician after Hours/Holidays HR $

19 Utility Locator Regular Hours HR $

20 Utility Locator after Hours/Holidays HR $

21 Lineman Regular Hours HR $

22 Lineman after Hours/Holidays HR $

23 Groundman Regular Hours HR $

24 Groundman after Hours/Holidays HR $

25 CAD Designer Regular Hours HR $

26 CAD Designer after Hours/Holidays HR $

27 General Laborer Regular Hours HR $

28 General Laborer after Hours/Holidays HR $

29 Equipment Operator Regular Hours HR $

30 Equipment Operator after Hours/Holidays HR $

31 Large Bucket Truck (60-ft or greater working height) Hourly HR $

32 Large Bucket Truck (60-ft or greater working height) Daily DAY $

33 Medium Bucket Truck (40-ft or 59-ft working height) Daily DAY $

34 Medium Bucket Truck (40-ft or 59-ft working height) Hourly HR $

35 Small Bucket Truck (Under 40-ft working height) Hourly HR $

36 Small Bucket Truck (Under 40-ft working height) Daily DAY $

37 Digger Derrick/ Pole Setting Truck Daily DAY $

38 Digger Derrick/ Pole Setting Truck Hourly HR $

39 Electronic Mapping- Capable Directional Boring Equip. Hourly HR $

40 Electronic Mapping- Capable Directional Boring Equip. Daily DAY $

Hydro Excavate Truck (Min 6,000 CFM and 10 GPM 3K PSI) Daily DAY $

Hydro Excavate Truck (Min 6,000 CFM and 10 GPM 3K PSI) Hourly HR $

43 Backhoe Loader Hourly HR $

44 Backhoe Loader Daily DAY $

45 Mini Excavator Daily DAY $

46 Mini Excavator Hourly HR $

47 Skid Steer with Bucket or Auger Hourly HR $

48 Skid Steer with Bucket or Auger Daily DAY $

49 Trencher (48' min. depth) Daily DAY $

50 Trencher (48' min. depth) Hourly HR $

51 Wire Pulling Reel Trailer Hourly HR $

52 Wire Pulling Reel Trailer Daily DAY $

53 Cable Tensioner Daily DAY $

54 Cable Tensioner Hourly HR $

55 Pressure Drill (Up to 36-inch diameter/20 0 ft depth) Hourly HR $

56 Pressure Drill (Up to 36-inch diameter/20 0 ft depth) Daily DAY $

57 Ground Penetrating Radar Daily DAY $

58 Ground Penetrating Radar Hourly HR $

59 Very Low Frequency (VLF) Cable Tester Hourly HR $

60 Very Low Frequency (VLF) Cable Tester Daily DAY $

61 Power Quality Analyzer Daily DAY $

62 Power Quality Analyzer Hourly HR $

63 Infrared Thermography Camera Hourly HR $

64 Infrared Thermography Camera Daily DAY $

Total $

*The total is only being used to determine the low bidder. The total will not be reflected on the contract.

REIMBURSEMENT FOR MATERIALS The Commonwealth will only pay the price invoiced to the vendor.

Vendor is to provide a copy of their invoice received from their suppliers for any materials used.

ATTACHMENT B RFB-110-27

OFFICIAL BID DOCUMENT

AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST

I, HEREBY CERTIFY:

1. That I am the bidder (if the bidder is an individual), a partner in the bidder (if the bidder is a partnership), or an officer and employee of the bidding corporation having authority to sign on its behalf (if the bidder is a corporation).

2. That the submitted bid or bids covering Division of Engineering and Contract Administration Request for Bid No.

RFB-110-27 have been arrived at by the bidder independently and have been submitted without collusion with, and without any agreement, understanding or planned common course of action with any other contractor, vendor of materials, supplies, equipment or services described in the Request for Bid, designed to limit independent bidding or competition; as prohibited by provision KRS 45A.325;

3. That the contents of the bid or bids have not been communicated by the bidder or its employees or agents to any person not an employee or agent of the bidder, its surety on any bond furnished with the bid or bids and will not be communicated to any such person prior to the official opening of the bid or bids.

4. That the bidder is legally entitled to enter into the contract with the Commonwealth of Kentucky and is not in violation of any prohibited conflict of interest, including those prohibited by the provisions of KRS 164.390; and 45A.330 to 45A.340 and 45A.455.

5. This offer is for sixty (60) calendar days from the date this bid is opened. In submitting the above, it is expressly agreed that upon proper acceptance by the Division of Engineering and Contract Administration of any or all items bid above, a contract shall thereby be created with respect to the items accepted.

6. That I have fully informed myself regarding and affirm the accuracy of all statements made in this Official Bid Document including Bid Amount.

7. Unless otherwise exempted by KRS 45.590, the bidder intends to comply in full with all requirements of the Kentucky Civil Rights Act and to submit data required by the Kentucky Equal Employment Act upon being designated the successful bidder.

8. That the bidder, if awarded a contract, would not be in violation of the Executive Branch Code of Ethics established by KRS 11A.001 through KRS 11A.990.

9. That the bidder is not debarred from doing business with federal agencies and that, if debarred during the life of the contract, the bidder will notify the Commonwealth buyer of record within seventy-two (72) hours of the federal debarment.

READ CAREFULLY – SIGN IN SPACE BELOW – FAILURE TO SIGN INVALIDATES BID

SIGNED BY: ________________________________________ FIRM: ______________________________________________

PRINT NAME: ______________________________________ ADDRESS: __________________________________________

TITLE: _____________________________________________ ____________________________________________________

CITY STATE ZIP CODE

DATE: ______________________________________________

TELEPHONE NO: ___________________________________

FEDERAL ID. NO. OR SOCIAL SECURITY NO. EMAIL: ____________________________________________