Attachment_B_-_2022_CriteriaADA.pdf
PDF 4 MB Posted
- Attached to
- Port Saint John Gravity Sewer Replacement
- Solicitation number
- B-7-25-19
- Issued by
- Brevard County, Florida
About this file
The document is the Criteria for Water and Sanitary Sewerage Systems for Brevard County, Florida, published by the Brevard County Utility Services Department and revised in April 2021. This comprehensive technical standards manual provides detailed engineering and construction specifications for utility infrastructure, including sanitary sewer, potable water, and reclaimed water systems. The document serves as a guidebook for utility construction projects within Brevard County, establishing minimum standards for facilities owned or connected to the county's utility systems, and outlining requirements for design, materials, construction methods, inspection, testing, and system acceptance.
The criteria cover a wide range of technical specifications, including pipe materials, installation techniques, valve and hydrant requirements, lift station design, grease interceptors, and record drawing standards. It includes detailed appendices with approved manufacturers for various utility components, ensuring quality and consistency in infrastructure development. The document is structured to provide comprehensive guidance for developers, engineers, and contractors, with sections addressing everything from easement requirements and material specifications to testing protocols and system acceptance procedures. The manual reflects the county's commitment to maintaining high-quality utility infrastructure and provides a standardized approach to utility construction and expansion within Brevard County.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRITERIA FOR
WATER AND SANITARY SEWERAGE
SYSTEMS WITHIN BREVARD COUNTY
AMENDED APRIL 2021
Utility Services Department
Brevard County Board of County Commissioners
Introduction to the Eighth Amendment to the Criteria for Water and Sanitary Sewerage Within Brevard County, Florida
Since 1979, construction standards for Brevard County Utility Services have been set forth in a document titled the Criteria for Water and Sewerage Within Brevard County. It is authorized by Section 110-184 of the Brevard County Code. There have been seven amendments to the Criteria since the original was authorized. The last amendment was done in January 2018.
Originally, the Criteria was intended as a guidebook for the Utility’s field inspectors. Over the years, it has become a comprehensive set of design and construction standards. As with any engineering project, each amendment built upon the work of the prior amendment. After 36 years (11 years since the last amendment) the Utility recognized the need to eliminate redundant sections, consolidate similar standards, consider the use of modern materials, and provide drawings and technical specifications that could be incorporated directly into projects to streamline the review and approval process. Consequently, the re-formatted Criteria now provides standard drawings and technical specifications approved by the Utility. Additionally, administrative matters are consolidated into a single section at the beginning of the document for ease of use.
i
Table of Contents
DEFINITIONS AND ABBREVIATIONS
1 POLICY AND ADMINISTRATION
1.1 GENERAL
1.1.1 PURPOSE
1.1.2 MINIMUM STANDARDS
1.1.3 DEVIATIONS
1.1.4 PRIVATELY OWNED SYSTEMS
1.1.5 CONFORMANCE TO MASTER PLAN
1.1.6 SURVEY
1.1.7 DRAWING SIZE
1.1.8 PLAN AND PROFILE
1.1.9 SIGNATURES
1.1.10 MASTER UTILITY PLAN
1.1.11 CALCULATIONS
1.1.12 CONSTRUCTION PLAN APPROVAL
1.1.13 PHASED DEVELOPMENTS
1.1.14 UPGRADES TO EXISTING SYSTEMS
1.1.15 PIPE SEPARATION
1.1.16 LANDSCAPING
1.2 EASEMENTS, RIGHTS OF WAY AND PERMITS
1.2.1 GENERAL
1.2.2 EASEMENT WIDTH
1.2.3 COUNTY RIGHT-OF-WAY PERMITS
1.2.4 FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) RIGHT-OF-WAY PERMITS
1.2.5 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS
1.3 CONSTRUCTION DOCUMENTS
1.3.1 SPECIFICATIONS AND DRAWINGS
1.3.2 DIMENSIONS
1.3.3 EXISTING UTILITIES
1.3.4 SHOP DRAWINGS
1.4 METHODS AND MATERIALS
1.4.1 PROOF OF CONFORMANCE AND ALTERNATIVE ITEMS
ii
1.4.2 MEANS AND METHODS
1.4.3 DEFECTIVE MATERIALS AND WORKMANSHIP
1.4.4 SPECIAL MATERIALS
1.4.5 CASTINGS
1.4.6 PRE-CONSTRUCTION MEETING
1.4.7 OMISSIONS
1.4.8 CHANGES
1.4.9 MONUMENT PRESERVATION
1.5 PROTECTION OF THE PUBLIC
1.5.1 BARRICADES, GUARDS, AND SAFETY PROVISIONS
1.6 PROTECTION OF EXISTING UTILITIES
1.6.1 GENERALLY
1.6.2 EXISTING UTILITIES
1.6.3 LOCATION OF EXISTING UTILITIES
1.6.4 PROTECTION OF TREES, SHRUBS AND SODDED AREAS
1.6.5 RESTORATION OF FENCES
1.6.6 NUISANCE
1.6.7 ISOLATION OF SYSTEM
1.6.8 OPERATION OF EXISTING VALVES AND CONTROLS
1.6.9 UNAUTHORIZED CONNECTIONS
1.7 INSPECTION
1.7.1 ASSIGNMENT OF INSPECTOR
1.7.2 AUTHORITY
1.7.3 RIGHT TO REJECT
1.7.4 SCHEDULED INSPECTIONS
1.7.5 INSPECTION PROCESS
1.7.6 COMMENCEMENT OF WORK
1.7.7 INSPECTOR WORK HOURS
1.7.8 CONSTRUCTION HOURS
1.7.9 COUNTY HOLIDAYS
1.8 PRIVATELY OWNED UTILITY SYSTEMS
1.8.1 WRITTEN REQUEST
1.8.2 REQUIRED DOCUMENTATION
iii
1.8.3 DIRECT CONNECTION
1.8.4 CONNECTION TO A PRIVATELY-OWNED UTILITY
1.8.5 ACCEPTANCE OF PRIVATE SYSTEMS FOR PUBLIC MAINTENANCE
1.8.6 PRIVATE LIFT STATION CONTACT INFORMATION
1.8.7 PRIVATE LIFT STATION DESIGN
1.9 CONSTRUCTION
1.9.1 APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS
1.9.2 APPROVED MANUFACTURES AND PRODUCTS
1.9.3 GRADES
1.9.4 BENCH MARKS
1.9.5 SURVEYS
1.9.6 FACILITY MARKINGS
1.9.7 STREET RESTORATION
1.9.8 DEWATERING EQUIPMENT
1.9.9 MATERIAL HANDLING
1.10 SPECIAL CONSTRUCTION
1.10.1 DIRECTIONAL BORE
1.10.2 JACK AND BORE
1.11 MAINTENANCE OF TRAFFIC AND CLOSING OF STREETS
1.12 RECORD DRAWINGS
1.12.1 GENERAL
1.12.2 VALVES, FITTINGS AND BENDS
1.12.3 DEVELOPER'S RESPONSIBILITY
1.12.4 STATE PLANE COORDINATES
1.12.5 DISTANCES
1.12.6 ELEVATIONS
1.12.7 SCALE FACTOR
1.12.8 ELECTRONIC DATA FILE
1.12.9 SANITARY SEWER RECORD DRAWINGS
1.12.10 RECORD DRAWING CERTIFICATE
1.13 ACCEPTANCE OF NEW SYSTEMS
1.13.1 DEDICATION TO COUNTY
1.13.2 CONFORMANCE TO COUNTY STANDARDS
iv
1.13.3 REQUIRED DOCUMENTATION
2 SANITARY SEWER SYSTEM
2.1 DESIGN
2.1.1 FLORIDA ADMINISTRATIVE CODE
2.1.2 SEWER AVAILABILITY
2.1.3 “TEN STATE STANDARDS”
2.1.4 CAPACITY CALCULATIONS
2.1.5 FDEP PERMIT
2.1.6 CALCULATIONS
2.1.7 RIM ELEVATION
2.2 PRE-TREATMENT
2.2.1 GREASE INTERCEPTORS FOR KITCHEN WASTE
2.2.2 PEAKING FACTOR
2.2.3 SIZING EQUATION
2.2.4 DESIGN CALCULATIONS
2.2.5 RESPONSIBILITY
2.2.6 OPERATION AND MAINTENANCE
2.3 GRAVITY SANITARY SEWER SYSTEMS
2.3.1 MINIMUM PIPE DIAMETER
2.3.2 MINIMUM PIPE SLOPE
2.3.3 SEWER STUBS FOR FUTURE EXTENSION
2.3.4 INCREASE IN PIPE DIAMETER
2.3.5 BUILDING SERVICE MANIFOLDS
2.4 MANHOLES
2.4.1 GENERAL
2.4.2 TERMINAL MANHOLE
2.4.3 EXTERIOR DROP MAN HOLES
2.4.4 INTERIOR DROP MAN HOLES
2.4.5 CONFLICT MAN HOLES
2.5 FORCE MAIN SEWER SYSTEMS
2.5.1 DESIGN PRESSURE
2.5.2 DESIGN FRICTION LOSSES
2.5.3 DESIGN VELOCITY
v
2.5.4 MINIMUM PIPE DIAMETER
2.5.5 VALVES
2.5.6 AIR RELEASE VALVES
2.5.7 FORCE MAIN TERMINATION
2.5.8 LOW PRESSURE SEWER SYSTEMS
2.6 LIFT STATIONS
2.6.1 TYPE
2.6.2 PUMPS
2.6.3 PEAK PUMP DESIGN
2.6.4 LIFT STATION SITE
2.6.5 WARRANTY DEED
2.6.6 EMERGENCY GENERATOR
2.6.7 ABOVE GROUND FUEL STORAGE TANK REGISTRATION
2.6.8 UNDER GROUND FUEL STORAGE TANK
2.6.9 WET WELLS
2.6.10 VALVE VAULT
2.7 SYSTEM ACCEPTANCE
2.7.1 FIELD TESTING
2.7.2 ACCEPTABLE LEAKAGE
2.7.3 VIDEO RECORDING
2.7.4 REQUIRED LIFT STATION DOCUMENTS
2.8 ABANDONMENT OF ON-SITE TREATMENT
3 POTABLE WATER
3.1 DESIGN
3.1.1 FLORIDA ADMINISTRATIVE CODE
3.1.2 “TEN STATE STANDARDS”
3.1.3 FDEP PERMIT
3.1.4 CROSS CONNECTION CONTROL
3.1.5 CALCULATIONS
3.1.6 DESIGN VELOCITY
3.1.7 FRICTION LOSS
3.1.8 MINIMUM PIPE DIAMETER
3.1.9 WATER MAIN VALVES
vi
3.1.10 DEAD END WATER MAINS
3.2 MATERIALS
3.2.1 BACKFLOW PREVENTION DEVICES
3.2.2 METERS
3.2.3 FIRE HYDRANTS AND FIRE SPRINKLER SYSTEMS
3.3 DISINFECTION AND BACTERIOLOGICAL TESTING
3.3.1 DISINFECTION
3.3.2 SAMPLING
3.3.3 TESTING
3.4 CONNECTIONS TO EXISTING COUNTY WATER SYSTEM
3.4.1 OPERATION OF VALVES
3.4.2 JUMPERS
3.4.3 FDEP CLEARANCE
3.4.4 FDEP CERTIFICATE OF COMPLETION
3.5 SYSTEM ACCEPTANCE BY BREVARD COUNTY UTILITY SERVICES
4 RECLAIMED WATER
4.1 DESIGN
4.1.1 FLORIDA ADMINISTRATIVE CODE
4.1.2 CROSS CONNECTION CONTROL
4.1.3 CALCULATIONS
4.1.4 MINIMUM PIPE DIAMETER
4.1.5 RECLAIMED WATER SERVICES
4.1.6 RECLAIMED WATER MAIN VALVES
4.1.7 DESIGN PRESSURE
4.1.8 DESIGN VELOCITY
4.1.9 FRICTION LOSS
4.1.10 SEWER PLAN REQUIREMENT
4.1.11 APPLICATION FOR USE
4.1.12 POTABLE WATER SUPPLY WELLS
4.1.13 FUTURE POTABLE WATER SUPPLY WELLS
4.1.14 LOCATION OF RECLAIMED WATER TRANSMISSION FACILITIES
4.1.15 HOLD HARMLESS AGREEMENT
4.1.16 SIGNS
vii
4.1.17 FIRE PROTECTION
4.1.18 TANK TRUCKS
4.1.19 DWELLINGS
4.1.20 ABOVE GROUND CONNECTIONS
4.1.21 OTHER USES
4.2 MATERIALS
4.2.1 BACKFLOW PREVENTION DEVICES
4.3 TESTING
4.3.1 CROSS CONNECTION TESTING
SECTION 02080 UTILITY MATERIALS
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 CONSTRUCTION REQUIREMENTS
1.03 HANDLING AND INSPECTION
1.03 SUBMITTALS
PART 2 - PRODUCTS
2.01 GENERALLY
2.02 DUCTILE IRON PIPE AND FITTINGS
2.03 POLYVINYL CHLORIDE PIPE AND FITTINGS (PVC)
2.04 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (HDPE)
2.05 PIPE COUPLINGS
2.06 FLANGED COUPLING ADAPTERS
2.07 GATE VALVES
2.08 PLUG VALVES
2.09 WET TAPPING SLEVES AND VALVES
2.10 SWING CHECK VALVES
2.11 SEWAGE AIR RELEASE VALVES
2.12 PRESSURE GAUGE ASSEMBLIES
2.13 SERVICE SADDLES, CORPORATION STOPS AND SAMPLING STATIONS
2.14 VALVE BOXES AND EXTENSIONS
2.15 ELECTRONIC MARKERS AND LOCATORS
2.16 LOCATION MARKING
2.17 MANHOLE GRADE RINGS
viii
2.18 MISCELLANEOUS ITEMS
PART 3 - EXECUTION
3.01 INSPECTION
3.02 GENERAL INSTALLATION REQUIREMENTS
3.03 TRACING WIRE
3.04 INSTALLATION OF DUCTILE IRON PIPE
3.05 INSTALLATION OF PVC PIPE
3.06 INSTALLATION OF HDPE PIPE
3.07 FITTINGS ON UNDERGROUND PIPING
3.08 THRUST BLOCKS
3.09 INSTALLATION OF VALVES
3.10 INSTALLATION OF VALVE AND METER VAULTS
3.11 MANHOLE RING ADJUSTMENT
3.12 CLEANING AND FLUSHING
3.13 TESTING
SECTION 02200 SITE PREPARATION
PART 1 – GENERAL
1.01 DESCRIPTION
PART 2 - PRODUCTS
PART 3 - EXECUTION
3.01 DEMOLITION
3.02 ASBESTOS CONTAINING MATERIAL
3.03 CLEARING AND GRUBBING
3.04 PRESERVATION OR REMOVAL OF TREES
SECTION 02240 DEWATERING
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 SUBMITTALS
1.03 PUMPING AND DRAINAGE
PART 2 – PRODUCTS
2.01 GENERAL
PART 3 - EXECUTION
SECTION 02300 EARTHWORK
ix
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 GENERALLY
1.03 APPLICABLE PUBLICATIONS
1.04 QUALITY ASSURANCE
1.05 FEDERAL AND STATE REGULATORY REQUIREMENTS
1.06 PRE-CONSTRUCTION SURVEY
1.06 SUBMITTALS
PART 2 – PRODUCTS
2.01 MATERIALS
PART 3 – EXECUTION
3.01 CLEARING AND GRUBBING
3.02 SHEETING, SHORING, AND BRACING
3.03 PUMPING AND DRAINAGE
3.04 EXCAVATION
3.05 OVERCUT AND UNDERCUT
3.06 STABILIZATION
3.07 FILL AND COMPACTION
3.08 TRENCH EXCAVATION
3.09 TESTS
3.10 DRAINAGE MAINTENANCE
3.11 FINAL GRADING
3.12 EXCESS EXCAVATED MATERIALS
3.13 SOIL SETTLEMENT
TABLE A – COMPACTION AND BACKFILL SCHEDULE FOR STRUCTURES
TABLE B – BACKFILL SCHEDULE FOR PIPING
SECTION 02500 EXISTING UTILITIES
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 CONSTRUCTION REQUIREMENTS
PART 2 – MATERIALS
2.01 MATERIALS FOR RECONSTRUCTION
2.02 TAPPING SLEEVES
x
2.03 TAPPING VALVES
PART 3 – EXECUTION
3.01 GENERAL
3.02 TAPPING SLEEVES AND VALVES
3.03 PUMPING AND DRAINAGE
3.04 BACKFILL AND COMPACTION
3.05 THRUST BLOCKS ON WATER LINES
SECTION 02950 SITE RESTORATION
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 CONSTRUCTION REQUIREMENTS
1.03 QUALITY CONTROL
PART 2 – PRODUCTS
2.01 SOD
PART 3 – EXECUTION
3.01 SODDING
3.02 LANDSCAPING AND TREES
3.03 PUMPING AND DRAINAGE
3.04 MAINTENACE PRIOR TO FINAL ACCEPTANCE
SECTION 03050 MISCELLANEOUS CONCRETE
PART 1 -- GENERAL
1.01 DESCRIPTION
PART 2 – PRODUCTS
2.01 MATERIALS
PART 3 – EXECUTION
3.01 GENERAL
3.02 EXPANSION JOINTS
3.03 CONTROL JOINTS
3.04 FINISHING
3.05 CURING
3.06 BACKFILL
3.07 THRUST BLOCKS
3.08 TESTING
xi
SECTION 03410 PRECAST CONCRETE
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 QUALITY ASSURANCE
1.03 SUBMITTALS
1.04 DELIVERY, STORAGE AND HANDLING
PART 2 – PRODUCTS
2.01 MATERIALS AND FABRICATION
PART 3 - EXECUTION
3.01 CONTROL JOINTS
SECTION 03600 GROUT
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 SUBMITTALS
PART 2 - PRODUCTS
2.01 APPLICATION
2.02 EPOXY ANCHOR GROUT
2.03 CEMENT-BASED GROUTS
2.04 PRESSURE GROUT
2.05 CURING MATERIALS
PART 3 – EXECUTION
3.01 GENERALLY
3.02 GROUTING PROCEDURES
SECTION 06820 FIBERGLASS LINERS {PRIVATE}
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 SUBMITTALS
1.03 CERTIFICATION
PART 2 - PRODUCTS
2.01 MATERIALS
PART 3 – EXECUTION
3.01 PREPARATION
3.02 INSTALLATION
xii
SECTION 09900 PAINTING
PART 1 – GENERAL
1.01 WORK INCLUDED
PART 2 - PRODUCTS
2.01 MATERIALS
PART 3 – EXECUTION
3.01 MATERIAL PREPARATION
3.02 APPLICATION
3.03 FIELD QUALITY CONTROL
SECTION 09980 CONCRETE COATINGS
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 SUBMITTALS
1.03 QUALITY ASSURANCE
1.04 SITE CONDITIONS
1.05 WARRANTY
PART 2 - PRODUCTS
2.01 COATING PRODUCTS
2.02 REPAIR AND RESURFACING PRODUCTS
PART 3 – EXECUTION
3.01 INITIAL EXAMINATION
3.02 SURFACE PREPARATION
3.03 APPLICATION OF COATING PRODUCTS
3.04 TESTING AND INSPECTION
SECTION 11300 SUBMERSIBLE PUMPS
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 SUBMITTALS
1.03 DELIVERY, STORAGE AND HANDLING
1.04 WARRANTY
PART 2 - PRODUCTS
2.01 EQUIPMENT
2.02 MATERIALS
xiii
PART 3 – EXECUTION
3.01 INSPECTION AND TESTING
SECTION 11320 DIESEL PUMPS
PART 1 – GENERAL
1.01 DESCRIPTION
1.02 SUBMITTALS
1.03 DELIVERY, STORAGE AND HANDLING
1.04 WARRANTY
PART 2 - PRODUCTS
2.01 EQUIPMENT
2.02 AUTOMATIC STARTING CONTROL SYSTEM
2.03 OPTIONS
PART 3 – EXECUTION
3.01 MANUFACTURERS SERVICE
3.02 TOOLS AND SPARE PARTS
Figure 1 – Sewer Service Connection Notes (US-10)
Figure 2 - Sewer Service Connection Details (US-11)
Figure 3 -Sewer Cleanout Detail (US-12)
Figure 4 - Traffic Bearing Sewer Clean-out (US-13)
Figure 5 -Private/Public Force main Transition (US-14)
Figure 6 - In Ground Air Release Valve Vault Detail (US-15)
Figure 7 -Above Ground Air Release Valve Detail (US-16)
Figure 8 - Grease Interceptor Detail (US-17)
Figure 9 - General Manhole Notes (US-20 Page 1 of 2)
Figure 10 - General Manhole Notes (US-20 Page 2 of 2)
Figure 11 - Concentric Manhole Detail (US-21)
Figure 12 - Eccentric Manhole Detail (US-22)
Figure 13 - Single Interior Drop Manhole Detail (US-23)
Figure 14 - Double Interior Drop Manhole Detail (US-24)
Figure 15 - Conflict Manhole Detail (US-25)
Figure 16 - Dog House Manhole Detail (US-26)
Figure 17 - AS Legacy Manhole Cover Detail (US-27)
Figure 18 - Manhole Inverts Detail (US-28) xiv
Figure 19 - Lift Station Notes (US-30)
Figure 20 - Lift Station Profile View Detail (US-31 Page 1 of 3)
Figure 21 - Tremie Wet Well Installation Detail (US-31 Page 2 of 3)
Figure 22 - Tremie & Wet Well Causes for Rejection Notes (US-31 Page 3 of 3)
Figure 23 - Lift Station Plan View Detail (US-32-ALL Page 1 of 3)
Figure 24 - Lift Station Plan View Detail (US-32-ALL Page 2 of 3)
Figure 25 - Lift Station Section View Detail (US-32-ALL Page 3 of 3)
Figure 26 - Lift Station Above Ground Valving Detail (US-33)
Figure 27 - Lift Station Valve Vault Detail (US-34)
Figure 28 - Lift Station Control Panel Detail (US-35 Page 1 of 2 / Elec-10-ALL)
Figure 29 - Lift Station Control Panel Detail (US-35 Page 2 of 2 / Elec-11-ALL)
Figure 30 - 30' Maximum Height Telemetry Mast Detail (US-36)
Figure 31 - Telemetry RTU Detail (US-37)
Figure 32 - 45' Maximum Height Telemetry Mast Detail (US-38)
Figure 33 - Wet Well Pipe Bracing Detail (US-39)
Figure 34 - Water Service General Notes (US-40)
Figure 35 - Water Service Section View Detail (US-41)
Figure 36 - Water Service Plan View Detail (US-42)
Figure 37 - Fire Hydrant Assembly Detail (US-43)
Figure 38 - Blow Off Detail (US-44)
Figure 39 - Temporary Jumper Connection Detail (US-45)
Figure 40 - 3/4" to 2" Backflow Preventer Detail (US-46)
Figure 41 - Backflow Preventer with Meter for Fire Services 3" to 8" Detail (US-47)
Figure 42 - Reclaimed Water Service General Notes (US-50)
Figure 43 - Reclaimed Water Service Section View Detail (US-51)
Figure 44 - Reclaimed Water Service Plan View Detail (US-52)
Figure 45 - Reclaimed Water Sign Detail (US-53)
Figure 46 - Reclaimed Water Service Connection Detail (US-54)
Figure 47 - Pipe Separation Detail (US-60)
Figure 48 - PVC Pipe Restraint Table Detail (US-61)
Figure 49 - Ductile Iron Pipe Restraint Table Detail (US-62)
Figure 50 - Roadway Open Cut Detail (US-63)
Figure 51 - Utility Crossing Detail (US-64) xv
Figure 52 - Vertical Pipe Deflection Detail (US-65)
Figure 53 - Concrete Support Cradle Detail (US-66)
Figure 54 - Valve Box Detail (US-67)
Figure 55 - Subaqueous / Ditch Crossing Detail (US-68)
Figure 56 - Utility Main Crossing Sign Detail (US-69)
Figure 57 - Casing Installation Detail (US-70)
Figure 58 - Aerial Crossing Fan Guard Detail (US-71)
Figure 59 - Aerial Canal Crossing Detail (US-72)
Figure 60 - Bollard Detail (US-73)
Figure 61 - Utility Marker Detail (US-74)
Appendix A – BCUSD Details .................................................................................................................. i
US-10 Sewer Service Connection Notes ............................................................................................ i
US-11 Sewer Service Connection .......................................................................................................ii
US-12 Sewer Cleanout ...................................................................................................................... iii
US-13 Traffic Bearing Sewer Clean-out ............................................................................................. iv
US-14 Private/Public Forcemain Transition ....................................................................................... v
US-15 In-Ground Air Release Valve Vault ......................................................................................... vi
US-16 Above Ground Air Release Valve ........................................................................................... vii
US-17 Grease Interceptor ............................................................................................................... viii
US-20 Page 1 of 2 - General Manhole Notes ..................................................................................... x
US-20 Page 2 of 2 - General Manhole Notes ................................................................................... xii
US-21 - Concentric Manhole ........................................................................................................... xiii
US-22 – Eccentric Manhole ............................................................................................................. xiv
US-23 – Single Interior Drop Manhole ............................................................................................. xv
US-24 - Double Interior Drop Manhole........................................................................................... xvi
US-25 – Conflict Manhole .............................................................................................................. xvii
US-26 – Dog House Manhole ........................................................................................................ xviii
US-27 - AS Legacy Manhole Cover .................................................................................................. xix
US-28 - Manhole Inverts .................................................................................................................. xx
US-30 - Lift Station Notes ................................................................................................................ xxi
US-31 Page 1 of 3 - Lift Station Profile View ................................................................................. xxiii
US-31 Page 2 of 3 - Tremie Wet Well Installation Detail .............................................................. xxiv
US-31 Page 3 of 3 - Tremie & Wet Well Causes for Rejection Notes ............................................ xxv xvi
US-32-ALL Page 1 of 3 - Lift Station Plan View .............................................................................. xxvi
US-32-ALL Page 2 of 3 Lift Station Plan View ............................................................................... xxvii
US-32-ALL Page 3 of 3 Lift Station Section View ......................................................................... xxviii
US-33 Lift Station Above Ground Valving ..................................................................................... xxix
US-34 Lift Station Valve Vault ........................................................................................................ xxx
US-35 Page 1 of 2 (Elec-10-ALL) Lift Station Control Panel .......................................................... xxxi
US-35 Page 2 of 2 (Elec-11-ALL) Lift Station Control Panel ......................................................... xxxii
US-36 Telemetry Mast 30’ Maximum Height ............................................................................. xxxiii
US-37 Telemetry RTU .................................................................................................................. xxxiv
US-38 Telemetry Mast 45’ Maximum Height .............................................................................. xxxv
US-39 Wet Well Pipe Bracing Detail ........................................................................................... xxxvi
US-40 Water Service General Notes ...........................................................................................xxxvii
US-41 Water Service Section View ............................................................................................ xxxviii
US-42 Water Service Plan View ...................................................................................................xxxix
US-43 Fire Hydrant Assembly ........................................................................................................... xl
US-44 Blow Off Detail ...................................................................................................................... xli
US-45 Temporary Jumper Connection ............................................................................................ xlii
US-46 Backflow Preventer 3/4" – 2” .............................................................................................. xliii
US-47 Backflow Preventer with Meter for Fire Services 3”-8” ...................................................... xliv
US-50 Reclaimed Water Service General Notes ............................................................................. xlv
US-51 Reclaimed Water Service Section View ............................................................................... xlvi
US-52 Reclaimed Water Service Plan View ................................................................................... xlvii
US-53 Reclaimed Water Sign ....................................................................................................... xlviii
US-54 Reclaimed Water Service Connection ..................................................................................... l
US-60 Pipe Separation .......................................................................................................................li
US-61 Restraint Table PVC Pipe ....................................................................................................... liv
US-62 Restraint Table Ductile Iron Pipe ............................................................................................ lv
US-63 Open Cut – Roadway ............................................................................................................ lvii
US-64 Utility Crossing ..................................................................................................................... lviii
US-65 Vertical Pipe Deflection ......................................................................................................... lix
US-66 Concrete Support Cradle ........................................................................................................ lx
US-67 Valve Box ............................................................................................................................... lxi
US-68 Subaqueous / Ditch Crossing ................................................................................................ lxii xvii
US-69 Utility Main Crossing Sign .................................................................................................... lxiii
US-70 Casing Installation ............................................................................................................... lxiv
US-71 Aerial Crossing Fan Guard .................................................................................................... lxv
US-72 Aerial Canal Crossing ........................................................................................................... lxvi
US-73 Bollard Detail ...................................................................................................................... lxvii
US-74 Utility Markers ................................................................................................................... lxviii
APPROVED MANUFACTURERS AND PRODUCTS
WASTEWATER SERVICE MATERIALS
Adhesive Marking Tape
Air Release and Vacuum Valves
Casing Spacers
Check Valves
Concrete coatings (Spray On Liners)
Drop Bowls
Ductile Iron Fittings
Ductile Iron Pipe
Ductile Iron Pipe Lining
Electronic Markers
Fiberglass Liners
Gate Valves- Resilient Wedge
HDPE Liners for Wet Wells
HDPE Pipe
Joint Sealing Compound
Joint Restraints
Manhole Coatings
Manhole Exterior Shrink
Manhole Adjustment Rings - Concrete
Manhole Adjustmnent Rings - HDPE
Non-Shrink Grout
Pipe Couplings
Plug Valves
PVC Fittings
PVC Pipe - Force Main Integral Bell xviii
PVC Pipe - Gravity Main Integral Bell
Resilient Connectors
Substrate Patching Material
Stainless Ball Valve
Tapping Saddle
Tapping Sleeves
Tracer Wire
Traffic Bearing Clean Out
Valve Boxes
Valve Extensions
LIFT STATION MATERIALS
Access Frames and Covers
Drop Bowls
Fall Protection
Float Regulators
Pressure Gauges
Pressure Transducers
Pressure Transducer Hanger
Submersible Pumps
WATER SERVICE MATERIALS
Adhesive Marking Tape
Backflow Prevention
Ball Valves
Casing Spacers
Corporation Stops
Curb Stops
Ductile Iron Fittings
Ductile Iron Pipe (cement lined)
Electronic Markers
Fire Hydrants
Gate Valves (Resilient Wedge)
HDPE Pipe
Joint Restraints xix
Meter Boxes
Meter, Fire Services
Polyethylene Tubing
Pipe Couplings
PVC Pipe, Integral Bell
Service Saddles
Tapping Sleeves
RECLAIMED WATER SERVICE MATERIALS
Adhesive Marking Tape
Casing Spacers
Corporation Stops
Curb Stops
Ductile Iron Fittings
Ductile Iron Pipe
Electronic Markers
Gate Valves- Resilient Wedge
Hose Bibb Lockable Box
HDPE Pipe
Joint Restraints
Meter Box
Polyethylene Tubing
Pipe Couplings
PVC Pipe - Integral Bell
Service Saddles
Tapping Sleeves
Tracer Wire
Valve Boxes
Valve Extensions
Cross Reference
GENERAL INFORMATION
SANITARY SEWERAGE SYSTEM
WATER SYSTEM
RECLAIMED WATER SYSTEM
xx
Cross Reference
GENERAL INFORMATION
SANITARY SEWERAGE SYSTEM
WATER SYSTEM
RECLAIMED WATER SYSTEM
DEFINITIONS AND ABBREVIATIONS
Within the context of this document, the terms and abbreviations below have the following meanings:
Contractor - A constructor of water, wastewater, and reclaimed water utilities.
County - The Brevard County Government Criteria - (see STANDARDS) Engineer (or Design Engineer) - A developer's engineer or the Utility's design engineering consultant, as the case may be, who is the engineer of record for the utility design or construction project.
Developer - An owner or developer of real estate proposing water or wastewater utility construction.
Facility - Water, wastewater, or reclaimed water pipeline, structure, or appurtenance.
Inspector - The Brevard County Utility Services utility construction inspector.
Proponent - A person or entity advancing or advocating the proposal or project.
Standards - The engineering and construction standards that comprise the Criteria for Water and Sanitary Sewerage Systems Within Brevard County, most recent edition.
Utility (the Utility or Utility Services) - Brevard County Utility Services Work (the Work) - Any of the items that comprise the construction of a water, wastewater, or reclaimed water utility project.
AASHTO - American Association of State Highway and Transportation Officials ANSI - American National Standards Institute ASTM - American Society for Testing and Materials AWWA - American Water Works Association C-Factor - Hazen-Williams equation pipe friction factor DIP - Ductile Iron Pipe DR - Dimension Ratio EPA - United States Environmental Protection Agency FAC - Florida Administrative Code FDEP - Florida Department of Environmental Protection FDOT - Florida Department of Transportation HDPE - High Density Polyethylene NAVD88 - North American Vertical Datum of 1988 OSHA - United States Occupational Safety and Health Administration PSI - Pounds per Square Inch PVC - Polyvinyl Chloride SRF - State Revolving Funds
1 POLICY AND ADMINISTRATION
1.1 GENERAL
1.1.1 PURPOSE
Section 110-180 of the Brevard County Code states, “It is hereby declared that public ownership of all water and sewerage systems in the County is in the public interest and that the furnishing of water and sewerage service by publicly owned utilities is in the public interest.”
The authority for these standards is provided for in Section 110-184 of the Brevard County Code. Applicable State and federal laws and regulations shall be adhered to concurrently with these standards. When laws or regulations are conflicting, the most restrictive requirement shall be followed.
The objective of these standards is to create durable and economically maintainable public utility systems.
The information in this document is available on-line at the following website:
www.brevardcounty.us/utilityservices.
1.1.2 MINIMUM STANDARDS
This document sets forth the minimum standards applicable to utility construction projects and is intended to provide a basis for the design and construction of water and wastewater facilities within Brevard County as follows:
1. Facilities owned and operated by Brevard County, or
2. Facilities connecting to Brevard County utility systems.
1.1.3 DEVIATIONS
Any deviation from these standards must be approved in writing by the Utility Services Department Director before construction plans can be approved.
1.1.4 PRIVATELY OWNED SYSTEMS
A privately-owned utility system connecting to a County maintained system shall conform to these standards. Privately owned systems are not permitted for residential subdivisions or properties that have the potential to be subdivided in the future. Proposals for privately owned systems must be approved by the Utility Services Department Director prior to construction plan review.
1.1.5 CONFORMANCE TO MASTER PLAN
Developer constructed wastewater collection and transmission systems, water distribution systems, and reclaimed water distribution systems shall conform to master plans for system extensions proposed by Brevard County Utility Services.
1.1.6 SURVEY
The Design Engineer should strive to design utility systems to avoid occupying points that are important for surveying, such as points of intersection, curvature, or tangency.
1.1.7 DRAWING SIZE
All drawings shall be submitted on 24” x 36” sheets of paper, or if delivered electronically, formatted to be viewed in scale on 24" x 36" format. Electronic format (pdf) submittal is encouraged in lieu of paper format for review purposes. Drawings shall be of true scale when submitted for review. Reduced drawings are not acceptable for review.
1.1.8 PLAN AND PROFILE
Construction drawings for site plans and subdivisions shall include plan and profile of the proposed utilities, including gravity sewer, force mains, reclaimed water lines, and potable water lines. Plan and profile shall be on the same sheet, show all other utilities that may conflict with the proposed construction, and shall be formatted so the plan is aligned with the profile. The plan and profile sheets shall have a horizontal scale no smaller than 1” =60’ and have a horizontal to vertical scale ratio of 10:1.
1.1.9 SIGNATURES
All drawings, excluding record drawings, and calculations submitted for review and approval shall be signed, sealed and dated by an engineer registered in the State of Florida. Record drawings shall be certified by an engineer registered in the State of Florida.
1.1.10 MASTER UTILITY PLAN
A master utility plan shall be included in the construction drawings for all projects. The master utilities plan shall be on one sheet, shall show existing and proposed water, sewer, reclaimed water, and storm sewer; and shall clearly show connections to existing systems.
All phases of a phased development shall be shown.
1.1.11 CALCULATIONS
The Design Engineer shall provide calculations demonstrating the adequacy of the existing and proposed utility systems in a manner that is clear and convincing.
1.1.12 CONSTRUCTION PLAN APPROVAL
Approval of construction plans by Utility Services is valid for a period of one year, beginning when permit applications and drawings are forwarded to the Florida Department of Environmental Protection for approval. If construction is not started within one year, Utility Services retains the right to require compliance with the version of these standards in effect at the time an extension of the approval is requested. This requirement shall apply to currently approved projects.
1.1.13 PHASED DEVELOPMENTS
When a development is to be constructed in phases, each phase must be applied for, permitted, and cleared separately by the Florida Department of Environmental Protection.
1.1.14 UPGRADES TO EXISTING SYSTEMS
If the Utility has determined that a proposed development will overload existing systems, or is inconsistent with established master plans, the Developer shall pay for improvements to the existing systems to assure adequate additional capacity for the proposed development and compliance with established master plans.
1.1.15 PIPE SEPARATION
Minimum pipe separations are set forth in US-60
1.1.16 LANDSCAPING
Trees must be planted a minimum 10-foot offset from all utility mains
1.2 EASEMENTS, RIGHTS OF WAY AND PERMITS
1.2.1 GENERAL
Whenever possible, utility lines shall be located within road rights-of-way or utility easements immediately adjacent to road rights-of-way.
1.2.2 EASEMENT WIDTH
Easements of sufficient width are required to guarantee that permanent or semi-permanent non-utility structures are not placed close to a facility or main. The easement shall allow unhindered access to all such facilities and mains. Easements adjacent to and parallel with rights-of-ways shall have a minimum width of 10-feet. For single lines in open areas and for lines running on side property lines of subdivisions, the minimum width shall be 15 feet for lines up to 7 feet deep measured from the finished grade to the bottom of the pipe or two times the excavated depth rounded up to the next five-foot interval, whichever is greater. The width is based on the utility being located in the center of the easement. A wider easement may be required when utilities are not centered within the easement or when more than one line is in the same easement. Utility Services reserves the right to require wider easements for access where it deems necessary.
1.2.3 COUNTY RIGHT-OF-WAY PERMITS
Right-of-way permits are required for work within public rights-of-way. The Contractor is responsible for obtaining these permits from Brevard County Public Works Department.
Copies of permits must be submitted to Utility Services prior to the start of construction.
1.2.4 FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) RIGHT-OF-WAY PERMITS
Right-of-way permits are required for work within Florida Department of Transportation (FDOT) rights-of-way. In addition to an FDOT permit, a performance bond is required by Utility Services, prior to the preconstruction conference, in the amount of 125% of the value of the work to be performed within the FDOT right-of-way.
1.2.5 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS
Copies of Florida Department of Environmental Protection (FDEP) permits shall be submitted to Utility Services prior to construction.
1.3 CONSTRUCTION DOCUMENTS
1.3.1 SPECIFICATIONS AND DRAWINGS
The Work shall be completed according to the intention of the design engineer as reflected in the drawings and specifications. The Work exhibited in one but not the other shall be executed as if it had been set forth in both.
1.3.2 DIMENSIONS
Drawings are not intended to be scaled for dimensions. If dimensions are not shown, the Contractor shall request them from the Design Engineer.
1.3.3 EXISTING UTILITIES
Existing utility lines shall have been located from available information furnished by the Utility and from additional site investigation. Such obstructions are to be shown for the purpose of advising the Contractor that they may interfere with the work to be done, but not for the purpose of indicating that the work can be performed without such interference.
It shall be the responsibility of the Design Engineer to secure proper existing utility information, and prepare drawings in accordance with these standards.
1.3.4 SHOP DRAWINGS
Details and shop drawings for products and materials to be used in the utility construction shall be first submitted to the Design Engineer and then to the Utility for review prior to construction. The Utility will accept shop drawings only after they are stamped approved by both the Contractor and the Design Engineer. Electronic submittals in pdf format are acceptable. Two stamped copies shall be sent to Utility Services. Products that are not manufactured and installed in strict compliance with approved shop drawings and specifications will be rejected.
1.4 METHODS AND MATERIALS
1.4.1 PROOF OF CONFORMANCE AND ALTERNATIVE ITEMS
When a material is specified by brand or “approved equal”, an alternate material may be submitted for consideration by Utility Services. Proof of conformity is the Proponent’s responsibility. “Equal” items may be used only if approved by the Proponent’s Engineer and Utility Services.
1.4.2 MEANS AND METHODS
The means and methods used by a Contractor shall conform to generally accepted standards for underground utility construction.
1.4.3 DEFECTIVE MATERIALS AND WORKMANSHIP
The Contractor shall repair any damage or leaks caused by defective materials or workmanship during the period of the maintenance bond.
1.4.4 SPECIAL MATERIALS
Utility Services reserves the right to mandate certain materials to be used where deemed necessary. Special materials will be specified during the review process when possible. The Utility intends to allow PVC, HDPE, or ductile iron pipe for construction of potable water, reclaimed water, and force mains 4 inches in diameter to 12 inches in diameter. Potable water, Reclaimed water and Sanitary Sewer Force Mains larger than 12 inches in diameter shall be ductile iron.
1.4.5 CASTINGS
Castings for valves, vaults, manholes and other appurtenances shall conform to, and shall be tested in accordance with the specifications for Gray Cast Iron, ANSI/ASTM A48, Class 30 and meet FDOT specifications where applicable. Castings that are to be located within a dedicated public right-of-way, or any other location subject to vehicular traffic, shall have all bearing surfaces machined so that the fitting parts will not rattle or rock under traffic. All castings shall be subject to a hammer test before installation.
1.4.6 PRE-CONSTRUCTION MEETING
Construction shall not start until a pre-construction meeting has been conducted with Utility Services’ staff.
1.4.7 OMISSIONS
Should anything be omitted from the specifications and drawings that is necessary for a clear understanding of the work, or should it appear that instructions are in conflict, the Contractor shall request written instructions from the Design Engineer before proceeding with the construction affected by such omissions or discrepancies.
1.4.8 CHANGES
Changes shall not be made to finally-approved drawings without the approval of Utility Services.
1.4.9 MONUMENT PRESERVATION
Property corners and survey monuments shall be preserved using care not to disturb or destroy them. If a property corner or survey monument is disturbed or destroyed during construction, whether intentionally or unintentionally, or is required to be disturbed or destroyed by the construction work, said property corner or survey monument shall be restored by a land surveyor registered in the State of Florida. All costs for this work shall be paid for by the Contractor.
1.5 PROTECTION OF THE PUBLIC
1.5.1 BARRICADES, GUARDS, AND SAFETY PROVISIONS
The Contractor shall be solely responsible for adhering to the rules and regulations of the Occupational Safety and Health Administration (OSHA), the Trench Safety Act, and appropriate authorities regarding safety provisions. Adequate barricades, construction signs, lights, and guards as required shall be placed and mai
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .