Attachment_B_-_2022_CriteriaADA.pdf

PDF 4 MB Posted

Attached to
Port Saint John Gravity Sewer Replacement
Solicitation number
B-7-25-19
Issued by
Brevard County, Florida

About this file

The document is the Criteria for Water and Sanitary Sewerage Systems for Brevard County, Florida, published by the Brevard County Utility Services Department and revised in April 2021. This comprehensive technical standards manual provides detailed engineering and construction specifications for utility infrastructure, including sanitary sewer, potable water, and reclaimed water systems. The document serves as a guidebook for utility construction projects within Brevard County, establishing minimum standards for facilities owned or connected to the county's utility systems, and outlining requirements for design, materials, construction methods, inspection, testing, and system acceptance.

The criteria cover a wide range of technical specifications, including pipe materials, installation techniques, valve and hydrant requirements, lift station design, grease interceptors, and record drawing standards. It includes detailed appendices with approved manufacturers for various utility components, ensuring quality and consistency in infrastructure development. The document is structured to provide comprehensive guidance for developers, engineers, and contractors, with sections addressing everything from easement requirements and material specifications to testing protocols and system acceptance procedures. The manual reflects the county's commitment to maintaining high-quality utility infrastructure and provides a standardized approach to utility construction and expansion within Brevard County.

View the file

Other files

File Type Posted
B7-25-19_NOA.pdf PDF
B7-25-19_NOA.pdf PDF
B7-25-19_NOA.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Addendum_1.pdf PDF
Addendum_1.pdf PDF
Addendum_1.pdf PDF
Revised_Scope_of_Services.pdf PDF
Revised_Scope_of_Services.pdf PDF
Revised_Scope_of_Services.pdf PDF
Attachment_A_-_Approved_Manufacturer's_List.pdf PDF
Attachment_E_-_Project_Location_Map_-_PSJ_Gravity.pdf PDF
Attachment_D_-_Gravity_Sewer_MH_J02063_to_MH_J02062.pdf PDF
Attachment_A_-_Approved_Manufacturer's_List.pdf PDF
Attachment_E_-_Project_Location_Map_-_PSJ_Gravity.pdf PDF
Attachment_F_-_Location_Map.png PNG image
B-7-25-19_Inv_&_Specs.pdf PDF
Attachment_B_-_2022_CriteriaADA.pdf PDF
Attachment_C_-_Gravity_Sewer_MH_J02002_to_60_LF_North.pdf PDF
Attachment_B_-_2022_CriteriaADA.pdf PDF
Attachment_C_-_Gravity_Sewer_MH_J02002_to_60_LF_North.pdf PDF
Attachment_C_-_Gravity_Sewer_MH_J02002_to_60_LF_North.pdf PDF
Attachment_E_-_Project_Location_Map_-_PSJ_Gravity.pdf PDF
Attachment_F_-_Location_Map.png PNG image
Attachment_D_-_Gravity_Sewer_MH_J02063_to_MH_J02062.pdf PDF
Attachment_F_-_Location_Map.png PNG image
B-7-25-19_Inv_&_Specs.pdf PDF
Attachment_A_-_Approved_Manufacturer's_List.pdf PDF
B-7-25-19_Inv_&_Specs.pdf PDF
Attachment_D_-_Gravity_Sewer_MH_J02063_to_MH_J02062.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRITERIA FOR

WATER AND SANITARY SEWERAGE

SYSTEMS WITHIN BREVARD COUNTY

AMENDED APRIL 2021

Utility Services Department

Brevard County Board of County Commissioners

Introduction to the Eighth Amendment to the Criteria for Water and Sanitary Sewerage Within Brevard County, Florida

Since 1979, construction standards for Brevard County Utility Services have been set forth in a document titled the Criteria for Water and Sewerage Within Brevard County. It is authorized by Section 110-184 of the Brevard County Code. There have been seven amendments to the Criteria since the original was authorized. The last amendment was done in January 2018.

Originally, the Criteria was intended as a guidebook for the Utility’s field inspectors. Over the years, it has become a comprehensive set of design and construction standards. As with any engineering project, each amendment built upon the work of the prior amendment. After 36 years (11 years since the last amendment) the Utility recognized the need to eliminate redundant sections, consolidate similar standards, consider the use of modern materials, and provide drawings and technical specifications that could be incorporated directly into projects to streamline the review and approval process. Consequently, the re-formatted Criteria now provides standard drawings and technical specifications approved by the Utility. Additionally, administrative matters are consolidated into a single section at the beginning of the document for ease of use.

i

Table of Contents

DEFINITIONS AND ABBREVIATIONS

1 POLICY AND ADMINISTRATION

1.1 GENERAL

1.1.1 PURPOSE

1.1.2 MINIMUM STANDARDS

1.1.3 DEVIATIONS

1.1.4 PRIVATELY OWNED SYSTEMS

1.1.5 CONFORMANCE TO MASTER PLAN

1.1.6 SURVEY

1.1.7 DRAWING SIZE

1.1.8 PLAN AND PROFILE

1.1.9 SIGNATURES

1.1.10 MASTER UTILITY PLAN

1.1.11 CALCULATIONS

1.1.12 CONSTRUCTION PLAN APPROVAL

1.1.13 PHASED DEVELOPMENTS

1.1.14 UPGRADES TO EXISTING SYSTEMS

1.1.15 PIPE SEPARATION

1.1.16 LANDSCAPING

1.2 EASEMENTS, RIGHTS OF WAY AND PERMITS

1.2.1 GENERAL

1.2.2 EASEMENT WIDTH

1.2.3 COUNTY RIGHT-OF-WAY PERMITS

1.2.4 FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) RIGHT-OF-WAY PERMITS

1.2.5 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS

1.3 CONSTRUCTION DOCUMENTS

1.3.1 SPECIFICATIONS AND DRAWINGS

1.3.2 DIMENSIONS

1.3.3 EXISTING UTILITIES

1.3.4 SHOP DRAWINGS

1.4 METHODS AND MATERIALS

1.4.1 PROOF OF CONFORMANCE AND ALTERNATIVE ITEMS

ii

1.4.2 MEANS AND METHODS

1.4.3 DEFECTIVE MATERIALS AND WORKMANSHIP

1.4.4 SPECIAL MATERIALS

1.4.5 CASTINGS

1.4.6 PRE-CONSTRUCTION MEETING

1.4.7 OMISSIONS

1.4.8 CHANGES

1.4.9 MONUMENT PRESERVATION

1.5 PROTECTION OF THE PUBLIC

1.5.1 BARRICADES, GUARDS, AND SAFETY PROVISIONS

1.6 PROTECTION OF EXISTING UTILITIES

1.6.1 GENERALLY

1.6.2 EXISTING UTILITIES

1.6.3 LOCATION OF EXISTING UTILITIES

1.6.4 PROTECTION OF TREES, SHRUBS AND SODDED AREAS

1.6.5 RESTORATION OF FENCES

1.6.6 NUISANCE

1.6.7 ISOLATION OF SYSTEM

1.6.8 OPERATION OF EXISTING VALVES AND CONTROLS

1.6.9 UNAUTHORIZED CONNECTIONS

1.7 INSPECTION

1.7.1 ASSIGNMENT OF INSPECTOR

1.7.2 AUTHORITY

1.7.3 RIGHT TO REJECT

1.7.4 SCHEDULED INSPECTIONS

1.7.5 INSPECTION PROCESS

1.7.6 COMMENCEMENT OF WORK

1.7.7 INSPECTOR WORK HOURS

1.7.8 CONSTRUCTION HOURS

1.7.9 COUNTY HOLIDAYS

1.8 PRIVATELY OWNED UTILITY SYSTEMS

1.8.1 WRITTEN REQUEST

1.8.2 REQUIRED DOCUMENTATION

iii

1.8.3 DIRECT CONNECTION

1.8.4 CONNECTION TO A PRIVATELY-OWNED UTILITY

1.8.5 ACCEPTANCE OF PRIVATE SYSTEMS FOR PUBLIC MAINTENANCE

1.8.6 PRIVATE LIFT STATION CONTACT INFORMATION

1.8.7 PRIVATE LIFT STATION DESIGN

1.9 CONSTRUCTION

1.9.1 APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS

1.9.2 APPROVED MANUFACTURES AND PRODUCTS

1.9.3 GRADES

1.9.4 BENCH MARKS

1.9.5 SURVEYS

1.9.6 FACILITY MARKINGS

1.9.7 STREET RESTORATION

1.9.8 DEWATERING EQUIPMENT

1.9.9 MATERIAL HANDLING

1.10 SPECIAL CONSTRUCTION

1.10.1 DIRECTIONAL BORE

1.10.2 JACK AND BORE

1.11 MAINTENANCE OF TRAFFIC AND CLOSING OF STREETS

1.12 RECORD DRAWINGS

1.12.1 GENERAL

1.12.2 VALVES, FITTINGS AND BENDS

1.12.3 DEVELOPER'S RESPONSIBILITY

1.12.4 STATE PLANE COORDINATES

1.12.5 DISTANCES

1.12.6 ELEVATIONS

1.12.7 SCALE FACTOR

1.12.8 ELECTRONIC DATA FILE

1.12.9 SANITARY SEWER RECORD DRAWINGS

1.12.10 RECORD DRAWING CERTIFICATE

1.13 ACCEPTANCE OF NEW SYSTEMS

1.13.1 DEDICATION TO COUNTY

1.13.2 CONFORMANCE TO COUNTY STANDARDS

iv

1.13.3 REQUIRED DOCUMENTATION

2 SANITARY SEWER SYSTEM

2.1 DESIGN

2.1.1 FLORIDA ADMINISTRATIVE CODE

2.1.2 SEWER AVAILABILITY

2.1.3 “TEN STATE STANDARDS”

2.1.4 CAPACITY CALCULATIONS

2.1.5 FDEP PERMIT

2.1.6 CALCULATIONS

2.1.7 RIM ELEVATION

2.2 PRE-TREATMENT

2.2.1 GREASE INTERCEPTORS FOR KITCHEN WASTE

2.2.2 PEAKING FACTOR

2.2.3 SIZING EQUATION

2.2.4 DESIGN CALCULATIONS

2.2.5 RESPONSIBILITY

2.2.6 OPERATION AND MAINTENANCE

2.3 GRAVITY SANITARY SEWER SYSTEMS

2.3.1 MINIMUM PIPE DIAMETER

2.3.2 MINIMUM PIPE SLOPE

2.3.3 SEWER STUBS FOR FUTURE EXTENSION

2.3.4 INCREASE IN PIPE DIAMETER

2.3.5 BUILDING SERVICE MANIFOLDS

2.4 MANHOLES

2.4.1 GENERAL

2.4.2 TERMINAL MANHOLE

2.4.3 EXTERIOR DROP MAN HOLES

2.4.4 INTERIOR DROP MAN HOLES

2.4.5 CONFLICT MAN HOLES

2.5 FORCE MAIN SEWER SYSTEMS

2.5.1 DESIGN PRESSURE

2.5.2 DESIGN FRICTION LOSSES

2.5.3 DESIGN VELOCITY

v

2.5.4 MINIMUM PIPE DIAMETER

2.5.5 VALVES

2.5.6 AIR RELEASE VALVES

2.5.7 FORCE MAIN TERMINATION

2.5.8 LOW PRESSURE SEWER SYSTEMS

2.6 LIFT STATIONS

2.6.1 TYPE

2.6.2 PUMPS

2.6.3 PEAK PUMP DESIGN

2.6.4 LIFT STATION SITE

2.6.5 WARRANTY DEED

2.6.6 EMERGENCY GENERATOR

2.6.7 ABOVE GROUND FUEL STORAGE TANK REGISTRATION

2.6.8 UNDER GROUND FUEL STORAGE TANK

2.6.9 WET WELLS

2.6.10 VALVE VAULT

2.7 SYSTEM ACCEPTANCE

2.7.1 FIELD TESTING

2.7.2 ACCEPTABLE LEAKAGE

2.7.3 VIDEO RECORDING

2.7.4 REQUIRED LIFT STATION DOCUMENTS

2.8 ABANDONMENT OF ON-SITE TREATMENT

3 POTABLE WATER

3.1 DESIGN

3.1.1 FLORIDA ADMINISTRATIVE CODE

3.1.2 “TEN STATE STANDARDS”

3.1.3 FDEP PERMIT

3.1.4 CROSS CONNECTION CONTROL

3.1.5 CALCULATIONS

3.1.6 DESIGN VELOCITY

3.1.7 FRICTION LOSS

3.1.8 MINIMUM PIPE DIAMETER

3.1.9 WATER MAIN VALVES

vi

3.1.10 DEAD END WATER MAINS

3.2 MATERIALS

3.2.1 BACKFLOW PREVENTION DEVICES

3.2.2 METERS

3.2.3 FIRE HYDRANTS AND FIRE SPRINKLER SYSTEMS

3.3 DISINFECTION AND BACTERIOLOGICAL TESTING

3.3.1 DISINFECTION

3.3.2 SAMPLING

3.3.3 TESTING

3.4 CONNECTIONS TO EXISTING COUNTY WATER SYSTEM

3.4.1 OPERATION OF VALVES

3.4.2 JUMPERS

3.4.3 FDEP CLEARANCE

3.4.4 FDEP CERTIFICATE OF COMPLETION

3.5 SYSTEM ACCEPTANCE BY BREVARD COUNTY UTILITY SERVICES

4 RECLAIMED WATER

4.1 DESIGN

4.1.1 FLORIDA ADMINISTRATIVE CODE

4.1.2 CROSS CONNECTION CONTROL

4.1.3 CALCULATIONS

4.1.4 MINIMUM PIPE DIAMETER

4.1.5 RECLAIMED WATER SERVICES

4.1.6 RECLAIMED WATER MAIN VALVES

4.1.7 DESIGN PRESSURE

4.1.8 DESIGN VELOCITY

4.1.9 FRICTION LOSS

4.1.10 SEWER PLAN REQUIREMENT

4.1.11 APPLICATION FOR USE

4.1.12 POTABLE WATER SUPPLY WELLS

4.1.13 FUTURE POTABLE WATER SUPPLY WELLS

4.1.14 LOCATION OF RECLAIMED WATER TRANSMISSION FACILITIES

4.1.15 HOLD HARMLESS AGREEMENT

4.1.16 SIGNS

vii

4.1.17 FIRE PROTECTION

4.1.18 TANK TRUCKS

4.1.19 DWELLINGS

4.1.20 ABOVE GROUND CONNECTIONS

4.1.21 OTHER USES

4.2 MATERIALS

4.2.1 BACKFLOW PREVENTION DEVICES

4.3 TESTING

4.3.1 CROSS CONNECTION TESTING

SECTION 02080 UTILITY MATERIALS

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 CONSTRUCTION REQUIREMENTS

1.03 HANDLING AND INSPECTION

1.03 SUBMITTALS

PART 2 - PRODUCTS

2.01 GENERALLY

2.02 DUCTILE IRON PIPE AND FITTINGS

2.03 POLYVINYL CHLORIDE PIPE AND FITTINGS (PVC)

2.04 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (HDPE)

2.05 PIPE COUPLINGS

2.06 FLANGED COUPLING ADAPTERS

2.07 GATE VALVES

2.08 PLUG VALVES

2.09 WET TAPPING SLEVES AND VALVES

2.10 SWING CHECK VALVES

2.11 SEWAGE AIR RELEASE VALVES

2.12 PRESSURE GAUGE ASSEMBLIES

2.13 SERVICE SADDLES, CORPORATION STOPS AND SAMPLING STATIONS

2.14 VALVE BOXES AND EXTENSIONS

2.15 ELECTRONIC MARKERS AND LOCATORS

2.16 LOCATION MARKING

2.17 MANHOLE GRADE RINGS

viii

2.18 MISCELLANEOUS ITEMS

PART 3 - EXECUTION

3.01 INSPECTION

3.02 GENERAL INSTALLATION REQUIREMENTS

3.03 TRACING WIRE

3.04 INSTALLATION OF DUCTILE IRON PIPE

3.05 INSTALLATION OF PVC PIPE

3.06 INSTALLATION OF HDPE PIPE

3.07 FITTINGS ON UNDERGROUND PIPING

3.08 THRUST BLOCKS

3.09 INSTALLATION OF VALVES

3.10 INSTALLATION OF VALVE AND METER VAULTS

3.11 MANHOLE RING ADJUSTMENT

3.12 CLEANING AND FLUSHING

3.13 TESTING

SECTION 02200 SITE PREPARATION

PART 1 – GENERAL

1.01 DESCRIPTION

PART 2 - PRODUCTS

PART 3 - EXECUTION

3.01 DEMOLITION

3.02 ASBESTOS CONTAINING MATERIAL

3.03 CLEARING AND GRUBBING

3.04 PRESERVATION OR REMOVAL OF TREES

SECTION 02240 DEWATERING

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 SUBMITTALS

1.03 PUMPING AND DRAINAGE

PART 2 – PRODUCTS

2.01 GENERAL

PART 3 - EXECUTION

SECTION 02300 EARTHWORK

ix

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 GENERALLY

1.03 APPLICABLE PUBLICATIONS

1.04 QUALITY ASSURANCE

1.05 FEDERAL AND STATE REGULATORY REQUIREMENTS

1.06 PRE-CONSTRUCTION SURVEY

1.06 SUBMITTALS

PART 2 – PRODUCTS

2.01 MATERIALS

PART 3 – EXECUTION

3.01 CLEARING AND GRUBBING

3.02 SHEETING, SHORING, AND BRACING

3.03 PUMPING AND DRAINAGE

3.04 EXCAVATION

3.05 OVERCUT AND UNDERCUT

3.06 STABILIZATION

3.07 FILL AND COMPACTION

3.08 TRENCH EXCAVATION

3.09 TESTS

3.10 DRAINAGE MAINTENANCE

3.11 FINAL GRADING

3.12 EXCESS EXCAVATED MATERIALS

3.13 SOIL SETTLEMENT

TABLE A – COMPACTION AND BACKFILL SCHEDULE FOR STRUCTURES

TABLE B – BACKFILL SCHEDULE FOR PIPING

SECTION 02500 EXISTING UTILITIES

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 CONSTRUCTION REQUIREMENTS

PART 2 – MATERIALS

2.01 MATERIALS FOR RECONSTRUCTION

2.02 TAPPING SLEEVES

x

2.03 TAPPING VALVES

PART 3 – EXECUTION

3.01 GENERAL

3.02 TAPPING SLEEVES AND VALVES

3.03 PUMPING AND DRAINAGE

3.04 BACKFILL AND COMPACTION

3.05 THRUST BLOCKS ON WATER LINES

SECTION 02950 SITE RESTORATION

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 CONSTRUCTION REQUIREMENTS

1.03 QUALITY CONTROL

PART 2 – PRODUCTS

2.01 SOD

PART 3 – EXECUTION

3.01 SODDING

3.02 LANDSCAPING AND TREES

3.03 PUMPING AND DRAINAGE

3.04 MAINTENACE PRIOR TO FINAL ACCEPTANCE

SECTION 03050 MISCELLANEOUS CONCRETE

PART 1 -- GENERAL

1.01 DESCRIPTION

PART 2 – PRODUCTS

2.01 MATERIALS

PART 3 – EXECUTION

3.01 GENERAL

3.02 EXPANSION JOINTS

3.03 CONTROL JOINTS

3.04 FINISHING

3.05 CURING

3.06 BACKFILL

3.07 THRUST BLOCKS

3.08 TESTING

xi

SECTION 03410 PRECAST CONCRETE

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 QUALITY ASSURANCE

1.03 SUBMITTALS

1.04 DELIVERY, STORAGE AND HANDLING

PART 2 – PRODUCTS

2.01 MATERIALS AND FABRICATION

PART 3 - EXECUTION

3.01 CONTROL JOINTS

SECTION 03600 GROUT

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 SUBMITTALS

PART 2 - PRODUCTS

2.01 APPLICATION

2.02 EPOXY ANCHOR GROUT

2.03 CEMENT-BASED GROUTS

2.04 PRESSURE GROUT

2.05 CURING MATERIALS

PART 3 – EXECUTION

3.01 GENERALLY

3.02 GROUTING PROCEDURES

SECTION 06820 FIBERGLASS LINERS {PRIVATE}

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 SUBMITTALS

1.03 CERTIFICATION

PART 2 - PRODUCTS

2.01 MATERIALS

PART 3 – EXECUTION

3.01 PREPARATION

3.02 INSTALLATION

xii

SECTION 09900 PAINTING

PART 1 – GENERAL

1.01 WORK INCLUDED

PART 2 - PRODUCTS

2.01 MATERIALS

PART 3 – EXECUTION

3.01 MATERIAL PREPARATION

3.02 APPLICATION

3.03 FIELD QUALITY CONTROL

SECTION 09980 CONCRETE COATINGS

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 SUBMITTALS

1.03 QUALITY ASSURANCE

1.04 SITE CONDITIONS

1.05 WARRANTY

PART 2 - PRODUCTS

2.01 COATING PRODUCTS

2.02 REPAIR AND RESURFACING PRODUCTS

PART 3 – EXECUTION

3.01 INITIAL EXAMINATION

3.02 SURFACE PREPARATION

3.03 APPLICATION OF COATING PRODUCTS

3.04 TESTING AND INSPECTION

SECTION 11300 SUBMERSIBLE PUMPS

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 SUBMITTALS

1.03 DELIVERY, STORAGE AND HANDLING

1.04 WARRANTY

PART 2 - PRODUCTS

2.01 EQUIPMENT

2.02 MATERIALS

xiii

PART 3 – EXECUTION

3.01 INSPECTION AND TESTING

SECTION 11320 DIESEL PUMPS

PART 1 – GENERAL

1.01 DESCRIPTION

1.02 SUBMITTALS

1.03 DELIVERY, STORAGE AND HANDLING

1.04 WARRANTY

PART 2 - PRODUCTS

2.01 EQUIPMENT

2.02 AUTOMATIC STARTING CONTROL SYSTEM

2.03 OPTIONS

PART 3 – EXECUTION

3.01 MANUFACTURERS SERVICE

3.02 TOOLS AND SPARE PARTS

Figure 1 – Sewer Service Connection Notes (US-10)

Figure 2 - Sewer Service Connection Details (US-11)

Figure 3 -Sewer Cleanout Detail (US-12)

Figure 4 - Traffic Bearing Sewer Clean-out (US-13)

Figure 5 -Private/Public Force main Transition (US-14)

Figure 6 - In Ground Air Release Valve Vault Detail (US-15)

Figure 7 -Above Ground Air Release Valve Detail (US-16)

Figure 8 - Grease Interceptor Detail (US-17)

Figure 9 - General Manhole Notes (US-20 Page 1 of 2)

Figure 10 - General Manhole Notes (US-20 Page 2 of 2)

Figure 11 - Concentric Manhole Detail (US-21)

Figure 12 - Eccentric Manhole Detail (US-22)

Figure 13 - Single Interior Drop Manhole Detail (US-23)

Figure 14 - Double Interior Drop Manhole Detail (US-24)

Figure 15 - Conflict Manhole Detail (US-25)

Figure 16 - Dog House Manhole Detail (US-26)

Figure 17 - AS Legacy Manhole Cover Detail (US-27)

Figure 18 - Manhole Inverts Detail (US-28) xiv

Figure 19 - Lift Station Notes (US-30)

Figure 20 - Lift Station Profile View Detail (US-31 Page 1 of 3)

Figure 21 - Tremie Wet Well Installation Detail (US-31 Page 2 of 3)

Figure 22 - Tremie & Wet Well Causes for Rejection Notes (US-31 Page 3 of 3)

Figure 23 - Lift Station Plan View Detail (US-32-ALL Page 1 of 3)

Figure 24 - Lift Station Plan View Detail (US-32-ALL Page 2 of 3)

Figure 25 - Lift Station Section View Detail (US-32-ALL Page 3 of 3)

Figure 26 - Lift Station Above Ground Valving Detail (US-33)

Figure 27 - Lift Station Valve Vault Detail (US-34)

Figure 28 - Lift Station Control Panel Detail (US-35 Page 1 of 2 / Elec-10-ALL)

Figure 29 - Lift Station Control Panel Detail (US-35 Page 2 of 2 / Elec-11-ALL)

Figure 30 - 30' Maximum Height Telemetry Mast Detail (US-36)

Figure 31 - Telemetry RTU Detail (US-37)

Figure 32 - 45' Maximum Height Telemetry Mast Detail (US-38)

Figure 33 - Wet Well Pipe Bracing Detail (US-39)

Figure 34 - Water Service General Notes (US-40)

Figure 35 - Water Service Section View Detail (US-41)

Figure 36 - Water Service Plan View Detail (US-42)

Figure 37 - Fire Hydrant Assembly Detail (US-43)

Figure 38 - Blow Off Detail (US-44)

Figure 39 - Temporary Jumper Connection Detail (US-45)

Figure 40 - 3/4" to 2" Backflow Preventer Detail (US-46)

Figure 41 - Backflow Preventer with Meter for Fire Services 3" to 8" Detail (US-47)

Figure 42 - Reclaimed Water Service General Notes (US-50)

Figure 43 - Reclaimed Water Service Section View Detail (US-51)

Figure 44 - Reclaimed Water Service Plan View Detail (US-52)

Figure 45 - Reclaimed Water Sign Detail (US-53)

Figure 46 - Reclaimed Water Service Connection Detail (US-54)

Figure 47 - Pipe Separation Detail (US-60)

Figure 48 - PVC Pipe Restraint Table Detail (US-61)

Figure 49 - Ductile Iron Pipe Restraint Table Detail (US-62)

Figure 50 - Roadway Open Cut Detail (US-63)

Figure 51 - Utility Crossing Detail (US-64) xv

Figure 52 - Vertical Pipe Deflection Detail (US-65)

Figure 53 - Concrete Support Cradle Detail (US-66)

Figure 54 - Valve Box Detail (US-67)

Figure 55 - Subaqueous / Ditch Crossing Detail (US-68)

Figure 56 - Utility Main Crossing Sign Detail (US-69)

Figure 57 - Casing Installation Detail (US-70)

Figure 58 - Aerial Crossing Fan Guard Detail (US-71)

Figure 59 - Aerial Canal Crossing Detail (US-72)

Figure 60 - Bollard Detail (US-73)

Figure 61 - Utility Marker Detail (US-74)

Appendix A – BCUSD Details .................................................................................................................. i

US-10 Sewer Service Connection Notes ............................................................................................ i

US-11 Sewer Service Connection .......................................................................................................ii

US-12 Sewer Cleanout ...................................................................................................................... iii

US-13 Traffic Bearing Sewer Clean-out ............................................................................................. iv

US-14 Private/Public Forcemain Transition ....................................................................................... v

US-15 In-Ground Air Release Valve Vault ......................................................................................... vi

US-16 Above Ground Air Release Valve ........................................................................................... vii

US-17 Grease Interceptor ............................................................................................................... viii

US-20 Page 1 of 2 - General Manhole Notes ..................................................................................... x

US-20 Page 2 of 2 - General Manhole Notes ................................................................................... xii

US-21 - Concentric Manhole ........................................................................................................... xiii

US-22 – Eccentric Manhole ............................................................................................................. xiv

US-23 – Single Interior Drop Manhole ............................................................................................. xv

US-24 - Double Interior Drop Manhole........................................................................................... xvi

US-25 – Conflict Manhole .............................................................................................................. xvii

US-26 – Dog House Manhole ........................................................................................................ xviii

US-27 - AS Legacy Manhole Cover .................................................................................................. xix

US-28 - Manhole Inverts .................................................................................................................. xx

US-30 - Lift Station Notes ................................................................................................................ xxi

US-31 Page 1 of 3 - Lift Station Profile View ................................................................................. xxiii

US-31 Page 2 of 3 - Tremie Wet Well Installation Detail .............................................................. xxiv

US-31 Page 3 of 3 - Tremie & Wet Well Causes for Rejection Notes ............................................ xxv xvi

US-32-ALL Page 1 of 3 - Lift Station Plan View .............................................................................. xxvi

US-32-ALL Page 2 of 3 Lift Station Plan View ............................................................................... xxvii

US-32-ALL Page 3 of 3 Lift Station Section View ......................................................................... xxviii

US-33 Lift Station Above Ground Valving ..................................................................................... xxix

US-34 Lift Station Valve Vault ........................................................................................................ xxx

US-35 Page 1 of 2 (Elec-10-ALL) Lift Station Control Panel .......................................................... xxxi

US-35 Page 2 of 2 (Elec-11-ALL) Lift Station Control Panel ......................................................... xxxii

US-36 Telemetry Mast 30’ Maximum Height ............................................................................. xxxiii

US-37 Telemetry RTU .................................................................................................................. xxxiv

US-38 Telemetry Mast 45’ Maximum Height .............................................................................. xxxv

US-39 Wet Well Pipe Bracing Detail ........................................................................................... xxxvi

US-40 Water Service General Notes ...........................................................................................xxxvii

US-41 Water Service Section View ............................................................................................ xxxviii

US-42 Water Service Plan View ...................................................................................................xxxix

US-43 Fire Hydrant Assembly ........................................................................................................... xl

US-44 Blow Off Detail ...................................................................................................................... xli

US-45 Temporary Jumper Connection ............................................................................................ xlii

US-46 Backflow Preventer 3/4" – 2” .............................................................................................. xliii

US-47 Backflow Preventer with Meter for Fire Services 3”-8” ...................................................... xliv

US-50 Reclaimed Water Service General Notes ............................................................................. xlv

US-51 Reclaimed Water Service Section View ............................................................................... xlvi

US-52 Reclaimed Water Service Plan View ................................................................................... xlvii

US-53 Reclaimed Water Sign ....................................................................................................... xlviii

US-54 Reclaimed Water Service Connection ..................................................................................... l

US-60 Pipe Separation .......................................................................................................................li

US-61 Restraint Table PVC Pipe ....................................................................................................... liv

US-62 Restraint Table Ductile Iron Pipe ............................................................................................ lv

US-63 Open Cut – Roadway ............................................................................................................ lvii

US-64 Utility Crossing ..................................................................................................................... lviii

US-65 Vertical Pipe Deflection ......................................................................................................... lix

US-66 Concrete Support Cradle ........................................................................................................ lx

US-67 Valve Box ............................................................................................................................... lxi

US-68 Subaqueous / Ditch Crossing ................................................................................................ lxii xvii

US-69 Utility Main Crossing Sign .................................................................................................... lxiii

US-70 Casing Installation ............................................................................................................... lxiv

US-71 Aerial Crossing Fan Guard .................................................................................................... lxv

US-72 Aerial Canal Crossing ........................................................................................................... lxvi

US-73 Bollard Detail ...................................................................................................................... lxvii

US-74 Utility Markers ................................................................................................................... lxviii

APPROVED MANUFACTURERS AND PRODUCTS

WASTEWATER SERVICE MATERIALS

Adhesive Marking Tape

Air Release and Vacuum Valves

Casing Spacers

Check Valves

Concrete coatings (Spray On Liners)

Drop Bowls

Ductile Iron Fittings

Ductile Iron Pipe

Ductile Iron Pipe Lining

Electronic Markers

Fiberglass Liners

Gate Valves- Resilient Wedge

HDPE Liners for Wet Wells

HDPE Pipe

Joint Sealing Compound

Joint Restraints

Manhole Coatings

Manhole Exterior Shrink

Manhole Adjustment Rings - Concrete

Manhole Adjustmnent Rings - HDPE

Non-Shrink Grout

Pipe Couplings

Plug Valves

PVC Fittings

PVC Pipe - Force Main Integral Bell xviii

PVC Pipe - Gravity Main Integral Bell

Resilient Connectors

Substrate Patching Material

Stainless Ball Valve

Tapping Saddle

Tapping Sleeves

Tracer Wire

Traffic Bearing Clean Out

Valve Boxes

Valve Extensions

LIFT STATION MATERIALS

Access Frames and Covers

Drop Bowls

Fall Protection

Float Regulators

Pressure Gauges

Pressure Transducers

Pressure Transducer Hanger

Submersible Pumps

WATER SERVICE MATERIALS

Adhesive Marking Tape

Backflow Prevention

Ball Valves

Casing Spacers

Corporation Stops

Curb Stops

Ductile Iron Fittings

Ductile Iron Pipe (cement lined)

Electronic Markers

Fire Hydrants

Gate Valves (Resilient Wedge)

HDPE Pipe

Joint Restraints xix

Meter Boxes

Meter, Fire Services

Polyethylene Tubing

Pipe Couplings

PVC Pipe, Integral Bell

Service Saddles

Tapping Sleeves

RECLAIMED WATER SERVICE MATERIALS

Adhesive Marking Tape

Casing Spacers

Corporation Stops

Curb Stops

Ductile Iron Fittings

Ductile Iron Pipe

Electronic Markers

Gate Valves- Resilient Wedge

Hose Bibb Lockable Box

HDPE Pipe

Joint Restraints

Meter Box

Polyethylene Tubing

Pipe Couplings

PVC Pipe - Integral Bell

Service Saddles

Tapping Sleeves

Tracer Wire

Valve Boxes

Valve Extensions

Cross Reference

GENERAL INFORMATION

SANITARY SEWERAGE SYSTEM

WATER SYSTEM

RECLAIMED WATER SYSTEM

xx

Cross Reference

GENERAL INFORMATION

SANITARY SEWERAGE SYSTEM

WATER SYSTEM

RECLAIMED WATER SYSTEM

DEFINITIONS AND ABBREVIATIONS

Within the context of this document, the terms and abbreviations below have the following meanings:

Contractor - A constructor of water, wastewater, and reclaimed water utilities.

County - The Brevard County Government Criteria - (see STANDARDS) Engineer (or Design Engineer) - A developer's engineer or the Utility's design engineering consultant, as the case may be, who is the engineer of record for the utility design or construction project.

Developer - An owner or developer of real estate proposing water or wastewater utility construction.

Facility - Water, wastewater, or reclaimed water pipeline, structure, or appurtenance.

Inspector - The Brevard County Utility Services utility construction inspector.

Proponent - A person or entity advancing or advocating the proposal or project.

Standards - The engineering and construction standards that comprise the Criteria for Water and Sanitary Sewerage Systems Within Brevard County, most recent edition.

Utility (the Utility or Utility Services) - Brevard County Utility Services Work (the Work) - Any of the items that comprise the construction of a water, wastewater, or reclaimed water utility project.

AASHTO - American Association of State Highway and Transportation Officials ANSI - American National Standards Institute ASTM - American Society for Testing and Materials AWWA - American Water Works Association C-Factor - Hazen-Williams equation pipe friction factor DIP - Ductile Iron Pipe DR - Dimension Ratio EPA - United States Environmental Protection Agency FAC - Florida Administrative Code FDEP - Florida Department of Environmental Protection FDOT - Florida Department of Transportation HDPE - High Density Polyethylene NAVD88 - North American Vertical Datum of 1988 OSHA - United States Occupational Safety and Health Administration PSI - Pounds per Square Inch PVC - Polyvinyl Chloride SRF - State Revolving Funds

1 POLICY AND ADMINISTRATION

1.1 GENERAL

1.1.1 PURPOSE

Section 110-180 of the Brevard County Code states, “It is hereby declared that public ownership of all water and sewerage systems in the County is in the public interest and that the furnishing of water and sewerage service by publicly owned utilities is in the public interest.”

The authority for these standards is provided for in Section 110-184 of the Brevard County Code. Applicable State and federal laws and regulations shall be adhered to concurrently with these standards. When laws or regulations are conflicting, the most restrictive requirement shall be followed.

The objective of these standards is to create durable and economically maintainable public utility systems.

The information in this document is available on-line at the following website:

www.brevardcounty.us/utilityservices.

1.1.2 MINIMUM STANDARDS

This document sets forth the minimum standards applicable to utility construction projects and is intended to provide a basis for the design and construction of water and wastewater facilities within Brevard County as follows:

1. Facilities owned and operated by Brevard County, or

2. Facilities connecting to Brevard County utility systems.

1.1.3 DEVIATIONS

Any deviation from these standards must be approved in writing by the Utility Services Department Director before construction plans can be approved.

1.1.4 PRIVATELY OWNED SYSTEMS

A privately-owned utility system connecting to a County maintained system shall conform to these standards. Privately owned systems are not permitted for residential subdivisions or properties that have the potential to be subdivided in the future. Proposals for privately owned systems must be approved by the Utility Services Department Director prior to construction plan review.

1.1.5 CONFORMANCE TO MASTER PLAN

Developer constructed wastewater collection and transmission systems, water distribution systems, and reclaimed water distribution systems shall conform to master plans for system extensions proposed by Brevard County Utility Services.

1.1.6 SURVEY

The Design Engineer should strive to design utility systems to avoid occupying points that are important for surveying, such as points of intersection, curvature, or tangency.

1.1.7 DRAWING SIZE

All drawings shall be submitted on 24” x 36” sheets of paper, or if delivered electronically, formatted to be viewed in scale on 24" x 36" format. Electronic format (pdf) submittal is encouraged in lieu of paper format for review purposes. Drawings shall be of true scale when submitted for review. Reduced drawings are not acceptable for review.

1.1.8 PLAN AND PROFILE

Construction drawings for site plans and subdivisions shall include plan and profile of the proposed utilities, including gravity sewer, force mains, reclaimed water lines, and potable water lines. Plan and profile shall be on the same sheet, show all other utilities that may conflict with the proposed construction, and shall be formatted so the plan is aligned with the profile. The plan and profile sheets shall have a horizontal scale no smaller than 1” =60’ and have a horizontal to vertical scale ratio of 10:1.

1.1.9 SIGNATURES

All drawings, excluding record drawings, and calculations submitted for review and approval shall be signed, sealed and dated by an engineer registered in the State of Florida. Record drawings shall be certified by an engineer registered in the State of Florida.

1.1.10 MASTER UTILITY PLAN

A master utility plan shall be included in the construction drawings for all projects. The master utilities plan shall be on one sheet, shall show existing and proposed water, sewer, reclaimed water, and storm sewer; and shall clearly show connections to existing systems.

All phases of a phased development shall be shown.

1.1.11 CALCULATIONS

The Design Engineer shall provide calculations demonstrating the adequacy of the existing and proposed utility systems in a manner that is clear and convincing.

1.1.12 CONSTRUCTION PLAN APPROVAL

Approval of construction plans by Utility Services is valid for a period of one year, beginning when permit applications and drawings are forwarded to the Florida Department of Environmental Protection for approval. If construction is not started within one year, Utility Services retains the right to require compliance with the version of these standards in effect at the time an extension of the approval is requested. This requirement shall apply to currently approved projects.

1.1.13 PHASED DEVELOPMENTS

When a development is to be constructed in phases, each phase must be applied for, permitted, and cleared separately by the Florida Department of Environmental Protection.

1.1.14 UPGRADES TO EXISTING SYSTEMS

If the Utility has determined that a proposed development will overload existing systems, or is inconsistent with established master plans, the Developer shall pay for improvements to the existing systems to assure adequate additional capacity for the proposed development and compliance with established master plans.

1.1.15 PIPE SEPARATION

Minimum pipe separations are set forth in US-60

1.1.16 LANDSCAPING

Trees must be planted a minimum 10-foot offset from all utility mains

1.2 EASEMENTS, RIGHTS OF WAY AND PERMITS

1.2.1 GENERAL

Whenever possible, utility lines shall be located within road rights-of-way or utility easements immediately adjacent to road rights-of-way.

1.2.2 EASEMENT WIDTH

Easements of sufficient width are required to guarantee that permanent or semi-permanent non-utility structures are not placed close to a facility or main. The easement shall allow unhindered access to all such facilities and mains. Easements adjacent to and parallel with rights-of-ways shall have a minimum width of 10-feet. For single lines in open areas and for lines running on side property lines of subdivisions, the minimum width shall be 15 feet for lines up to 7 feet deep measured from the finished grade to the bottom of the pipe or two times the excavated depth rounded up to the next five-foot interval, whichever is greater. The width is based on the utility being located in the center of the easement. A wider easement may be required when utilities are not centered within the easement or when more than one line is in the same easement. Utility Services reserves the right to require wider easements for access where it deems necessary.

1.2.3 COUNTY RIGHT-OF-WAY PERMITS

Right-of-way permits are required for work within public rights-of-way. The Contractor is responsible for obtaining these permits from Brevard County Public Works Department.

Copies of permits must be submitted to Utility Services prior to the start of construction.

1.2.4 FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) RIGHT-OF-WAY PERMITS

Right-of-way permits are required for work within Florida Department of Transportation (FDOT) rights-of-way. In addition to an FDOT permit, a performance bond is required by Utility Services, prior to the preconstruction conference, in the amount of 125% of the value of the work to be performed within the FDOT right-of-way.

1.2.5 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS

Copies of Florida Department of Environmental Protection (FDEP) permits shall be submitted to Utility Services prior to construction.

1.3 CONSTRUCTION DOCUMENTS

1.3.1 SPECIFICATIONS AND DRAWINGS

The Work shall be completed according to the intention of the design engineer as reflected in the drawings and specifications. The Work exhibited in one but not the other shall be executed as if it had been set forth in both.

1.3.2 DIMENSIONS

Drawings are not intended to be scaled for dimensions. If dimensions are not shown, the Contractor shall request them from the Design Engineer.

1.3.3 EXISTING UTILITIES

Existing utility lines shall have been located from available information furnished by the Utility and from additional site investigation. Such obstructions are to be shown for the purpose of advising the Contractor that they may interfere with the work to be done, but not for the purpose of indicating that the work can be performed without such interference.

It shall be the responsibility of the Design Engineer to secure proper existing utility information, and prepare drawings in accordance with these standards.

1.3.4 SHOP DRAWINGS

Details and shop drawings for products and materials to be used in the utility construction shall be first submitted to the Design Engineer and then to the Utility for review prior to construction. The Utility will accept shop drawings only after they are stamped approved by both the Contractor and the Design Engineer. Electronic submittals in pdf format are acceptable. Two stamped copies shall be sent to Utility Services. Products that are not manufactured and installed in strict compliance with approved shop drawings and specifications will be rejected.

1.4 METHODS AND MATERIALS

1.4.1 PROOF OF CONFORMANCE AND ALTERNATIVE ITEMS

When a material is specified by brand or “approved equal”, an alternate material may be submitted for consideration by Utility Services. Proof of conformity is the Proponent’s responsibility. “Equal” items may be used only if approved by the Proponent’s Engineer and Utility Services.

1.4.2 MEANS AND METHODS

The means and methods used by a Contractor shall conform to generally accepted standards for underground utility construction.

1.4.3 DEFECTIVE MATERIALS AND WORKMANSHIP

The Contractor shall repair any damage or leaks caused by defective materials or workmanship during the period of the maintenance bond.

1.4.4 SPECIAL MATERIALS

Utility Services reserves the right to mandate certain materials to be used where deemed necessary. Special materials will be specified during the review process when possible. The Utility intends to allow PVC, HDPE, or ductile iron pipe for construction of potable water, reclaimed water, and force mains 4 inches in diameter to 12 inches in diameter. Potable water, Reclaimed water and Sanitary Sewer Force Mains larger than 12 inches in diameter shall be ductile iron.

1.4.5 CASTINGS

Castings for valves, vaults, manholes and other appurtenances shall conform to, and shall be tested in accordance with the specifications for Gray Cast Iron, ANSI/ASTM A48, Class 30 and meet FDOT specifications where applicable. Castings that are to be located within a dedicated public right-of-way, or any other location subject to vehicular traffic, shall have all bearing surfaces machined so that the fitting parts will not rattle or rock under traffic. All castings shall be subject to a hammer test before installation.

1.4.6 PRE-CONSTRUCTION MEETING

Construction shall not start until a pre-construction meeting has been conducted with Utility Services’ staff.

1.4.7 OMISSIONS

Should anything be omitted from the specifications and drawings that is necessary for a clear understanding of the work, or should it appear that instructions are in conflict, the Contractor shall request written instructions from the Design Engineer before proceeding with the construction affected by such omissions or discrepancies.

1.4.8 CHANGES

Changes shall not be made to finally-approved drawings without the approval of Utility Services.

1.4.9 MONUMENT PRESERVATION

Property corners and survey monuments shall be preserved using care not to disturb or destroy them. If a property corner or survey monument is disturbed or destroyed during construction, whether intentionally or unintentionally, or is required to be disturbed or destroyed by the construction work, said property corner or survey monument shall be restored by a land surveyor registered in the State of Florida. All costs for this work shall be paid for by the Contractor.

1.5 PROTECTION OF THE PUBLIC

1.5.1 BARRICADES, GUARDS, AND SAFETY PROVISIONS

The Contractor shall be solely responsible for adhering to the rules and regulations of the Occupational Safety and Health Administration (OSHA), the Trench Safety Act, and appropriate authorities regarding safety provisions. Adequate barricades, construction signs, lights, and guards as required shall be placed and mai

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .