Attachment B - 12-months of Leachate Hauling.pdf
PDF 107 KB Posted
- Solicitation number
- CRFQ 0313 DEP2000000003 2
- Issued by
- Wayne County, West Virginia
About this file
This is a Scope of Work document for leachate hauling services for a 12-month period. The document outlines the requirement for transporting leachate—the liquid that percolates through solid waste in landfills—from a specified facility to an approved disposal location. The service involves regular scheduled pickups and transportation of leachate in appropriate tanker trucks, with the contractor responsible for ensuring compliance with all environmental regulations and safety standards. The contractor must maintain documentation of all hauling activities, including volume measurements, disposal locations, and dates of service. The 12-month contract period begins upon execution and may be subject to renewal options at the discretion of the contracting agency.
The pricing structure for this service is based on a per-gallon or per-load fee, with the contractor required to submit detailed pricing proposals that include all associated costs for transportation, disposal fees, and administrative overhead. The contractor must carry appropriate insurance coverage and maintain valid permits for hazardous waste transportation and disposal. The incumbent contractor information and specific funding sources should be verified with the contracting agency, as this document serves as the technical specification for the leachate hauling service requirement. All hauling operations must be performed in accordance with local, state, and federal environmental protection standards and regulations governing waste disposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .