About this file
This specification sheet details the construction and material requirements for a modular Blazer PM office building measuring 144 feet by 60 feet, designed for the Portland Air National Guard in Portland, Oregon. The facility is classified as an office/ADA-compliant structure with a transverse roof and will be installed on a provided foundation. The building includes a steel frame with 12 modules (each 11 feet 8 inches by 60 feet), a floor system with R30 insulation and plywood decking, 2x6 exterior wall framing at 128 inches height with R21 insulation, and a roof structure featuring 2x8 rafters with cellulose blow-in insulation (R24) and rigid insulation (R17). The exterior finish specifies LP SmartSide Panel T1-11 siding with finger-jointed cedar trim and fascia, 60 mil TPO roofing, and includes skirting with aluminum vents. The building incorporates four restrooms equipped with ADA-compliant fixtures, a break area with 40 linear feet of cabinets, and comprehensive mechanical, electrical, and plumbing systems.
The specification includes twelve Bard 2.5-ton heat pumps with 10 kilowatt electric resistance and economizers rated at 11 EER, accompanied by supply and return plenums, insulated flexduct, and remote temperature sensors. Plumbing provisions include ADA-compliant toilets, urinals, lavatories, a commercial sink, two electric tankless water heaters, a six-gallon energy-saver water heater, and one barrier-free drinking fountain. Electrical service comprises 120/240-volt single-phase power with twelve 125-amp weather-proof panels, 130 standard duplex receptacles, multiple GFCI-protected outlets, 40 automated wall switches, and 67 LED troffer fixtures with 6000 lumens and occupancy sensors. The specification includes a wet-system sprinkler installation per NFPA 13 for light hazard classification, with crossover unions and on-site testing performed by Western States Sprinkler. The specification excludes backflow devices, fire department connections, under-floor/exterior piping, electrical and fire alarm work, and notes that prevailing wage requirements are not included in the Blazer estimate.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION SHEET
Bidspec Blazer PM
Date: Size: 144x60 Floor:
Customer: Sabala Management Description: Office/ADARR Wind:
Location: Portland, Oregon Mobile Roof:
Project: Portland Air National Guard Insignias: Oregon
Install insignias on exterior of building as shown on A-3
MBI Seals - One per Module
FOUNDATION
Block and level - Provided and installed on site by others - Tie down straps provided and installed by others
STEEL FRAME
Size: (12) 11'-8" x 60'-0"
Type: Blazer built frame (no outriggers - Full width front and rear crossmembers)
Main Rail: W10 x 12
Axles: 4 or 5-Brake with 8:00x14.5 - 14 ply tires as required per engineering
Hitch: Detachable
FLOOR SYSTEM
Joists: 2x8 @ 16" oc
Rims: Single LVL 7-1/8"
Frame Openings For: (2) Floor Drains
Bottom Board: Class "A" woven polyethylene fabric
Insulation: R30 - Use two layers of R15 unfaced fiberglass batt
Decking (1st): 23/32" (3/4") APA rated Sturd-I-Floor T&G – Glued and Nailed - PointSIX (turquoise edge)
Decking (2nd): 1/4" Plywood Underlayment in Restrooms only
WALL FRAMING
Framing (Exterior): 2x6 @ 16" oc - Height = 128"
Framing (Interior): 2x4 @ 16" oc - Plumbing walls to be 2x6 or 2x8 - Double walls at mod line - Height = 114-1/2"
Plenum Wall: (12) Standard for sound reduction - Insulate stud wall - Shaft to be lined with 5/8" sheetrock
Columns/Posts: Wood end columns with wood and steel posts built into interior walls - Exposed posts in Common Area
ROOF STRUCTURE
Style: Transverse - Roof pitch = 1/4 / 12
Framing: 2x8 Rafters @ 16" oc
Bottom cover: Class "A" woven polyethylene fabric
Modline Beams: Single or Double LVL 1-1/2" x 24" - Double Taper Cut - As required per engineering
Rims: Single LVL 1-1/2" x 14-3/4" - Double Taper Cut
Insulation: Cellulose blow in between rafters (R24) with two layers 1-1/2" rigid (R17) on top of roof framing
Sheathing: 3/4" CDX plywood
Roof Overhang: None
Venting: None
DESIGN LOADS:
120/B
8/11/2026
SPEC-E5808-144x60 Portland Air National Guard (2026 0811) Page 1 of 6 8/11/2026
Blazer PM
EXTERIOR WALL FINISH
Insulation (Exterior): R21 unfaced fiberglass batt
Moisture protection: Wrap lower 12" of building with Moistop - Wrap building with Tyvek building wrap
Siding: 76 Series LP SmartSide Panel T1-11 with grooves 8" oc - 4x10
Trims: Corners: 1x4 Finger Jointed Cedar - 2" x 2" galvanized flashing installed over siding and under corners
Mod line: 1x4 Finger Jointed Cedar - Ship loose to be installed on site by others
Fascia: 1x6 Finger Jointed Cedar - Furred out 1-1/2" on all four sides
Door: 1x4 Finger Jointed Cedar
Window: 1x4 Finger Jointed Cedar
Z flashings: 1/2" at bottom of siding and at siding break - 2" back leg and 3/4" front leg
Skirting: Ship loose (34) 4' x 9' pieces of 7/16" LP SmartSide Panel T1-11 with grooves 8" oc with
(4) corners and (58) 16" x 8" Aluminum vents
ROOFING
Cover: 60 mil TPO Carlisle Sure-Weld - Fully Adhered to 1/2" Securock
NOTES: Termination bar installed on perimeter
Ship loose TPO tape for mod line close up
Drainage: Gutters and downspouts - Provided and installed on site
DOORS
QTY
1 3 PAINT
TEXTURED
2 4 VW OAK
3 27 VW OAK
4 2 VW OAK
DOOR TYPE: HM = 18 ga. Insulated Steel door
GALV = Galvanized
SV = Solid core Vinyl wrap (1-3/4" thick)
JAMB: WELDED = 16 ga. Welded Steel Jamb - Weather-stripping, ADA Threshold and Sweep
TM = Timely Jamb - 47S
HARDWARE: ALL DOOR HARDWARE TO HAVE SATIN CHROME / ALUMINUM TYPE FINISH
Key exterior and Common Room doors alike - Provide 2 keys per lock
Door Pull Plate - 4x16 Trimco 1017-3 32D
Push Plate - 4x16 Trimco 1001-3-630
Kick Plate - SS 10x34 - Trimco K0050
Drip Rail 40" Aluminum - Pemko 346C-40 - On all Exterior Doors
NOTE: PROVIDE WALL BUMPERS FOR INTERIOR DOORS
NRP CYPHER LOCK 180 degree
3'x6'8" SV TM BBH NONE
EXT/INT LOCK CLOSERDOOR
FINISH
SIZE DOOR TYPE JAMB HINGES
LITE OPEN DEG
TM STD HAGER 3510
PASSAGE
HM/GALV WELDED SS-BBH SCHLAGE LCN 1461EXT 3'x6'8"
24"x32"
PUSH/PULL
KICK PLATE
INT 3'x6'8" SV
INT 3'x6'8" SV TM STD SCHLAGE
CYPHER LOCK
LCN 1461
180 degree
INT
SPEC-E5808-144x60 Portland Air National Guard (2026 0811) Page 2 of 6 8/11/2026
Blazer PM
WINDOWS
QTY GLAZING FINISH
1 12 DUAL WHITE ARGON
LOW E VINYL GAS
2 8 DUAL WHITE ARGON
LOW E VINYL GAS
NOTE: GALVANIZED FLASHING INSTALLED UNDER SIDING AND OVER TOP FLANGE OF WINDOWS UNDER TRIM
FLOOR COVER
Restrooms: Tarkett Performa sheet vinyl
Base: 4" rubber
All Else: Provided and installed on site by others
Base: Provided and installed on site by others
WALL COVER
Insulation (Interior): Unfaced fiberglass batt insulation at Restroom walls to ceiling height
Unfaced fiberglass batt insulation at plenum walls to ceiling height
NOTES: R15 (2x4 walls) R21 (2x6 walls) Double R15 (2x8 walls)unfaced fiberglass batt insulation
Insulate one side of double modline walls only
Restrooms: Class C - .090 FRP "Textured" wainscot on all walls to 48" AFF with 5/8" vinyl wrap sheetrock above
NOTE: FRP wainscot installed behind and beside drinking fountain to 48" AFF
All Else: 5/8" Vinyl wrap sheetrock
CEILING
Entire Building: 2'x4' T-bar grid and tile - Armstrong "Cortega" #769A
Ceiling Height: 9'-6" AFF
INTERIOR TRIM
Wainscot: Aluminum inside corners and seam battens with vinyl wrap batts at top
Wall: Vinyl wrap corners and batts at each side of windows and doors
Window: Vinyl wrap Oak surrounds and casing
Door (Exterior): Vinyl wrap Oak surrounds and casing
Door (Interior): Vinyl wrap Oak wood doors with metal "Timely" jambs and casing
Door on dbl modlines: Vinyl wrap sheetrock surrounds with vinyl wrap corners and batts
Modline Joints: Vinyl wrap batts - Provided by Blazer - Installed on site by others
PAINT
Exterior Siding/Trims: Miller "Evolution" Exterior (satin)
Exterior Doors: Miller "Acrimax" (satin)
WASHROOM ACCESSORIES
Toilet Tissue: (4) Double roll Bobrick B-2740
Mirror: (4) 18" wide x 30" high - Framed Glass Bobrick B-165-1830
Grab Bars: (2) 18", (2) 36" and (2) 42" Bobrick B-6806 Series
Toilet Partitions: (4) Metal - Powder Coated - Floor Mounted
Signs - Restroom: (1) Plastic - (1) Men's with Braille Donjo HS-9070-01
(1) Plastic - (1) Women's with Braille Donjo HS-9070-05
SLIDER
3'x4' PRIME SINGLE HUNG
BRAND TYPE
EXT 4'x4' PRIME
9000 SLIDER
EXT
EXT/INT SIZE
W x H
HORIZONTAL
VERTICAL
SPEC-E5808-144x60 Portland Air National Guard (2026 0811) Page 3 of 6 8/11/2026
SPECIALITIES
Signs - Exit: (3) 6" wide x 6" high - Plastic Exit Sign with Braille Donjo HS-9070-35
To Exit: (4) 6" wide x 6" high - Plastic "To Exit" with Braille Donjo
CABINETS
Type: Plastic laminate - Wilsonart
Brand/Style: Cascade Casework
Break Area: 21 LF of base and 19 LF of uppers
Countertop: Wilsonart plastic laminate countertop, backsplash and front edge
NOTE: 24" water heater cabinet has No floor
APPLIANCES
Refrigerator: (1) Rough-in only by Blazer
NOTE: Refrigerator provided and installed on site
HVAC
Comb Heat/AC: (12) Bard wall hung Heat Pumps - 2.5 ton 10 kw with Economizers - 11 EER W30HB-A10xP4xxR
Filter: MERV 8
Plenums: (12) Supply Plenums Model #PWS132
(12) Return Plenums Model #PWR113
Supply Ducting: Round galvanized overhead and insulated flexduct with flexduct isolation sleeves and flow controls at wyes - R4 insulated flexduct
Return Ducting: Overhead - R4 insulated flexduct
Diffuser: 24"x24" T-bar with no dampers
Thermostat: (5) Programmable - Bard #8403-060
Indoor Temp. Sensor: (6) Remote Indoor Temperature Sensor - Bard #8403-062
Outdoor Temp. Sensor: Installed in each HVAC unit from factory
HVAC Relay Box: (2) HVAC Relay Box for (3) Units
(1) HVAC Relay Box for (4) Units
Return Air: Thru return air grills in ceiling ducted back to plenum walls
Outside Air: As required to meet Indoor Ventilation Code
NOTE: Balancing on site
Provide: (10) HVAC Duct Smoke Detector Air Products and Control Inc SL-2000-P
(10) Firex Sampling Tube 2.5'-5' APC STN 5.0
NOTE: Duct smoke detectors installed at return or supply plenums
Exhaust Fan: (3) S110-130-150 CFM - Switched with light in Restroom Fantech 484315
NOTE: Exhaust fans ducted through roof with galvanized 6" hard duct
SPEC-E5808-144x60 Portland Air National Guard (2026 0811) Page 4 of 6 8/11/2026
PLUMBING
Toilet - ADA: (2) ADA Height, Elongated Bowl, Pressure Assist Gerber UF-21-377
Toilet - Standard: (2) Standard Height, Elongated Bowl, Pressure Assist Gerber UL21-372
Urinal - ADA: (1) ADA Height, Siphon Jet, Top Spud Gerber HE27-710
Flush Valve: (1) 1.0/ 1.5/ 0.5/ 0.125/ 0.25 Gallon Flush Cycle, ADA Handle Sloan 186-0.5-XL
Lavatory: (4) 19" x 17" Wall Hung, One Piece Wall Hanger 4" center 3 hole Proflo PF5414WH
Faucet: (4) Ceramic Disc, Hot Limit Stop, ADA Lever Handle A/S 7385.050.002
Sink: (1) 33" x 19" Stainless Steel, Double Compartment Dayton D233193
Faucet: (1) Ceramic Disc, ADA Single Handle, Swing Spout A/S 7074.000.002
Water Heaters: (2) Electric Tankless Water Heater 240V - 7.2kw Stiebel DHC-E 8/10
(1) 6 Gallon, 120 Volts, 1650 Watts, Energy Saver AO Smith EJC-6
NOTES: Tankless Water Heaters mounted on wall in Restrooms below Lavatories
6 gallon Water Heater mounted on floor in Base Cabinet
Floor Drain: (2) PVC Body, Polished Nickel Ring and Grate S8222PNR
Trap Primer: (2) Automatically Activated at Pressure Drops Proflo PFTP2500
Arrestors: (1) Maintenance-Free, Brass Body, Piston Type Sioux Chief 654-CS
Drinking Fountain: (1) Barrier-Free, Split-Level, ADA Pads, Cooled with bottle filler Elkay ELZSTL8WSLP
Ice Maker Outlet Box: (1) 1/4 Turn Valves, 6" x 6" Plastic Body and Faceplate Oatey 39152
Water Lines: Copper and Aquapex - Single Point Water Stub
Sewer Lines: PVC DWV Schedule 40 Plastic
ELECTRICAL
Service: 120/240V Single phase
NOTE: Bond each frame together and to each panel with #6 copper
Panel: (12) 125 amp - Weather Proof - 36" AFF to top of box Square D HOM2448M125PRB
Material: Metallic Raceway System
NOTE: All devices and face plates to be White
Receptacles: (130) Duplex 20 amp Leviton BR20
(2) Dedicated Duplex 20 amp Leviton BR20
(6) Duplex 20 amp GFCI Leviton GFNT2
(2) 20 amp Faceless GFCI - Refrigerator/Drinking Fountain Leviton GFRBF
(6) 20 amp WP GFCI Leviton GFWR2 w/ Intermatic WP 5000C cover
(1) Dedicated 20 amp WP Leviton WBR20 w/ CHE WP TP7199 cover
Mounted under floor, for site installed Heat Tape
Fed from 20 amp Ground Fault Equipment Protection device (GFEPD) HOM120EPD
Switches: (40) nLight Air Wall Switch Lithonia RPODLA
Automatic Controls: (2) Occupancy sensor - Ceiling mount Lithonia NCMPDT9ADCX
Data Box: (65) 4" square boxes with single gang mud ring - Stub up and down with 3/4" flex conduit -
Electrical Continued on next page
SPEC-E5808-144x60 Portland Air National Guard (2026 0811) Page 5 of 6 8/11/2026
Blazer PM
Provide: (2) 20 amp dedicated J-boxes above ceiling for future power drops
Wire For: (12) 2.5 ton 10 kw Heat Pumps with Economizers - 11 EER
(5) Programmable Thermostats
(6) Remote Temperature Sensor
(10) HVAC Duct Smoke Detectors
(2) HVAC Relay Box for (3) Units
(1) HVAC Relay Box for (4) Units
(1) 6 Gallon, 120 Volt, 1650 Watt Water Heater
(2) Electric Tankless Water Heater 240V - 7.2kw
(3) Exhaust fans - Switched with lights in Restrooms
Sign circuit: (1) 20 amp dedicated circuit
Lights: (67) Troffer 2'x4' NLight AIR Enabled - LED - 6000 Lumen - 48 Watts - 4000k
Lithonia 2BLT4 60L ADPT EZ1 LP840 NLTAIR2 RES7 PWS1836
(3) 18.5 Watt LED Wall Pack with integral Photo Cell Lithonia OLWPLEDSWW212OPEDDBM4
(3) dual head with battery back up KEYBL KTEMTP3WHWLSD
(7) Illuminated with dual head emergency lights and battery back up - Red Letters Lithonia LHQM
(7) dual head with battery back up Lithonia ELM2
Exterior Light:
Ext. Emergency Light:
Exit-Emergency Combo:
Int. Emergency Light:
SPRINKLER SYSTEM
PIPE SYSTEM PER NFPA 13 LIGHT HAZARD - WET SYSTEM
CROSSOVER UNIONS SUPPLIED AND INSTALLED ON SITE BY WESTERN STATES
SPRINKLER HEADS ARE WHITE SEMI-RECESSED
RISER PROVIDED - LOCATION TO BE DECIDED
TESTING OF SYSTEM ON SITE BY WESTERN STATES
WORK DOES NOT INCLUDE:
* BACKFLOW, OR FIRE DEPARTMENT CONNECTION
* UNDER FLOOR OR EXTERIOR PIPING
* ELECTRICAL/FIRE ALARM WORK
SYSTEM ASSUMES ADEQUATE WATER SUPPLY AND PIPING/LAYOUT BETWEEN
EXISTING SITE WATER SUPPLY AND BUILDING TO MEET BUILDING SPRINKLER
SYSTEM REQUIREMENTS
OTHER
Building Height: 13'-2" - Add 2'-8" for mobile frame height to get total shipping height
Close-up: Standard close-up plastic
Prevailing wages: Blazer's estimate does not include any allowance for prevailing wage requirements.
SPEC-E5808-144x60 Portland Air National Guard (2026 0811) Page 6 of 6 8/11/2026
File details come from the government source that posted it. Updated .